Forth and Clyde Junction Railway

Last updated

Contents

Forth and Clyde Junction Railway
BSicon STRc2.svg
BSicon CONT3.svg
BSicon STRc2.svg
BSicon eBHF3+1.svg
BSicon STRc4.svg
Balloch Central
BSicon STRc2.svg
BSicon ABZ1+3xf.svg
BSicon STRc4.svg
Forth and Clyde Junction
BSicon CONT1.svg
BSicon xSTR+c4.svg
BSicon exKDSTaq.svg
BSicon exABZgr.svg
Dalmonach (Croftengea) Siding
BSicon exHST.svg
Jamestown
BSicon exHST.svg
Caldarvan
BSicon exHST.svg
Drymen
BSicon exHST.svg
Gartness
BSicon exCONT2.svg
BSicon exSTR+c3.svg
BSicon exSTRc1.svg
BSicon exABZg+4.svg
Gartness Junction
BSicon exHST2.svg
BSicon exSTRc3.svg
Balfron
BSicon exSTRc1.svg
BSicon exHST+4.svg
Buchlyvie
BSicon exABZg2.svg
BSicon exSTRc3.svg
Buchlyvie Junction
BSicon exSTR+c1.svg
BSicon exCONT4.svg
BSicon exHST.svg
Port of Menteith
BSicon exHST.svg
Ladylands Platform
BSicon exHST.svg
Fairfield Siding closed 1866
BSicon exHST.svg
Kippen
BSicon exHST.svg
Gargunnock
BSicon xSTR+c2.svg
BSicon CONT3.svg
BSicon STRc2.svg
BSicon ABZ3+1xg.svg
BSicon STRc4.svg
Balloch Line (Stirling North) Junction
BSicon STRc2.svg
BSicon BHF3+1.svg
BSicon STRc4.svg
Stirling
BSicon CONT1.svg
BSicon STRc4.svg

The Forth and Clyde Junction Railway was a railway line in Scotland which ran from Stirling to Balloch.

It was built with the expectation of conveying coal from the Fife coalfields to a quay at Bowling on the Clyde for onward transport, but that traffic did not materialise. The line opened in 1856; it was a simple rural line running through sparsely populated terrain, and traffic was thin.

In 1882 the Strathendrick and Aberfoyle Railway made a connection with the line, using a few miles of it as part of its own route to Aberfoyle.

The Forth and Clyde Junction route lost its passenger train service in 1934, but the Aberfoyle trains continued until they too were discontinued in 1951. Goods train continued on parts of the line, but in 1965 the line was completely closed, and none of it remains in railway use.

History

First proposal

In 1845 there was a frenzy of railway promotion in Scotland; the Edinburgh and Glasgow Railway had been opened in 1842 and shown that railways of more than purely local relevance could be successful, and many schemes were put forward. Considerable volumes of coal were being extracted in Fife. While coastwise and export shipping from east coast ports was carried on, there was a commercial need to get access to the west coast ports. A railway to make the transit to the lower Clyde was proposed, but after 1845 the money market collapsed, and nothing further was heard of the idea for some years.

A practicable scheme

System map of the Forth and Clyde Junction Railway Forth and Clyde.gif
System map of the Forth and Clyde Junction Railway

By 1850 the railway network was developing, and Stirling was becoming a focal point for railways. The Stirling and Dunfermline Railway opened in 1850, connecting the Fife coalfields. However, when traffic was consigned from Fife to the west coast, the S&DR, the Edinburgh and Glasgow Railway and its associated companies were obliged to hand over the traffic to rival companies - the Scottish Central Railway and the Caledonian Railway - to complete the transit.

In 1851 a Forth and Clyde Junction Railway was promoted by commercial interests in Stirling to build a line north of the Campsie Fells to reach the harbour at Bowling, on the River Clyde. The line would connect with the Caledonian and Dumbartonshire Junction Railway (C&DJR; the spelling Dumbartonshire was used by the company). The C&DJR opened in 1850 and although it had intended to reach Glasgow, its finances only permitted construction from Balloch to Bowling; the F&CJR would join it near Alexandria, in the Leven Valley. [1]

The Forth and Clyde Junction Railway was incorporated by Act of Parliament on 4 August 1853; [2] [3] the line was to be 30 miles (48 km) in length, and the trunk haul traffic, minerals westbound to the Clyde and manufactured textiles from the Leven dyeworks eastbound, was to be dominant.

