USS Sculpin (SSN-590)

Last updated

USS Sculpin;0859003.jpg
History
Flag of the United States.svgUnited States
NameUSS Sculpin
Ordered18 January 1957
Builder Ingalls Shipbuilding
Laid down3 February 1958
Launched31 March 1960
Commissioned1 June 1961
Decommissioned3 August 1990
Stricken30 August 1990
Motto"Videte eos prius" - "See 'em first"
FateEntered the Submarine Recycling Program on 1 October 2000
General characteristics
Class and type Skipjack-class submarine
Displacement
  • 2,830 long tons (2,880 t) surfaced
  • 3,500 long tons (3,600 t) submerged
Length251 ft 8 in (76.71 m)
Beam32 ft (9.8 m)
Draft28 ft (8.5 m)
Propulsion
  • 1 × S5W reactor
  • 2 × Westinghouse steam turbines, 15,000 shp (11 MW)
  • 1 shaft
Speed
  • 15 knots (17 mph; 28 km/h) surfaced
  • More than 30 knots (35 mph; 56 km/h) submerged
Test depth700 ft (210 m)
Complement118
Sensors and
processing systems
  • BPS-12 radar
  • BQR-21 sonar
  • BQR-2 passive sonar
  • BQS-4 (modified) active/passive sonar
Armament6 × 21 in (530 mm) torpedo tubes

USS Sculpin (SSN-590), a Skipjack-class nuclear-powered submarine, was the second ship of the United States Navy to be named for the sculpin.

Contents

Construction and commissioning

Sculpin′s keel was laid down on 3 February 1958 by Ingalls Shipbuilding in Pascagoula, Mississippi. She was launched on 31 March 1960, sponsored by Mrs. Fred Connaway, widow of Commander Fred Connaway, who was killed while commanding the first USS Sculpin (SS-191) during World War II, and commissioned on 1 June 1961 with Commander C. N. Mitchell in command.

Operational history

1960s

Sculpin departed Pascagoula on 8 June for her designated home port, San Diego, California. Following her arrival there, she began a period of shakedown training. In July, she held special trials and tests in the Puget Sound area and then returned to San Diego for type training. In August, Sculpin cruised to Pearl Harbor for two weeks before returning to San Diego. She operated off the West Coast before entering the Mare Island Naval Shipyard for post-shakedown availability in October. This was completed in late March 1962, and Sculpin returned to her home port.

Following training operations, in early May she deployed for the western pacific visiting Pearl Harbor and then continued her special operations in the western Pacific, upon completing operations visited Naha, Okinawa and Pearl Harbor returning to San Diego in August. The nuclear submarine participated in local training operations, ordnance evaluation projects, and fleet exercises until entering the Mare Island Naval Shipyard in early January 1963 for a hull survey. Sculpin returned to San Diego at the end of the month, conducted type training for two months and, on 29 March, got underway for a dependents' cruise. The submarine returned to Mare Island in April for restricted availability and remained there until August when she returned to San Diego and commenced local operations. She was the first submarine leaving Mare Island after the Thresher Disaster.

Sculpin was in Pearl Harbor, in early December, en route to the western Pacific, when defective piping forced her to sail back to Mare Island for repairs. She returned to San Diego on 25 February 1964, and operated from that port until early April. On 8 April, Sculpin sailed for duty with the Seventh Fleet. Prior to reporting, she made port calls at Pearl Harbor, Sydney, and Subic Bay. For the remainder of her deployment, Sculpin operated in and out of Subic Bay, and Naha, Okinawa, with the Seventh Fleet. She returned to her home port on 20 October 1964 and was awarded the Navy Unit Commendation for her deployment. Operations and exercises along the west coast, from San Diego to Bangor, Washington, occupied the submarine for the next 25 months.

On 27 November 1966, Sculpin stood out of San Diego for Naha and another tour with the Seventh Fleet. She returned to her home port on 11 May 1967 and began conducting local operations. The submarine had an extended training cruise from 27 July to 26 October and, on 11 November, gave a demonstration dive for President of the United States Lyndon B. Johnson.

