Javits Center

Last updated

Jacob K. Javits Convention Center
Javits Center - Full Front (49052081016).jpg
36th Street entrance
Javits Center
Address655 West 34th Street
Location Manhattan, New York City 10014
Coordinates 40°45′27″N74°00′09″W / 40.75750°N 74.00250°W / 40.75750; -74.00250
OperatorNew York City Convention Center Operating Corporation
BuiltJune 18, 1979 (1979-06-18) – April 2, 1986 (1986-04-02)
OpenedApril 3, 1986;37 years ago (April 3, 1986)
Renovated2006-13
Expanded2013
Former names
New York Convention and Exhibition Center
Enclosed space
  Total space3,300,000 sq ft (310,000 m2)
  Exhibit hall floor850,000 sq ft (79,000 m2)
  Breakout/meeting603,204 sq ft (56,039.5 m2)
ParkingPay parking nearby
Public transit access New York City Subway : NYCS-bull-trans-7-Std.svg NYCS-bull-trans-7d-Std.svg at 34th Street-Hudson Yards
New York City Bus: M12, M34 SBS
Website
www.javitscenter.com

The Jacob K. Javits Convention Center, commonly known as the Javits Center, is a large convention center on Eleventh Avenue between 34th Street and 38th Street in Hell's Kitchen, Manhattan, New York City. It was designed by architect James Ingo Freed of Pei Cobb Freed & Partners. The space frame structure was constructed from 1979 to 1986 and was named to honor Jacob Javits, the United States Senator for New York. [1] [2] When the Javits Center opened, it replaced the New York Coliseum at Columbus Circle as the city's major convention facility; the Coliseum was subsequently demolished and replaced by Time Warner Center.

Contents

The Javits Center is operated and maintained by the New York Convention Center Operating Corporation, a New York State public-benefit corporation. As of 2021, the Javits Center has a total interior area of 3.3 million square feet (310,000 m2). [3] It is billed as one of the busiest convention centers in the United States. [4] It has undergone expansions throughout its history, with the most recent expansion being completed in 2021 and adding 1.2 million square feet to the building. [5] Plans have also been made for the Javits Center to have panels providing solar power. [5]

Organization

The New York Convention Center Operating Corporation (NYCCOC) - not to be confused with the New York Convention Center Development Corporation ("CCDC"), which is a subsidiary of New York State Urban Development Corporation, dba Empire State Development ("ESD") - operates the Javits Center. [6] [7] NYCCOC's management team is headed by President and CEO Alan Steel. There is a 16-member board that provides guidance. [8] In 2017, NYCCOC had operating expenses of $194 million and employed 3,786 people. [9]

Use and components

Inside of Center, 2017 At New York, USA 2017 191.jpg
Inside of Center, 2017

Javits Center has hosted annual events such as the New York International Auto Show [10] the New York Comic Con, [11] and Anime NYC. In November 2016, it was the location of Hillary Clinton's 2016 United States presidential election watching venue. [12]

The complex includes a:

The Javits Center added 1.2 million square feet (110,000 m2) following a major expansion project which was completed in May 2021. This included 500,000 square feet (46,000 m2) of contiguous event space, which will help the facility attract international business conferences. [5] As of this expansion, the Javits Center has a total interior area of 3.3 million square feet (310,000 m2). [3]

Early history

Planning

The main plaza at the Javits Center HudsonYards 05-06-19-3 (47003438764).jpg
The main plaza at the Javits Center

Planning and constructing a convention center on Manhattan's west side has had a long and controversial history. [14] Proposals for a convention center to replace the New York Coliseum on Columbus Circle date to 1962, only six years after the Coliseum was completed. A new convention center over the river between 38th and 42nd Streets was included in the city's 1962 plan for the West Side waterfront. [15] Several other sites were subsequently studied, including the New York Central rail yard between Tenth and Eleventh Avenues (now known as the Eastern Rail Yard site at Hudson Yards) and the west 50s between Eighth and Ninth avenues. [16]

Eventually the Lindsay administration included a new convention center between 10th and 11th avenues in the west 40s along with an extensive redevelopment of the West Side in their 1969–70 Plan for New York City. [17] [18] Opposition to the massive residential displacement that this development project would have caused, [19] and the failure of the city to complete any replacement housing, led the State Legislature to kill the convention center proposal in 1970. The City then moved the convention center site to the Hudson River, in place of Piers 84 and 86, [20] despite the high cost of foundations and the lack of space for future expansion. That 44th Street convention center, designed by Gordon Bunshaft of Skidmore, Owings & Merrill, was approved by the Board of Estimate in 1973 despite renewed opposition from the local community. In exchange, the community received a special zoning district that offered some protection from development. [21]

However the 44th Street convention center was never built because of the city's near bankruptcy in 1975, which led instead to a search by the City and State for a less expensive site with some opportunity for expansion. Three sites were proposed — the Penn Central rail yard between 11th and 12th Avenues north of 34th Street; Battery Park City; and in the west 40s near Times Square, somewhere between 6th and 7th Avenues or 7th and 8th Avenues. The Battery Park City site was rejected because it was considered to be too far from midtown hotels. The Times Square plan, by the Regional Plan Association, was not seriously considered by the city. [22] [23]

The rail yard site was originally proposed by the local community to avoid direct residential displacement that would be caused by office and residential development associated with the convention center. [18] As an alternative to forestall the negative impacts of both, Daniel Gutman, an environmental planner working with the Clinton Planning Council, proposed that the convention center and all major development be located south of 42nd Street. [24] Their proposed convention center site — between Eleventh and Twelfth avenues from 34th to 39th streets — was later promoted by Donald Trump, who had obtained an option on the rail yard from the bankrupt Penn Central in 1975. [25] The City and State eventually chose the rail yard site. [26] Although Trump's offer to build the Convention Center was rejected, he was paid a broker's commission by Penn Central. [27]