Construction was relatively straightforward; the line was built as a single line, although land was acquired for subsequent doubling. [1] There were two major river crossings, of the Leven and the Endrick. The Leven bridge was a large timber viaduct, probably one of the last wooden bridges to be built in Scotland. [3] (It had to be replaced by a metal bridge after about twenty years.) The Endrick crossing was a long low timber trestle. [3]

Opening

The line opened in two stages: the eastern half opened as far as Buchlyvie on 18 March 1856, followed by the western half on 26 May 1856. [1] [4]

The line had been authorised to make a south-facing connection with the Caledonian and Dumbartonshire Junction Railway near Alexandria, reflecting the intended trunk haulage to the Clyde. In fact the actual construction arranged the connection facing Balloch. This seems to have been done without proper authority, and the reason for the change is unclear; it may have been simply an acceptance that the through goods traffic would lay over at Balloch. [note 1] [1]

There were 32 manned level crossings on the route. [3]

The line in operation

By the time the line was open, the attraction of operating coal traffic over the line and back to Bowling had faded; there were shorter transits to better harbours on the Clyde, and the trunk traffic never materialised. Moreover, the population on the line itself was fairly limited, and some of the communities on the line were located some distance from the stations that purported to serve them. Drymen station was really in the smaller village of Croftamie, and Balfron (probably the largest village on the route) was not very near Balfron station. The line settled down to its role as a simple rural route, although some tourist traffic was developed.

The Dalmonach Dyeworks near Balloch sought a branch connection from the F&CJR; competitors further down the Leven Valley had connections from the C&DJR. The short branch was authorised on 1 August 1861.

The company operated the railway itself, although it hired in engine power from the Scottish Central Railway at first, but the arrangement was terminated from 7 February 1860, as the F&CJR considered the SCR's price was excessive. Locomotive power was hired in from the Scottish North Eastern Railway until four 2-4-0 tender engines were delivered by from the Canada Works, Birkenhead, early in 1861. [1] [3]

Lease to the NBR

From 1865 the North British Railway and the Caledonian Railway expressed interest in acquiring the F&CJR. Absorption by the Caledonian Railway looked promising: as well as good terms the Caledonian would upgrade and modernise the track, but Parliament refused the necessary authority. [5] The NBR withdrew an opposing Parliamentary Bill it had prepared for the purpose. The company decided to remain independent, but it agreed to lease the line to the North British Railway from 1866. On 1 August 1871 the lease was concluded; the NBR would pay 50% of gross revenue for 30 years. On 1 August 1875 the term was extended to 50 years, paying 6% on the F&CJR's capital of £106,000, rising with the potential dividend on NBR ordinary stock.. [6] The company itself continued, receiving the lease charge but not operating any railway, until the grouping of railways in Great Britain in 1923. [1]

Part of the lease agreement was that the remaining timber bridges on the line should be rebuilt in durable materials at the expense of the F&CJR. The Endrick timber trestle viaduct was now in a very poor state, having been repeatedly damaged by ice in the river during the 1860s, and it was rebuilt with iron truss girders on stone piers. [3]

Passenger train service

The 1895 Bradshaw shows four through trains daily from Balloch to Stirling, with an additional short working from Balloch to Balfron. The throughout journey time was about two hours. [7]

The Aberfoyle line

The North British Railway sponsored a nominally independent line to reach Aberfoyle, an important town in the expanding tourist trade, and the Gateway to the Trossachs. The line was authorised as the Strathendrick and Aberfoyle Railway. It opened on 1 August 1882. It ran for a few miles on the F&CJR line, joining it at Gartness Junction and leaving it again at Buchlyvie Junction. [8] [4]

The twentieth century

The line passed into the ownership of the London and North Eastern Railway (LNER) in 1923. [1]

As early as the 1920s bus competition eroded the already limited passenger carryings on the line. The LNER tried to reduce costs of the loss-making passenger service by introducing a steam railcar, Quicksilver, manufactured by the Sentinel Waggon Works in Shrewsbury. It had a vertical boiler power plant and geared drive. However its effect on the viability of the passenger business was insignificant. [3] The thin population density on the route never became sufficient to sustain a passenger service, and the line was closed as a through passenger route on 1 October 1934. [3] [9] The former Strathendrick and Aberfoyle Railway route, now simply the Aberfoyle branch of the LNER, remained open for passenger traffic until 29 September 1951: the trains worked over the F&CJR route between Gartness and Buchlyvie. [1]

Final closures

By 1949 the section between Drymen and Gartness was listed as "out of use", probably due to the state of the Endrick Viaduct. [3] The section was formally closed on 1 November 1950. Successive closures to goods traffic followed: Buchlyvie Junction to Mye Siding also closed completely on 1 November 1950. The section from Mye Siding to Port of Menteith followed on 1 December 1952. On 5 October 1959 the sections between Gartness Junction and Buchlyvie Junction, Jamestown and Drymen, and from Port of Menteith to Stirling closed. On 1 September 1964 the short section from Croftengea Siding to Jamestown closed, and finally the Croftengea Siding stub closed on 9 April 1965. The entire route is now closed.

