Traffic Bridge | |
---|---|
Coordinates | 52°7′18″N106°39′48″W / 52.12167°N 106.66333°W |
Carries | 2 lanes of Victoria Avenue/3rd Avenue South |
Crosses | South Saskatchewan River |
Locale | Saskatoon, Saskatchewan, Canada |
Official name | Traffic Bridge |
Other name(s) | Victoria Bridge 19th Street Bridge 3rd Avenue Bridge Iron Bridge Black Bridge Short Hill Bridge |
Maintained by | City of Saskatoon |
Preceded by | Senator Sid Buckwold Bridge |
Followed by | Broadway Bridge |
Characteristics | |
Design | Parker truss bridge |
Material | Steel, wood, concrete |
Total length | 289.8 metres (951 ft) |
Width | 5.95 metres (19.5 ft) |
No. of spans | (original) 5; (replica) 4 |
Piers in water | 3 |
History | |
Designer | Saskatchewan Department of Public Works |
Constructed by | (original) John D. Gunn and Sons Ltd.; (replica) Graham Construction & Engineering Inc. |
Fabrication by | Canadian Bridge Company/McDiarmid Company |
Construction start | (original) August 1906; (replica) August 2016 |
Construction end | (original) October 10, 1907; (replica) October 2, 2018 |
Opened | (original) October 10, 1907; (replica) October 3, 2018 |
Closed | (original) August 24, 2010 |
Location | |
The Traffic Bridge is the name given to two truss bridges constructed across the South Saskatchewan River, connecting Victoria Avenue to 3rd Avenue South and Spadina Crescent in Saskatoon, Saskatchewan, Canada. The original bridge opened on October 10, 1907, and was the first bridge to carry motor vehicle traffic in Saskatoon, replacing an unreliable ferry service. The promised construction of the bridge was considered a prime factor in the amalgamation of the towns of Saskatoon, Nutana and Riversdale into one city named Saskatoon. The Traffic Bridge was the only road bridge in Saskatoon until 1916, when the University Bridge was completed. [1] In 2010, the bridge was permanently closed due to severe corrosion and was demolished by 2016. [2]
A new truss bridge, a near-replica of the original except with fewer steel spans and a wider road bed, was constructed on the same site after the original bridge was closed. [3] It opened on October 3, 2018. [4]
The bridge is known both popularly and in official correspondence as the Traffic Bridge, originally distinguishing it from the QLLS/CN railway bridge just upstream and later becoming a proper noun in its own right (the railway bridge was built in 1890 and demolished in 1965 when the rail line and downtown yards were removed; the Senator Sid Buckwold Bridge now crosses the river at its former location). Although it is Saskatoon's oldest bridge, it was never formally named until it was nearly a century old. On January 22, 2007, Saskatoon City Council voted to officially name it the "Traffic Bridge", on the recommendation of the Municipal Heritage Advisory Committee, as a way to acknowledge its historic character and the vital role it played in the city's early history. This name was retained for the replacement bridge that opened in October 2018.
The original bridge was referred to by various other names since its construction (see infobox). The most popular name is Victoria Bridge, given that Victoria Avenue runs right up to the bridge's south end. It has been called the 19th Street Bridge, although 19th Street actually passes two blocks north of the bridge and connects with the northwest end of Broadway Bridge (this name made more sense prior to the construction of Broadway Bridge, when the streetcar line came down 19th street before turning onto the bridge) and the 3rd Avenue Bridge, as that is its continuation on the north end of the bridge. Due to its colour, it was also called the Black Bridge, although a later paint scheme was a rather dark grey. It was also sometimes called the Iron Bridge and even the Short Hill Bridge after the Short Hill, down which Victoria Avenue comes (as opposed to "Long Hill" which was a longer route down the same hill originally used by street cars. [1]
The Traffic Bridge came into being when residents of Nutana agreed to merge with the town of Saskatoon and the village of Riversdale to form a city. As a condition of their joining with the other two communities, they demanded that a bridge be built for foot and vehicular traffic. Up to then, the only way to cross the river was on an unreliable ferry, or a difficult and sometimes dangerous walk across the QLLS railway bridge. [5] The province provided funding and John Gunn and Sons was selected as the contractor. [6] On October 10, 1907, the Traffic Bridge officially opened. [7]
