The Transmission Owner Transmission Solutions (TOTS) was a group of three electric power bulk transmission projects constructed on the New York bulk transmission system to increase transfer capability between Upstate New York and Downstate New York. The projects were in-service by June 2016. The projects were proposed by a consortium of the state's seven Investor-Owned Utility (IOU) companies (New York Transco (Transco), [1] composed of Consolidated Edison, Orange and Rockland, PSEG-Long Island, Central Hudson, National Grid, New York State Electric and Gas, and Rochester Gas and Electric) in response to a New York State Public Service Commission (NYSPSC) appeal for Indian Point contingency plans in the event that the 2,060-MW Indian Point power facility were to retire. [2] [3] The shutdown of the Indian Point facility has been a policy goal of Governor Andrew Cuomo since before he began his administration in New York in 2011. [4] The TOTS projects are estimated to have costed $240 million [5] to construct. Construction costs were divided between the seven Transco utilities and the New York Power Authority (NYPA). The IOUs are receiving a 10% return on equity (approved by the Federal Energy Regulatory Commission) [6] for construction of the projects which is being recovered through retail consumer rates approved by the NYSPSC.

Contents

History

An Indian Point contingency plan, initiated in 2012 by the NYSPSC under the administration of Cuomo, solicited energy solutions from which the TOTS plan was selected. Proposals were solicited from third party developers and the incumbent transmission IOUs. The TOTS projects consist of 3 separate projects that were projected to provide 450 MW [7] of additional transfer capability across a NYISO defined electric transmission corridor. The NYSPSC approved the Certificate of Public Convenience and Necessity for the TOTS projects (usually required before construction of a project) on behalf of Transco on May 19, 2016 (pursuant to section 68 of the Public Service Law). [7] Most other major transmission projects in New York are subject to Article VII of the Public Service Law. [8] These TOTS projects, with the exception of part of the Staten Island "unbottling" were in service by June 2016. The cost of the TOTS projects are distributed among the various IOUs in their rate cases that were approved by the public service commission. The cost allocation amongst themselves was approved by the Federal Energy Regulatory Commission (FERC). NYPA is also receiving a portion of the cost allocation, which they are recovering through tariffs. The cost of the TOTS projects has been estimated to be in the range of between $27 million to $240 million. [2] [9] [10] [11] [12]

Facilities

Cost allocation

IOUCost allocation (%)Estimated Increase in Rate Base ($ mm)
Central Hudson5.9914.4
Con Edison / Orange and Rockland63.18151.6
New York State Electric and Gas / Rochester Gas and Electric10.1224.3
National Grid12.1629.2
Long Island Power Authority (PSEG-Long Island)8.5520.5

Note: "Increase in Rate Base" is based on an estimated $240 million total construction cost without including the FERC approved 10% ROE. [5] [6]

Other facilities

Several other facilities have been or are being constructed near Indian Point Energy Center which at one point attempted to qualify for the original 2012 contingency plan solicitation from the NYSPSC.

An energy highway initiative was prompted by the Indian Point Contingency Plan order from 2012 (generally speaking, additional lines on the Edic-Pleasant Valley and the Oakdale-Fraser transmission corridors) which is still going through the regulatory process in both the NYISO and NYSPSC. [13] [14]

Other projects include the proposed Champlain Hudson Power Express and the in-service (as of October 1, 2018) CPV Valley Energy plant, a 650 MW natural gas plant located in Wawayanda, New York. [15] The CPV Valley plant has been associated with Governor Cuomo's close aid, Joe Percoco, and the associated corruption trial. [16] There was a 1,000 MW merchant HVDC transmission line proposed in 2013 to the NYSPSC that would have interconnected at Athens, New York and Buchanan, New York, however this project was indefinitely stalled when its proposed southern converter station site was bought by the Town of Cortlandt in a land auction administered by Con Edison. [17] [18] [19] Another plant being built, Cricket Valley Energy Center, rated at 1,100 MW, is on schedule to provide energy by 2020 in Dover, New York. [20]

New capacity zone

FERC has also been instrumental in developing wholesale market policy in the region of New York that TOTS was designed to alleviate. Approved in 2013 and upheld by a federal appeals court in 2015, [21] a new capacity zone for the NYISO's wholesale capacity market was implemented. Previously, the state only had three locational capacity zones in the wholesale capacity market (rest of state, New York City, and Long Island). The new capacity zone is a fourth zone that extends from the Hudson Valley to New York City and essentially acts as a price floor to the New York City capacity zone price. Historically, the Hudson Valley zone and two other zones north of New York City were located in the lower priced rest-of-state zone. The NYISO's wholesale capacity market provides wholesale energy producers with a revenue stream independent of actual energy production and based upon a unit's power production capability, but it has never been called a standby fee or market. [22] [23] [24] While the creation of new capacity zones has been historically documented, the NYISO has disallowed policy that would provide the ability to remove a capacity zone in the state if a transmission corridor is deemed unrestrained. [25]

