TeraSun Energy Solar Power Station

Last updated

TeraSun Energy Solar Power Station
TeraSun Energy Solar Power Station
Country Namibia
Location Arandis, Erongo Region
Coordinates 22°24′44″S14°59′57″E / 22.41222°S 14.99917°E / -22.41222; 14.99917
StatusProposed
Construction began2022
Commission date 2024 Expected
Construction costUS$69.8 million
Owner(s)TeraSun Energy
Operator(s)TeraSun Energy
Solar farm
Type Flat-panel PV
Site area120 hectares (300 acres)
Power generation
Units planned148,000
Nameplate capacity 81 MW (109,000 hp)
Annual net output 227.7 GWh

The TeraSun Energy Solar Power Station is a planned 81 megawatts solar power plant in Namibia. The power station is owned and is being developed by a consortium comprising Natura Energy, a Namibia-based energy company and Globleq Africa Limited, an independent power producer (IPP), headquartered in the United Kingdom. [1] [2]

Contents

The developers of this solar farm intend to sell the electricity directly to commercial customers in Namibia, through the transmission network of NamPower, the national electricity utility company, as permissible by the recent changes in the laws of the country. [1] [2]

Location

The power station would occupy a piece of real estate measuring 120 hectares (300 acres), in the town of Arandis, in Erongo Region, in western central Namibia. [1] [2] Arandis is located approximately 51 kilometres (32 mi) northeast of Swakopmund, the capital of the Erongo Region. [3] This is about 307 kilometres (191 mi) west of Windhoek, the capital city of that country. [4]

History

Namibia's Natura Energy, through its subsidiary TeraSun Energy, has been developing this power station on its own since circa 2018. At that time a 50 MW installation was being considered at an estimated cost of US$63.2 million. [5] [6]

In 2021, Natura Energy convinced Globeleq Africa to become a shareholder in the project. Globeleq Africa is an IPP based in the United Kingdom with knowledge and experience in energy generation, transmission, distribution, marketing and financing in Africa. The capacity of the power station was increased from the original 50 MW to 81 MW. The cost of construction also went up from US$63.2 million to US$69.8 million. [1] [2] [7]

Developers

TeraSun Energy is the special purpose vehicle (SPV) created by the power station developers to design, own, build, operate and maintain this power station. The ownership of the SPV company is as illustrated in the table below. [1] [2] [7]

Shareholding In TeraSun Energy
RankShareholderDomicilePercentageNotes
1Natura Energy Namibia [1] [2] [7]
2GlobeleqUnited Kingdom [1] [2] [7]
Total100.0

Timeline

Construction is expected to start in 2022, with commercial commissioning anticipated in 2023. [1] [2]

See also

Related Research Articles

Menengai II Geothermal Power Station, is a 35 MW (47,000 hp) geothermal power station under construction in Kenya. The power station is owned and under development by Globeleq, an independent power producer headquartered in London, United Kingdom. Globeleq is 70 percent owned by British International Investment and 30 percent by Norfund.

The Malindi Solar Power Station is a 52 MW (70,000 hp) solar power plant in Kenya.

The Golomoti Solar Power Station is a 20 MW (27,000 hp) solar power plant in Malawi. The power station was developed by a consortium comprising InfraCo Africa of the United Kingdom and JCM Power, a Canadian independent power producer. Construction began during the first quarter of 2021. The solar farm came online during the second quarter of 2022.

The Erongo Desalination Plant, also known as the Orano Desalination Plant, is a sea water desalination plant in Namibia. The facility was constructed between 2008 and 2010 by Orano Mining Namibia, which at the time was known as Areva Resources Namibia. The desalination plant was established to supply water to Orano’s Trekkopje Uranium Mine. At the time this plant was commissioned, it was the largest reverse osmosis desalination plant in Southern Africa.

<span class="mw-page-title-main">Mariental Solar Power Station</span> Power station in Namibia

The Mariental Solar Power Station is a 45.5 MW (61,000 hp) solar power plant in Namibia. The project is owned and was developed by a consortium of various IPPs and the Namibian electricity utility company, NamPower.

The Nagreongo Solar Power Station, also Nagréongo Solar Power Station, is a 30 MW (40,000 hp) solar power in Burkina Faso. The solar farm, which was commissioned in July 2022, was developed by the French IPP, GreenYellow, a subsidiary of the Casino Group. The energy generated here is sold to the Burkinabe electricity utility company SONABEL,, under a 25-year power purchase agreement (PPA).

The Khan Solar Power Station, is a 20 megawatts (27,000 hp) solar power plant under construction in Namibia. The project is owned and under development by Access Aussenkehr Solar One Namibia a Namibian independent power producer (IPP), based in Windhoek, the country's capital city. The energy generated here will be purchased by NamPower, the national electricity utility company, which is wholly owned by the government of Namibia. A 25-year power purchase agreement (PPA), governs the terms under which the energy will be sold and bought.

The Balama Solar Power Station, is a 11.25 megawatts (15,090 hp) solar power plant under construction in Mozambique. The project is owned and under development by Solarcentury an independent power producer (IPP), based in the United Kingdom. The solar farm will be connected to an 8.5 MW/8.5MWh battery storage system. The two energy sources will then be synchronized with the existing 15.4 MW diesel-fired thermal power source, to form a 35.15 MW hybrid power station. The energy generated here is used in the Balama Graphite Mine, owned and operated by Syrah Resources, a Canadian minerals and technology company.

