Company type | New York state authority |
---|---|
Industry | Power generation |
Founded | 1931 |
Founder | Franklin D. Roosevelt |
Headquarters | , United States |
Key people | Justin Driscoll – President and CEO |
Products | Electricity generation |
Owner | State of New York |
Website | nypa.gov |
The New York Power Authority (NYPA), is the largest state public power utility in the United States providing some of the lowest-cost electricity in the nation, operating 16 generating facilities and more than 1,400 circuit-miles of transmission lines. Its main administrative offices are in White Plains, New York.
NYPA uses no state tax dollars and incurs no state debt, financing its projects principally through the sale of bonds. The bonds are repaid and the projects operated using revenues from operations.
State and federal regulations determine NYPA’s customer base, which includes large and small businesses, not-for-profit organizations, public power systems and government agencies. NYPA also sells electricity to private utilities for resale (without profit) to their customers, and to neighboring states[ which? ], under federal requirements. Approximately 70 percent of the electricity it produces is clean, renewable hydropower.
The New York Power Authority has been financially responsible for the New York State Canal Corporation since April 2016 and has owned it since January 1, 2017. [1]
Justin Driscoll has been the president and CEO since July 2023 and was previously acting president and CEO. [2]
From 2011, the president and chief executive officer was Gil C. Quiniones. The executive staff report to a seven-member board. [3] In 2017, it had operating expenses of $2.335 billion, an outstanding debt of $1.305 billion, and a staffing level of 2,327 people. [4] He resigned in 2021 to be CEO of Commonwealth Edison company in Illinois. [5] [6]
Justin Driscoll was voted as acting president and CEO in 2022 [5] and automatically became president and CEO due to the New York State Senate deciding to not hold a confirmation hearing. [2]
In 2024, Sandra Bleckman was hired as the New York Power Authority's workforce development project director.
Electric power produced from NYPA's facilities – in addition to being sold to large and small businesses, not-for-profit organizations, public power systems, government agencies, private utilities for resale (without profit) to their customers, and neighboring states, under federal requirements – is sold into the wholesale electricity market of New York State, which is administered by the NYISO. One of the larger direct sales customers of electric power is the Metropolitan Transportation Authority. NYPA also provides electrical engineering consulting services to the MTA when the MTA is planning for and building new power facilities.
NYPA operates three large hydroelectric complexes: the 2,441-megawatt (MW) Niagara Power Project, on the Niagara River in Lewiston; the 800-MW St. Lawrence-Franklin D. Roosevelt Power Project, on the St. Lawrence River in Massena; and the 1,160-MW Blenheim-Gilboa Pumped Storage Power Project in the Catskill Mountain towns of North Blenheim and Gilboa.
NYPA also has four small hydro facilities with a net capability of 10-MW: the Ashokan Project in Ulster County, the Crescent Plant in Albany and Saratoga counties, the Gregory B. Jarvis Plant in Oneida County and the Vischer Ferry Plant in Schenectady and Saratoga counties.
Other generating facilities include two natural gas-fueled combined cycle power plants: the 150-MW Richard M. Flynn Power Plant, in Holtsville, Long Island and a 500-MW facility, in Astoria, Queens.
Additionally, NYPA operates ten small power plants also fueled by natural gas. Those sites – six in New York City and one in Long Island – have combined output of 460-MW. [7]
Power Plant [8] | Location | Nameplate Rating (MW) | Capacity Factor 2019 |
---|---|---|---|
Pouch | Staten Island | 47 | 12.10% |
Vernon Blvd | Queens | 94 | 4.3% |
Kent/North 1st | Brooklyn | 47 | 7.7% |
Gowanus 5-6/Joseph Seymour | Brooklyn | 94 | 9.3% |
Harlem River Yard | Bronx | 94 | 3.5% |
Hell Gate | Bronx | 94 | 3.5% |
Brentwood | Islip/Suffolk County | 47 | 13.0% |
Astoria CC 1 and 2 (Zeltmann) | Queens | 576 | 48.7% |
Flynn | Holtsville | 170 | 26.2% |
The hub of NYPA’s statewide power transmission facilities is the Frederick R. Clark Energy Center, in Marcy, New York. NYPA’s high-voltage transmission assets include a 765-kilovolt (kV) line that stretches more than 100 miles from the Canada–US border to the Clark Energy Center and almost 1,000 miles of 345-kV power lines that crisscross New York State, including the Marcy South line and a 26.3 mi (42.3 km) transmission project, that follows an underground and underwater path from Westchester County to Long Island.