NYSPSC Staff

At least one member of the NYSPSC staff responsible for guiding the TOTS projects through the state regulatory process in the years 2012-2016, Raj Addepalli, retired in 2016 as an office Director with a final salary of $165,489 and a total compensation of $181,178 - the highest level of compensation for the department that year. [26] [27]

Related Research Articles

<span class="mw-page-title-main">Federal Energy Regulatory Commission</span> Independent agency of the United States federal government

The Federal Energy Regulatory Commission (FERC) is the United States federal agency that regulates the transmission and wholesale sale of electricity and natural gas in interstate commerce and regulates the transportation of oil by pipeline in interstate commerce. FERC also reviews proposals to build interstate natural gas pipelines, natural gas storage projects, and liquefied natural gas (LNG) terminals, in addition to licensing non-federal hydropower projects.

<span class="mw-page-title-main">Stephentown, New York</span> Town in New York, United States

Stephentown is a town in Rensselaer County, New York, United States. The population was 2,903 at the 2010 census. The town, which was originally Jericho Hallow in the Massachusetts Bay Colony, was renamed for Stephen Van Rensselaer. The town is located in the southeastern corner of the county, and has a sign proclaiming it to be the only Stephentown on Earth.

<span class="mw-page-title-main">Kintigh Generating Station</span>

The Kintigh Generating Station, also known as Somerset Operating Co. LLC of the Upstate New York Power Producers was a 675-megawatt coal-fired power plant located in Somerset, New York, United States. The plant was owned by AES Corporation until bankruptcy. Its unit was launched into service in 1984. Coal is provided to the plant via the Somerset Railroad. The waste heat is dumped into Lake Ontario, resulting in a warm-water plume visible on satellite images. The plant's 625-foot smoke stack can be seen across Lake Ontario from the shores of Toronto, Pickering, Oshawa, and Ajax, Ontario. It can also be seen from points along the Niagara Escarpment, including Lockport, NY, approximately 20 miles south. Power from the plant is transferred by dual 345kV power lines on wood pylons, which run south from the plant through rural agricultural land. In Royalton, NY they split at their physical junction with the dual circuit 345-kV Niagara-to-Edic transmission line, owned by the New York Power Authority, one circuit heads west to a substation at Niagara Falls, the other heads east to Station 80 south of Rochester. This bulk electric transmission constraint, created by the Somerset plant tie-in and forcing wheeling through 230kV and 345kV transmission lines to the Homer City Coal Plant east of Pittsburgh, PA, and returning to NY at the Watercurry substation outside Elmira, will be resolved through the Empire State Line proposal approved by NY Independent System Operator (NYISO).

<span class="mw-page-title-main">Indian Point Energy Center</span> Nuclear power plant in Buchanan, New York

Indian Point Energy Center (I.P.E.C.) is a three-unit nuclear power plant station located in Buchanan, just south of Peekskill, in Westchester County, New York. It sits on the east bank of the Hudson River, about 36 miles (58 km) north of Midtown Manhattan. The facility has permanently ceased power operations as of April 30, 2021. Before its closure, the station's two operating reactors generated about 2,000 megawatts (MWe) of electrical power, about 25% of New York City's usage. The station is owned by Holtec International, and consists of three permanently deactivated reactors, Indian Point Units 1, 2, and 3. Units 2 and 3 were Westinghouse pressurized water reactors. Entergy purchased Unit 3 from the New York Power Authority in 2000 and Units 1 and 2 from Consolidated Edison in 2001.

The New York Power Authority (NYPA), officially the Power Authority of the State of New York, is a New York State public-benefit corporation. It is the largest state public power utility in the United States providing some of the lowest-cost electricity in the nation, operating 16 generating facilities and more than 1,400 circuit-miles of transmission lines. Its main administrative offices are in White Plains, New York

<span class="mw-page-title-main">Regional transmission organization (North America)</span>

A regional transmission organization (RTO) in the United States is an electric power transmission system operator (TSO) that coordinates, controls, and monitors a multi-state electric grid. The transfer of electricity between states is considered interstate commerce, and electric grids spanning multiple states are therefore regulated by the Federal Energy Regulatory Commission (FERC). The voluntary creation of RTOs was initiated by FERC Order No. 2000, issued on December 20, 1999. The purpose of the RTO is to promote economic efficiency, reliability, and non-discriminatory practices while reducing government oversight.

