USNS Henry Eckford (T-AO-192) (left) and USNS Benjamin Isherwood (T-AO-191) preparing for long-term storage. | |
History | |
---|---|
United States | |
Name | USNS Henry Eckford |
Namesake | Henry Eckford (1775–1832), naval architect and shipbuilder |
Awarded | 6 May 1985 |
Builder | Pennsylvania Shipbuilding Company, Chester, Pennsylvania, and Tampa Shipbuilding Company, Tampa, Florida |
Laid down | 22 January 1987 |
Launched | 22 July 1989 |
In service | Never |
Stricken | 10 November 1997 |
Identification | IMO number: 8508888 |
Fate |
|
General characteristics | |
Class and type | Henry J. Kaiser-class replenishment oiler |
Type | Fleet replenishment oiler |
Tonnage | 31,200 deadweight tons |
Displacement |
|
Length | 677 ft (206 m) |
Beam | 97 ft 5 in (29.69 m) |
Draft | 35 ft (11 m) maximum |
Installed power |
|
Propulsion | Two medium-speed Colt-Pielstick PC4-2/2 10V-570 diesel engines, twin shafts, controllable-pitch propellers |
Speed | 20 knots (37 km/h; 23 mph) |
Capacity |
|
Complement | 103 (18 civilian officers, 1 U.S. Navy officer, 64 merchant seamen, 20 U.S. Navy enlisted personnel) |
Armament |
|
Aircraft carried | None |
Aviation facilities | Helicopter landing platform |
Notes |
|
USNS Henry Eckford (T-AO-192) was a Henry J. Kaiser-class fleet replenishment oiler of the United States Navy. She was never completed.
Henry Eckford, the sixth Henry J. Kaiser-class ship, was laid down by the Pennsylvania Shipbuilding Company in Chester, Pennsylvania, on 22 January 1987. Her construction encountered numerous problems. Although she was launched on 22 July 1989, her construction contract with Pennsylvania Shipbuilding was cancelled on 31 August 1989. Along with her unfinished sister ship USNS Benjamin Isherwood (T-AO-191), the incomplete Henry Eckford was towed to the Philadelphia Naval Shipyard in Philadelphia on 27 October 1989 for lay-up.
A new contract was awarded on 16 November 1989 to the Tampa Shipbuilding Company of Tampa, Florida, to complete Henry Eckford, and she was towed from Philadelphia to Tampa. However, construction problems continued, and that contract also was canceled, on 15 August 1993, when the ship was 84 percent complete. Cost overruns had run into the millions of U.S. dollars.
The Navy decided that completion of Henry Eckford as an oiler was no longer necessary, and considered converting her into an ammunition ship, but the conversion was found to be cost-prohibitive. Instead, the nearly complete Henry Eckford was turned over to the Maritime Administration and towed up the James River in Virginia, where she remained in reserve in the National Defense Reserve Fleet as part of the United States Navy's James River Reserve Fleet at Lee Hall, Virginia. She was struck from the Navy List on 10 November 1997, and her title was transferred to the Maritime Administration on 2 February 1998. She and Benjamin Isherwood were the only units of the 18-ship Henry J. Kaiser class not to be completed.
On 19 July 2011, Henry Eckford departed for Brownsville, Texas, to be recycled by International Shipbreaking Limited.
USS Ponchatoula (AO-148) was one of six Neosho-class fleet oilers built for the United States Navy, in service from 1956 to 1992, and named for the Ponchatoula Creek which rises in Tangipahoa Parish, Louisiana, and flows into the Natalbany River, west of Ponchatoula, Louisiana. She was the second U.S. Naval vessel to bear the name.
Henry Eckford may refer to:
The Henry J. Kaiser class is an American class of eighteen fleet replenishment oilers which began construction in August 1984. The class comprises fifteen oilers which are operated by Military Sealift Command to provide underway replenishment of fuel to United States Navy combat ships and jet fuel for aircraft aboard aircraft carriers at sea.
USNS John Ericsson (T-AO-194) is a Henry J. Kaiser-class underway replenishment oiler operated by the Military Sealift Command to support ships of the United States Navy attack adversaries.
USNS Petrolite (T-AO-164) was a Suamico-class T2 tanker laid down on 12 October 1943 under Maritime Commission contract. The ship was built at Sun Shipbuilding and Drydock Co. in Chester, Pennsylvania. Launched on 13 January 1944; the ship was delivered to the United States Navy at Philadelphia Naval Shipyard on 31 January 1944.
USNS Joshua Humphreys (T-AO-188) is a Henry J. Kaiser-class replenishment oiler of the United States Navy. She was named for Joshua Humphreys, who designed the six original US Navy frigates. She entered service in 1987 and was placed in reserve just nine years later, but has twice been brought out of reserve and as of 2015 is once more on active duty.
USS Pawcatuck (AO-108) was a T3 Ashtabula class replenishment oiler tanker that served in the U.S. Navy from 1946 to 1975, then transferred to the Military Sealift Command to continue in non-commissioned service with a civilian crew as United States Naval Ship USNS Pawcatuck (T-AO-108). She was the only United States Navy ship to bear the name Pawcatuck.
USNS Kanawha (T-AO-196) is a Henry J. Kaiser-class fleet replenishment oiler of the United States Navy in non-commissioned service in the Military Sealift Command.
USNS Benjamin Isherwood (T-AO-191) was a Henry J. Kaiser class fleet replenishment oiler of the United States Navy. She was never completed.
USNS Henry J. Kaiser (T-AO-187) is a United States Navy fleet replenishment oiler and the lead ship of her class. Her mission is to resupply U.S. Navy and allied ships at sea with fuel oil, jet fuel, lubricating oil, potable water, and dry and refrigerated goods, including food and mail.
USNS Andrew J. Higgins (T-AO-190) was a Henry J. Kaiser-class oiler of the United States Navy which saw active service from 1987 to 1996. Sold to Chile in 2009, she was commissioned as Almirante Montt in the Chilean Navy in 2010.
USNS Walter S. Diehl (T-AO-193) is a Henry J. Kaiser-class replenishment oiler of the United States Navy. She was named after Captain Walter Stuart Diehl, USN, a career naval officer and aeronautical engineer.
USNS Big Horn (T-AO-198) is a Henry J. Kaiser-class replenishment oiler of the United States Navy.
USNS Patuxent (T-AO-201) is a Henry J. Kaiser-class underway replenishment oiler operated by the Military Sealift Command to support ships of the United States Navy.
USNS Laramie (T-AO-203) is a Henry J. Kaiser-class underway replenishment oiler operated by the Military Sealift Command to support ships of the United States Navy.
USNS John Lewis (T-AO-205) is a United States Navy replenishment oiler and the lead ship of her class. She is part of the Military Sealift Command fleet of support ships.
The John Lewis class is a class of fleet replenishment oilers which began construction in September 2018. The class will comprise twenty oilers which will be operated by Military Sealift Command to provide underway replenishment of fuel and limited amounts of dry cargo to United States Navy carrier strike groups, amphibious ready groups, and other surface forces, to allow them to operate worldwide.
USNS Earl Warren (T-AO-207) is the third of the John Lewis-class of underway replenishment oilers, operated by the Military Sealift Command (MSC) to support ships of the United States Navy.