Dholera International Airport

Last updated
Dholera International Airport
Summary
Airport typePublic
Owner/Operator Airports Authority of India (AAI)/DIACL
Serves Dholera Special Investment Region
Location Dholera, Gujarat, India
OpenedDecember 2025 [1]
Coordinates 22°35′22″N72°28′06″E / 22.58944°N 72.46833°E / 22.58944; 72.46833
Map
India Gujarat location map.svg
Airplane silhouette.svg
Dholera International Airport
Location of the airport in Gujarat
India location map.svg
Airplane silhouette.svg
Dholera International Airport
Dholera International Airport (India)
Runways
Direction LengthSurface
ftm
10,5003,200

Dholera International Airport( IATA : none, ICAO : none) is an under-construction international airport and a greenfield airport, which will serve the Dholera Special Investment Region (DSIR) in Gujarat, India. It is being built near Navagam in the Dholera taluka of Ahmedabad district. The project site is spread over 1,426 hectares [2] about 80 km (50 mi) from Ahmedabad and around 20 km (12 mi) from the Dholera Special Investment Region (DSIR). [3] 75 hectares of government land has been allocated for commercial development. [4]

The airport would serve the logistics requirements of the DSIR, which is planned as a huge industrial township in the Delhi–Mumbai Industrial Corridor (DMIC) project, [5] as well as to relieve congestion of the existing Sardar Vallabhbhai Patel International Airport serving the cities of Ahmedabad and Gandhinagar, the capital of Gujarat. It is expected to be commissioned by December 2025. [6]

Development

The Airports Authority of India (AAI) inspected the site in January 2010 to carry out a techno-economical feasibility study [7] and gave its technical clearance the following month. [8] The project received "site clearance" from the central government in July 2014. [9] The Environment Ministry gave its approval in December 2015. [10]

Dholera International Airport Company Ltd (DIACL) was set up in 2012 by the State Government of Gujarat as a special-purpose vehicle to develop the airport. The Airports Authority of India picked up a 51% stake in DIACL in 2018. Following this, the Gujarat government holding dropped to 33% while the remaining 16% is held by the Delhi Mumbai Industrial Corridor Development Corporation (DMICDC). [11]

The Airports Authority of India (AAI) signed a memorandum of understanding (MoU) with the State Government in January 2019 for the construction of airport. [12] [13] In 2021, the Airport Authority of India released a Rs. 987 crore tender for Phase 1 of airport project. [4] Phase 1 civil works involved construction of the airport’s infrastructure including a 3,200 metre long runway suitable for 4E category aircraft, taxiways, aprons and road network. The contract was awarded to Jodhpur-based Varaha Infrastructure in June 2021 which was the lowest bidder at 636.45 crores. [14]

In June 2022, the Union Cabinet Committee on Economic Affairs approved the development of Phase I at an estimated cost of Rs. 1305 crore, to be completed within 48 months. [15]

In January 2024, DIACL awarded a Rs 333 crore EPC contract to Ahmedabad-based Yashnand Engineers and Contractors. The scope of the contract includes the construction of a new integrated passenger terminal building, ATC tower, cargo complex, and environmental support services (ESS) among others, with a construction deadline of 18 months. [16]

Related Research Articles

<span class="mw-page-title-main">Ahmedabad Airport</span> International airport in Ahmedabad, Gujarat, India

Sardar Vallabhbhai Patel International Airport is an international airport serving the twin cities of Ahmedabad and Gandhinagar in Gujarat, India. It is named after Sardar Vallabhbhai Patel, the first Deputy Prime Minister of India. The airport is the busiest and largest airport in the state of Gujarat, and is the seventh busiest airport in India.

Vijayapura Airport Proposed to be named as Jagatjyoti Shri Basaveshwar Airport, Vijayapura is an under-construction greenfield airport that will serve the city of Vijayapura in Karnataka, India. The airport is being built by the Karnataka State Industrial and Infrastructure Development Corporation (KSIIDC) at a cost of Rs 220 crore. The project site is located 15 km from the city on 727-acre (2.94 km2) of land in Madhabavi, located outside the city premises. The airport was expected to be ready by early 2023, but this has been pushed back to February 2024.

<span class="mw-page-title-main">Noida International Airport</span> Upcoming international airport to serve Noida and Greater Noida in Uttar Pradesh, India

Noida International Airport, also known as Jewar Airport, is an upcoming international airport being constructed near Jewar in Gautam Buddha Nagar District, Uttar Pradesh in India, which will serve the National Capital Region (NCR). The airport is situated in the new planned YEIDA city.

Fedara is a small village near Dholera in Ahmedabad district in Indian state of Gujarat.