Less than a year after it opened, on June 7, 1908, the bridge became the site of Saskatoon's only shipping disaster, when a steamboat called the SS City of Medicine Hat crashed into one of the bridge's piers and sank; all aboard managed to make it to safety. [8] This accident marked the end of steamboat traffic on the river. An anchor presumed to be the SS City of Medicine Hat's was located in August 2006 by divers training just downstream, near the Broadway Bridge. [9] This discovery led to a full-scale, five-day underwater excavation, which was conducted from September 8 to 12, 2008. A number of artifacts were uncovered from the water. A documentary film, titled "The Last Steamship: The Search for the SS City of Medicine Hat" was created in 2010 about the wreck and the search. More artifacts were unearthed in 2012 underneath Rotary Park, where the river used to run until it was covered by landfill to create the park in the 1960s. [10] [11] [12]
Two roadways cut out of the riverbank are often associated with the Traffic Bridge. Short Hill referred to the steep rise up the east bank from the foot of the bridge along Victoria Avenue. The grade was too steep for most wagon teams, as well as the streetcars that began operation in 1913. [13] Long Hill referred to the more gradual slope up the east riverbank from the foot of the bridge to the end of 12th Street, around where the end of the Broadway Bridge is today. This road followed the old ferry road up the bank along what is now Saskatchewan Crescent. Even the Long Hill was difficult for streetcars; in March 1922, a streetcar derailed when it slid off ice-covered tracks while attempting to turn onto the bridge. [14]
The 2 metre-wide pedestrian walkway was added on the upstream side of the bridge in 1908. [1] In 1961, the southern end of the bridge was raised to reduce the slope on the Short Hill and to improve traffic flow, allowing Saskatchewan Crescent to pass underneath the bridge. The bridge carried approximately 10,000 vehicles per day.
The bridge was repainted in 1979, albeit as little or no surface preparation was done the work was of dubious structural benefit. Beginning in the 1980s, the bridge started to show its age and needed to be closed periodically for refurbishment. Some adjustments were also made to widen the roadway, as many modern motorists were experiencing difficulty crossing the bridge. It was also closed for extended periods of time in the early 1990s when City of Saskatoon work crews damaged the bridge twice by driving over the bridge with vehicles too heavy or too large for the bridge specifications.
On September 6, 2005, the City of Saskatoon closed the bridge for inspection, in preparation for planned upgrades to the roadway (including the installation of the city's first roundabout (since the removal of the "traffic circle" on 8th Street a decade earlier) just off the north end of the bridge) in anticipation of an adjacent riverfront development (River Landing). On November 2, the bridge was closed indefinitely to vehicular traffic upon completion of the inspection, due to corrosion and other factors. The bridge was re-opened on September 8, 2006, following repairs that cost $500,000. The bridge remained open to pedestrian and bicycle traffic for most of this period. Replacing the bridge instead of repairing it would have cost between $24 and $45 million. [15]
Without major repairs, engineers had given the bridge a 20 year life expectancy (either as a vehicle or a pedestrian crossing). The job of sandblasting the bridge to bare metal and re-painting it was made very expensive by the need to keep all sandblasting debris out of the river as the existing paint was lead-based.
The bridge's arches were equipped with several series of decorative LED lights in the summer of 2007. They included a programmable controller that made the lights change colour and move in different patterns. However, the lights proved controversial; they cost the city $462,000, which was almost twice the city's original estimate. They also broke down frequently, fueling further complaints from the public about their high price tag. [16]
On August 24, 2010, the City of Saskatoon closed the original Traffic Bridge to vehicles, bicycles and pedestrians following a preliminary inspection which could not conclude that the bridge was safe.
