10th Avenue station (IRT Flushing Line)

Last updated

 10 Avenue
 
Planned New York City Subway station
YOtel W42 10Av jeh.jpg
The Yotel and MiMA at 42nd Street, near the location of one of the planned station's proposed entrances
Station statistics
Address 41st Street & 10th Avenue
New York, NY 10036
Borough Manhattan
Locale Hell's Kitchen
Coordinates 40°45′32″N73°59′46″W / 40.759°N 73.996°W / 40.759; -73.996
Division A (IRT) [1]
Line     IRT Flushing Line
ServicesNone; unbuilt
StructureUnderground
Tracks2
Other information
OpenedProposed
Location
NYCS map blank.svg
Map pointer.svg
USA New York City location map.svg
Map pointer.svg
USA New York location map.svg
Map pointer.svg
Street map

10th Avenue station (IRT Flushing Line)

Station service legend
SymbolDescription
NYCS-SSI-alltimes.svg Stops in station at all times
NYCS-SSI-allexceptnights.svg Stops all times except late nights
NYCS-SSI-nightsonly.svg Stops late nights only
NYCS-SSI-nightsweekends.svg Stops late nights and weekends only
NYCS-SSI-weekdaysonly.svg Stops weekdays during the day
NYCS-SSI-weekendsonly.svg Stops weekends during the day
NYCS-SSI-allexceptrush.svg Stops all times except rush hours in the peak direction
NYCS-SSI-allexceptrush.svg Stops all times except weekdays in the peak direction
NYCS-SSI-allexceptrush.svg Stops all times except nights and rush hours in the peak direction
NYCS-SSI-rushonly.svg Stops rush hours only
NYCS-SSI-rushpeak.svg Stops rush hours in the peak direction only
NYCS-SSI-closed.svg Station is closed
(Details about time periods)

10th Avenue is a proposed station, first planned as part of the 7 Subway Extension for the IRT Flushing Line ( 7 and <7> trains) of the New York City Subway. It would be located at 10th Avenue and 41st Street and have two tracks and two side platforms if built. Under the original 2007 plan, there would be one street-level entrance for each direction, and no crossovers or crossunders to allow free transfer between directions.

Contents

The station was not built due to a lack of funding, but it could be completed if funding became available to build it. Various development proposals since 2009 have included completion of the station.

Initial plans

Construction of the station was planned as part of the Hudson Yards Redevelopment Project, and construction was deemed possible as demand in the area grew. [2] It was originally planned to be constructed as part of the 7 Subway Extension. [3] The station would originally have had two exits from the eastbound platform to 40th Street—one at Hudson Boulevard and one east of 10th Avenue—and one from the westbound platform to 42nd Street east of 10th Avenue. [4] Among the proponents is former deputy mayor Dan Doctoroff, who stated in 2015 that building the 10th Avenue station would boost development for decades. [5]

A $450 million option to build a shell for the station was included as part of the October 2007 contract, requiring action by the city within nine months to have a shell built as part of the initial contract. Reports in late December 2007 indicated that the postponed station might be partially built, should the City of New York and the MTA come to terms on the additional financing for the station shell. [6] As of October 2007, the city had no plans to fund the station; however, it could still be built if $550 million was raised privately to build the station. [2] [7] Construction of the station was estimated to have cost at least $450 million as of 2013. [8] [9]

In February 2009, the MTA announced that it would build the station if the agency received sufficient funds from the federal economic stimulus package. [10] Otherwise, the station would be cut to keep costs under budget, as the 7 Subway Extension was already costing $2.4 billion. [11]

Developers and local residents created a petition to construct the shell, fearing that the opportunity for a station would be lost once tunnel excavation was completed. In June 2010, the city announced it was seeking funding to assess the feasibility of constructing the station at a later date, using a two-platform, two-entrance model without an underground connecting passage. This type of station, while common in Manhattan, is not considered ideal by the MTA, but would nonetheless be acceptable were funding eventually found. [12] [13] [14] [15] The planned entrances would still be located two blocks apart due to the location's depth—with the westbound entrance on 42nd Street and the eastbound entrance on 40th Street—but the new plan only called for one exit in each direction. [16] New York City Mayor Michael Bloomberg stated that he hoped that the station would be built in the future, with several others saying that building it would be "still possible". [16] [7]