Construction

Metal and glass building shell, 2017 Javits Center (34156219060).jpg
Metal and glass building shell, 2017

In March 1979, the New York State Legislature approved a plan to allocate $375 million toward the construction of the convention center near the Penn Central yard. [28] The next month, the architectural firm I. M. Pei and Partners was selected to build the New York Convention and Exhibition Center, as it was called at that time. [29] Immediately after the center's construction was announced, real estate prices in the area increased. Properties that previously had trouble selling suddenly had several potential buyers, spurring real estate speculation. [30] Designs for the center were revealed in December 1979. [31] In March 1980, a few squatters on the site were evicted so the site's structures could be demolished to make room for the New York Convention Center. [32] The ground-breaking ceremony for the center was held on June 18 of that year. [33] In October 1980, the MTA issued $100 million in bonds to pay for the center's construction. [34]

The New York Convention Center Development Corporation (CCDC), which was building the Convention Center, proposed building a promenade with restaurants and shops on the building's west side, facing the Hudson River shore. It would also be open year-round, as opposed to other convention centers. At the time, the presence of the Convention Center was supposed to garner $82 million in annual city and state taxes, and the events at the center would allow the city to net $832 million annually. However, a report commissioned by the CCDC found that the center's benefits to the surrounding neighborhood would be reduced due to a lack of public transit and the predominantly industrial zoning of the area. [35] Jerry Lowery was hired to find conventions to host at the New York Convention Center. By late 1981, he had booked 171 conventions for the Convention Center between mid-1984 and late 1986. [36]

The problems with the center's construction started in 1982, when it was revealed that there were difficulties in manufacturing the custom parts for the Convention Center's structure. [37] In March 1983, officials stated that the Convention Center was facing cost overruns of at least $16.8 million. [38] The next month, officials announced that the cost overruns had risen to between $25 million and $50 million, and that the center's opening had been postponed to at least 1985. In order to reduce the delay, workers were ordered to speed up construction. [39] Lowery described the delay as "disastrous" for the city, since the delays left the city vulnerable to lawsuits from the hosts of the 141 conventions that were scheduled to be hosted at the Convention Center through the end of 1985. [40]

By April 1984, the opening date had been delayed further to mid-1986. At the time, Governor Mario Cuomo stated that the center would have a new name by the time it opened. He said, "It should be reasonably utterable and easy to write. It should be a name that's going to identify it with New York as much as possible." [41] In December 1984, at Cuomo's suggestion, the CCDC officially renamed the New York Convention Center to honor former Senator Jacob K. Javits. [42] The Javits Center was topped out on December 19, 1984. [37]

The center was opened on April 3, 1986. [43] [44] [13] The opening of the Javits Center was accompanied by a five-minute ribbon-cutting ceremony. The first exhibitions to be hosted at the Javits Center were the International Fur Fair and an Art Expo of "emerging younger artists". [45] A week later, a formal ribbon-cutting was held, with Governor Cuomo, Mayor Ed Koch, and Javits's widow Marian Javits in attendance. [46]

Mafia charges

West 30th Street Heliport with the Javits Center in the background, 2009 30t-heliport.jpg
West 30th Street Heliport with the Javits Center in the background, 2009

In 1995, the Independent Review Board charged that jobs at the center had come under Mafia control. A New York Times article stated: [47]

From the day the center opened in 1986 ... Robert Rabbitt Sr. and his son Michael gave the work mainly to people with mob connections, to relatives and friends of organized-crime figures and to relatives and friends of union officers, the panel said.

The jobs at the center were reserved for members of Local 807 of the International Brotherhood of Teamsters, who were paid up to $350 a day for working on a Sunday. Other local members who work outside the center are usually paid less than $100 a day, the panel said.

The panel, the Independent Review Board, which investigates corruption in the union, reported that the Rabbitts also tried to engineer a deal that would let Robert Rabbitt control the jobs after serving a prison sentence, and would give his son $236,000 as severance pay from companies that do business at the center. [47]

Expansions

2006–2010 expansion

The Javits Center (upper center) is located between the Hudson River and the New York City Subway's 34th Street-Hudson Yards station, next to the Long Island Rail Road's West Side Yard (foreground) and 34th Street terminus of the High Line elevated park (far left). 2015. Hudson Yards Real Estate Development Update- April 16, 2015 (16992354740).jpg
The Javits Center (upper center) is located between the Hudson River and the New York City Subway's 34th Street–Hudson Yards station, next to the Long Island Rail Road's West Side Yard (foreground) and 34th Street terminus of the High Line elevated park (far left). 2015.

On October 16, 2006, a groundbreaking ceremony was held to mark the symbolic start of a $1.7 billion expansion project. The project, which would have expanded the center's size by 45 percent, was scheduled for completion by 2010. [48] Architect Richard Rogers led the design team, and Leslie E. Robertson Associates were the structural engineers. However, the physical constraints on the project site imposed by the Bloomberg administration complicated the design and caused the cost to soar to $5 billion. To address the site constraint, an alternative plan produced in 2007 by Meta Brunzema, an architect, and Daniel Gutman, an environmental planner, for the Hell's Kitchen Neighborhood Association would have expanded the Javits Center south over the Western Rail Yard, the site of the defeated West Side Stadium. Other features of the HKNA plan included an rooftop park, office and residential towers at the corners of the new exhibition hall, and conversion of Pier 76 to public use. [49] In the end, the mayor proposed rezoning the Western Rail Yard site for commercial and residential development as part of the Hudson Yards. [50]

