Aura (Toronto)

Last updated
Aura
Aura skyscraper in Toronto.jpg
Aura in 2021
Aura (Toronto)
General information
StatusCompleted
Type Residential and retail [1]
Location386 & 388 Yonge Street (at Gerrard Street)
Toronto, Ontario
Coordinates 43°39′34″N79°22′58″W / 43.65942°N 79.382787°W / 43.65942; -79.382787
Construction startedJanuary 2010
CompletedSummer 2014
OpenedFall 2014
Owner Ingka Centres (retail podium, floors 1-3)
Various residential owners via TSCC 2421 (386 Yonge) and TSCC 2446 (388 Yonge)
Height
Antenna spire272 m (892 ft) [2]
Technical details
Floor count79
Floor area123,732 square metres (1,331,840 sq ft)
Design and construction
Architect(s)Graziani + Corazza
DeveloperCanderel Stoneridge Equity Group Inc. [3]
Main contractorReliance Construction Management

Aura is a mixed-use skyscraper completed in 2014 in Toronto, Ontario, Canada. [4] It is the final phase of a series of condominium buildings near College Park in Toronto's Downtown Yonge district. It is part of the Residences of College Park project. Construction lasted from 2010 to 2014. With 79 floors, as of 2018 it is the tallest residential building in Canada and the 38th tallest residential building in the world.

Contents

History

The excavated site in September 2010 Excavation for Aura September 2010.jpg
The excavated site in September 2010

The original design proposed two towers. The building would have featured a ten-storey podium, with two towers on top. The taller tower would have been (including podium) 60 storeys and 196.5 m tall. The shorter tower (including podium) would have been 20 storeys and 74.5 m tall. [5] In February 2012, Toronto city council approved a three-storey increase to 78 floors, meaning that Aura is Canada's tallest residential building. [6]

The lower floors of the building were occupied while the upper floors were still being constructed. Floors 1-31 were opened for occupancy in Fall 2013, while floors 32-80 were still bare concrete. The second set of floors, 32 to 57, were occupied in spring 2014. The final phase, floors 58-80, were expected to be completed in December 2014.

On August 2, 2016, several residents - including members of the condo board - went public to describe the unreliable condition of the elevators. At this time only one elevator served all floors above the 50th. Many residents on the upper floors were not able to rely on the elevators to exit the building, and believed that design flaws did not account for passenger demand. Property management blamed flooding for the outages. [7]

On January 25, 2020, the residents of the Aura condominium were notified that all water would be shut off for seven weeks. [8] Cold water was restored the next day. Property management blamed the city's water main and requested residents to find "alternative accommodations". [9] It was later demonstrated that several pumps had failed inside the building. [10]

In March 2021, Ingka Centres, the real estate division of IKEA lead franchisee INGKA Holding, announced it had taken ownership of the podium (excluding the basement-level retail condominium units) and would be converting much of the space to an urban-format IKEA store, the first permanent store of its kind in Canada. Shortly before the sale announcement, a Bed Bath & Beyond location on the second level as well as three large restaurants on the main level had announced they would be closing permanently. [11] The IKEA store opened on May 25, 2022. [12]

The fourth floor, which previously housed a gym (originally Hard Candy Fitness and later Crunch Fitness), was listed for sale or lease by Aura's condo boards in early 2021. [13]

Architecture

The semi-transparent metal and high-tempered brick 78-storey tower has approximately 100,000 m2 (1.1 million sq.ft.) of residential space. This makes Aura Canada's tallest and largest residential building. The residential portion of the tower is built above a three-storey podium which has approximately 14,000 m2 (150,000 sq.ft.) of retail space.