Further proposals

Construction of the line proceeded to its completion in 2014 without the station or its shell, which would have been between the Times Square and 34th Street–Hudson Yards stations. The only evidence of the station's planned existence is the flattening out of the tunnel walls near where the station would have been. [17] [18] Building the "previously deferred No. 7 station at 10th Avenue" was a "key design element" of the proposed extension of the 7 service to Secaucus, New Jersey, but plans for that extension were later abandoned. [19]

In January 2016, the New York City Economic Development Corporation released a request for proposal (RFP) for a site of a proposed development at 41st Street and Tenth Avenue. [20] [21] As part of that RFP, a study into the station's feasibility was to be conducted. [22] The new station is projected to cost $1 billion, an increase from the previous estimate of $500 million. The new station could provide better access to a new Port Authority Bus Terminal if a connection was provided. [23] In the Port Authority's 2016 design competition for a replacement Port Authority Bus Terminal west of Times Square, most of the announced finalists included the construction of, and direct access into, the Tenth Avenue station in their design plans. [24]

In January 2021, developer Gotham Organization filed permits for a 47-story skyscraper to be built at 41st Street and 10th Avenue, near where the station's entrance would have been. The 2016 RFP for the station had been conducted for that skyscraper's construction. [25] [26] That June, New York City Council candidate Erik Bottcher proposed completing the station during his candidacy. [27] Elected officials again pushed for the station's construction in August 2022. [28] [29] The MTA's 20-year needs assessment, released in October 2023, included a possible new station at 10th Avenue; [30] [31] by then, the MTA predicted that the station could cost $1.9 billion. [32]

Related Research Articles

<span class="mw-page-title-main">Hell's Kitchen, Manhattan</span> Neighborhood in New York City

Hell's Kitchen, also known as Clinton, is a neighborhood on the West Side of Midtown Manhattan in New York City, United States. It is considered to be bordered by 34th Street to the south, 59th Street to the north, Eighth Avenue to the east, and the Hudson River to the west.

<span class="mw-page-title-main">Proposed expansion of the New York City Subway</span>

Since the opening of the original New York City Subway line in 1904, and throughout the subway's history, various official and planning agencies have proposed numerous extensions to the subway system. The first major expansion of the subway system was the Dual Contracts, a set of agreements between the City of New York and the IRT and the BRT. The system was expanded into the outer reaches of the Bronx, Brooklyn, and Queens, and it provided for the construction of important lines in Manhattan. This one expansion of the system provided for a majority of today's system.

<span class="mw-page-title-main">23rd Street station (IRT Lexington Avenue Line)</span> New York City Subway station in Manhattan

The 23rd Street station is a local station on the IRT Lexington Avenue Line of the New York City Subway. Located at the intersection of Park Avenue South and 23rd Street in Gramercy Park and Flatiron District, Manhattan, it is served by 6 trains at all times, <6> trains during weekdays in the peak direction, and 4 trains during late night hours.

<span class="mw-page-title-main">Times Square–42nd Street station</span> New York City Subway station complex in Manhattan

The Times Square–42nd Street station is a major New York City Subway station complex located under Times Square, at the intersection of 42nd Street, Seventh Avenue, and Broadway, in Midtown Manhattan. The complex allows free transfers between the IRT 42nd Street Shuttle, the BMT Broadway Line, the IRT Broadway–Seventh Avenue Line and the IRT Flushing Line, as well as to the IND Eighth Avenue Line one block west at 42nd Street–Port Authority Bus Terminal. The complex is served by the 1, 2, 3, 7, N and Q trains at all times, the W train during weekdays; the R and 42nd Street Shuttle (S) trains at all times except late nights; and ⟨7⟩ trains during rush hours in the peak direction. A free passageway from the shuttle platform to the 42nd Street–Bryant Park/Fifth Avenue station, served by the 7, <7>​​, B, ​D, ​F, <F>, and ​M trains, is open during the day from 6 a.m. to 12 a.m.