About 1969 a water main was erected crossing the Endrick, using the stone piers of the viaduct. A cycle path was later constructed on the route. [3] The Leven viaduct near Balloch is now a pedestrian walkway. [10]

Topography

The line opened from Forth and Clyde Junction, Balloch to Buchlyvie on 26 May 1856, and from Buchlyvie to Stirling North Junction on 18 March 1856,. It closed to passenger services on 1 October 1934, except between Gartness and Buchlyvie, which closed on 29 September 1951.

Locations on the line were:

Notes

  1. In those days, primitive lubrication of wagon bearings required attention at frequent intervals, and this may have been more simply achieved at Balloch.
  2. At the request of R D MacKenzie of Caldarvan House, according to Noble.
  3. A Cardross station near Helensburgh had opened in March 1858.

Related Research Articles

<span class="mw-page-title-main">Stirling (council area)</span> Council area of Scotland

The Stirling council area is one of the 32 council areas of Scotland, and has a population of about 94,330. It was created under the Local Government etc (Scotland) Act 1994 with the boundaries of the Stirling district of the former Central local government region, and it covers most of Stirlingshire and the south-western portion of Perthshire. Both counties were abolished for local government purposes under the Local Government (Scotland) Act 1973.

<span class="mw-page-title-main">North Clyde Line</span> Railway line in Glasgow City, Scotland, UK

The North Clyde Line is a suburban railway in West Central Scotland. The route is operated by ScotRail Trains. As a result of the incorporation of the Airdrie–Bathgate rail link and the Edinburgh–Bathgate line, this route has become the fourth rail link between Glasgow and Edinburgh.

The Edinburgh and Glasgow Railway was authorised by Act of Parliament on 4 July 1838. It was opened to passenger traffic on 21 February 1842, between its Glasgow Queen Street railway station and Haymarket railway station in Edinburgh. Construction cost £1,200,000 for 46 miles (74 km). The intermediate stations were at Corstorphine, Gogar, Ratho, Winchburgh, Linlithgow, Polmont, Falkirk, Castlecary, Croy, Kirkintilloch and Bishopbriggs. There was a ticket platform at Cowlairs. The line was extended eastwards from Haymarket to North Bridge in 1846, and a joint station for connection with the North British Railway was opened on what is now Edinburgh Waverley railway station in 1847.

The Stobcross Railway was a railway line in Glasgow, Scotland, built by the North British Railway to connect from Maryhill to the new dock being built at Stobcross; the dock became the Queen's Dock, opened in 1877. The line was opened first, in 1874, and gave the North British company access to the north bank of the River Clyde; there was a goods depot at Partick.

<span class="mw-page-title-main">Buchlyvie</span> Human settlement in Scotland

Buchlyvie is a village in the Stirling council area of Scotland. It is situated 14 miles (23 km) west of Stirling and 18 miles (29 km) north of Glasgow. Lying within the Carse of Forth, to the north is Flanders Moss and to the south are the Campsie Fells. The village lies on the A811, which follows the line of an eighteenth-century military road between Stirling and Balloch. According to the 2001 census the village's population was 479.

The Lanarkshire and Dumbartonshire Railway was a railway company in Scotland. It was promoted independently but supported by the Caledonian Railway, and it was designed to connect Balloch and Dumbarton with central Glasgow, linking in heavy industry on the north bank of the River Clyde. From Dumbarton to Balloch the line would have closely duplicated an existing railway, and negotiation led to the latter being made jointly operated, and the L&DR terminated immediately east of Dumbarton, trains continuing on the joint section.

<span class="mw-page-title-main">Stirling and Dunfermline Railway</span> Former railway in Scotland

The Stirling and Dunfermline Railway was a railway in Scotland connecting Stirling and Dunfermline. It was planned by the Edinburgh and Glasgow Railway to get access to the mineral deposits on the line of route, but also as a tactical measure to keep the rival Caledonian Railway out of Fife.

The Caledonian and Dumbartonshire Junction Railway (C&DJR) was a Scottish railway opened in 1850 between Bowling and Balloch via Dumbarton. The company had intended to build to Glasgow but it could not raise the money.

<span class="mw-page-title-main">Balloch Central railway station</span> Disused railway station in Scotland

Balloch Central railway station was the main railway station serving the town of Balloch in Scotland. It was opened on 15 July 1850 by the Caledonian and Dumbartonshire Junction Railway. It was renamed Balloch Central on 30 June 1952.

The Glasgow to Aberfoyle Line was a railway line in Scotland, built in stages, leaving the Edinburgh and Glasgow Railway near Lenzie. Tourist traffic was a dominant part of the motivation for building the line, and road tours to the Trossachs from Aberfoyle formed a significant part of the traffic.