The New York Power Authority has been financially responsible for the New York State Canal Corporation since April 2016 and has owned it since January 1, 2017. [1]
Then-New York Governor Roosevelt signed the Power Authority Act into law on April 27, 1931 that established the Power Authority of the State of New York (PASNY); the name was later changed to New York Power Authority (NYPA). Leland Olds headed the authority from 1931 to 1939. [9]
St. Lawrence-Franklin D. Roosevelt Power Project
The International Joint Commission granted its approval for a cross-border construction project in 1952. In 1953, the Federal Power Commission issued a license for NYPA to develop the U.S. portion of a power dam crossing the Canada–US border. On May 13, 1954, President Dwight D. Eisenhower signed legislation that cleared the way for construction of both a hydroelectric facility and the St. Lawrence Seaway. First power was achieved in July 1958, and on June 27, 1959, Queen Elizabeth II and Vice President Richard M. Nixon formally dedicated the St. Lawrence Project as a symbol of international cooperation. In 1981, NYPA’s half of the cross-border power dam was renamed the St. Lawrence-Franklin D. Roosevelt Power Project in honor of the man who founded the Power Authority half a century earlier.
Niagara Power Project
In 1956, a rockslide destroyed most of the Niagara Mohawk Power Corporation's Schoellkopf hydropower plant, resulting in a power shortage that endangered thousands of local manufacturing jobs. In response to the emergency, Congress passed the Niagara Redevelopment Act in 1957. After obtaining a license from the Federal Power Commission, Robert Moses commenced work on NYPA’s second hydroelectric generating station in early 1958. When it was completed, three years later, the Niagara Power Project was the largest facility of its kind in the Western world. In a recorded message broadcast February 10, 1961, to mark first power, President John F. Kennedy called the Niagara project “an outstanding engineering achievement” and an “example to the world of North American efficiency and determination.”
Blenheim-Gilboa Pumped Storage Power Project
Legislation signed by Governor Nelson A. Rockefeller in 1968 allowed NYPA to expand its generation assets and build nuclear and pumped storage power projects. This led to construction of the Blenheim-Gilboa Pumped Storage Power Project, which produced electricity for the first time in July 1973, and the James A. FitzPatrick Nuclear Power Plant (named after a NYPA chairman), in Scriba, Oswego County, where power was first generated in February 1975.
Francis Patrick Walsh, 1931–1939.
James Cummings Bonbright, 1939–1946. [10]
Maj.-Gen. Francis Bowditch Wilby, 1946–1950. [11]
John Edward Burton, 1950–1954. [12]
Robert Moses, 1954–1963.
James A. FitzPatrick, 1963–1977. [13]
Frederick R. Clark, 1977–1979. [14]
John Stuart Dyson, 1979–1985.
Richard M. Flynn, 1985–1994. [15]
Clarence D. Rappleyea Jr., 1995–2001.
Joseph J. Seymour, 2001–2002.
Louis P. Ciminelli, 2002–2006.
Frank S. McCullough Jr., 2006–2008.
Michael J. Townsend, 2008–2012.
John R. Koelmel, 2012.
Gil C. Quiniones, 2012–2021. [16]
Justin Driscoll, 2022–Present.
Stephentown is a town in Rensselaer County, New York, United States. The population was 2,791 at the 2020 census. The town, which was originally Jericho Hallow in the Massachusetts Bay Colony, was renamed for Stephen Van Rensselaer. The town is located in the southeastern corner of the county, and has a sign proclaiming it to be the only Stephentown on Earth.