National Grid plc is a British multinational electricity and gas utility company headquartered in London, England. Its principal activities are in the United Kingdom, where it owns and operates electricity and natural gas transmission networks, and in the Northeastern United States, where as well as operating transmission networks, the company produces and supplies electricity and gas, providing both to customers in New York and Massachusetts.

<span class="mw-page-title-main">NRG Energy</span> Energy company serving customers in the northeast United States and Texas

NRG Energy, Inc. is an American energy company, headquartered in Houston, Texas. It was formerly the wholesale arm of Northern States Power Company (NSP), which became Xcel Energy, but became independent in 2000. NRG Energy is involved in energy generation and retail electricity. Their portfolio includes natural gas generation, coal generation, oil generation, nuclear generation, wind generation, utility-scale generation, and distributed solar generation. NRG serves 6 million retail customers in 24 US states including Texas, Connecticut, Delaware, Illinois, Maryland, Massachusetts, New Jersey, New York, Pennsylvania, Ohio; the District of Columbia, and eight provinces in Canada.

<span class="mw-page-title-main">Robert Moses Niagara Power Plant</span> Niagara River dam in New York State

The Robert Moses Niagara Hydroelectric Power Station is a hydroelectric power station in Lewiston, New York, near Niagara Falls. Owned and operated by the New York Power Authority (NYPA), the plant diverts water from the Niagara River above Niagara Falls and returns the water into the lower portion of the river near Lake Ontario. It uses 13 generators at an installed capacity of 2,525 MW (3,386,000 hp).

<span class="mw-page-title-main">Economy of New York (state)</span> Overview of the economy of the state of New York

The economy of the State of New York is reflected in its gross state product in 2022 of $2.053 trillion, ranking third in size behind the larger states of California and Texas. If New York State were an independent nation, it would rank as the 10th largest economy in the world. However, in 2019, the multi-state, New York City-centered metropolitan statistical area produced a gross metropolitan product (GMP) of $US2.0 trillion, ranking first nationally by a wide margin and would also rank as the 10th largest GDP in the world.

<span class="mw-page-title-main">PJM Interconnection</span>

PJM Interconnection LLC (PJM) is a regional transmission organization (RTO) in the United States. It is part of the Eastern Interconnection grid operating an electric transmission system serving all or parts of Delaware, Illinois, Indiana, Kentucky, Maryland, Michigan, New Jersey, North Carolina, Ohio, Pennsylvania, Tennessee, Virginia, West Virginia, and the District of Columbia.

New York has 2,192 MW of installed wind power capacity as of 2022. Most of New York's wind power is located in upstate New York as onshore wind farms. New York has set a goal of developing 9,000 MW of offshore installed wind power capacity by 2035 that will power an estimated 6 million homes. As of October 2022, New York has five offshore wind farms in development with approximately 4,300 MW installed capacity.

<span class="mw-page-title-main">New York energy law</span>

New York energy law is the statutory, regulatory, and common law of the state of New York concerning the policy, conservation, taxation, and utilities involved in energy. Secondary sources have also influenced the law of energy in the Empire State.

<span class="mw-page-title-main">Danskammer Generating Station</span>

Danskammer Generating Station is located on the shore of the Hudson River in the Town of Newburgh, New York, United States, 0.5 miles (0.8 km) upstream of the larger oil-fired Roseton Generating Station. Danskammer 'units 1 and 2 burn natural gas as a primary fuel, and oil as a backup fuel, whereas units 3 and 4 are exclusively fired with natural gas.

<span class="mw-page-title-main">New York Public Service Commission</span>

The New York Public Service Commission is the public utilities commission of the New York state government that regulates and oversees the electric, gas, water, and telecommunication industries in New York as part of the Department of Public Service. The department's regulations are compiled in title 16 of the New York Codes, Rules and Regulations. The current chairman of the Commission and chief executive of the Department is Rory M. Christian. His term began on June 10, 2021 and runs through February 1, 2027.

Bayonne Energy Center is a power plant on Constable Hook in Bayonne, New Jersey originally built as a joint venture between Hess Corporation and ArcLight Capital Partners. it is operated by EthosEnergy.

South Fork Wind Farm is a utility-scale offshore wind farm project on the Outer Continental Shelf Offshore Rhode Island (RI) which will provide energy to New York state.