<span class="mw-page-title-main">Flushing–Main Street station (IRT Flushing Line)</span> New York City Subway station in Queens

The Flushing–Main Street station is the eastern terminal on the IRT Flushing Line of the New York City Subway, located at Main Street and Roosevelt Avenue in Downtown Flushing, Queens. It is served by the 7 local train at all times and the <7> express train during rush hours in the peak direction.

<span class="mw-page-title-main">New York City Subway stations</span> Rapid transit system in New York City

The New York City Subway is a rapid transit system that serves four of the five boroughs of New York City, New York: the Bronx, Brooklyn, Manhattan, and Queens. Its operator is the New York City Transit Authority, which is itself controlled by the Metropolitan Transportation Authority of New York. In 2015, an average of 5.65 million passengers used the system daily, making it the busiest rapid transit system in the United States and the 11th busiest in the world.

The IRT Flushing Line is a rapid transit route of the New York City Subway system, named for its eastern terminal in Flushing, Queens. It is operated as part of the A Division. The Interborough Rapid Transit Company (IRT), a private operator, had constructed the section of the line from Flushing, Queens, to Times Square, Manhattan between 1915 and 1928. A western extension was opened to Hudson Yards in western Manhattan in 2015, and the line now stretches from Flushing to Chelsea, Manhattan. It carries trains of the 7 local service, as well as the express <7> during rush hours in the peak direction. It is the only currently operational IRT line to serve Queens.

<span class="mw-page-title-main">Grand Central–42nd Street station</span> New York City Subway station complex in Manhattan

The Grand Central–42nd Street station is a major station complex of the New York City Subway. Located in Midtown Manhattan at 42nd Street between Madison and Lexington Avenues, it serves trains on the IRT Lexington Avenue Line, the IRT Flushing Line and the 42nd Street Shuttle. The complex is served by the 4, 6, and 7 trains at all times; the 5 and 42nd Street Shuttle (S) trains at all times except late nights; the <6> train during weekdays in the peak direction; and the <7> train during rush hours and early evenings in the peak direction.

<span class="mw-page-title-main">Sutphin Boulevard–Archer Avenue–JFK Airport station</span> New York City Subway station in Queens

The Sutphin Boulevard–Archer Avenue–JFK Airport station is a two-level station on the IND and BMT Archer Avenue Lines of the New York City Subway. It is located at the intersection of Sutphin Boulevard and Archer Avenue in Jamaica, Queens. It is served by the E and J trains at all times, as well as the Z train during rush hours in the peak direction. This station has four tracks and two island platforms, with two platform levels: E trains stop on the upper level while J/Z trains stop on the lower level.

<span class="mw-page-title-main">Tenth Avenue (Manhattan)</span> North-south avenue in Manhattan, New York

Tenth Avenue, known as Amsterdam Avenue between 59th Street and 193rd Street, is a north-south thoroughfare on the West Side of Manhattan in New York City. It carries uptown (northbound) traffic as far as West 110th Street, after which it continues as a two-way street.

<span class="mw-page-title-main">34th Street–Penn Station (IRT Broadway–Seventh Avenue Line)</span> New York City Subway station in Manhattan

34th Street–Penn Station is an express station on the IRT Broadway–Seventh Avenue Line of the New York City Subway. Located at the intersection of 34th Street and Seventh Avenue, it is served by the 1 and 2 trains at all times, and the 3 train at all times except late nights. Connections are available to the LIRR, NJ Transit and Amtrak at Pennsylvania Station.