<span class="mw-page-title-main">Expressways of India</span> List of Expressways in India

Expressways are the highest class of roads in India. In July 2023, the total length of expressways in India was 5,579 km (3,467 mi), with 8,366 km (5,198 mi) under construction. These are controlled-access highways where entrance and exits are controlled by the use of cloverleaf or trumpet or grade separated interchanges that are incorporated into the design of the expressway and designed for maximum speed of 120 km/h, whereas National highways are flyover access or tolled, where entrance and exit is through the side of the flyover, at each intersection of highway with road, flyovers are provided to bypass the city/town/village traffic and these highways are designed for speed of 100 km/h. Some roads are not access-controlled expressways but are still named expressways, such as the Biju Expressway, these are actually state highways that are not declared by the central government as an Expressway, hence not an Expressway or National Highway.

<span class="mw-page-title-main">Lucknow Metro</span> Rapid transit system in Lucknow, Uttar Pradesh, India

The Lucknow Metro is a mass rapid transit (MRT) system in Lucknow, Uttar Pradesh, India. The metro is owned and operated by the Uttar Pradesh Metro Rail Corporation (UPMRC). The frequency of the metro's services is around 5 - 7 minutes.

<span class="mw-page-title-main">Ahmedabad Metro</span> Rapid transit system in Ahmedabad and Gandhinagar, Gujarat, India

Ahmedabad Metro is a rapid transit system for the cities of Ahmedabad and Gandhinagar in Gujarat state of India.

<span class="mw-page-title-main">Chaudhary Charan Singh International Airport</span> International airport in Lucknow, Uttar Pradesh, India

Chaudhary Charan Singh International Airport is an international airport serving Lucknow, the capital of the Indian state of Uttar Pradesh. It is located in Amausi, 14 km (8.7 mi) from the city centre, and was earlier known as ''Amausi Airport''. It is named after Chaudhary Charan Singh, the fifth Prime Minister of India. It is owned and operated by the Lucknow International Airport Limited (LIAL), a public–private consortium led by Adani Group.

<span class="mw-page-title-main">Urban rail transit in India</span> Overview of the urban rail transit system in India

Urban rail transit in India plays an important role in intracity transportation in the major cities which are highly populated. It consists of rapid transit, suburban rail, monorail, and tram systems.

<span class="mw-page-title-main">Mumbai–Ahmedabad high-speed rail corridor</span> Under-construction high-speed rail line in India

Mumbai–Ahmedabad High Speed Rail Corridor (MAHSR) or Mumbai–Ahmedabad HSR is an under-construction high-speed rail line, which will connect Mumbai, the financial hub of India, with Ahmedabad, the largest city in the state of Gujarat. When completed, it will be India's first high-speed rail line.

Hisar Airport, officially known as Maharaja Agrasen International Airport is a DGCA-licensed public airport serving Hisar in Haryana state of India. It is located 5 kilometres (3.1 mi) north-east of the city center on NH-9. The airport is planned to be upgraded to an international airport by 2030. It will eventually see the development of a new MRO, aerospace university, aerospace and defense manufacturing industrial zone, logistics and food parks, etc. over an area spread across 10,000 acres (4,000 ha). In 2021, the total cost of planned upgrade in 3 phases, including the actual spend and future approved allocations, is nearly ₹5,200 crore.

<span class="mw-page-title-main">Donyi Polo Airport, Itanagar</span> Airport in Arunachal Pradesh, India

Donyi Polo Airport, also known as Hollongi Airport, is a domestic airport serving Itanagar, the capital city of Arunachal Pradesh, India. It is located at Hollongi, situated 14 km (8.7 mi) south from the city centre, in the Papum Pare district. It is built by the Airports Authority of India, over an area of 320 hectares. The airport is the 16th airport of Northeast India. Prime Minister Narendra Modi laid the foundation stone for the airport on 9 February 2019. Construction was started on 15 December 2020, and was inaugurated on 19 November 2022, with flight services started by IndiGo to Kolkata and Mumbai from 28 November 2022.

GMR Visakhapatnam International Airport is an international airport and a greenfield airport under construction at Bhogapuram in Vizianagaram district, about 40 kilometres (25 mi) north-east of Visakhapatnam.

Manohar International Airport, is an international airport at Mopa in Pernem Taluka, North Goa district in the state of Goa, India. It serves North Goa and the adjoining districts of Karnataka and Maharashtra, and as a second airport of Goa after Dabolim Airport in Dabolim. On an average, the airport handles around 100 aircraft movements and about 15,000 passengers daily. It is the fifteenth busiest airport in India. The airport is developed by GMR Goa International Airport Limited (GGIAL), a special purpose vehicle (SPV). It is built at a cost of 3,000 crore. The airport is built under the Build Operate Transfer (BOT) model in four phases, with the first phase costing a total of 1,500 crore. In financial year 2023-24, the airport handled over 4.4 million passengers, which is close to its current maximum capacity of 4.5 million passengers per year. It is named after the former Minister of Defence and the former Chief Minister of Goa, Manohar Parrikar.