Aura at night Toronto sunset (52607796839) (cropped).jpg
Aura at night

The building features lighting installed on the top floors, visible across most of the city. This lighting, although discussed with city planners, was unexpectedly bright when installed. This resulted in a deadly impact on migratory birds. The city later negotiated with the developers to turn off the lights after 10:30PM during the fall migration season. [14]

Facilities and amenities

The building is connected by tunnel to adjacent College Park complex, which contains the College subway station. [15] The building has a shared patio on the 5th floor and a 40,000 square-foot fitness facility. There is a fast food court in the basement level of the building with space for 12 vendors. In 2015, the popular Toronto-based website BlogTO described Shops at Aura as "Toronto's Worst Mall". [16] This was largely in reaction to the half-vacant retail space, limited offerings at the food court, and atmosphere. As of 2016, only three of the 12 fast food units were occupied. [15]

As of 2016, only 50 of the 250 retail units were occupied. [17] As of August 2021, only 45 units were occupied. [18]

See also

Notes

  1. "Aura at College Park, Toronto". SkyscraperPage.com. Retrieved 2022-05-02.
  2. "Council on Tall Buildings and Urban Habitat".
  3. "Residences of College Park - Aura on Yonge Street (Skyscraper)". Archived from the original on 2007-10-24. Retrieved 2007-12-08.
  4. Aura, Toronto [usurped]
  5. Aura at College Park - SkyscraperPage.com
  6. Pigg, S. (2012, February 17). Toronto condo tower takes title of tallest residential skyscraper in Canada. The Toronto Star. https://www.thestar.com/business/article/1132809--toronto-condo-tower-takes-title-of-tallest-residential-skyscraper-in-canada?bn=1
  7. Ballingall, Alex (2 August 2016). "Downed elevators plague Aura condo, residents say". thestar.com. Toronto Star. Retrieved 3 July 2020.
  8. Contenta, Sandro (25 January 2020). "Aura condo residents in disbelief after being told their water could be out for seven weeks". thestar.com. Retrieved 2 July 2020.
  9. DeClerq, Catherine (25 January 2020). "Water to be restored to 80-storey downtown condo by midnight, management says". Toronto. CTV News. Retrieved 2 July 2020.
  10. Contenta, Sandro (26 January 2020). "After fears it would be out for seven weeks, the water is back on at the Aura condo tower". thestar.com. Toronto Star. Retrieved 2 July 2020.
  11. Patterson, Craig (March 25, 2021). "IKEA Announces Downtown Toronto Store". Retail Insider. Retrieved June 24, 2021.
  12. Chong, Joshua (May 19, 2022). "Ikea assembles a new downtown Toronto store to cater to urban customers". Toronto Star . Retrieved May 27, 2022.
  13. "BRIEF: All National Sports Stores Shutting, Off-Price Retailer Century 21 Looks to Enter Canada". Retail Insider. February 18, 2021. Retrieved June 24, 2021.
  14. Bozikovic, Alex (13 January 2017). "Light or blight? How Toronto's ugly Aura condo tower came to be" . Retrieved 2 July 2020.
  15. 1 2 Vendeville, Geoffrey (7 January 2016). "Businesses in 'ghost town' condo mall suing developer Canderel Residential". thestar.com. Toronto Star. Retrieved 2 July 2020.
  16. Flack, Derek (7 November 2015). "Is The Shops at Aura Toronto's worst mall?". www.blogto.com. Retrieved 2 July 2020.
  17. Marsh, Callum (7 October 2016). "'A world-class address': Nowhere else will you find such desolation and gloom as in the solitude of The Shops at Aura". National Post. National Post. Retrieved 2 July 2020.
  18. "Aura Concourse Shopping Mall Directory" . Retrieved 14 August 2021.

Related Research Articles

<span class="mw-page-title-main">Water Tower Place</span> Shopping mall in Illinois, U.S.

Water Tower Place is a large urban, mixed-use development comprising a 758,000 sq ft (70,400 m2) shopping mall in a 74-story skyscraper in Chicago, Illinois, United States. The mall is located at 835 North Michigan Avenue, along the Magnificent Mile. It is named after the nearby Chicago Water Tower, and is owned by affiliates of Brookfield Property Partners.

<span class="mw-page-title-main">Empress Walk</span> Condominium and retail complex in Toronto, Ontario

Empress Walk is a large Canadian condominium and retail complex in Toronto, Ontario, Canada. It is located at the intersection of Yonge Street and Empress Avenue in the North York Centre area of the North York district It was developed by Canadian-developers Menkes Developments Ltd. Phase 1 was completed in 1997 and Phase 2 was completed in 2000. It became an important retail complex in North York following its construction.