2010-2014 renovation

In April 2008, Governor David Paterson decided to renovate the existing Javits building with a severely revised budget of $465 million. [51] The renovation, started in 2010, was led by design team FXFOWLE Epstein, whose redesign of the Javits Center's interior focused on upgrading organization and efficiency, as well as occupant comfort. The more transparent curtain wall, less opaque skylight systems, and light gray paint on the space frame have dramatically transformed the voluminous public spaces. New mechanical systems have improved the indoor air quality, reduced ambient noise, and significantly saved on energy consumption. The diamond-patterned Tuscan red terrazzo of the original floor has been replaced with soft tones of gray terrazzo. A new high-performance curtain wall has simplified and lightened the aesthetics of the original façade by changing the façade's module from 5 by 5 feet (1.5 m × 1.5 m) to 5 by 10 feet (1.5 m × 3.0 m). This allowed for the introduction of more transparent glass with minimal structurally glazed mullions. Solid stainless steel panels replaced the opaque portions of glass to better express the building's functionality. [52] The renovation was completed in November 2013. [53] [54] [55] The expansion was meant to retain old tenants coming back annually, such as the New York Boat Show. [4] In January 2014, it was revealed that the new roof was still leaking after the expansion. [56] The roof of the new expansion was turned into a 6.75 acre sedum Green roof, making it the second largest extensive green roof in the U.S. [57] The green roof was finished in 2014, and research on the rooftop after its completion has reported increased biodiversity, [58] absorption and retention of rainwater runoff, [59] and cooling. [60]

In January 2012, Governor Andrew Cuomo announced plans to construct a new convention center on the site of Aqueduct Racetrack in Queens and redevelop the Javits Center site with a mix of commercial space and apartments, similar to Battery Park City. [61] However, Cuomo's plan was quickly scuttled due to disagreements over space in the Aqueduct Racetrack area. More Javits Center renovations are being eyed, with $15 million already going toward a new telephone system and improved Wi-Fi network in the building, as well as a truck idling area to the west and south being proposed for further expansion. [4]

The newly expanded Javits Center is served by the New York City Subway 7 and <7> trains at the 34th Street–Hudson Yards station, which was built as part of the 7 Subway Extension in anticipation for the adjoining Hudson Yards Redevelopment Project. [62] The station opened on September 13, 2015. [63] The expanded Javits Center, along with the completed High Line, the new Hudson Park and Boulevard, and the subway extension, are facilitating the development of Hudson Yards. [64]

2016–2021 expansion

In January 2016, Governor Cuomo announced that Javits Center would be expanded to 3,300,000 sq ft (310,000 m2) at a cost of US$1.5 billion. [3] [65] Javits North, a "semi-permanent structure" at the north end, would be demolished and replaced by a new glass building with "meeting rooms, new exhibition halls and outdoor space". [65] 1,200,000 square feet (110,000 m2), including about 100,000 square feet (9,300 m2) of exhibition space, would be added. [66] [3] [65] The consortium chosen is made up of project manager Lend Lease Group and Turner Construction Company, a subsidiary of Hochtief which is controlled by Spanish company ACS Group. [67] [68] [69] The expansion was intended to make Javits Center a more competitive location for conventions and events compared to other cities' convention centers. There were also no hotels near Javits Center, which led some convention planners to decide against holding their events there. [70] A groundbreaking ceremony was held in March 2017. [71] [72] Initially, the expansion was scheduled to be completed in March 2021. [73]

The "Javits New York Medical Station", a field hospital set up in the Javits Center, April 2020 New York National Guard - 49738408268.jpg
The "Javits New York Medical Station", a field hospital set up in the Javits Center, April 2020

In March 2020, amid the COVID-19 pandemic in New York City, the Javits Center was adapted for use as a temporary 2,000-bed alternate care site to treat COVID-19 patients, [74] [75] [76] though the number of beds was later expanded to 2,910. [77] [78] [79] The field hospital was ultimately little-used. [80] A total of slightly under 1,100 COVID-19 patients were treated at the Javits Center. [81] The field hospital, administered by FEMA, closed in May 2020 after one surge of New York City cases passed; the few dozen patients remaining were transferred to other hospitals in the city. [82] The facilities were not completely dismantled, in case they were needed for a subsequent wave. [82] In October 2020, Linda Diaz and her band became the first musicians to perform atop the Javits Center, which they used for an NPR Tiny Desk Concert; [83] the band could not access the NPR studio in Washington, D.C., due to risk of transmission of COVID-19. [84] In 2021, the Javits Center was used as a COVID-19 mass vaccination site; on three consecutive days in March 2021, the location set a national record for number of vaccinations administered in a single day (reaching up to 14,000 people). [85] [86]

The COVID-19 pandemic had started just as the Javits Center expansion was being completed. All of the large conventions scheduled to take place between March 2020 and mid-2021 were canceled or postponed because of Javits Center's use as a field hospital and then a vaccination site. The pandemic resulted in a loss of about $200 million in expected profits. Even so, the Javits Center expansion was only delayed by two months. [70] Construction of the expansion was completed within budget on May 11, 2021. [3] [5] Plans were made to construct 3,000 solar panels on the new and existing roofs of the building as well. [5]

See also

Related Research Articles

<span class="mw-page-title-main">New York Penn Station</span> Major rail hub in New York City

Pennsylvania Station is the main intercity railroad station in New York City and the busiest transportation facility in the Western Hemisphere, serving more than 600,000 passengers per weekday as of 2019. The station is located beneath Madison Square Garden in the block bounded by Seventh and Eighth Avenues and 31st and 33rd Streets and in the James A. Farley Building, with additional exits to nearby streets, in Midtown Manhattan. It is close to several popular Manhattan locations, including Herald Square, the Empire State Building, Koreatown, and Macy's Herald Square.

