Bijapur Airport

Last updated

Vijayapura Airport
Summary
OwnerInfrastructure Development Department, Government of Karnataka
ServesVijayapura
Location Madabhavi, Bijapur
Coordinates 16°50′50.3″N75°48′42.9″E / 16.847306°N 75.811917°E / 16.847306; 75.811917 (Bijapur Airport)
Map
India Karnataka relief map.svg
Airplane silhouette.svg
Vijayapura Airport
Location of the airport in Karnataka
India relief location map.jpg
Airplane silhouette.svg
Vijayapura Airport
Vijayapura Airport (India)
Runways
Direction LengthSurface
ftm
5,5771,700 Asphalt

Vijayapura Airport Proposed to be named as Jagatjyoti Shri Basaveshwar Airport, Vijayapura is an under-construction greenfield airport that will serve the city of Vijayapura in Karnataka, India. The airport is being built by the Karnataka State Industrial and Infrastructure Development Corporation (KSIIDC) at a cost of Rs 220 crore. The project site is located 15 km from the city on 727-acre (2.94 km2) of land in Madhabavi, located outside the city premises. The airport was expected to be ready by early 2023, but this has been pushed back to February 2024.

Contents

History

In March 2007, the State government Cabinet approved construction of greenfield airports in Bijapur, Gulbarga and Shimoga to give a boost to the tourism industry. Nineteen companies had responded when the Government called for an Expression of Interest (EoI) in 2007 to develop the airports. [1] [2] In January 2010, the Karnataka government signed a Memorandum of Understanding (MoU) with infrastructure development company MARG Limited for developing a green field airport at Bijapur under a public-private partnership agreement to cater to ATR 72 aircraft. [3] The airside development was to include a 2,500 square metre terminal building, a 1,700 m long runway, aprons, taxiways, hangars, isolated parking bay, a 15 m air traffic control tower, ground support equipment, fuel storage facilities and a fire station. [4]

The project came to a halt in 2012, when MARG demanded an additional 1,000 acres of land to build commercial complexes near the airport to make the project economically viable. According to the government, this amounted to a breach of contract signed through the MoU. [5] In 2013, the Government decided to abandon the PPP model and instead sought to partner with the Airports Authority of India (AAI) to complete the project. [6] AAI agreed to build Bijapur airport but sought Rs. 50 crore from the State government to start site levelling work, [7] but the State government failed to reply. In February 2019, the KSIIDC sought to develop a ‘no-frills airport’ at the site to boost tourism and business activities. [8]

On 9 July 2020, the state cabinet gave approval for the project to be completed by the State Public Works Department. The first Phase would cost Rs 95 crore and was given a deadline of 18 months. The first phase of development includes a 1900-metre runway, along with the associated taxiways and apron. A terminal building to handle 200 passengers during peak hours will also be built to handle ATR 72 type aircraft. The second phase, costing Rs 125 crore, will be implemented after operations commence. The airport would be expanded to handle larger aircraft like the Boeing 737 and Airbus A320 based on demand. [9]

See also

Related Research Articles

<span class="mw-page-title-main">Mangalore International Airport</span> Airport in Mangalore, Karnataka, India

Mangalore International Airport is an international airport serving the coastal city of Mangalore, India. It is one of only two international airports in Karnataka, the other being Kempegowda International Airport, Bangalore. Mangalore International Airport is the second busiest airport in Karnataka. In addition to domestic destinations, flights depart daily for major cities in the Middle East. The airport was named Bajpe Aerodrome, when it opened on 25 December 1951 by former Prime Minister Jawaharlal Nehru who arrived on a Douglas DC-3 aircraft.

Tezu Airport is a domestic airport serving the city of Tezu and adjoining Lohit district of Arunachal Pradesh, India. It is operated by the Airports Authority of India (AAI), which upgraded it to handle ATR-72 aircraft with night-landing facility. Prime Minister Narendra Modi inaugurated the upgraded airport on 9 February 2019. Scheduled commercial flights commenced from 19 August 2021.

<span class="mw-page-title-main">Hubli Airport</span> Airport in Karnataka, India

Hubli Airport is a domestic airport serving the twin cities of Hubballi and Dharwad in the state of Karnataka, India. It is situated in Gandhi Nagar, 8 km (5.0 mi) from Hubballi and 20 km (12 mi) from Dharwad. It is connected with 10 destinations throughout the country. The airport has been made self-reliant in terms of electricity generation, with the commissioning of an 8 megawatt (MW) ground-mounted grid-connected photovoltaic solar plant in April 2021.

<span class="mw-page-title-main">Belgaum Airport</span> Airport in Belgaum, Karnataka, India

Belgaum Airport, also known as Belagavi Airport, is a domestic airport serving Belgaum, Karnataka. The current integrated terminal building was inaugurated by the then Minister of Civil Aviation, Ashok Gajapathi Raju on 14 September 2017. Near the airport, there is an Indian Air Force station, where new recruits receive basic training.

