Soviet submarine tender Magadansky Komsomolets

Last updated
428-GX-USN 1143787 (27081283295).jpg
PB-3 in April 1970
History
Naval Ensign of the Soviet Union (1950-1991).svgNaval Jack of Russia.svgRussia
Name
  • PB-3
  • (ПБ-3)
Builder Black Sea Shipyard
Yard number620
Laid down8 June 1960
Launched7 October 1961
Commissioned30 September 1962
Decommissioned1992
Renamed
  • Magadansky Komsomolets (1979)
  • PB-27 (1992)
Namesake Magadan Komsomolets
Identification See Pennant numbers
Fate Scrapped
General characteristics
Class and type Don-class submarine tender
Displacement
  • 2,316 tonnes (2,279 long tons) standard
  • 3,066 tonnes (3,018 long tons) full load
Length140 m (460 ft)
Beam17.7 m (58 ft)
Draught6.4 m (21 ft)
Propulsion4 × diesel engines, 8,000 hp (6,000 kW)
Speed17 knots (31 km/h; 20 mph)
Range21,000 km (11,000 nmi; 13,000 mi) at 10 knots (19 km/h; 12 mph)
Complement300-450
Sensors and
processing systems
  • Hawk Screech
  • Slim Net
  • Rys-1
Electronic warfare
& decoys
  • 2 × Watch dog ECM systems
  • Vee cone communication system
Armament
  • as designed:
  • 4 × single 100 mm (4 in) guns
  • 4 × dual 57 mm (2.2 in) guns
  • as modernized:
  • 2 × single 100 mm (4 in) guns
  • 4 × dual 57 mm (2.2 in) guns
Aircraft carried1 × Kamov Ka-25
Aviation facilities Helipad

Magadansky Komsomolets was a Don-class submarine tender of the Soviet Navy.

Contents

Development and design

The project of the submarine tenders was developed in the central design bureau "Baltsudoproekt" under the leadership of the chief designer V. I. Mogilevich. The main observer from the Navy was Captain 1st Rank G.V. Zemlyanichenko. The construction of the lead ship was completed in Nikolaev at the Black Sea shipyard in 1958. In total, seven tenders of project 310 were built for the Soviet Navy in 1958-1963. [1]

Don-class submarine tenders had a total displacement of 7150 tons and 5030 tons while they're empty. Main dimensions: maximum length - 140 m, width - 17.67 m, draft - 5.6 m. Two-shaft diesel-electric main power plant with a capacity of 4000 hp. with. provided the ship with a full speed of 16 knots. The cruising range reached 3000 nautical miles (at a speed of 12.5 knots), autonomy - 40 days. The crew consisted of 350 people, including 28 officers. [1]

They could serve four submarines of Project 611 or Project 613. The equipment of the floating base was capable of providing navigational and emergency repair of the hull, mechanisms and weapons and storage of 42 533-mm torpedoes in a special room. A 100-ton crane was housed at the bow of the ship. [1]

The defensive armaments of the ships consisted of four single-barreled 100-mm artillery mounts B-34USMA and four 57-mm twin installations ZIF-31 with the Ryf control radar, the sonar station was not provided. After modernization, on two ships, instead of two aft 100-mm installations, a take-off and landing pad was equipped for basing one Ka-25 helicopter. On the last floating base of the series, the Osa-M air defense missile system was installed. [1]

Construction and career

The ship was built at Black Sea Shipyard in Mykolaiv and was launched on 25 June 1957 and commissioned on 1 July 1960.

It was in the summer of 1973, somewhere in the month of July. As usual in the Magadan region, especially in the Susumansky, Tenkinsky and Yagodninsky districts, there were many forest fires in the summer. Firefighters from the ship were sent to fight them, enterprises allocated their workers and equipment. In principle, nothing unusual, this happened almost every year and in our time, little has changed. [2]

A fire was discovered on March 4, 1975 at 4 a.m. From a garbage that caught fire - no one knows, but from this garbage a cork caught fire (insulation under the inner lining). And by morning, so much smoke had accumulated in the tank corridor that nothing could be seen. The ship's duty officer sounded the alarm - everyone ran to their combat posts, and the bulkheads were torn apart. They thought that it was necessary to ventilate, but it turned out the other way around - they added air to the fire. At this time, at the main command post (GKP) of the Magadan Komsomolets, the senior political officer remained in charge, who did not have time to thoroughly study the structure of the ship. And during the extinguishing of the fire, the ship duty officer, being in a state of passion, in connection with a fire on board, seeing an off-scale alarm milliammeter over the loudspeaker, reports to the GKP about an increase in temperature in the cellar of primary detonators (in the bow of the ship, almost at the bottom). Having heard such a warning from the person on duty on the loudspeaker, the political officer makes a decision to leave the torpedo unit and flood the compartment. From the story of Georgy Lobyshev, it became clear that the signaling cable passed in the highway above the place of the fire and burned out safely with everyone else. As a result, during the cable burnout, a short circuit occurred and the current in the network increased, the arrow on the milliammeter went off scale. [3]

In 1979, she was renamed Magadansky Komsomolets.