On 31 December, Sculpin was notified that she was due for drydock and overhaul at Puget Sound, and she sailed for that destination on 2 January 1968. This was Sculpin's first major overhaul and refueling since commissioning, seven years before, and she was in drydock from 30 January 1968 to 22 January 1969. Sea trials and training lasted until 26 July when she sailed to Pearl Harbor on a shakedown training cruise. She returned to the West Coast on 22 August and began an upkeep period at San Diego which lasted until 8 September. The submarine operated along the California coast until 6 February 1970 when she got underway for Pearl Harbor and deployment to the western Pacific.

1970s

Sculpin sailed from Pearl Harbor on 21 February and entered Buckner Bay, Okinawa, on 6 March. She also visited Subic Bay, Hong Kong, and Yokosuka before returning to San Diego on 21 August. She conducted local operations until 4 January 1971 when she began a three-month restricted availability period at Mare Island. The yard work was completed on 16 April, and the submarine returned to San Diego. The only interruption of her schedule came in October when she sailed to Puget Sound to have her bottom sand blasted and painted.

Sculpin returned to San Diego on 13 November 1971 and began preparing for a secret deployment to track gun smuggling trawlers in the South China Sea. The deployment began on 5 January 1972 and on 10 April 1972 Sculpin lay in wait south of the Chinese island of Hainan. After having spotted its target the Sculpin followed the smugglers for 2,500 miles to the Southern coasts of South Vietnam, where on 24 April a South Vietnamese destroyer escort under the direction of Sculpin sank the Chinese trawler. With its mission a success the Sculpin returned to port on 24 July. [1]

She was berthed at San Diego for the remainder of the year, with only 15 days being spent at sea.

On 2 February 1973, Sculpin entered the Mare Island Naval Shipyard for a three-month restricted availability. After leaving the yard in May, the submarine operated along the Pacific coast under the command of Captain James Joseph Pistotnik, until 12 November when it arrived at San Diego and began preparing for a deployment in early January 1974. Sculpin sailed from San Diego on 7 January for Pearl Harbor and the western Pacific on an extended cruise.

In 1975 the Sculpin entered drydock for a refueling overhaul in Bremerton, Washington and following completion of the overhaul, she returned to San Diego.

Most of 1977 was spent doing weekly operations out of San Diego and recovering from the overhaul that was completed in the early part of that year. At the completion of one such operation Sculpin had returned and tied up to the tender, and was broadsided by the USS Snook SSN 592 while Snook was trying to tie up next to Sculpin. Snook suffered damage to her bow tube outer doors and had to spend the next 6 weeks in drydock for repairs, forcing Sculpin back to sea to pick up Snook's operating schedule.

Sculpin participated in the RIMPAC exercise during April and May 1978, which included port call in Pearl Harbor. In June 1978, Sculpin left San Diego and headied south. She traversed the Panama Canal on the 2nd of July, followed by a memorable port call at Willemstad, Curaçao. From there she continued North to her new home port, Groton, Connecticut. During the fall of that year, she participated in the Northern Wedding Exercises with a stop at Holy Loch Scotland for repairs. The ship returned to Groton for the Holiday Season and the crew got their first taste of Winter in New England.

In February 1979 the boat left Groton for operations in the Mediterranean.

History from 1974 to 1981 needed.

In 1982 the boat completed a non-refueling overhaul in Mare Island Naval Shipyard. During sea trails, it experienced severe angles while completing a crashback maneuver while submerged. It recovered and made its way to San Diego, then went to its home port in Groton, Ct. (Subron 2) via the Panama Canal. After shakedowns and short cruises in 1983, in 1984 Sculpin served in the Mediterranean performing picket duty between Syria and the USS New Jersey as the New Jersey shelled Lebanon (a consequence of the 1983 bombing of the Marine barracks in Beirut.