<span class="mw-page-title-main">Hudson Yards, Manhattan</span> Neighborhood of Manhattan in New York City

Hudson Yards is a neighborhood on the West Side of Midtown Manhattan in New York City, bounded roughly by 30th Street in the south, 41st Street in the north, the West Side Highway in the west, and Eighth Avenue in the east. The area is the site of a large-scale redevelopment program that is being planned, funded, and constructed under a set of agreements among the State of New York, City of New York, and Metropolitan Transportation Authority (MTA), with the aim of expanding the Midtown Manhattan business district westward to the Hudson River. The program includes a major rezoning of the Far West Side, an extension of the New York City Subway's 7 and <7>​ trains to a new subway station at 34th Street and 11th Avenue, a renovation and expansion of the Javits Center, and a financing plan to fund the various components. The various components are being planned by New York City Department of City Planning and New York City Economic Development Corporation.

The 7 Subway Extension is a subway extension of the New York City Subway's IRT Flushing Line, which is served by the 7 local and <7> express services. The extension stretches 1.5 miles (2.4 km) southwest from its previous terminus at Times Square, at Seventh Avenue and 41st Street, to one new station at 34th Street and Eleventh Avenue. A second station at 10th Avenue and 41st Street was dropped from the plans in October 2007. The entirety of the extension is located within the New York City borough of Manhattan. The extension, a key part of the Hudson Yards Redevelopment Project, is expected to bring business and entertainment into the area, as well as aid redevelopment of nearby Chelsea and Hell's Kitchen, located around the Long Island Rail Road's West Side Yard. The extension also serves the nearby Jacob K. Javits Convention Center.

<span class="mw-page-title-main">Fulton Center</span> Transit center and mall in Manhattan, New York

Fulton Center is a subway and retail complex centered at the intersection of Fulton Street and Broadway in Lower Manhattan, New York City. The complex was built as part of a $1.4 billion project by the Metropolitan Transportation Authority (MTA), a public agency of the state of New York, to rehabilitate the New York City Subway's Fulton Street station. The work involved constructing new underground passageways and access points into the complex, renovating the constituent stations, and erecting a large station building that doubles as a part of the Westfield World Trade Center mall.

<span class="mw-page-title-main">42nd Street–Bryant Park/Fifth Avenue station</span> New York City Subway station complex in Manhattan

The 42nd Street–Bryant Park/Fifth Avenue station is an underground New York City Subway station complex, consisting of stations on the IRT Flushing Line and IND Sixth Avenue Line. Located at 42nd Street between Fifth Avenue and Sixth Avenue in Manhattan, it is served by the 7, D and F trains at all times, the B and M trains on weekdays, and the ⟨7⟩ and ⟨F⟩ trains during rush hours in the peak direction. A free passageway from the IND platforms to the Times Square–42nd Street/Port Authority Bus Terminal station, served by the 1, ​2, ​3​, 7, <7>​​, ​A​, ​C​, ​E​, N, ​Q, ​R, ​W​, and S trains is open during the day from 6 a.m. to 12 a.m.

<span class="mw-page-title-main">86th Street station (Second Avenue Subway)</span> New York City Subway station in Manhattan

The 86th Street station is a station on the first phase of the Second Avenue Line of the New York City Subway. Located at the intersection of Second Avenue and 86th Street, in the Yorkville section of the Upper East Side in Manhattan, it opened on January 1, 2017. The station is served by the Q train at all times, limited southbound rush hour N trains, and one northbound A.M. rush hour R train. There are two tracks and an island platform.

<span class="mw-page-title-main">Jay Street–MetroTech station</span> New York City Subway station complex in Brooklyn

The Jay Street–MetroTech station is a New York City Subway station complex on the IND Fulton Street, IND Culver, and BMT Fourth Avenue lines. The complex is located in the vicinity of MetroTech Center in Downtown Brooklyn. It is served by the A, F, and R trains at all times; the C train at all times except late nights; the N train during late nights only; and a few rush-hour W and <F> trains in the peak direction.