Empire Wind is a proposed utility-scale offshore wind farm on the Outer Continental Shelf Offshore New York. It will be located in Bureau of Ocean Energy Management (BOEM) lease area OCS-A 0512 in the New York Bight about 15 miles (24 km) south of Jones Beach, Long Island.

The Richard M. Flynn Power Plant is a power plant in Holtsville, in Suffolk County, on Long Island, in New York, United States. It is operated by the New York Power Authority (NYPA).

References

  1. "New York Transco". www.nytransco.com. Retrieved December 9, 2018.
  2. 1 2 "NYSPSC case no. 12-E-0503 February 24, 2016 Order". documents.dps.ny.gov. February 24, 2016. Retrieved October 31, 2018.
  3. NYSPSC case no. 12-E-0503
  4. Kaplan, Thomas (March 22, 2011). "For Cuomo and Indian Point, New Round in a Long Fight". www.nytimes.com. Retrieved December 8, 2018.
  5. 1 2 "New York "Energy Highway Plan" Forces Increase In Monthly Bills". www.engieresources.com. Retrieved December 8, 2018.
  6. 1 2 Opalka, William (March 21, 2016). "FERC OKs Settlement for NY TOTS Projects". www.rtoinsider.com. Retrieved December 8, 2018.
  7. 1 2 Linares, Corina Rivera (July 6, 2016). "New York ISO: TOTS projects placed in service in June". www.transmissionhub.com. Retrieved December 8, 2018.
  8. "NYSPSC DMM". documents.dps.ny.gov. Retrieved December 8, 2018.
  9. Opalka, William (November 11, 2015). "Settlement Reached on New York TOTS Projects". www.rtoinsider.com. RTO Insider. Retrieved November 14, 2018.
  10. "Costs for New Transmission Lines in NY Passed Through To You As of June 1st". energywatch-inc.com. Energywatch inc. Retrieved November 14, 2018.
  11. "NYPA Financial Report 2016-2017" (PDF). www.nypa.gov. December 31, 2017. pp. 20, 21, 74. Retrieved November 14, 2018.
  12. "Company Background". www.nytransco.com. Retrieved December 9, 2018.
  13. "NYSPSC AC Transmission website". www.dps.ny.gov. Retrieved December 8, 2018.
  14. "AC Transmission Upgrades - Q&A". www3.dps.ny.gov. Retrieved December 8, 2018.
  15. "CPV Achieves Commercial Operation at 680MW CPV Valley Energy Center New York". www.cpv.com. October 1, 2018. Retrieved October 31, 2018.
  16. James Nani (November 22, 2016). "Corruption Indictment Details Charges Against Former CPV Exec Ex Cuomo Aide". www.recordonline.com. Times Herald-Record. Retrieved October 31, 2018.
  17. NYSPSC DMM Case No. 13-T-0292
  18. "WPP Letter to ALJ asking for suspension of schedule". documents.dps.ny.gov. October 29, 2014. Retrieved November 13, 2018.
  19. "WPP Website". westpointproject.com. Retrieved November 13, 2018.
  20. Amy Wu (May 30, 2018). "Cricket Valley Energy Center Target 2020 Open". www.poughkeepsiejournal.com. Poughkeepsie Journal. Retrieved October 31, 2018.
  21. Troutman Sanders LLP (April 14, 2015). "Second Circuit Upholds FERC's NYISO Capacity Zone Order". troutmansandersenergyreport.com. Retrieved December 9, 2018.
  22. "FERC Approves NYISO's Proposal to Establish a New Capacity Zone". business.directenergy.com. September 17, 2013. Retrieved December 9, 2018.
  23. Walton, Robert (December 17, 2014). "NYISO: New NY capacity zone is boosting reliability". www.utilitydive.com. Retrieved December 9, 2018.
  24. Bonds News (September 26, 2013). "New York seeks delay of costly FERC power capacity zone decision". www.reuters.com. Retrieved December 9, 2018.
  25. Heidorn Jr., Rich (April 26, 2018). "NYISO Board Rejects Appeals on Capacity Votes". www.rtoinsider.com. Retrieved December 9, 2018.
  26. Addepalli, Raj (September 30, 2013). "Indian Point Contingency Proposal to NYS Senate Energy and Telecommunications Committee" (PDF). media.gractions.com. Retrieved December 9, 2018.
  27. "Seethroughny.net Payrolls "public service commission"". www.seethroughny.net. Retrieved December 9, 2018.