' ' History from 1985 to 1990 needed. ' '

Decommissioning

Sculpin was decommissioned on 3 August 1990 and stricken from the Naval Vessel Register on 30 August 1990. Her final Captain was Cmdr. J. B. Allen. Sculpin was decommissioned at Newport News Naval Shipyard with ceremonies occurring at Norfolk Naval Base prior to the shipyard event. ex-Sculpin entered the Nuclear Powered Ship and Submarine Recycling Program in Bremerton, Washington, on 1 October 2000 and on 30 October 2001 ceased to exist.

Related Research Articles

USS <i>Arnold J. Isbell</i> Gearing-class destroyer

USS Arnold J. Isbell (DD-869), a Gearing-class destroyer, was the only ship of the United States Navy to be named for Arnold J. Isbell, an aircraft carrier captain during World War II. The ship was laid down on 14 March 1945 at Staten Island, New York, by Bethlehem Mariners Harbor, launched on 6 August 1945 and commissioned on 5 January 1946. Constructed too late to see action in World War II, the vessel initially served as a training ship with the United States Atlantic Fleet, before transferring to the Pacific and deploying to Korea during the Korean War and off the Vietnam coast during the Vietnam War. In 1972 Arnold J. Isbell was made part of the reserve training fleet and in 1974, sold to Greece where the ship was renamed Satchouris and served with the Hellenic Navy until being sold for scrap in 2002.

USS <i>Blueback</i> (SS-581) Submarine of the United States

USS Blueback (SS-581) is a Barbel-class submarine that served in the United States Navy from 1959 to 1990, and subsequently was made into an exhibit at the Oregon Museum of Science and Industry. She was the second Navy submarine to bear the name.

USS <i>Theodore Roosevelt</i> (SSBN-600) George Washington-class submarine

USS Theodore Roosevelt (SSBN-600), a George Washington-class submarine, was the second ship of the United States Navy to be named for President Theodore Roosevelt (1858–1919). Initially unnamed and assigned hull classification symbol SSGN-600 as a guided missile submarine, her keel was laid down on 20 May 1958 by the Mare Island Naval Shipyard using components initially assembled for the Skipjack-class submarine nuclear attack submarine USS Scamp (SSN-588). She was named Theodore Roosevelt and redesignated fleet ballistic missile submarine SSBN-600 on 6 November 1958, launched on 3 October 1959, sponsored by Alice Roosevelt Longworth, daughter of Theodore Roosevelt and widow of Nicholas Longworth III, and commissioned on 13 February 1961 with Commander William E. Sims commanding the Blue Crew and Commander Oliver H. Perry, Jr. commanding the Gold Crew.

USS <i>Abraham Lincoln</i> (SSBN-602) George Washington class fleet ballistic missile submarine

USS Abraham Lincoln (SSBN-602), a George Washington-class fleet ballistic missile submarine, was the first ship of the United States Navy to be named for Abraham Lincoln (1809–1865), the 16th President of the United States (1861–1865).

USS <i>Sailfish</i> (SSR-572) Submarine of the United States

USS Sailfish (SSR/SS/AGSS-572), the lead ship of her class of submarine, was the second ship of the United States Navy to be named for the sailfish, a large gamefish inhabiting tropical seas, related to the swordfish, but possessing scales and a large sail-like dorsal fin.

USS <i>Salmon</i> (SSR-573) Navy to be named for the salmon

USS Salmon (SSR/SS/AGSS-573), a Sailfish-class submarine, was the third ship of the United States Navy to be named for the salmon.

USS <i>Tang</i> (SS-563) American submarine

USS Tang (SS/AGSS-563), the lead ship of her class was the second ship of the United States Navy to be named for the tang.

USS <i>Omaha</i> (SSN-692) Los Angeles-class nuclear-powered attack submarine of the US Navy

USS Omaha (SSN-692), a Los Angeles-class submarine, was the third ship of the United States Navy to be named for Omaha, Nebraska. The contract to build her was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut on 31 January 1971 and her keel was laid down on 27 January 1973. She was launched on 21 February 1976 sponsored by Mrs. Victoria Kuncl Hruska, wife of Senator Roman L. Hruska, and commissioned on 11 March 1978.