<span class="mw-page-title-main">34th Street–Hudson Yards station</span> New York City Subway station in Manhattan

The 34th Street–Hudson Yards station is a New York City Subway station in Manhattan's West Side on the IRT Flushing Line, and is the western terminus for the 7 local and <7> express services. It has two tracks and one island platform, with two levels of mezzanines: one directly above the platform and the other directly below street level. The station directly serves the Hudson Yards mega-development above it, and is located within the greater Hudson Yards neighborhood. The station contains two entrances along Hudson Boulevard: a primary entrance south of 34th Street, and a secondary entrance south of 35th Street.

<span class="mw-page-title-main">Hudson Park and Boulevard</span> Street and park in Manhattan, New York

Hudson Park and Boulevard is a greenway and boulevard in Hell's Kitchen, Manhattan in New York City, being built as part of the Hudson Yards Redevelopment Project. It lies between 10th and 11th Avenues. The park, officially called Bella Abzug Park, is located in the median of the boulevard, which consists of two one-way roads that run parallel to each other.

<span class="mw-page-title-main">Technology of the New York City Subway</span>

Since the late 20th century, the Metropolitan Transportation Authority has started several projects to maintain and improve the New York City Subway. Some of these projects, such as subway line automation, proposed platform screen doors, the FASTRACK maintenance program, and infrastructural improvements proposed in 2015–2019 Capital Program, contribute toward improving the system's efficiency. Others, such as train-arrival "countdown clocks", "Help Point" station intercoms, "On the Go! Travel Station" passenger kiosks, wireless and cellular network connections in stations, MetroCard fare payment alternatives, and digital ads, are meant to benefit individual passengers. Yet others, including the various methods of subway construction, do not directly impact the passenger interface, but are used to make subway operations efficient.

