Stockport, Disley and Whaley Bridge Railway

Last updated

Stockport, Disley and Whaley Bridge Railway
Overview
Locale Stockport Edgeley
Davenport (1858)
Hazel Grove
Middlewood (1879)
New Mills Newtown
Furness Vale
Whaley Bridge
Dates of operation18531866
Successor London and North Western Railway
Technical
Track gauge 4 ft 8 12 in (1,435 mm) standard gauge

The Stockport, Disley and Whaley Bridge Railway was an early railway company in England which was opened in 1857 between Stockport Edgeley and Whaley Bridge.

Contents

Origins

As early as 1828 when the Cromford and High Peak Railway and the Liverpool and Manchester Railway were still under construction, a Mr Thomas Legh had proposed in Stockport, that they could well be connected by a railway line from the former's terminus at Whaley Bridge. There were also number of other ideas for lines from London to meet the C&HPR at Cromford to reach Manchester. The main problem had been that of carrying passengers on the series of cable operated sections (see Derby station)

In the next few years the route of the line was hotly contested by the three major railways of the time. The Manchester, Sheffield and Lincolnshire Railway had gained approval in 1848 for an extension of the Whaley Bridge branch of the Peak Forest Canal, which it owned, from Bugsworth to the tramway, with the eventual aim of reaching Buxton. This was succeeded by plans for a railway line, but neither scheme had been proceeded with due to lack of funds. [1]

The Midland Railway and the Manchester and Birmingham Railway had jointly leased the impecunious Manchester, Buxton, Matlock and Midlands Junction Railway which had reached Rowsley by 1849, with the view of running through Buxton and up the Goyt Valley to Whaley Bridge and thence to a junction with the M&B at Cheadle Hulme. However, when the M&B merged into the new LNWR the latter naturally sought to restrict competition with its own London to Manchester service.

Construction

In 1853 Thomas Legh, together with other landowners and financiers from London, formed the committee of the Stockport Disley and Whaley Bridge railway, with its first meeting at the Swann Inn Disley. The engineers would be Joseph Locke and J. E. Errington. [2] When the Bill was put before Parliament there was opposition from both the MS&LR and the LNWR, however the Stockport and Whaley Bridge Railway Act was passed on 31 July 1854. The line would be operated on the company's behalf by the LNWR. A further Act in 1855 allowed for a short line from Whaley Bridge to the end of the Cromford and High Peak.

Construction of the line produced very few problems, the main one being an embankment between Hazel Grove and Norbury. The line was opened on 28 May 1857 and a special train left Stockport for Whaley Bridge where on the return a celebratory dinner was held in the schoolroom at Disley. That evening a supper was provided for the workmen.

The actual first service was on 9 June, the intermediate stations being Hazel Grove, Disley, New Town (south of New Mills) and Furness Vale. Coaching connections were provided to Buxton and Chapel-en-le-Frith.

A viaduct to connect the line with the Cromford and High Peak was not complete when traffic began in August 1857. The carrier had to transfer the limestone using his own horses and carts. The wagons carrying the limestone were added to the passenger trains, and it was reported that three wagonloads were despatched with each. The viaduct was completed towards the end of the year.

In 1855 there a meeting of the three companies at Euston Square, where it was noted that the S&WB line was virtually complete. The possibility of extending it to Buxton or Rowsley was discussed. Both the MS&LR and the Midland proposed that no one of the three companies should proceed alone with any scheme, but the meeting ended with them more than a little suspicious of the LNWR.

The SD&WBR's capital was £150,000, of which £85,000 came from the LNWR and £3,750 from the C&HPR. Although, the public message was that the line was independently financed, James Allport of the Midland Railway felt justified in saying it was an LNWR undertaking - moreover deliberately designed to prevent other railways from entering the area.

