Shrewsbury and Wellington Joint Railway

Last updated

Railway Clearing House Junction Diagram showing the area around Shrewsbury in 1912 Blodwell, Buttington, Llanymynech, Porthywaen, Shrewsbury & Welsh Pool Meole Brace RJD 068.jpg
Railway Clearing House Junction Diagram showing the area around Shrewsbury in 1912
Railway Clearing House Junction Diagram showing the area around Wellington in 1903 Craven Arms, Marsh Farm, Stretford Bridge, Tenbury & Wellington RJD 19.jpg
Railway Clearing House Junction Diagram showing the area around Wellington in 1903

The Shrewsbury and Wellington Joint Railway (S&WJR) was operated by the London North Western Railway and the Great Western Railway. Its line ran from Shrewsbury (Abbey Foregate station, not to be confused with Abbey station, also in Shrewsbury) to Wellington. Abbey Foregate also acted as a junction, with chords to Shrewsbury station and to the direct line to Wales.

Contents

Construction

Construction, between 1846 and 1849, was a joint effort between the Shropshire Union Railways (SUR) and the Shrewsbury and Birmingham Railway (S&BR). [1] The line was 10 miles (16 km) long. [2]

Opening

The line opened on 1 June 1849, simultaneously with the SUR line from Stafford and the first section of the S&BR, which was between Wellington and Oakengates (the latter was extended to Wolverhampton on 12 November that year). [3] The three companies met at Stafford Junction, Wellington. [4]

Ownership and leasing

Upon completion of the SUR line, that company was leased to the London and North Western Railway (LNWR), and so passed to the London, Midland and Scottish Railway (LMS) on 1 January 1923; [5] in the meantime, the S&BR was absorbed by the Great Western Railway (GWR) on 1 September 1854, [6] [7] and so from 1 January 1923 the S&WJR was joint GWR/LMS property.

Stations

Of the five stations of the joint line (Abbey Foregate, Upton Magna, Walcot, Admaston and Wellington) only Wellington is still open.

Related Research Articles

The Wolverhampton–Shrewsbury line is the railway line from Wolverhampton to Shrewsbury via Wellington; it was originally built by the Shrewsbury and Birmingham Railway. The line is double track throughout, with rarely used relief sidings at Cosford and four tracks through Wellington station.

Shrewsbury railway station Grade II listed railway station in Shropshire, England

Shrewsbury railway station is in Shrewsbury, Shropshire, England. Built in 1848, it was designated a grade II listed building in 1969.

Shropshire Union Railways and Canal Company

The Shropshire Union Railways and Canal Company was a Company in England, formed in 1846, which managed several canals and railways. It intended to convert a number of canals to railways, but was leased by the London and North Western Railway (LNWR) from 1847, and although they built one railway in their own right, the LNWR were keen that they did not build any more. They continued to act as a semi-autonomous body, managing the canals under their control, and were critical of the LNWR for not using the powers which the Shropshire Union Company had obtained to achieve domination of the markets in Shropshire and Cheshire by building more railways.

Shrewsbury and Birmingham Railway

The Shrewsbury and Birmingham Railway was authorised in 1846. It agreed to joint construction with others of the costly Wolverhampton to Birmingham section, the so-called Stour Valley Line. This work was dominated by the hostile London and North Western Railway, which used underhand and coercive tactics. The section between Shrewsbury and Wellington was also built jointly, in this case with the Shropshire Union Railway.

Wellington railway station (Shropshire) Railway station in Shropshire, England

Wellington railway station serves the town of Wellington, Shropshire, England. It is situated on the former Great Western Railway's London Paddington to Birkenhead via Birmingham Snow Hill line. Trains are operated by West Midlands Railway, Avanti West Coast and Transport for Wales.

Moreton-in-Marsh railway station Railway station in Gloucestershire, England

Moreton-in-Marsh railway station is a railway station serving the town of Moreton-in-Marsh in Gloucestershire, England. It is on the Cotswold Line between Kingham and Honeybourne stations. The station and all passenger trains serving it are operated by Great Western Railway.

Bristol and Exeter Railway Former English railway company

The Bristol & Exeter Railway (B&ER) was an English railway company formed to connect Bristol and Exeter. It was built on the broad gauge and its engineer was Isambard Kingdom Brunel. It opened in stages between 1841 and 1844. It was allied with the Great Western Railway (GWR), which built its main line between London and Bristol, and in time formed part of a through route between London and Cornwall.

The Stour Valley Line is the present-day name given to the railway line between Birmingham and Wolverhampton, in England. It was authorised as the Birmingham, Wolverhampton and Stour Valley Railway in 1836; the title was often shortened to the Stour Valley Railway.

The Wellington to Craven Arms Railway was formed by a group of railway companies that eventually joined the Great Western Railway family, and connected Wellington, Shropshire and Shifnal, with Coalbrookdale, Buildwas, Much Wenlock and a junction near Craven Arms. Its objectives were dominated by the iron, colliery and limestone industries around Coalbrookdale.