<span class="mw-page-title-main">Deutsche Bank Center</span> Skyscraper in Manhattan, New York

Deutsche Bank Center is a mixed-use building on Columbus Circle in Manhattan, New York City, United States. The building occupies the western side of Columbus Circle and straddles the border between Hell's Kitchen and the Upper West Side. It was developed by The Related Companies and Apollo Global Management, and designed by David Childs and Mustafa Kemal Abadan of Skidmore, Owings & Merrill.

The Triborough Bridge and Tunnel Authority (TBTA), doing business as MTA Bridges and Tunnels, is an affiliate agency of the Metropolitan Transportation Authority that operates seven toll bridges and two tunnels in New York City. In terms of traffic volume, it is the largest bridge and tunnel toll agency in the United States, serving more than a million people each day and generating more than $1.9 billion in toll revenue annually as of 2017. As of 2018, its budget was $596 million, funded through taxes and fees.

<span class="mw-page-title-main">James A. Farley Building</span> Historic post office in Manhattan, New York

The James A. Farley Building is a mixed-use structure in Midtown Manhattan, New York City, which formerly served as the city's main United States Postal Service (USPS) branch. Designed by McKim, Mead & White in the Beaux-Arts style, the structure was built between 1911 and 1914, with an annex constructed between 1932 and 1935. The Farley Building, at 421 Eighth Avenue between 31st Street and 33rd Street in Midtown Manhattan, faces Pennsylvania Station and Madison Square Garden to the east.

<span class="mw-page-title-main">High Line</span> Linear park in New York City

The High Line is a 1.45-mile-long (2.33 km) elevated linear park, greenway, and rail trail created on a former New York Central Railroad spur on the west side of Manhattan in New York City. The High Line's design is a collaboration between James Corner Field Operations, Diller Scofidio + Renfro, and Piet Oudolf. The abandoned spur has been redesigned as a "living system" drawing from multiple disciplines which include landscape architecture, urban design, and ecology. The High Line was inspired by the 4.7 km (2.9 mi) long Coulée verte, a similar project in Paris completed in 1993.

<span class="mw-page-title-main">Hudson Yards, Manhattan</span> Neighborhood in New York City

Hudson Yards is a neighborhood on the West Side of Midtown Manhattan in New York City, bounded roughly by 30th Street in the south, 41st Street in the north, the West Side Highway in the west, and Eighth Avenue in the east. The area is the site of a large-scale redevelopment program that is being planned, funded, and constructed under a set of agreements among the State of New York, City of New York, and Metropolitan Transportation Authority (MTA), with the aim of expanding the Midtown Manhattan business district westward to the Hudson River. The program includes a major rezoning of the Far West Side, an extension of the New York City Subway's 7 and <7>​ trains to a new subway station at 34th Street and 11th Avenue, a renovation and expansion of the Javits Center, and a financing plan to fund the various components. The various components are being planned by New York City Department of City Planning and New York City Economic Development Corporation.

<span class="mw-page-title-main">Port Jefferson Branch</span> Long Island Rail Road branch

The Port Jefferson Branch is a rail line and service owned and operated by the Long Island Rail Road in the U.S. state of New York. The branch splits from the Main Line just east of Hicksville and runs northeast and east to Port Jefferson. Several stations on the Main Line west of Hicksville are served primarily by trains bound to/from the Port Jefferson branch, so LIRR maps and schedules for the public include that part of the Main Line in the "Port Jefferson Branch" service.

<span class="mw-page-title-main">New York Coliseum</span> Former convention center in New York City

The New York Coliseum was a convention center that stood at Columbus Circle in Manhattan, New York City, from 1956 to 2000. It was designed by architects Leon Levy and Lionel Levy in a modified International Style, and included both a low building with exhibition space and a 26-story office block. The project also included the construction of a housing development directly behind the complex.

<span class="mw-page-title-main">2006 New York state elections</span> 2006 elections in the state of New York

New York held various elections on November 7, 2006. Most notably, elections were held for the state governor, attorney general, comptroller, and for the U.S. Senate, all of which saw Democrats win and build on their existing majority. While Democrats had already been a strong force in the New York City area, most of the Democratic gains in 2006 occurred upstate. Former Attorney General Eliot Spitzer won the 2006 gubernatorial election by a record margin, while Andrew Cuomo replaced him as the new attorney general. Alan Hevesi was re-elected as comptroller, despite mounting ethics concerns. Hillary Clinton was re-elected to the Senate. For the first time in over 50 years, all major statewide elected offices were held by one party. For the first time in over 60 years, they were all held by Democrats.

<span class="mw-page-title-main">Industry City</span> Historic intermodal shipping, warehousing, and manufacturing complex in Brooklyn, New York

Industry City is a historic intermodal shipping, warehousing, and manufacturing complex on the Upper New York Bay waterfront in the Sunset Park neighborhood of Brooklyn, New York City. The northern portion, commonly called "Industry City" on its own, hosts commercial light manufacturing tenants across 6,000,000 square feet (560,000 m2) of space between 32nd and 41st Streets, and is operated by a private consortium. The southern portion, known as "Bush Terminal", is located between 40th and 51st Streets and is operated by the New York City Economic Development Corporation (NYCEDC) as a garment manufacturing complex.

<span class="mw-page-title-main">Brooklyn Navy Yard</span> Shipyard and industrial complex in Brooklyn, New York

The Brooklyn Navy Yard is a shipyard and industrial complex located in northwest Brooklyn in New York City, New York. The Navy Yard is located on the East River in Wallabout Bay, a semicircular bend of the river across from Corlears Hook in Manhattan. It is bounded by Navy Street to the west, Flushing Avenue to the south, Kent Avenue to the east, and the East River on the north. The site, which covers 225.15 acres (91.11 ha), is listed on the National Register of Historic Places.