The Buxton extension

At the end of 1856, the Midland approached the LNWR with a proposal to extend the jointly leased MBM&MJR as a through route. They offered to subscribe £200,000 and the Duke of Devonshire was willing to add £50,000, even allowing the line to pass through Chatsworth Park if necessary. The LNWR turned down the offer and, in fact, were quietly pursuing plans for an extension of the SD&WB. When the Bill went before Parliament the Midland made no opposition. They had been refused a hearing about the original railway on the ground that they had no locus standi. The 'Stockport Disley and Whaley Bridge Railway Extension Act was passed on 27 July 1857. Fox [3] suggests this was facilitated by the Duke of Devonshire and discussions with the MSL and Midland Railways. While these may have been amicable at first they were not the destined to stay that way. Additional capital of £200,000 was to be raised for the extension and, once again, the LNWR contributed the lion's share - £105,000 with the MS&LR providing up to £35,000. Formal transfer to the LNWR took place on 16 November 1866. [4]

Moreover, while the Midland's original plan had been to cross from Buxton to the Goyt Valley then north to Whaley Bridge, [5] the LNWR took a roundabout route through Chapel-en-le-Frith thence by an immense curve to Dove Holes before travelling south to Buxton. It certainly didn't suit the expresses that the Midland intended to run,

The Midland felt that, simply for political reasons, the LNWR had built an inferior line. As Allport put it "The proposed railway, for some reason which does not appear on the face of it" is run along the high country where there is little or no population; and instead of taking the valley with a gradually rising ascent, "it goes up the steep gradient out of Buxton, to fall down again. The line appears to me to have gone up the hill for the sake of going down again." [6]

Work began in 1859 and progressed fairly smoothly. There were problems at Combs where there was to be a road underbridge. In the end, it proved necessary to divert the road to a point where the embankment was shallower. There was one tunnel planned - Eaves Tunnel. It had been expected to be 300 yards, but finished as 431 yards long. On the same stretch over the Barmoor, north of Dove Holes, a planned 87 feet deep cutting, became Barmoor Clough Tunnel of 111 yards. The company was now openly under the control of the LNWR with its secretary, C. E. Stewart, also the secretary of the SD&WBR.

The line was open to Buxton on 30 May 1863. On the same day as the Midland line from Rowsley, although full passenger services did not begin until 15 June.


Related Research Articles

Midland Railway British pre-grouping railway company (1844–1922)

The Midland Railway (MR) was a railway company in the United Kingdom from 1844. The Midland was one of the largest railway companies in Britain in the early 20th century, and the largest employer in Derby, where it had its headquarters. It amalgamated with several other railways to create the London, Midland and Scottish Railway at grouping in 1922.

Hope Valley line Trans-Pennine railway line in Northern England

The Hope Valley line is a trans-Pennine railway line in England, linking Sheffield with Manchester. It was completed in 1894.

Manchester, Sheffield and Lincolnshire Railway

The Manchester, Sheffield and Lincolnshire Railway (MS&LR) was formed in 1847 when the Sheffield, Ashton-under-Lyne and Manchester Railway joined with authorised but unbuilt railway companies, forming a proposed network from Manchester to Grimsby. It pursued a policy of expanding its area of influence, especially in reaching west to Liverpool, which it ultimately did through the medium of the Cheshire Lines Committee network in joint partnership with the Great Northern Railway and the Midland Railway.

Whaley Bridge Human settlement in England

Whaley Bridge is a town and civil parish in the High Peak district of Derbyshire, England. It is on the River Goyt, 16 miles (26 km) southeast of Manchester, 7 miles (11 km) north of Buxton, 9 miles (14 km) east of Macclesfield and 28 miles (45 km) west of Sheffield. It had a population of 6,455 at the 2011 census, including Furness Vale, Horwich End, Bridgemont, Fernilee, Stoneheads and Taxal.

Cromford and High Peak Railway Early British railway company (1833–1871)

The Cromford and High Peak Railway (C&HPR) was a standard-gauge line between the Cromford Canal wharf at High Peak Junction and the Peak Forest Canal at Whaley Bridge. The railway, which was completed in 1831, was built to carry minerals and goods through the hilly rural terrain of the Peak District within Derbyshire, England. The route was marked by a number of roped worked inclines. Due to falling traffic, the entire railway was closed by 1967.

Manchester, Buxton, Matlock and Midland Junction Railway

The Manchester, Buxton, Matlock and Midland Junction Railway ran from a junction with the Midland Railway at Ambergate to Rowsley north of Matlock and thence to Buxton.

Chinley railway station Railway station in Derbyshire, England

Chinley railway station serves the village of Chinley in Derbyshire, England. The station is 17 12 miles (28.2 km) south east of Manchester Piccadilly, on the Hope Valley Line from Sheffield to Manchester. It is unstaffed and is managed by Northern Trains.

Buxton railway station Railway station in Derbyshire, England

Buxton railway station serves the Peak District town of Buxton in Derbyshire, England. It is managed and served by Northern. The station is 25 34 miles (41.4 km) south east of Manchester Piccadilly and is the terminus of the Buxton Line.