<span class="mw-page-title-main">Rajkot International Airport</span> International airport serving Rajkot, Gujarat, India

Rajkot International Airport is an international airport and a greenfield airport at Hirasar, Gujarat, India, serving the city of Rajkot and the Saurashtra region. It is located near the National Highway 8B (NH-8B) connecting Ahmedabad and Rajkot. It has a single runway for the operation of ‘C’ category aircraft. The airport was developed by the Airports Authority of India (AAI) at a cost of 2,654 crore (US$330 million). The foundation stone for the construction of the airport was laid on 7 October 2017, and was inaugurated by Prime Minister Narendra Modi on 27 July 2023, which was previously expected to be done on 31 December 2023.

The Delhi–Mumbai Expressway is a 1,350 km long, 8-lane wide under-construction access-controlled expressway connecting India's national capital New Delhi to its financial capital Mumbai. The foundation stone for the project was laid by union minister Nitin Gadkari in the presence of Sushma Swaraj and Arun Jaitley on 8 March 2019 and is inaugurated by PM Modi. The total project value including the land acquisition cost is around ₹1,00,000 crores . 

Ahmedabad–Dholera Expressway is a 109 km (68 mi) long, four-lane wide access-controlled under-construction expressway in Gujarat, India. It will connect Sardar Patel Ring Road near Sarkhej in Ahmedabad with Adhelai village in Bhavnagar district via Dholera Special Investment Region (DSIR). The proposed Dholera International Airport near Navagam, about 20 km (12 mi) from Dholera SIR will also lie in the route.

Dholera Special Investment Region (DSIR) is a greenfield industrial planned city near Dholera in Gujarat's Ahmedabad district, around 100 kilometers to the south-west. spread over more than 920 km2 it is a new industrial city being jointly developed by the Government of India and Gujarat. Dholera is strategically located, well connected with trade gateways and falls in the influence zone of proposed Delhi – Mumbai Industrial Corridor project (DMIC), a joint initiative by the Government of India and Japan.

Kota Greenfield Airport is a proposed airport, planned to be built at Shambupura village in Bundi district, approximately 15 kilometres from Kota and 20 kilometres from Bundi, in Rajasthan, India. The airport will be built by the Airports Authority of India (AAI). The airport site is within 10 kilometres of the Chambal Ghariyal wildlife sanctuary and within 10 kilometres of the Mukundara Hills National Park. The proposed airport falls in the notified buffer area of Ramgarh Vishdhari Wildlife Sanctuary and will use 466 hectares of forest land.

References

  1. "Greenfield Airport at Dholera likely to be ready by December 2025: Govt". Dholera Metro City . 6 February 2023. Retrieved 8 March 2023.
  2. "Dholera airport work to take off in Q3 of FY'16". The Times of India . 25 June 2015. Retrieved 25 June 2015.
  3. "PM Narendra Modi-govt grants 'site clearance' to Gujarat's Dholera airport". The Financial Express (India) . 21 July 2013. Retrieved 28 July 2014.
  4. 1 2 "Coming up: Gujarat's Largest airport". Outlook . 2 March 2021. Retrieved 3 March 2021.
  5. "Nod for Dholera airport a push for Delhi-Mumbai corridor". Business Standard . 3 January 2016. Retrieved 12 May 2018.
  6. "Greenfield Airport at Dholera likely to be ready by December 2025: Govt". Dholera Metro City . 6 February 2023. Retrieved 8 March 2023.
  7. "AAI team inspects site for greenfield airport in Ahmedabad". Daily News & Analysis . 23 January 2010. Retrieved 28 July 2014.
  8. "Federa airport gets AAI nod". Daily News & Analysis . 11 February 2010. Retrieved 28 July 2014.
  9. "Site Clearance for Dholera Airport Project". Press Information Bureau . Archived from the original on 26 June 2015. Retrieved 28 July 2014.
  10. "Gujarat's Dholera airport project gets Centre's green nod". Business Standard . 10 December 2015. Retrieved 12 May 2018.
  11. "AAI to pick 51% stake in Dholera International Airport". The Financial Express (India) . 28 November 2018. Retrieved 3 March 2021.
  12. "MoUs inked for airports at Dholera, Ankleshwar". Times of India. 20 January 2019. Retrieved 21 January 2019.
  13. "6 years on, ground work on Dholera airport yet to start". The Indian Express. 2019-02-22. Retrieved 2019-05-22.
  14. "Varaha Wins Dholera Airport Phase 1's Construction Work". The Metro Rail Guy. 26 June 2021. Retrieved 9 May 2024.
  15. "Dholera Airport: Phase I of new greenfield airport gets Cabinet approval". Business Today . 14 June 2022. Retrieved 9 May 2024.
  16. "Ahmedabad's Second Airport At Dholera: AAI Awards Rs 333-Crore Contract To Yashnand Engineers for Terminal Buildingl". India Infrahub. 7 January 2024. Retrieved 9 May 2024.