<span class="mw-page-title-main">34th Street–Hudson Yards station</span> New York City Subway station in Manhattan

The 34th Street–Hudson Yards station is a New York City Subway station in Manhattan's West Side on the IRT Flushing Line, and is the western terminus for the 7 local and <7> express services. It has two tracks and one island platform, with two levels of mezzanines: one directly above the platform and the other directly below street level. The station directly serves the Hudson Yards mega-development above it, and is located within the greater Hudson Yards neighborhood. The station contains two entrances along Hudson Boulevard: a primary entrance south of 34th Street, and a secondary entrance south of 35th Street.

<span class="mw-page-title-main">The Shed (arts center)</span> Cultural center in New York City

The Shed is a cultural center in Hudson Yards, Manhattan, New York City. Opened on April 5, 2019, the Shed commissions, produces, and presents a wide range of activities in performing arts, visual arts, and pop culture.

<span class="mw-page-title-main">32 Old Slip</span> Office skyscraper in Manhattan, New York

32 Old Slip, also known as One Financial Square, is a skyscraper in the Financial District of Lower Manhattan in New York City. Completed in 1987, the building has 36 floors and stands at 575 ft 0 in (175.26 m). 32 Old Slip was designed by the firm of Edward Durell Stone Associates for developer Howard Ronson and his firm HRO International. It is home to various office tenants, including a Convene convention center and the New York Regional Office of the United States Census Bureau. The ground floor houses the New York City Fire Department (FDNY) Engine Company 4 and Ladder Company 15.

<span class="mw-page-title-main">Ted Weiss Federal Building</span> Office skyscraper in Manhattan, New York

The Ted Weiss Federal Building, also known as the Foley Square Federal Building, is a 34-story United States Federal Building at 290 Broadway in the Civic Center neighborhood of Lower Manhattan in New York City. Opened in 1994, the building was developed by Linpro New York Realty and designed by Hellmuth Obata & Kassabaum (HOK), with Raquel Ramati Associates as the design consultant and Tishman Construction as the general contractor. The building is named for Ted Weiss (1927–1992), a U.S. representative from New York.

Anime NYC is an annual three-day anime convention held during August at the Jacob K. Javits Convention Center in New York City.

<span class="mw-page-title-main">Hudson Yards (development)</span> Development project in Manhattan, New York

Hudson Yards is a 28-acre (11 ha) real estate development in the Hudson Yards neighborhood in Manhattan, New York City, between the Chelsea and Hell's Kitchen neighborhoods. It is located on the waterfront of the Hudson River. Upon completion, 13 of the 16 planned structures on the West Side of Midtown South would sit on a platform built over the West Side Yard, a storage yard for Long Island Rail Road trains. The first of its two phases, opened in 2019, comprises a public green space and eight structures that contain residences, a hotel, office buildings, a mall, and a cultural facility. The second phase, on which construction had not started as of 2023, will include residential space, an office building, and a school.

<span class="mw-page-title-main">Moynihan Train Hall</span> Expansion of New York Penn Station (opened 2021)

Moynihan Train Hall is an expansion of Pennsylvania Station, the main intercity and commuter rail station in New York City, into the city's former main post office building, the James A. Farley Building. Located between Eighth Avenue, Ninth Avenue, 31st Street, and 33rd Street in Midtown Manhattan, the annex provides new access to most of Penn Station's platforms for Amtrak and Long Island Rail Road passengers, serving 17 of the station's 21 tracks. The hall is named after Daniel Patrick Moynihan, the U.S. senator who had originally championed the plan. The building's Beaux-Arts exterior resembles that of the original Penn Station; both buildings were designed by the architectural firm of McKim, Mead & White.

<span class="mw-page-title-main">Saks Fifth Avenue flagship store</span> Department store flagship in Manhattan, New York

The Saks Fifth Avenue flagship store is a department store in Midtown Manhattan, New York City on Fifth Avenue between 49th and 50th Streets. The original 10-story structure at 611 Fifth Avenue has served as the flagship store of Saks Fifth Avenue since its completion in 1924. The store also occupies part of 623 Fifth Avenue, a 36-story tower completed in 1990.

The following is a timeline of the COVID-19 pandemic in New York City.