Dove Holes railway station Railway station in Derbyshire, England

Dove Holes railway station serves the village of Dove Holes, Derbyshire, England. The station is on the Manchester Piccadilly to Buxton line 22 34 miles (36.6 km) south east of Piccadilly. It is managed and served by Northern.

Chapel-en-le-Frith railway station Railway station in Derbyshire, England

Chapel-en-le-Frith railway station serves the Peak District town of Chapel-en-le-Frith, Derbyshire, England. It is 20 12 miles south east of Manchester Piccadilly on the Buxton Line from Manchester. It was built in 1863 for the London & North Western Railway on its line from Whaley Bridge to Buxton. as an extension of the Stockport, Disley and Whaley Bridge Railway.

Whaley Bridge railway station Railway station in Derbyshire, England

Whaley Bridge railway station serves the Peak District town of Whaley Bridge in Derbyshire, England. The station is on the Manchester-Buxton Line 16 14 miles (26.2 km) south east of Manchester Piccadilly.

Furness Vale railway station

Furness Vale railway station in Derbyshire, England, is 15 14 miles (24.5 km) south east of Manchester Piccadilly on the Manchester to Buxton line and serves the village of Furness Vale. It has a level crossing at the end of the platform controlled by a signal box.

New Mills Newtown railway station

New Mills Newtown railway station serves the Peak District town of New Mills in Derbyshire, England. The station is 14 14 miles (22.9 km) south east of Manchester Piccadilly on the Manchester to Buxton line. It also serves as an interchange with the Hope Valley Line station New Mills Central, 15 minutes' walk away across the valley.

New Mills Central railway station Railway station in Derbyshire, England

New Mills Central railway station serves the town of New Mills in Derbyshire, England. It is on the Hope Valley Line between Manchester Piccadilly and Sheffield, 12 34 miles (20.5 km) east of the former. The town is also served by New Mills Newtown station, which is on the Buxton to Stockport and Manchester line.

Dove Holes Tunnel

Dove Holes Tunnel is a tunnel built by the Midland Railway between Peak Forest Signal Box and Chapel-en-le-Frith in Derbyshire in 1860–64, now carrying the Great Rocks Line.

Buxton line

The Buxton line is a railway line in Northern England, connecting Manchester with Buxton in Derbyshire. Passenger services on the line are currently operated by Northern Trains.

Sheffield and Midland Railway Companies Committee

The Sheffield and Midland Railway Companies' Committee was incorporated by Act of Parliament in 1869 as a joint venture between the Midland Railway and the Manchester, Sheffield and Lincolnshire Railway.

Hindlow railway station Former railway station in Derbyshire, England

Hindlow railway station was opened for goods in 1833 near to Hindlow near King Sterndale to the south east of Buxton, Derbyshire on the Cromford and High Peak Railway and the LNWR line to Ashbourne and the south.

High Peak Junction

High Peak Junction, near Cromford, Derbyshire, England, is the name now used to describe the site where the former Cromford and High Peak Railway (C&HPR), whose workshops were located here, meets the Cromford Canal. It lies within Derwent Valley Mills World Heritage Site, designated in 2001, and today marks the southern end of the High Peak Trail, a 17 miles (27 km) trail for walkers, cyclists and horse riders. The Derwent Valley Heritage Way also passes this point, and popular walks lead from here along the towpath in both directions.

Buxton railway station (Midland Railway) Former railway station in Derbyshire, England

Buxton (Midland) railway station served the town of Buxton, Derbyshire, England between 1863 and 1967.

References

  1. Dow, G., (1962) Great Central, Volume Two: Dominion of Watkin (1864-1899) , Shepperton: Ian Allan Ltd.
  2. "Stockport, Disley and Whaley Bridge Railway map". 30 November 1853. Retrieved 18 July 2010.
  3. Fox, G.K. (2006) The Buxton Line - Part One, Stockport: Foxline Limited
  4. Railway Magazine June 1963 p.382
  5. "District map of the Ambergate, Nottingham & Boston, and Eastern Junction Railway, with extension and branches." Late 19th century. Lincolnshire Archives ref: 4 GL/5/6. Acc. Number: 2008/35.
  6. Williams, F.S., (1874) The Midland Railway: Its Rise and Progress Derby: Bemrose and Son