<span class="mw-page-title-main">One Yonge Street</span> Toronto Star headquarters

One Yonge Street is a 25-storey office building in Toronto, Ontario, Canada. The building served as the headquarters of Torstar and its flagship newspaper, the Toronto Star, from 1971 to 2022. It is 100 metres tall and built in the International style. It was built as a replacement to the Old Toronto Star Building, which was located at 80 King Street West. That building was torn down to make room for First Canadian Place.

<span class="mw-page-title-main">The Sail @ Marina Bay</span> Residential in Downtown Core, Singapore

The Sail @ Marina Bay is a waterfront lifestyle condominium located in the Marina Bay area in Singapore. It was completed in 2008. The first tenants have moved into Central Park Tower in July 2008. Residents moved into Marina Bay Tower a few weeks later. The structure of The Sail is 245 m (804 ft) with 70 storeys and is one of Singapore's tallest condominia/apartment buildings. This development offers panoramic city view of Marina Bay and the sea. It is close to some of Singapore's famous landmarks such as Suntec City, Marina Bay Sands, Esplanade, Telok Ayer Market and the Singapore River. The Downtown MRT station is built a few meters to the West of the building. The building was erected on reclaimed land, and the Central Linear Park is built on the South Side next to the building.

<span class="mw-page-title-main">Living Shangri-La</span> Mixed-use skyscraper in Vancouver, British Columbia

Living Shangri-La is a mixed-use skyscraper in downtown Vancouver, British Columbia, Canada, and is the tallest building in the city and second tallest in the province. The 62-storey Shangri-La tower contains a 5-star hotel and its offices on the first 15 floors, with condominium apartment units occupying the rest of the tower. The building's podium complex also includes a spa, Urban Fare specialty grocery store, a Vancouver Art Gallery public display, and a curated public sculpture garden. The high-rise stands 200.86 metres (659 ft) tall and there is a private roof garden on floor 61. It is the 34th tallest building in Canada.

<span class="mw-page-title-main">Downtown Toronto</span> Central business district in Toronto, Ontario, Canada

Downtown Toronto is the main central business district of Toronto, Ontario, Canada. Located entirely within the district of Old Toronto, it is approximately 16.6 square kilometres in area, bounded by Bloor Street to the northeast and Dupont Street to the northwest, Lake Ontario to the south, the Don Valley to the east, and Bathurst Street to the west. It is also the home of the municipal government of Toronto and the Government of Ontario.

<span class="mw-page-title-main">INGKA Holding</span> Holding company

INGKA Holding B.V. is a holding company based in Leiden, Netherlands. It is the largest IKEA franchisee holding company that controls 367 stores of the 422 of IKEA in 2018. The company is fully owned by the Stichting INGKA Foundation. INGKA is named after Ingvar Kamprad, its Swedish founder.

Eaton's / John Maryon Tower was a proposed supertall 140-storey office skyscraper, to be built in Toronto, Ontario, Canada. In 1971, Eaton's was to partner with a developer named John Maryon to build a 503 metre tower in the College Park area of Downtown Toronto. With a 183-metre communication mast added to the roof of the triangular glass office tower, the total proposed height was 686 metres. Plans for the tower were cancelled, because building a structure of this height was considered impossible at the time of its planning. The skyscraper was planned two years before the Willis Tower was completed, and five years before the CN Tower was completed. Had the tower been built, it would have been the world's tallest building until 2008, when the Burj Khalifa surpassed its planned height.

<span class="mw-page-title-main">900 Biscayne Bay</span> Building in Miami, Florida

900 Biscayne Bay is a skyscraper in Miami, Florida, United States. It is located in northeastern Downtown Miami, on Biscayne Bay along the west side of Biscayne Boulevard. It opened for residential occupancy in early 2008. The tower is 650 feet (200 m) tall and has 63 floors. The building stands as the 7th-tallest building in Miami and in the state of Florida, behind Four Seasons Hotel Miami, Southeast Financial Center and Marquis Miami. It also stands as tallest all-residential building in the City and the State. 900 Biscayne Bay is located across the street from Ten Museum Park, another Miami residential high-rise, near Museum Park and American Airlines Arena in northern Biscayne Boulevard. It is also adjacent to the Park West Metromover station. Originally planned to rise 712 feet (217 m) and 65 floors, the Building went through a height reduction during its construction, with a decorative rooftop spire and two floors being removed from the final plans.