References

  1. Purnick, Joyce (June 18, 1980). "Carey, Koch Join Forces To Celebrate New Center". The New York Times. Archived from the original on February 22, 2020. Retrieved January 6, 2012.
  2. Gottlieb, Martin (April 4, 1986). "Javits Center Bustles on Opening Day". The New York Times. Archived from the original on June 13, 2018. Retrieved January 6, 2012.
  3. 1 2 3 4 5 Clukey, Keshia (May 11, 2021). "Cuomo Says $1.5 Billion Javits Center Expansion Is Complete". Bloomberg.com. Archived from the original on May 12, 2021. Retrieved May 12, 2021.
  4. 1 2 3 "Javits Center expansion revisited". Crain's New York Business. September 27, 2013. Archived from the original on October 27, 2020. Retrieved September 10, 2014.
  5. 1 2 3 4 5 "Gov. Cuomo announces construction completion of $1.5 billion Javits Center expansion". WABC-TV. May 11, 2021. Archived from the original on May 11, 2021. Retrieved May 11, 2021.
  6. "ESD description of NYCCDC". June 22, 2017. Archived from the original on November 7, 2018. Retrieved November 6, 2018.
  7. "Javits Center description". Archived from the original on May 10, 2021. Retrieved November 6, 2018.
  8. "Javit's Center Governance page". Archived from the original on July 2, 2018. Retrieved November 6, 2018.
  9. "NYSABO 2018 Report" (PDF). pp. 16, 44. Archived (PDF) from the original on November 5, 2018. Retrieved November 6, 2018.
  10. "Car News - Latest Auto News, First Looks and First Drives". Edmunds. Archived from the original on February 23, 2021. Retrieved March 24, 2020.
  11. Colangelo, Lisa L. (October 2, 2019). "New York Comic Con taking over Javits Center this weekend". amNewYork. Archived from the original on March 24, 2020. Retrieved March 24, 2020.
  12. Gardner, Chris (November 7, 2016). "5 Things to Know About Javits Center, Hillary Clinton's Election Night Venue". The Hollywood Reporter . Archived from the original on August 17, 2021. Retrieved August 17, 2021.
  13. 1 2 "Jacob K. Javits Convention Center and Plaza". Pei Cobb Freed & Partners Architects LLP. Archived from the original on May 3, 2011. Retrieved May 21, 2011.
  14. "Convention site called a danger; West Side Group Will Sue on Ground of Pollution Environmental Study". The New York Times . No. 3624331. August 22, 1973. p. 56. Archived from the original on February 15, 2018. Retrieved January 4, 2012.
  15. Horne, George (April 26, 1963). "670-Million, 40-Year Waterfront Plan To Alter West Side Is Urged by Mayor; Convention Center, Docks and Housing Would Be Built". The New York Times. Archived from the original on July 23, 2018. Retrieved July 25, 2018.
  16. King, Seth S. (February 10, 1967). "CONVENTION HALL WEIGHED BY CITY; Two Studies of Needs and Facilities Are Ordered". The New York Times. Archived from the original on July 23, 2018. Retrieved July 26, 2018.
  17. Burks, Edward C. (March 25, 1970). "New Exhibit Hall Planned Here". The New York Times. Archived from the original on April 8, 2023. Retrieved July 26, 2018.
  18. 1 2 Stern, Michael (December 8, 1970). "6TH AND LAST PART OF MASTER PLAN ON CITY RELEASED; Volume on Manhattan Urges Building of Offices Along 48th St. Transit Line WESTWARD PATTERN SET Condemnation of Big Tracts Intended to Insure Public Use of Some of Area". The New York Times. Archived from the original on November 7, 2017. Retrieved September 20, 2015.
  19. Blumenthal, Ralph (March 7, 1972). "ELLIOTT ASSAILED AT PLAN HEARING; Clinton-Chelsea Residents Denounce Proposals". The New York Times. Archived from the original on April 8, 2023. Retrieved July 25, 2018.
  20. Burks, Edward C. (February 24, 1971). "City Planning Convention Center". The New York Times. Archived from the original on April 8, 2023. Retrieved February 9, 2017.
  21. Fowler, Glenn (November 22, 1974). "CITY IS LIMITING CLINTON BUILDING; Board of Estimate Enacts Special Zoning Controls on Runaway Development". The New York Times. Archived from the original on October 2, 2017. Retrieved September 20, 2015.
  22. Oser, Alan S. (June 9, 1976). "About Real Estate; Some Urge Convention Center in Midtown". The New York Times. Archived from the original on July 23, 2018. Retrieved July 22, 2018.
  23. Fowler, Glenn (November 23, 1977). "Panel Recommends Convention Center Near 34th on River". New York Times. Archived from the original on July 23, 2018. Retrieved July 26, 2018.
  24. Darnton, John (February 14, 1973). "Convention Center Model Unveiled Here With Pride; A Dissenting View". The New York Times. Archived from the original on November 7, 2017. Retrieved September 20, 2015.
  25. "Developer Proposes a Convention Center in Midtown". The New York Times. December 18, 1975. Archived from the original on November 7, 2017. Retrieved September 20, 2015.
  26. Kaiser, Charles (April 29, 1978). "Convention Site At West 34th St. Chosen by Koch; He and Carey Outline Plans for Center". The New York Times. Archived from the original on October 2, 2017. Retrieved September 20, 2015.
  27. Bender, Marilyn (August 7, 1983). "The Empire and Ego of Donald Trump". The New York Times. Archived from the original on June 16, 2016. Retrieved December 9, 2017.
  28. Goldman, Aril (March 30, 1979). "Legislature Votes Convention Center for New York City". The New York Times. ISSN   0362-4331. Archived from the original on February 15, 2018. Retrieved February 14, 2018.
  29. McFadden, Robert D. (April 22, 1979). "I. M. Pei Will Design Convention Center". The New York Times. ISSN   0362-4331. Archived from the original on February 15, 2018. Retrieved February 14, 2018.
  30. Barron, James (June 3, 1979). "In Convention Center Area, Hopeful Sellers Lift Prices". The New York Times. ISSN   0362-4331. Archived from the original on June 15, 2018. Retrieved February 14, 2018.