<span class="mw-page-title-main">Gwalior Airport</span> Airport in Gwalior, Madhya Pradesh India

Rajmata Vijayaraje Scindia Airport, also known as Gwalior Airport, is a domestic airport and an Indian Air Force base serving the city of Gwalior, Madhya Pradesh, India. It is located in Maharajpur, 10 km north-east of the city premises. It is one of the six airports in Madhya Pradesh. The airport is spread over an area of 760 acres. The civil enclave is built on 29 acres of area. IndiGo and SpiceJet airlines operate scheduled flight services to and from the airport. It is named after Vijaya Raje Scindia, the former Maharani of Gwalior and a prominent Member of Parliament.

<span class="mw-page-title-main">Tuticorin Airport</span> Airport in Tuticorin, India

Tuticorin Airport is a domestic airport serving Thoothukudi and its adjoining districts of Thoothukkudi, Tirunelveli, Tenkasi, and Kanniyakumari in Tamil Nadu. It is located at Vagaikulam, 15.6 km (9.7 mi) west of the city centre, on National Highway 7A. The airport was ISO 9001:2015 quality certified on 13 April 2018. It is the fifth busiest airport in Tamil Nadu after Chennai, Coimbatore, Tiruchirappalli, and Madurai airports.

<span class="mw-page-title-main">Surat Airport</span> International airport in Surat, Gujarat, India

Surat Airport is an international airport serving Surat, Southern Gujarat. It is located in Magdalla, situated 12 km (6.4 mi) from the city centre. It has a total area of 770 acres, and is the second busiest airport in Gujarat after Ahmedabad, in terms of both aircraft movements and passenger traffic. It was awarded the status of a customs airport on 9 June 2018, and the international status was approved by the cabinet on 15 December 2023.

<span class="mw-page-title-main">Kangra Airport</span> Domestic airport in Dharamshala, Himachal Pradesh, India

Kangra-Gaggal Airport, officially known as Kangra Airport, is a regional airport serving areas of Kangra including Dharamshala, the winter capital of Himachal Pradesh, India. It is located at Gaggal, which is situated 12 km (7.5 mi) from the city, 8 km (5.0 mi) from Kangra and 14 km (8.7 mi) from Kangra Railway Station. Kangra Airport is located on National Highway 154, that runs between Pathankot and Mandi, and is the largest airport in Himachal Pradesh in terms of Passengers and Aircraft movement.

<span class="mw-page-title-main">Shirdi Airport</span> Airport in Maharashtra, India

Shirdi International Airport is an international airport serving the city of Shirdi, Maharashtra, India. It is located at Kakadi, about 14 km (8.7 mi) southwest of the city and 22 km (14 mi) from Sangamner. It is the fourth busiest airport in the state after Mumbai, Pune, and Nagpur airports. The airport, spread over 400 hectares, is owned by the Maharashtra Airport Development Company (MADC) and was inaugurated by President, Ram Nath Kovind on 1 October 2017. Communication Navigation Surveillance (CNS) and Air Traffic Control (ATC) at the airport is operated by the Airports Authority of India (AAI).

<span class="mw-page-title-main">Bareilly Airport</span> Domestic airport in Bareilly, Uttar Pradesh, India

Bareilly Airport is a domestic airport serving Bareilly, Uttar Pradesh, India at Indian Air Force's Trishul Air Base in Izzatnagar, located 6 kilometres (3.7 mi) north from the city centre.

Shivamogga Airport, officially renamed as Rashtrakavi Kuvempu Airport, is a domestic airport serving the city of Shimoga, Karnataka, India. It is located at Sogane, 8.8 km (5.5 mi) from Shimoga and 8.2 km (5.1 mi) from Bhadravathi. The airport was to be built under Public–Private Partnership (PPP) with the Government of Karnataka. However, due to delays in project execution, the contract was terminated in January 2015. On 15 June 2020, the Chief Minister of Karnataka, B. S. Yediyurappa, laid the foundation stone to start the construction of the airport at a cost of ₹ 4.5 billion. The airport is to be constructed in two phases, out of which the first phase was inaugurated on 27 February 2023 by Prime Minister, Narendra Modi. It is named after Kuvempu, who is regarded as the greatest Kannada poet of the 20th century.

<span class="mw-page-title-main">Kalaburagi Airport</span> Airport in Karnataka, India

Kalaburagi Airport is a domestic airport serving the city of Kalaburagi in Karnataka, India. It is located 12 km (7.5 mi) east from the city centre. It was built by the Karnataka State Public Works Department (PWD) with technical assistance from RITES Limited and is operated by the Airports Authority of India (AAI).

Hassan Airport is a greenfield airport project under construction at Boovanahalli village, 6 km from Hassan, Karnataka, India. The State government had initially found the project financially un-viable and decided to revise the project plan in 2012. The project was revived in 2021 and the airport development will be taken up the UDAN scheme at a cost of Rs 175 crore.