USS <i>Wahoo</i> (SS-565) Submarine of the United States

USS Wahoo (SS-565), a Tang-class submarine, was the second ship of the United States Navy to be named for the wahoo, a dark blue food fish of Florida and the West Indies.

USS <i>Scamp</i> (SSN-588) Submarine of the United States

USS Scamp (SSN-588), a Skipjack-class nuclear-powered submarine, was the second ship of the United States Navy to be named for the scamp, a member of the fish family Serranidae.

USS <i>Snook</i> (SSN-592) Submarine of the United States

USS Snook (SSN-592), a Skipjack-class submarine, was the second ship of the United States Navy to be named for the common snook, an Atlantic marine fish that is bluish-gray above and silvery below a black lateral line.

USS <i>Barb</i> (SSN-596) Submarine of the United States

USS Barb (SSN-596), a Permit-class attack submarine, was the second ship of the United States Navy to be named for the barb, a kingfish of the Atlantic coast.

USS <i>Tautog</i> (SSN-639) Submarine of the United States

USS Tautog (SSN-639), a Sturgeon-class attack submarine, was the second ship of the United States Navy to be named for the Tautog, a wrasse commonly found along the Northern Atlantic coast. The submarine was in service from 17 August 1968 to 31 March 1997.

USS <i>Aspro</i> (SSN-648) Submarine of the United States

USS Aspro (SSN-648) was a Sturgeon-class submarine launched in 1969 and decommissioned in 1995. Scrapping was completed in 2000.

USS <i>Drum</i> (SSN-677) Submarine of the United States

USS Drum (SSN-677), a Sturgeon-class attack submarine, was the second ship of the United States Navy to be named for the drum, also known as the croaker or hardhead, any of various fishes of the Sciaenidae family, capable of making a drumming noise and best known on the Atlantic coast of North America.

USS <i>Archerfish</i> (SS-311) American World War 2 submarine

USS Archerfish (SS/AGSS-311) was a Balao-class submarine. She was the first ship of the United States Navy to be named for the archerfish. Archerfish is best known for sinking the Japanese aircraft carrier Shinano in November 1944, the largest warship ever sunk by a submarine. For this achievement, she received a Presidential Unit Citation after World War II.

USS <i>Bream</i> Submarine of the United States

USS Bream (SS/SSK/AGSS-243), a Gato-class submarine, was the first ship of the United States Navy to be named for the bream. She served during World War II, and her war operations extended from 1 June 1944 to 15 June 1945. During this period she completed six war patrols operating in the Java Sea, Celebes Sea, Sulu Sea, South China Sea, and Gulf of Siam. She sank two Japanese merchant ships totaling 6,934 gross register tons. In addition, Bream shared with the submarines USS Ray (SS-271) and USS Guitarro (SS-363) the destruction of a 6,806-gross register ton passenger-cargo ship. On 23 October 1944, while patrolling off western Luzon, Bream made a daring surface attack on a Japanese naval force, damaging the heavy cruiser Aoba.

USS <i>Greenfish</i> (SS-351) Submarine of the United States

USS Greenfish (SS-351) was a Balao-class submarine of the United States Navy. It was named for the greenfish.

USS <i>Agerholm</i> Gearing-class destroyer

USS Agerholm (DD-826) was a Gearing-class destroyer of the United States Navy. She was the only ship named for Harold Crist Agerholm, a Private First Class (Pfc.) in the 2nd Marine Division of the United States Marine Corps. He was killed during the assault on Saipan, and posthumously awarded the Medal of Honor.

USS <i>Fulton</i> (AS-11) Tender of the United States Navy

USS Fulton (AS-11) was the leader of her class of seven submarine tenders, launched on 27 December 1940 by Mare Island Navy Yard and sponsored by Mrs. A. T. Sutcliffe, great-granddaughter of Robert Fulton. Fulton was commissioned on 12 September 1941.

References

  1. Larson, Admiral Charles R. "The Sculpin's Lost Mission: A Nuclear Submarine in the Vietnam War". Naval History Magazine. US Naval Institute. Retrieved 10 April 2017.