Tidal power or tidal energy is harnessed by converting energy from tides into useful forms of power, mainly electricity using various methods.
Grand Coulee Dam is a concrete gravity dam on the Columbia River in the U.S. state of Washington, built to produce hydroelectric power and provide irrigation water. Constructed between 1933 and 1942, Grand Coulee originally had two powerhouses. The third powerhouse ("Nat"), completed in 1974 to increase energy production, makes Grand Coulee the largest power station in the United States by nameplate capacity at 6,809 MW.
Hydroelectricity, or hydroelectric power, is electricity generated from hydropower. Hydropower supplies 15% of the world's electricity, almost 4,210 TWh in 2023, which is more than all other renewable sources combined and also more than nuclear power. Hydropower can provide large amounts of low-carbon electricity on demand, making it a key element for creating secure and clean electricity supply systems. A hydroelectric power station that has a dam and reservoir is a flexible source, since the amount of electricity produced can be increased or decreased in seconds or minutes in response to varying electricity demand. Once a hydroelectric complex is constructed, it produces no direct waste, and almost always emits considerably less greenhouse gas than fossil fuel-powered energy plants. However, when constructed in lowland rainforest areas, where part of the forest is inundated, substantial amounts of greenhouse gases may be emitted.
Indian Point Energy Center (I.P.E.C.) is a now defunct three-unit nuclear power station located in Buchanan, just south of Peekskill, in Westchester County, New York. It sits on the east bank of the Hudson River, about 36 miles (58 km) north of Midtown Manhattan. The facility permanently ceased power operations on April 30, 2021. Before its closure, the station's two operating reactors generated about 2,000 megawatts (MWe) of electrical power, about 25% of New York City's usage. The station is owned by Holtec International, and consists of three permanently deactivated reactors, Indian Point Units 1, 2, and 3. Units 2 and 3 were Westinghouse pressurized water reactors. Entergy purchased Unit 3 from the New York Power Authority in 2000 and Units 1 and 2 from Consolidated Edison in 2001.
The James A. FitzPatrick (JAF) Nuclear Power Plant is located in the Town of Scriba, near Oswego, New York, on the southeast shore of Lake Ontario. The nuclear power plant has one General Electric boiling water reactor. The 900-acre (360 ha) site is also the location of two other units at the Nine Mile Point Nuclear Generating Station.
Peaking power plants, also known as peaker plants, and occasionally just "peakers", are power plants that generally run only when there is a high demand, known as peak demand, for electricity. Because they supply power only occasionally, the power supplied commands a much higher price per kilowatt hour than base load power. Peak load power plants are dispatched in combination with base load power plants, which supply a dependable and consistent amount of electricity, to meet the minimum demand.
Long Island Power Authority is a municipal subdivision of the State of New York that owns the electric transmission and electric distribution system serving all of Long Island and a portion of New York City known as the Rockaways. LIPA was originally created under the Long Island Power Act of 1985 to acquire the Long Island Lighting Company (LILCO)'s electric and natural gas infrastructure after the cancellation of the Shoreham Nuclear Power Plant. LIPA acquired LILCO's transmission system in May 1998, while the remainder of LILCO's natural gas-related infrastructure merged with Brooklyn Union Gas to form KeySpan Energy.
Sir Adam Beck Hydroelectric Generating Stations are two hydroelectric generating stations in Niagara Falls, Ontario, Canada. Sir Adam Beck Generating Station I, Sir Adam Beck Generating Station II and the Sir Adam Beck Pump Generating Station are all owned by Ontario Power Generation. Following the development of several smaller generating stations around Niagara Falls in the late 19th and early 20th centuries, the Province of Ontario authorized the construction of the first major publicly owned generating station in the province. At the time it was built, it was the largest hydroelectric generating station in the world.