<span class="mw-page-title-main">Jalgaon Airport</span> Airport in Maharashtra, India

Jalgaon Airport is a domestic airport located off National Highway 753F southeast of the city of Jalgaon in Maharashtra, India. It had flights to Mumbai, Ahmedabad, Nanded, and Kolhapur operated by TruJet. Jalgaon Airport is 47 km away from the Ajanta Caves for which it is its closest airport. Jalgaon Airport has a Flight Training Institute run by Skynex Aviation. Also very soon Jalgaon Airport is going to have Helicopter Pilot Training Institute. Jalgaon airport is a ATC controlled Airport with Night Landing Facility. Currently the Airport serves Private Chartered Flights.

<span class="mw-page-title-main">Pakyong Airport</span> Airport in Sikkim, India

Pakyong Airport is a seasonal domestic airport serving Gangtok, the capital of Sikkim, India.

Nellore Airport is a proposed greenfield airport project near Dagadarthi, India, intended to serve the Nellore district in Andhra Pradesh. The airport is to be developed on 1,352 acres (5.47 km2) of land with an estimated cost of 368 crore.

<span class="mw-page-title-main">Donyi Polo Airport, Itanagar</span> Airport in Arunachal Pradesh, India

Donyi Polo Airport, also known as Hollongi Airport, is a domestic airport serving Itanagar, the capital city of Arunachal Pradesh, India. It is located at Hollongi, situated 14 km (8.7 mi) south from the city centre, in the Papum Pare district. It is built by the Airports Authority of India, over an area of 320 hectares. The airport is the 16th airport of Northeast India. Prime Minister Narendra Modi laid the foundation stone for the airport on 9 February 2019. Construction was started on 15 December 2020, and was inaugurated on 19 November 2022, with flight services started by IndiGo to Kolkata and Mumbai from 28 November 2022.

New Bellary Airport is a proposed greenfield airport, which will serve the city of Bellary in Karnataka, India. As of March 2020, the survey work has been started. The runway at the existing Bellary Airport is too short and narrow, and there is no room for its expansion. The new airport will be erected roughly 12 kilometres (7.5 mi) northeast of Bellary, near the villages of Chaganur and Sirivaram. The area of the airport is around 900 acres. The new airport will be the 10th airport of Karnataka.

<span class="mw-page-title-main">Rajkot International Airport</span> International airport serving Rajkot, Gujarat, India

Rajkot International Airport is an international airport and a greenfield airport at Hirasar, Gujarat, India, serving the city of Rajkot and the Saurashtra region. It is located near the National Highway 8B (NH-8B) connecting Ahmedabad and Rajkot. It has a single runway for the operation of ‘C’ category aircraft. The airport was developed by the Airports Authority of India (AAI) at a cost of 2,654 crore (US$330 million). The foundation stone for the construction of the airport was laid on 7 October 2017, and was inaugurated by Prime Minister Narendra Modi on 27 July 2023, which was previously expected to be done on 31 December 2023.

Mandi Airport is a proposed greenfield airport to be built at Nag Chala in Mandi District in the Indian state of Himachal Pradesh. The airport will be built on a total of 698 acres. The Airports Authority of India (AAI) gave its clearance for the airport after visiting the site in May 2018. In August 2019, Himachal Pradesh Chief Minister Jai Ram Thakur requested the Fifteenth Finance Commission for a special purpose grant of Rs 2,000 crore towards construction of the airport for operation of wide-body aircraft. The AAI completed its Obstacle Limitation Surfaces survey for the project site in August 2019. The Ministry of Civil Aviation gave in-principle approval for the execution of the project with the help of the AAI in October 2019. In January 2020, AAI signed a Memorandum of Understanding (MoU) with the Himachal Pradesh Government to build and operate the airport through a Joint Venture Company. The airport will have a unidirectional runway, suitable for operation of aircraft up to ATR 72 initially. WAPCOS has been appointed as project consultant and has floated tenders for environmental impact assessment for the project following a site visit in July 2020.

References

  1. "Karnataka gets 19 EoIs for three airport projects". The Indian Express . 20 June 2007. Retrieved 9 June 2015.
  2. Minor Airports Archived 25 April 2012 at the Wayback Machine Infrastructure Development Department, Government of Karnataka
  3. "Pact for Rs 200 cr Bijapur airport". Business Standard . 19 January 2010. Retrieved 9 June 2015.
  4. "MARG to develop Bijapur airport". Construction World. Retrieved 9 June 2015.
  5. "Greenfield airport project in Bijapur hits a roadblock". The Hindu . 5 July 2012. Retrieved 9 June 2015.
  6. "Govt looks to AAI as pvt developers' feuds stall regional airport projects". The Financial Express . 29 September 2013. Archived from the original on 5 March 2016. Retrieved 9 June 2015.
  7. "AAI agrees to take up Bijapur airport project". The Hindu . 27 January 2014. Retrieved 9 June 2015.
  8. "Vijayapura may get no-frills airport". The New Indian Express . 15 February 2019. Archived from the original on 17 February 2019. Retrieved 28 July 2020.
  9. "Vijayapura airport gets Karnataka cabinet nod, 18-month deadline to start operations". The New Indian Express . 10 July 2020. Retrieved 28 July 2020.