Severn Bridge Junction Place in Shrewsbury, England

Severn Bridge Junction is the area of railway lines just south of Shrewsbury railway station, in Shropshire, England. It is controlled by a mechanical interlocked signal box of the same name, which is the largest operational mechanical signal box in the world. The Network Rail signalling area code is 'SBJ.'

The Shrewsbury and Hereford Railway was an English railway company that built a standard gauge line between those places. It opened its main line in 1853.

Birkenhead Railway

The Birkenhead Railway was a railway company in England. It was incorporated as the Birkenhead, Lancashire and Cheshire Junction Railway (BL&CJR) in 1846 to build a line connecting Chester and the manufacturing districts of Lancashire by making a junction near Warrington with the Grand Junction Railway. The BL&CJR took over the Chester and Birkenhead Railway in 1847, keeping its own name for the combined company until it shortened its name to The Birkenhead Railway in 1859. It was taken over jointly, on 1 January 1860, by the London and North Western Railway (LNWR) and the Great Western Railway (GWR). It remained a Joint Railway until Nationalisation of the railways in 1948.

The West London Railway was conceived to link the London and Birmingham Railway and the Great Western Railway with the Kensington Basin of the Kensington Canal, enabling access to and from London docks for the carriage of goods. It opened in 1844 but was not commercially successful.

Railways in Buckinghamshire Overview of the railway system in Buckinghamshire

The railway system of Buckinghamshire has a long and complex history dating back to the 1830s with the opening of sections of today's West Coast Main Line and Great Western Main Line. The development of Buckinghamshire's railway network was largely due to its position nationally as many long-distance routes chose to go through Buckinghamshire, especially between Britains two largest cities, London and Birmingham. The county had its own pulling power in addition, as produce such as the Aylesbury Duck could then be easily transported to the capital.

The Worcester and Hereford Railway started the construction of a standard gauge railway between the two cities in 1858. It had needed the financial assistance of larger concerns, chiefly the Oxford, Worcester and Wolverhampton Railway, and the Newport, Abergavenny and Hereford Railway. It opened its line progressively from 1859 to 1861, delayed by exceptionally difficult tunnelling at Colwall and Ledbury. The company was purchased by the West Midland Railway in 1860, and that company amalgamated with the Great Western Railway in 1863.

The Stafford–Shrewsbury line is a former railway line in England, which ran between Stafford in Staffordshire and Shrewsbury in Shropshire, via Newport and Wellington, from 1849 to 1966. The Shropshire Union Railways and Canal Company (SUR&CC) constructed and ran one of the few railways in England ever built by a canal company. The line served Newport and Wellington stations. The SUR&CC were solely responsible for the section from Stafford to Wellington; but the building and operation of the 10.5 mile (17 km)-long Shrewsbury-to-Wellington section was shared with the Shrewsbury and Birmingham Railway.

Shrewsbury and Chester Railway

The North Wales Mineral Railway was formed to carry coal and ironstone from the mineral-bearing area around Wrexham to the River Dee wharves. It was extended to run from Shrewsbury and formed part of a main line trunk route, under the title The Shrewsbury and Chester Railway. It opened in 1846 from Chester to Ruabon, and in 1848 from Ruabon to Shrewsbury. It later merged with the Great Western Railway.

The Oxford and Rugby Railway was promoted by the Great Western Railway as a means of connecting to the West Midlands and the north of England, by joining existing railways at Rugby. It was authorised in 1845, but the GWR soon decided to make its own line to Birmingham, and in 1846 it acquired the O&RR; work had not started on its construction. In the same year the GWR obtained Parliamentary authorisation for its Birmingham line. The two railways were treated as a single project, to connect Birmingham and Oxford. In 1850 a single line was opened between Oxford and Banbury, and in 1852 the whole line to Birmingham was opened.

The Birmingham and Oxford Junction Railway was an English railway line promoted by the Great Western Railway to gain a route from its southern base towards the industrial centres of the West Midlands, and in due course the north-west. It overtook another GWR subsidiary, the unbuilt Oxford and Rugby Railway, and the Birmingham Extension Railway which was to build a new independent station in the city. It was authorised in 1846 and formed a single project to connect Birmingham and Oxford.

The Birmingham, Wolverhampton and Dudley Railway was an English railway company promoted to connect those places by rail. It was authorised by Parliament in 1846. It became apparent that it would be advantageous to merge with the Great Western Railway. The rival London and North Western Railway went to great lengths to frustrate the amalgamation, but ultimately failed, and the merger took place in 1847.

References

  1. "The Shrewsbury & Birmingham Railway". Archived from the original on 8 October 2006. Retrieved 29 January 2008.
  2. MacDermot, E.T. (1927). History of the Great Western Railway, vol. I: 1833-1863. Paddington: Great Western Railway. p. 350.
  3. MacDermot 1927 , pp. 353, 864
  4. MacDermot 1927 , p. 869
  5. Awdry, Christopher (1990). Encyclopaedia of British Railway Companies. London: Guild Publishing. pp. 102–3. CN 8983.
  6. MacDermot 1927 , p. 390
  7. Awdry 1990 , p. 42