<span class="mw-page-title-main">Architecture of Toronto</span>

The architecture of Toronto is an eclectic combination of architectural styles, ranging from 19th century Georgian architecture to 21st century postmodern architecture and beyond.

<span class="mw-page-title-main">International Plaza (Singapore)</span> Commercial offices, Residential condominiums in Anson Road, Singapore

International Plaza is a high-rise commercial and residential building at 10 Anson Road in Tanjong Pagar, within the Downtown Core of Singapore, next to Tanjong Pagar MRT station on the East West line.

<span class="mw-page-title-main">One Bloor</span> Skyscraper on Bloor Street and Yonge Street in downtown Toronto, Ontario, Canada

One Bloor, previously One Bloor East and Number One Bloor, is a mixed-use skyscraper at the intersection of Bloor Street and Yonge Street in downtown Toronto, Ontario, Canada. The project was initially launched by developer Bazis International Inc. in 2007, before being cancelled and re-developed by Great Gulf. As of 2018, it is the tenth-tallest residential building outside of Asia and the 40th tallest residential building in the world.

<span class="mw-page-title-main">Downtown Dubai</span> Community in United Arab Emirates

Downtown Dubai or The DubaiDowntown is a large-scale, mixed-use complex in Dubai, United Arab Emirates. It was developed by the Emaar real estate development company. Before 2000 this place called was Umm Al Tarif It is home to some of the city's most notable landmarks, including Burj Khalifa, The Dubai Mall, and The Dubai Fountain. It covers an area of 2 square kilometres (0.77 sq mi), at an estimated cost of US$20 billion upon completion and, as of 2017, has a population of 13,201.

<span class="mw-page-title-main">Four Seasons Hotel and Residences Toronto</span> Luxury condominium and hotel

The Four Seasons Hotel and Residences Toronto is a complex consisting of a 204-metre, 55-storey residential condominium tower and a 125-meter, 30-storey luxury hotel tower in the Yorkville district of Toronto, Ontario, Canada, which opened on October 5, 2012. Located at 60 Yorkville Avenue, at its intersection with Bay Street, the complex is situated one block east of the former Four Seasons Hotel Toronto building at 21 Avenue Road.

<span class="mw-page-title-main">Merdeka 118</span> Megatall skyscraper in Kuala Lumpur, Malaysia

Merdeka 118, formerly known as Menara Warisan Merdeka, KL 118 and PNB 118, is a 118-storey megatall skyscraper in Kuala Lumpur, Malaysia. At 678.9 m (2,227 ft) tall, it is the second-tallest building and structure in the world, only behind the Burj Khalifa at 828 m (2,717 ft).

<span class="mw-page-title-main">Stantec Tower</span> Skyscraper in Edmonton, Canada (opened 2018)

Stantec Tower is a 66-story building and 4 underground, 250.8 m (823 ft) mixed-use skyscraper in Ice District in the downtown core of Edmonton, Alberta, Canada. On May 23, 2018, it reached a construction height of 197 m (646.3 ft) and surpassed the JW Marriott Edmonton Ice District & Residences, becoming the tallest building in Edmonton and one of the largest mixed-use projects in Canada. The office area of the tower opened on September 26, 2018, and the residential portion opened in 2019.

<span class="mw-page-title-main">Sam Mizrahi</span> Canadian real estate developer (born 1971)

Sam Mizrahi is an Iranian-born Canadian real estate developer who is active in Toronto. Mizrahi is currently the president of a number of corporations, including Mizrahi Developments, Mizrahi Inc. and Mizrahi Enterprises Inc. He is best known for being the developer of The One skyscraper at the intersection of Yonge and Bloor streets in Toronto. In 2015, Toronto Life named him the 45th most influential person in Toronto.

<span class="mw-page-title-main">The One (Toronto)</span> Supertall skyscraper in Toronto

The One is a supertall skyscraper currently under construction in Toronto, Ontario, Canada. If completed, it will be the tallest building in Canada. At a revised 306.3 metres and a revised 85 storeys, it will be taller than First Canadian Place, which has been Canada's tallest building since 1975. It will also be Canada's first supertall skyscraper, as defined by the Council on Tall Buildings and Urban Habitat. Construction of the building is estimated to be completed by March 2025.