<span class="mw-page-title-main">Ambatolampy Solar Power Station</span> Solar farm in Madagascar

The Ambatolampy Solar Power Station is a 40 MW solar power plant in Madagascar. As of April 2022, it was the first grid-connected, privately-funded solar power plant in the country. The power plant, which was first commissioned in 2018, underwent expansion from 20 MW to 40 MW, between 2021 and 2022. The off-taker of the energy generated at this renewable energy power plant is Jirama, the national electricity utility company.

The Xina Solar One Power Station is a 100 MW (130,000 hp) concentrated solar power plant in South Africa. Constructed between 2014 and 2016, the power station was commercially commissioned in 2017. The solar component of this power station is complemented by molten salt thermal storage technology, which allows the power station to provide full power for another 5.5 hours, after the sun goes down, thus supplying energy during South African peak hours. The consortium that owns the solar farm comprises a foreign independent power producer (IPP), two domestic finance development companies and a local charity. The energy generated here is sold directly to Eskom, the South African national electricity utility company, under a 20-year power purchase agreement (PPA).

The Karoshoek Solar One Power Station, also Karoshoek Concentrated Solar Power Station, is a 100 megawatts concentrated solar power plant in South Africa. The solar component of this power station comprises curved mirrors that heat a fluid to a high temperature. The hot fluid is used to heat water, creating steam. The steam then "drives a steam turbine to convert the energy into electricity". That part of the power station is complemented by molten salt thermal storage technology, which "allows five hours of energy storage, enabling the plant to continue producing electricity in the absence of sunlight", supplying energy during South African peak hours. The consortium that owns the solar farm comprises foreign and domestic independent power producers (IPPs) and local and international financiers and other investors. A 20-year power purchase agreement (PPA), between the owners and Eskom, the South African electric utility company, governs the sale of the generated energy to Eskom, the off-taker. The power station achieved commercial commissioning in November 2018.

The Diaz Wind Power Station, is a 44 MW (59,000 hp) power plant under construction in Namibia. The power station is under development and is owned by Diaz Wind Power, a joint venture company owned by (a) United Africa Group and (b) Quantum Power. The energy generated at this wind farm will be sold to NamPower, the national electricity parastatal company of Namibia, under a 25-year power purchase agreement (PPA).

The Kokerboom Power Station, is an 18.5 megawatts solar power plant under development in Namibia. The public private partnership (PPP) development project is owned by Alpha Namibia Industries Renewable Power (ANIREP), a Namibian independent power producer (IPP), who was awarded the concession in June 2022, to design, construct, finance, own, operate and maintain the power station. The energy off-taker is "Dundee Precious Metal", a Canadian mining company, for use in its mining operations in the area. This is possible via the national grid "through a modified single-buyer model", under Namibian laws.

The Omburu Solar Power Station, is a 20 megawatts solar power station in Namibia. The power station, which was developed and is owned by Namibia Power Corporation (Proprietary) Limited (NamPower), was constructed between March 2021 and June 2022 and was commercially commissioned on 24 June 2022. NamPower integrates the energy generated here, calculated at 67.8 GWh annually, into the Namibian grid. This is the first grid-connected PV solar power station, fully owned and operated by NamPower.

The Bolobedu Solar Power Station is an 148 MW solar power plant planned in South Africa. The solar farm is owned and under development by a consortium led by Voltalia, the French multinational independent power producer (IPP) and Black South African shareholders, including a community trust. The off-taker of the power generated here is Richards Bay Minerals (RBM), a South African mining company owned by the Anglo-Australian mining conglomerate, Rio Tinto. The power will be conveyed from the solar farm to the customer's mine using the transmission lines of Eskom, the national electricity parastatal company, as is permissible under South African law.

The Kairouan Power Station, also Kairouan Solar Park 3, is a 120 MW (160,000 hp) solar power plant under development in Tunisia. The power station is owned and under development by a special purpose vehicle (SPV) company, under the public private partnership (PPP) arrangement. The lead investor is Amea Power, an independent power producer (IPP), based in the United Arab Emirates.

The Sokhoro Solar Power Station is a planned 52 MW (70,000 hp) solar power plant in Ivory Coast. The solar farm is under development by PFO Africa, an Ivorian subsidiary of the French conglomerate, PFO Energies. When completed, it will be the largest grid-connected solar power station in the country.

References

  1. 1 2 3 4 5 6 7 8 New Era (28 June 2021). "N$1 billion solar plant planned for Arandis…agreement between Namibia and UK companies". New Era . Windhoek, Namibia. Retrieved 16 May 2022.
  2. 1 2 3 4 5 6 7 8 Adam Hartman (2 July 2021). "Major solar park on the cards for Arandis". The Namibian . Windhoek, Namibia. Retrieved 16 May 2022.
  3. Google (16 May 2022). "Road Distance Between Arandis, Namibia And Swakopmund, Namibia" (Map). Google Maps . Google. Retrieved 16 May 2022.
  4. Google (16 May 2022). "Road Distance Between Arandis, Namibia And Windhoek, Namibia With Map" (Map). Google Maps . Google. Retrieved 16 May 2022.
  5. Carmen (25 January 2022). "TeraSun Energy Arandis Solar PV Park, Namibia". Power-Technology.com. New York City. Retrieved 16 May 2022.
  6. Boris Ngounou (29 June 2019). "Namibia: Natura Energy to build 50 MW solar power plant in Arandis". Afrik21.africa. Paris, France. Retrieved 16 May 2022.
  7. 1 2 3 4 Jean Marie Takouleu (1 July 2021). "Namibia: Natura Energy agrees with Globeleq for 81 MWp solar power plant". Afrik21.africa. Paris, France. Retrieved 16 May 2022.