The Robert Moses Niagara Hydroelectric Power Station is a hydroelectric power station in Lewiston, New York, near Niagara Falls. Owned and operated by the New York Power Authority (NYPA), the plant diverts water from the Niagara River above Niagara Falls and returns the water into the lower portion of the river near Lake Ontario. It uses 13 generators at an installed capacity of 2,525 MW (3,386,000 hp) with an average annual net generation of 15,897,000 MWh between 2014 and 2023, and a capacity factor of 71.9%.
The Blenheim–Gilboa Pumped Storage Power Station is a pumped-storage hydroelectricity plant in the Catskill Mountains of New York State. The plant is part of the New York Power Authority, and can generate over 1,100 megawatts (1,500,000 hp) of electricity. It is used daily to cover peak demand. There are two reservoirs that are involved in the project, both with a capacity of 5 billion US gallons (19,000,000 m3); one at the foot of Brown Mountain in the Schoharie Valley, and another one at the top of the mountain. The power station has an accumulated capacity of about 12,000 megawatt-hours (43,000 GJ) after storing up to 17,000 megawatt-hours (61,000 GJ).
Ontario Power Generation Inc. (OPG) is a Crown corporation and "government business enterprise" that is responsible for approximately half of the electricity generation in the province of Ontario, Canada. It is wholly owned by the government of Ontario. Sources of electricity include nuclear, hydroelectric, wind, gas and biomass. Although Ontario has an open electricity market, the provincial government, as OPG's sole shareholder, regulates the price the company receives for its electricity to be less than the market average, in an attempt to stabilize prices. Since 1 April 2008, the company's rates have been regulated by the Ontario Energy Board.
New York has 2,192 MW of installed wind power capacity as of 2022. Most of New York's wind power is located in upstate New York as onshore wind farms. New York has set a goal of developing 9,000 MW of offshore installed wind power capacity by 2035 that will power an estimated 6 million homes. As of October 2022, New York has five offshore wind farms in development with approximately 4,300 MW installed capacity.
Hydroelectricity is, as of 2019, the second-largest renewable source of energy in both generation and nominal capacity in the United States. In 2021, hydroelectric power produced 31.5% of the total renewable electricity, and 6.3% of the total U.S. electricity.
The Grand River Dam Authority (GRDA) is an agency of the state of Oklahoma created to control, develop, and maintain the Grand River waterway. It was created by the Oklahoma state legislature in 1935, and is headquartered in Tulsa, Oklahoma. GRDA was designed to be self-funding from the sales of electricity and water. The state of Oklahoma was to provide no funding from taxes. The Authority was authorized to issue revenue bonds to fund large-scale capital investments.
The New York Public Service Commission is the public utilities commission of the New York state government that regulates and oversees the electric, gas, water, and telecommunication industries in New York as part of the Department of Public Service. The department's regulations are compiled in title 16 of the New York Codes, Rules and Regulations. The current chairman of the Commission and chief executive of the Department is Rory M. Christian. His term began on June 10, 2021 and runs through February 1, 2027.
The Moses-Saunders Power Dam, short for Robert Moses-Robert H. Saunders Power Dam, is a dam on the Saint Lawrence River straddling the border between the United States and Canada. It is located between Massena in New York and Cornwall in Ontario. The dam supplies water to two adjacent hydroelectric power generating stations, the United States' 912 MW St. Lawrence-Franklin D. Roosevelt Power Project and Canada's 1,045 MW R.H. Saunders Generating Station. Constructed between 1954 and 1958 as part of the larger Saint Lawrence Seaway project, the dam created Lake St. Lawrence. Aside from providing significant amounts of renewable power, the dam regulates the St. Lawrence River and affords passage for the navigation of large vessels. Despite the enormous economic advantages to the dam, it required the relocation of 6,500 people and caused harm to the surrounding environment. Efforts have been made over the years to improve shoreline and fish habitats.
The Richard M. Flynn Power Plant is a power plant in Holtsville, in Suffolk County, on Long Island, in New York, United States. It is operated by the New York Power Authority (NYPA).