  31. "ARCHITECTURE VIEW; Redeveloping New York". The New York Times. December 23, 1979. ISSN   0362-4331. Archived from the original on January 17, 2022. Retrieved February 14, 2018.
  32. "ARCHITECTURE VIEW; Redeveloping New York" (PDF). The New York Times. December 23, 1979. ISSN   0362-4331 . Retrieved February 14, 2018.
  33. "Carey, Koch Join Forces To Celebrate New Center; Carey, Mayor At Ceremonies Of New Center" (PDF). The New York Times. June 18, 1980. ISSN   0362-4331 . Retrieved February 14, 2018.
  34. Andelman, David A. (October 18, 1980). "Bonding to Build Convention Hall Gains Approval; M.T.A. Officials Override Objection on Guarantee Legislature Created Corporation 'An Open Process' M.T.A Approves a Bond Issue for Convention Hall" (PDF). The New York Times. ISSN   0362-4331 . Retrieved February 14, 2018.
  35. Fleetwood, Blake (January 7, 1981). "New Convention Center Will House Shops, Too". The New York Times. ISSN   0362-4331. Archived from the original on February 19, 2018. Retrieved February 18, 2018.
  36. Dickenson, Ernest (November 29, 1981). "In Selling Conventions, It's Better to Be No.1". The New York Times. ISSN   0362-4331. Archived from the original on February 19, 2018. Retrieved February 18, 2018.
  37. 1 2 Gottlieb, Martin (December 20, 1984). "Javits Center: 2 Views; Convention Project to Bring Benefits, but Its Unmet Goals Leave Questions". The New York Times. ISSN   0362-4331. Archived from the original on February 19, 2018. Retrieved February 18, 2018.
  38. Raab, Selwyn (March 7, 1983). "Convention Site Faces Overruns of $16 Million". The New York Times. ISSN   0362-4331. Archived from the original on February 19, 2018. Retrieved February 18, 2018.
  39. Gottlieb, Martin (April 5, 1983). "Officials Hoping for Faster Work on Meeting Hall". The New York Times. ISSN   0362-4331. Archived from the original on February 19, 2018. Retrieved February 18, 2018.
  40. Oreskes, Michael (March 31, 1983). "Booker for City Convention Center Sees Delays as Economic Disaster". The New York Times. ISSN   0362-4331. Archived from the original on February 19, 2018. Retrieved February 18, 2018.
  41. Gottlieb, Martin (April 25, 1984). "Convention Site: New Name?". The New York Times. ISSN   0362-4331. Archived from the original on February 19, 2018. Retrieved February 18, 2018.
  42. Gottlieb, Martin (December 13, 1984). "Search for a Name New York's New Convention Center Ends in 'javits'". The New York Times. ISSN   0362-4331. Archived from the original on February 19, 2018. Retrieved February 18, 2018.
  43. Gottlieb, Martin (April 3, 1986). "Javits Hall Is Poised to Exhibit". The New York Times. ISSN   0362-4331. Archived from the original on February 15, 2018. Retrieved February 14, 2018.
  44. "Javits Convention Center". GreatBuildings. Archived from the original on June 29, 2020. Retrieved September 10, 2014.
  45. Gottlieb, Martin (April 4, 1986). "Javits Center Bustles on Opening Day". The New York Times. ISSN   0362-4331. Archived from the original on June 13, 2018. Retrieved February 14, 2018.
  46. Heller Anderson, Susan; Bird, David (April 10, 1986). "NEW YORK DAY BY DAY; Ribbons at Javits Center". The New York Times. ISSN   0362-4331. Archived from the original on May 24, 2015. Retrieved February 18, 2018.
  47. 1 2 Raab, Selwyn (May 4, 1995). "Panel Says Mob's Friends Got Teamster Jobs at Javits Center". The New York Times . Archived from the original on May 24, 2013. Retrieved January 4, 2012.
  48. "Final Scoping Document No. 7 Subway Extension -- Hudson Yards Rezoning and Development Program CEQR No. 03DCP031M Draft Generic Environmental Impact Statement (DGEIS)" (PDF). nyc.gov . New York City Department of City Planning. 2003. Archived from the original (PDF) on March 4, 2016. Retrieved November 1, 2015.
  49. "HKNA plan" (PDF). Archived (PDF) from the original on February 8, 2017. Retrieved August 27, 2014.
  50. Moss, Mitchell L. (November 2011). "How New York City Won the Olympics" (PDF). Rudin Center for Transportation Policy and Management, Robert F. Wagner Graduate School of Public Service. New York University. Archived (PDF) from the original on September 26, 2015. Retrieved September 11, 2015.
  51. Brown, Elliot (April 2, 2008). "Javits Renovation Plan Doesn't Go the Way of Client 9". The New York Observer. Archived from the original on May 23, 2011. Retrieved January 6, 2012.
  52. "Jacob K. Javits Convention Center Renovation and Expansion". ENR New York. June 1, 2010. Archived from the original on January 8, 2011. Retrieved September 10, 2014.
  53. Wimberly, Rachel (November 12, 2013). "New York's Javits Center Completes 110,000 Square Foot Expansion, $465 Million Renovation". TSNN Trade Show News. Archived from the original on November 11, 2018. Retrieved September 10, 2014.
  54. Hasek, Glenn (November 13, 2013). "Javits Convention Center Celebrates Renovation, Expansion, New Green Roof". Green Lodging News. Archived from the original on November 12, 2018. Retrieved September 10, 2014.
  55. Tishman Construction (November 15, 2013). "First look: Jacob K. Javits Convention Center renovation and expansion [slideshow]". Building Design + Construction. Archived from the original on October 22, 2020. Retrieved September 10, 2014.
  56. Buiso, Gary (January 26, 2014). "Javits Center roof continues to leak despite $465M fix - New York Post". New York Post. Archived from the original on September 15, 2014. Retrieved September 10, 2014.
  57. Marshall, Rebecca; Scalfani, Tony (2017). "Greening America's Convention Center" (PDF). Javits Center. Retrieved March 3, 2024.
  58. Partridge, Dustin R.; Parkins, Kaitlyn L.; Elbin, Susan B.; Clark, J. Alan (March 2020). "Bat Activity Correlates with Moth Abundance on an Urban Green Roof". Northeastern Naturalist. 27 (1): 77–89. doi:10.1656/045.027.0107. ISSN   1092-6194.