In 1992, she was renamed PB-27.

She was decommissioned on 24 August 1993 and later in 1994, she was moored to the pier in Sukharnaya Bay until finally towed to Dokovaya Bay for dismantling.

Pennant numbers

DatePennant number [4] [5]
1965701
1970963
1972970
1979968
941
805
1981825
1984839
1987812
1990825

See also

Related Research Articles

Soviet submarine K-278 <i>Komsomolets</i> Nuclear-powered attack submarine

The K-278 Komsomolets was the Project-685 Plavnik, nuclear-powered attack submarine of the Soviet Navy; the only submarine of her design class.

K-131 was a Project 675 of the Soviet Navy's Northern Fleet, she was also redesignated K-192.

<span class="mw-page-title-main">Romanian Naval Forces</span> Military unit

The Romanian Naval Forces is the principal naval branch of the Romanian Armed Forces and operates in the Black Sea and on the Danube. It traces its history back to 1860.

Kilo-class submarine Diesel electric submarine class

The Kilo-class submarines are a group of diesel-electric attack submarines designed by the Rubin Design Bureau in the Soviet Union in the 1970s and built originally for the Soviet Navy.

SS Dzhurma was converted to a Soviet steamship in 1935 and occasionally used for transporting prisoners within the Gulag system. In the Western sources its name used to be spelled as Djurma. Because of an urban legend of an incident in 1933–34 in which 12,000 prisoners were said to have died, it has become the most infamous ship of the Dalstroy prison fleet. The ship was built in the Netherlands in 1921 as the SS Brielle. When the ship was sold to the Soviet Union in 1935, it was registered under the spelling Djurma, in accordance with the Protocol of Third Soviet-American Session regarding maritime shipping dated to the first half of 1974. The ship's name has been most commonly transliterated as Dzhurma since 1974.

Don-class submarine tender

The Don-class submarine tender was the NATO reporting name for a group of seven submarine tenders built for the Soviet Navy in the late 1950s. The Soviet designation was Project 310 Batur. Evolving from a need for dispersed basing of submarines in the advent of a nuclear war, the ships were designed to support distant operations of the Soviet Union's submarine fleet, capable of repairing and resupplying. However, the Soviets returned to stationary basing of their submarines and the Don class were later converted into flagships. One vessel was exported to Indonesia in 1962 and due to the ship's heavy armament, was used primarily for patrol duties. The ships of the Don class were removed from service in the mid 1990s and broken up for scrap.

MO-class small guard ship

The MO (Russian: Малый Охотник, Malyj Okhotnik; English: Small Hunter, nickname Moshka is a class of small ships produced before and during World War II for the Soviet Navy. Their primary function originally was anti-submarine warfare. During the war they carried out many additional roles from supporting landing operations to escorting convoys. Over 350 ships were built.

Soviet cruiser <i>Kronstadt</i> Soviet Navys Kresta II-class cruiser

Kronstadt was a Project 1134A Kresta II-class cruiser of the Soviet Navy, named for the Kronstadt naval base. The first ship of her class, the ship served during the Cold War, from 1969 to 1991. She served with the Northern Fleet, with her shakedown cruise being through the Mediterranean Sea. After colliding with a destroyer in 1975, she spent five years being repaired and modernized. She was decommissioned in 1991 before being sold for scrap two years later due to reduced naval funding and deteriorating conditions.

Soviet frigate <i>Zadornyy</i> Krivak-class frigate

Zadornyy was a Project 1135 Burevestnik-class guard ship or Krivak-class frigate that served with the Soviet and Russian Navies. Displacing 3,200 tonnes full load, the vessel was built around the Metel anti-submarine missile system. Zadornyy was launched on 25 March 1979 in Leningrad, the last of the class to be built by the A.A. Zhdanov shipyard, and served with the Northern Fleet. After taking part in exercises Avangard-81, Sever-81 and Okean-83, and cruising as far as Havana, Cuba, the vessel was upgraded between 11 June 1990 and 23 May 1995 with missiles that added anti-ship capability. While serving with the Russian Navy, the ship took part in joint exercises with frigates of the Royal Navy, including a commemoration of the first Arctic convoy of the Second World War with HMS Campbeltown. After more than twenty-five years service, the ship was decommissioned on 3 December 2005.