According to Mayor Don Atchison on August 25, 2010, "The bridge is going to collapse. It's imminent that is going to collapse," further comparing it to the I-35W Mississippi River bridge collapse of 2007. [18] The bridge's closure initially led to traffic tie-ups leading into the downtown, which were feared to be long-term if the bridge was not repaired or replaced. [19] A 2010 poll conducted by Insightrix Research showed that the public was split over to repair or replace the bridge. [20]
The city commissioned Stantec Consulting to consider options for the future of the Traffic Bridge. The report came up with a number of recommendations, ranging from rehabilitating the existing bridge to replacing it with a new structure. [21] City council voted to eliminate any options that removed vehicle traffic from the bridge. After a series of public meetings and online surveys, the city administration recommended that the bridge be demolished and replaced with a modern steel truss bridge, but one of similar design to the original. [22] On December 6, 2010, city council voted 8–3 to proceed. [23] Although the final design, funding and timeline for construction for the new bridge are yet to be determined, it will be wider and possibly shorter than the existing structure. [24] [ full citation needed ] Proposals to salvage sections of the original bridge and its LED lights were scrapped due to cost, as decided by an executive committee in May 2011. [25]
Funding for the replacement of the Traffic Bridge was announced in 2014. [26] In 2015, the city's administration said it could save money on the project if restrictions on the design were relaxed. [27] Graham Commuter Partners was selected as the contractor, and illustrations of the new bridge were released in October 2015. The new bridge will have four spans instead of the original's five, built on the existing piers which will be reinforced. [28] Construction on the new bridge began in 2016. [3]
Demolition of the bridge first began on May 28, 2012. The pedestrian access ramp on the south side of the bridge was removed first to enable load testing on the piers. [29] Work began to tear down the first span on the east bank of the river on October 12, 2012. [30] By October 18th, the first span had been severed from the rest of the bridge. [31] On January 10, 2016, two spans of the bridge were imploded. [32] The northernmost span was removed by explosives on February 7. [33] The final span of the original bridge was torn down by machinery on November 17, 2016. [34]
The replacement bridge was scheduled to be opened in the fall of 2018. [35] In late April, 2017, the replacement bridge was half complete. City officials warned thrill-seekers that construction made the water near the bridge extra hazardous. [36]
The new bridge was completed on time and had a public opening ceremony on October 2, 2018. Vehicular traffic was allowed as of October 3, one day after the opening of the Chief Mistawasis Bridge at the north end of Saskatoon. [4]
Saskatoon is the largest city in the Canadian province of Saskatchewan. It straddles a bend in the South Saskatchewan River in the central region of the province. It is located along the Trans-Canada Yellowhead Highway, and has served as the cultural and economic hub of central Saskatchewan since its founding in 1882 as a Temperance colony.
Saskatoon John G. Diefenbaker International Airport is an international airport located 3 nautical miles north-west of downtown Saskatoon, Saskatchewan, though still within its city limits. The airport is served by passenger, courier and air freight operators. It is named for John Diefenbaker, the 13th prime minister of Canada.
Donald James Atchison is a Canadian politician who was Mayor of Saskatoon, the largest city in the central Canadian province of Saskatchewan, from 2003 to 2016. Atchison was elected mayor four times, tied for the most after mayoral terms were extended beyond one year in 1954. When he lost his bid for a fifth term in 2016, he left office as the longest-serving mayor in the city's history at 13 years.
The StarPhoenix is a daily newspaper that serves Saskatoon, Saskatchewan, Canada, and is a part of Postmedia Network. It has been referred to as a "sister newspaper" to the Leader-Post. The StarPhoenix puts out six editions each week and publishes one weekly, Bridges. It is also part of the canada.com web portal.
The Rural Municipality of Corman Park No. 344 is a rural municipality (RM) in the Canadian province of Saskatchewan within Census Division No. 11 and SARM Division No. 5. Located in the central portion of the province, the RM surrounds the City of Saskatoon.
The Saskatoon Minor Football Field at Gordon Howe Park is a football stadium located in Saskatoon, Saskatchewan, Canada. It was opened September 30, 1960, built on land repossessed by the city in 1931 for unpaid taxes. It is the home of the Saskatoon Hilltops, who play in the Prairie Football Conference of the Canadian Junior Football League, the Saskatoon Valkyries of the Western Women's Canadian Football League, and is also used for high school football. It is located on the southwest corner of the city. The park is named after Gordie Howe, a Saskatoon native and member of the Hockey Hall of Fame.
Saskatoon City Council is the governing body of Saskatoon, the largest city in the central Canadian province of Saskatchewan. It consists of ten councillors representing ten wards throughout the city and the mayor of Saskatoon, who is elected city-wide. The current council was elected to a four-year term on November 13, 2020.
Arbor Creek is a primarily residential neighbourhood located in northeast Saskatoon, Saskatchewan, Canada. It is mostly made up of low-density single detached dwellings. As of 2006, the area is home to 4,654 residents. The neighbourhood is considered a high-income area, with an average family income of $99,631, an average dwelling value of $327,262 and a home ownership rate of 92.5%.