  59. Abualfaraj, Noura; Cataldo, Joseph; Elborolosy, Yara; Fagan, Daniel; Woerdeman, Sloane; Carson, Tyler; Montalto, Franco A. (November 2018). "Monitoring and Modeling the Long-Term Rainfall-Runoff Response of the Jacob K. Javits Center Green Roof". Water. 10 (11): 1494. doi: 10.3390/w10111494 . ISSN   2073-4441.
  60. Smalls-Mantey, Lauren; Montalto, Franco (June 2021). "The seasonal microclimate trends of a large scale extensive green roof". Building and Environment. 197: 107792. Bibcode:2021BuEnv.19707792S. doi: 10.1016/j.buildenv.2021.107792 . ISSN   0360-1323.
  61. Lovett, Kenneth (January 4, 2012). "Cuomo Administration Inks Agreement with Developer to Build Convention Center at Aqueduct Racetrack". Daily News. New York. Archived from the original on January 9, 2012. Retrieved January 5, 2012.
  62. Marino, Vivian (May 6, 2014). "Alan Steel - The 30-Minute Interview". The New York Times. Archived from the original on May 13, 2014. Retrieved September 10, 2014.
  63. Tangel, Andrew (August 28, 2015). "At Last: New Station for 7 Train Set to Open". WSJ. Archived from the original on September 6, 2015. Retrieved September 10, 2015.
  64. Geiger, Daniel (October 6, 2013). "Hudson Yards' lucky No. 7". Crains New York Business . Archived from the original on March 28, 2017. Retrieved August 27, 2014.
  65. 1 2 3 Bagli, Charles V. (January 7, 2016). "Cuomo Announces $1 Billion Expansion for Javits Center". The New York Times. Archived from the original on July 13, 2020. Retrieved February 7, 2016.
  66. Young, Michael (June 25, 2020). "Jacob K. Javits Center's $1.5B Expansion Progresses in Hudson Yards". New York YIMBY. Archived from the original on April 19, 2021. Retrieved April 19, 2021.
  67. "ACS ampliará por 1.400 millones el mayor centro de convenciones en Nueva York". Expansión (in Spanish). EFE. February 8, 2017. Archived from the original on February 7, 2017. Retrieved February 8, 2017.
  68. Rosenberg, Zoe (January 31, 2017). "Javits Center's $1.5B expansion now has a design team". Curbed NY. Archived from the original on February 11, 2017. Retrieved February 8, 2017.
  69. "State taps Lendlease, Turner Construction for Javits expansion". The Real Deal. January 31, 2017. Archived from the original on February 6, 2017. Retrieved February 8, 2017.
  70. 1 2 McGeehan, Patrick (April 19, 2021). "New York Spent $1.5 Billion on Its Convention Center. Will Anyone Come?". The New York Times. ISSN   0362-4331. Archived from the original on April 19, 2021. Retrieved April 19, 2021.
  71. Warerkar, Tanay (March 2, 2017). "Javits Center's $1B expansion gets new renderings, breaks ground". Curbed NY. Archived from the original on April 19, 2021. Retrieved April 19, 2021.
  72. Slowey, Kim (March 3, 2017). "$1.5B NYC Javits Center expansion breaks ground". Construction Dive. Archived from the original on April 19, 2021. Retrieved April 19, 2021.
  73. Porpora, Tracey (December 8, 2019). "Cuomo: $1.5B expansion of the Javits Center to be complete by March 2021". Staten Island Advance. Archived from the original on April 19, 2021. Retrieved April 19, 2021.
  74. "New York City's Javits Center transforming into field hospital for coronavirus patients". CBS News. March 30, 2020. Archived from the original on April 12, 2020. Retrieved March 24, 2020.
  75. Slattery, Denis; Guse, Clayton (March 23, 2020). "Javits Center begins transformation into coronavirus medical complex". Daily News. New York. Archived from the original on April 10, 2020. Retrieved March 24, 2020.
  76. Konig, Joseph; Hogan, Bernadette; Feis, Aaron (March 23, 2020). "Cuomo previews the Javits Center's overhaul into a coronavirus hospital complex". New York Post. Archived from the original on March 24, 2020. Retrieved March 24, 2020.
  77. Myers, Meghann (March 27, 2020). "The Army Corps of Engineers has two or three weeks to get thousands of new hospital beds up and running". Military Times. Archived from the original on March 30, 2020. Retrieved March 30, 2020.
  78. Martinez, Luis (March 27, 2020). "Army helps make temporary hospital at New York's Javits Center one of the largest in the country". ABC News. Archived from the original on March 29, 2020. Retrieved March 30, 2020.
  79. Yuan, Jada (April 4, 2020). "Inside the Javits Center: New York's militarized, makeshift hospital". The Washington Post. Archived from the original on April 5, 2020. Retrieved April 6, 2020.
  80. Sisak, Michael R. (April 29, 2020). "Many field hospitals went largely unused, will be shut down". Associated Press. Archived from the original on December 1, 2020. Retrieved March 17, 2021.
  81. "Coronavirus News: Javits Center in NYC to close temporary hospital next week". WABC-TV. April 28, 2020. Archived from the original on April 16, 2021. Retrieved March 17, 2021.
  82. 1 2 Hickman, Matt (May 4, 2020). "Pop-up coronavirus hospitals begin to wind down operations". The Architect's Newspaper. Archived from the original on November 28, 2020. Retrieved March 17, 2021.
  83. Boilen, Bob; Carter, Bobby; Frame, Kara; Rogosin, Josh; Smith, Morgan Noelle; Stern, Maia (December 29, 2020). "Tiny Desk Staffers Pick Their Favorite Tiny Desk (Home) Concerts". NPR. Archived from the original on April 18, 2023. Retrieved May 7, 2023.
  84. Rose, Jordan (March 12, 2021). "NPR's Reimagined 'Tiny Desk' Concert Series Is a Home Run During COVID". Variety. Archived from the original on August 13, 2022. Retrieved May 7, 2023.
  85. "Javits Center Vaccine Site Scales Back 24/7 Service". Spectrum News NY1 . March 14, 2021. Archived from the original on March 16, 2021. Retrieved March 17, 2021.
  86. Lenthang, Marlene (March 6, 2021). "New York City's Javits Center offering COVID-19 vaccinations 24/7". ABC News. Archived from the original on March 18, 2021. Retrieved March 17, 2021.
Preceded by Venues of the
NFL Draft

2005
Succeeded by