Soviet destroyer <i>Komsomolets Ukrainy</i> Kashin-class destroyer of the Soviet Navy

Komsomolets Ukrainy was the lead ship of Kashin-class destroyer of the Soviet Navy.

Soviet submarine tender <i>Dmitriy Galkin</i> Don-class submarine tender

Dmitriy Galkin was a Don-class submarine tender of the Soviet Navy.

Soviet submarine tender <i>Magomed Gadzhiev</i> Don-class submarine tender

Magomed Gadzhiev was a Don-class submarine tender of the Soviet Navy.

KRI <i>Ratulangi</i> Don-class submarine tender

Nikolay Kartashov was a Don-class submarine tender of the Soviet Navy which later was transferred to the Indonesian Navy and renamed KRI Ratulangi.

Soviet submarine tender <i>Fyodor Vidyaev</i> Don-class submarine tender

Fyodor Vidyaev was a Don-class submarine tender of the Soviet Navy.

Soviet submarine tender <i>Viktor Kotelnikov</i> Don-class submarine tender

Viktor Kotelnikov was a Don-class submarine tender of the Soviet Navy.

Soviet submarine tender <i>Batur</i> Don-class submarine tender

Batur was a Don-class submarine tender of the Soviet Navy.

Russian submarine <i>Magadan</i> Akula-class submarine of the Russian Navy

The K-331 Magadan is an Akula-class submarine in the Russian Navy.

Soviet frigate <i>Gromkiy</i> Krivak-class frigate

Gromkiy was a Project 1135M Burevestnik-class Guard Ship or 'Krivak II'-class frigate that served with the Soviet and Russian Navies. Launched on 11 April 1978, the vessel operated as part of the Northern Fleet as an anti-submarine vessel, with an armament built around the URPK-5 Rastrub missile system. In 1991, the ship took part in the semicentennial commemoration of the first of the arctic convoys of the Second World War alongside the Royal Navy frigate HMS London. Soon afterwards, the ship was transferred to the Russian Navy following the dissolution of the Soviet Union. Gromkiy served for less than two years in this new role before being withdrawn for repairs and, ultimately, decommissioning on 16 March 1998.

Soviet frigate <i>Rezvyy</i> Krivak-class frigate

Rezvyy or Rezvy was the lead Project 1135M Burevestnik-class Guard Ship or 'Krivak II'-class frigate. Launched on 30 May 1975, the vessel was designed to operate in an anti-submarine role in the Soviet Navy, with armament built around the Metel Anti-Ship Complex. Part of the Northern Fleet, the vessel undertook operations in the Atlantic Ocean, including visits to Congo and Cuba, and participating in the Atlantic-84 major naval exercise in 1984. After a major refit between 1989 and 1992, Rezvyy was recommissioned into the Russian Navy. The ship continued to travel, visiting Norway in 1993. After more than twenty-five years service, Rezvyy was decommissioned on 1 June 2001 and subsequently broken up.

Soviet frigate <i>Neukrotimyy</i> Krivak-class frigate

Neukrotimyy was a Project 1135M Burevestnik-class Guard Ship or 'Krivak II'-class frigate that served with the Soviet and Russian Navies. The vessel was known as Komsomolets Litvyy between 1987 and 1990. Launched on 17 September 1977, Neukrotimyy was designed to operate as an anti-submarine vessel with the Baltic Fleet, using an armament built around the Metel Anti-Ship Complex. The vessel undertook many visits to other countries outside the Soviet Unions, including Angola, East Germany, Nigeria and Poland. Following the dissolution of the Soviet Union, in 1991, the ship was transferred to the Russian Navy and continued to travel to countries like the Netherlands. Despite being accidentally holed in 2005 and being badly burnt in a fire in 2008, Neukrotimyy remained the penultimate of the class to remain in service, finally being decommissioned on 29 June 2009.

References

  1. 1 2 3 4 V.P., Kuzin; V.I., Nikolsky (1996). The USSR Navy 1945-1991. Historical Marine Society. p. 653.
  2. ""Магаданский комсомолец" в лесах Сусумана – Моя родина – Магадан" (in Russian). Retrieved 2021-08-13.
  3. ""Магаданский комсомолец". Пожар на корабле – Моя родина – Магадан" (in Russian). 25 March 2017. Retrieved 2021-08-13.
  4. "Плавучие базы подводных лодок проектов 310, 310А". russianships.info. Retrieved 2021-08-14.
  5. "Поиск по запросу "Магаданский комсомолец"". www.balancer.ru (in Russian). Retrieved 2021-08-13.