Rosewood is a primarily residential neighbourhood under construction in southeast Saskatoon, Saskatchewan, Canada. The majority of its residents live in single detached dwellings. In 2011, the area was home to 73 residents. In early 2015 there were approximately 900 occupied residences. The neighbourhood is considered a high-income area, with an average family income of $104,964, and a home ownership rate of 93.3%.
Serge LeClerc was a pardoned Canadian ex-criminal, former politician and co-author of the autobiography Untwisted.
Andy Iwanchuk is a Canadian provincial politician. He was the Saskatchewan New Democratic Party member of the Legislative Assembly of Saskatchewan for the constituency of Saskatoon Fairview.
Circle Drive is a major road constructed as a ring road in Saskatoon, Saskatchewan, Canada. Its route constitutes both part of the Yellowhead Highway and Highway 11, signed as both along the entire length. It was first conceived in 1913 by the city commissioner and completed exactly 100 years later in 2013. Most of the route is a fully-controlled access freeway, however the segment between Airport Drive and Millar Avenue has at-grade intersections.
Robert Murray "Bob" Pringle is a former Canadian politician, who last served as a city councillor for Ward 7 on Saskatoon City Council in Saskatoon, Saskatchewan. He previously served as a New Democratic Party member of the Legislative Assembly of Saskatchewan, representing the electoral district of Saskatoon Eastview from 1988 to 1998. While in the legislature, he served as Minister of Social Services and Minister Responsible for Senior's Issues in the government of Roy Romanow.
Borden Bridge is an abandoned arch bridge that spans across the North Saskatchewan River near Borden, Saskatchewan, Canada. The bridge used to carry vehicular traffic from Saskatchewan Highway 16, but is now open to foot traffic only.
Kensington is a neighbourhood located in west Saskatoon, Saskatchewan, Canada that began construction in 2013. Around 2028, Kensington will reach completion and have an estimated population of 8,300. Kensington will feature Saskatoon's first application of the fused grid street network.
City of Medicine Hat was a paddle steamer sternwheeler that worked on the Saskatchewan River in Medicine Hat, Alberta, and Saskatchewan, Canada, from 1907 until its wreck and sinking on June 7, 1908.
The Gordie Howe Bridge is a vehicular freeway bridge that spans the South Saskatchewan River in Saskatoon, Saskatchewan, Canada. It is a steel girder bridge, built as part of the Circle Drive freeway system in southwestern Saskatoon. At the time of construction, it was projected to cost $272.5 million to build. It is the southernmost road bridge in the city. The bridge is located adjacent to the Grand Trunk Bridge. It is also the longest of Saskatoon's bridges at 440 metres (1,440 ft) in length, and the first to have a concrete road surface. The bridge was scheduled to open with the completion of the entire Circle Drive South project on September 30, 2012. However, record rainfall, high water tables and an early snowfall made that deadline unfeasible. The actual completion and opening date was July 31, 2013.
Rob McLaughlin is a Canadian journalist and digital media producer who is currently the executive producer of the National Film Board of Canada's Digital Studio in Vancouver. McLaughlin was announced as the head of the NFB studio in May 2016, having previously served as Director of Digital Content and Strategy at the NFB from 2008–2011.
Remai Modern is a public art museum in Saskatoon, Saskatchewan, Canada. The art museum is situated along the west bank of the South Saskatchewan River, at the River Landing development in Saskatoon's Central Business District. The museum's 11,582 square metres (124,670 sq ft) building was designed by Bruce Kuwabara of KPMB Architects in association with Architecture49.
The Chief Mistawasis Bridge is a girder bridge in Saskatoon, Saskatchewan. The bridge officially opened on Oct. 2, 2018, and extends McOrmond Drive across the South Saskatchewan River to connect to Marquis Drive, providing a commuter bypass connecting communities on Saskatoon's northeast and eastern sides more directly to industrial and business development on the city's north. Construction of this bridge, located in the northern portion of the city, was financed in concert with construction of replacement for the 1907 Traffic Bridge in the downtown core, which was closed in 2010; that project was opened to traffic on October 3, 2018.
At the Traffic Bridge site, three of four bridge spans have been installed, and work on the trusses for the final span is expected to be finished over the next two months.
The construction of the new Traffic Bridge has created a narrow channel with a fast current and people are asked not travel underneath it on the South Saskatchewan River.