References

  1. "Glossary". Second Avenue Subway Supplemental Draft Environmental Impact Statement (SDEIS) (PDF). Vol. 1. Metropolitan Transportation Authority. March 4, 2003. pp. 1–2. Archived from the original (PDF) on February 26, 2021. Retrieved January 1, 2021.
  2. 1 2 "No. 7 Subway Extension - Hudson Yards Development Corporation". Hydc.org. February 16, 2011. Archived from the original on February 9, 2015. Retrieved May 14, 2014.
  3. Neuman, William (September 19, 2008). "No. 7 Extension Won't Include 10th Ave. Station". City Room. The New York Times. Retrieved April 16, 2014.
  4. "NO. 7 SUBWAY EXTENSION-HUDSON YARDS REZONING AND DEVELOPMENT PROGRAM" (PDF). nyc.gov. Archived from the original (PDF) on March 4, 2016. Retrieved September 26, 2015.
  5. Doctoroff, Daniel L.; Meola, Michael N. (September 13, 2015). "Next station stop: 42nd Street!". NY Daily News. Retrieved September 14, 2015.
  6. Naanes, Marlene (December 20, 2007). "7 Line Extension May Get 41st Street Stop". amNewYork . Archived from the original on May 13, 2009. Retrieved February 28, 2010.
  7. 1 2 Saul, Michael Howard (June 30, 2010). "New Hope for Tenth Avenue Station on the No. 7 Subway Extension". The Wall Street Journal. Retrieved July 26, 2013.
  8. Smith, Stephen J. (October 2, 2013). "The Next 20 Years for New York's MTA – Next City". Nextcity.org. Retrieved May 14, 2014.
  9. "MTA Twenty-Year Capital Needs Assessment 2015-2034" (PDF). Metropolitan Transportation Authority. October 2013.
  10. Kabak, Benjamin (February 2, 2009). "Will the Stimulus Save 7 Extension Stop?". Second Ave. Sagas. Retrieved February 28, 2010.
  11. "Readers Write: MTA plays tricks to hide cost of No. 7 line". The Island Now. September 10, 2015. Archived from the original on March 4, 2016. Retrieved September 12, 2015.
  12. Agovino, Theresa (February 16, 2010). "Outcry Emerges for 41st St. Stop on New 7-Line". Crain's New York Business . Archived from the original on February 18, 2010. Retrieved April 3, 2010.
  13. Urban, Jill (April 2, 2010). "West Side Developers Fight For 7 Line Extension". NY1 . Archived from the original on April 17, 2010. Retrieved April 3, 2010.
  14. "City Officials Seek Federal Assistance For 7 Subway Extension". NY1 . April 27, 2010. Archived from the original on May 31, 2010. Retrieved April 27, 2010.
  15. "City Considering 10th Avenue Stop For 7 Train". NY1 . June 10, 2010. Archived from the original on September 27, 2012. Retrieved June 10, 2010.
  16. 1 2 "Mayor Applies For Funds To Redesign 7 Train Extension". NY1 . June 30, 2010. Archived from the original on July 14, 2011. Retrieved June 30, 2010.
  17. MTA.info—Video Release: Mayor Bloomberg Rides First 7 Train to 34 St - 12/20/2013 on YouTube. Retrieved May 27, 2014. (The tunnel wall flattens out between approximately 2:58 and 3:11 into the video.)
  18. Video inside the 7 extension Second Avenue Sagas.com
  19. Parsons Brinckerhoff (April 2013). No 7 Secaucus Extension Feasibility Analysis Final Report (PDF) (Report). NYCEDC. p. 1. Archived from the original (PDF) on November 5, 2013. Retrieved February 19, 2014.
  20. Rajamani, Maya (April 4, 2016). "MTA Revives Plans for 10th Avenue Station on 7 Line". DNAinfo New York. Archived from the original on November 10, 2017. Retrieved June 8, 2021.
  21. Plitt, Amy (January 27, 2016). "City Seeking Proposals For Huge Midtown West Mixed-Use Site". Curbed NY. Retrieved January 29, 2016.
  22. "HELL'S KITCHEN AT TENTH" (PDF). Archived from the original (PDF) on February 2, 2016. Retrieved January 29, 2016.
  23. Plitt, Amy (April 4, 2016). "MTA May Be Reconsidering a 7 Line Station at Tenth Avenue". Curbed NY. Retrieved April 4, 2016.
  24. Port Authority of NY and NJ webpage (2016). "International Design + Delivery Competition" . Retrieved September 27, 2016.
  25. Londono, Vanessa (January 28, 2021). "Gotham Files Permits for 47-Story Skyscraper at 550 Tenth Avenue in Hudson Yards, Manhattan". New York YIMBY. Retrieved June 8, 2021.
  26. Garber, Nick (January 25, 2021). "Permits Filed For 47-Story Tower In Hell's Kitchen". Midtown-Hell's Kitchen, NY Patch. Retrieved June 8, 2021.
  27. Garber, Nick (June 7, 2021). "Hells Kitchen Candidate Wants To Revive Proposed 7 Train Station". Midtown-Hell's Kitchen, NY Patch. Retrieved June 8, 2021.
  28. Duggan, Kevin (August 10, 2022). "Manhattan pols revive push for 10th Avenue station on No. 7 train in Hell's Kitchen". amNewYork. Retrieved October 6, 2023.
  29. Rahmanan, Anna (August 10, 2022). "Could Hell's Kitchen finally get a new subway station? Officials are pushing for it". Time Out New York. Retrieved October 6, 2023.
  30. Spielman, Ralph (October 5, 2023). "MTA's 20 Yr Plan Warns That to Ignore Needs Puts Very Survival of NYC At Risk". www.ourtownny.com. Retrieved October 6, 2023.
  31. Kramer, Marcia (October 5, 2023). "MTA: New York City could be crippled if transit infrastructure isn't upgraded soon". CBS New York. Retrieved October 6, 2023.
  32. Kaske, Michelle (October 4, 2023). "MTA Unveils a Plan to Fix NYC's Aging Transit System". Bloomberg.com. Retrieved October 6, 2023.