The Glasgow, Dumbarton and Helensburgh Railway was independently sponsored to build along the north of the River Clyde. It opened in 1858, joining with an earlier local line serving Balloch. Both were taken over by the powerful North British Railway in 1865, and for some time the line was the main route in the area. As industry developed other lines were opened to serve it, and the line formed the core of a network in the area.

The Rutherglen and Coatbridge Railway was a railway line in Scotland built by the Caledonian Railway to shorten the route from the Coatbridge area to Glasgow. It opened in 1865. It was later extended to Airdrie in 1886, competing with the rival North British Railway. Soon after a further extension was built from Airdrie to Calderbank and Newhouse.

<span class="mw-page-title-main">Aberfoyle railway station</span> Disused railway station in Aberfoyle, Stirling

Aberfoyle railway station served the village of Aberfoyle in Scotland between 1882 and 1951.

<span class="mw-page-title-main">Balfron railway station</span> Disused railway station in Kirkintilloch, Scotland

Balfron railway station was a railway station that served the village of Balfron in Scotland. The station was served by trains on the Strathendrick and Aberfoyle Railway and the Forth and Clyde Junction Railway, both of which closed in the 1950s.

The Strathendrick and Aberfoyle Railway was a railway line in Scotland.

The Glasgow, Bothwell, Hamilton and Coatbridge Railway was a railway company in Scotland, built to serve coal and ironstone pits in the Hamilton and Bothwell areas, and convey the mineral to Glasgow and to ironworks in the Coatbridge area. It was allied to the North British Railway, and it opened in 1877. Passenger services followed.

Gartness is a hamlet in Stirling, Scotland. It is located 1.8 miles/2.9 km from Killearn and 3.1 miles/5 km from Drymen. Most pupils attend Killearn Primary School and senior pupils attend Balfron High School. The Endrick Water passes through the hamlet.

The Caledonian Railway branches in North Lanarkshire built on the Caledonian Railway main line, which opened in 1848. In the following years the considerable increase of iron production and coal extraction in North Lanarkshire led to a progressive expansion of branch lines in the area between the eastern margin of Glasgow and Bellside in the east, and between Coatbridge, Airdrie and Motherwell. Mineral traffic was dominant and for some years passenger operation followed the construction of some of the mineral connections. In 1861 the Rutherglen and Coatbridge line was opened, extended later to Airdrie, rivalling the established Monkland Railways route. In 1869 the connection from Cleland to Midcalder was opened, connecting mineral sites but also forming a new passenger route to Edinburgh.

Killearn railway station served the village of Killearn, Stirling, Scotland from 1882 to 1951 on the Blane Valley Railway.

<span class="mw-page-title-main">Gartness railway station</span> Disused railway station in Gartness, Stirling

Gartness railway station served the hamlet of Gartness, Stirling, Scotland, from 1856 to 1934 on the Forth and Clyde Junction Railway.

References

  1. 1 2 3 4 5 6 7 8 John Thomas revised J S Paterson, A Regional History of the Railways of Great Britain: Volume 6, Scotland, the Lowlands and the Borders, David and Charles, Newton Abbot, 1984, ISBN   0 946537 12 7
  2. E F Carter, An Historical Geography of the Railways of the British Isles, Cassell, London, 1959
  3. 1 2 3 4 5 6 7 8 9 10 11 Stewart Noble, The Vanished Railways of Old Western Dunbartonshire, The History Press, Stroud, 2010, ISBN   978 0 7509 5096 1
  4. 1 2 Christopher Awdry, Encyclopaedia of British Railway Companies, Patrick Stephens Limited, Wellingborough, 1990, ISBN   1 85260 049 7
  5. John Thomas, The North British Railway, volume 1, David & Charles, Newton Abbot, 1969, ISBN   0 7153 4697 0, page 168
  6. David Ross, The North British Railway: A History, Stenlake Publishing Limited, Catrine, 2014, ISBN   978 1 84033 647 4
  7. Bradshaw's General Steam Navigation and Railway Guide, 12th mo, (December) 1895, reprinted by Middleton Press, Midhurst, 2011, ISBN   978 1 908174 11 6
  8. John Thomas, The North British Railway, volume 2, David & Charles, Newton Abbot, 1975, ISBN   0 7153 6699 8, pageds 127 and 128
  9. 1 2 Gordon Stansfield, Stirlingshire and Clackmannanshire's Lost Railways, Stenlake Publishing, Catrine, 2002, ISBN   1 84033 184 4
  10. 1 2 Gordon Stansfield, Glasgow and Dunbartonshire's Lost Railways, Stenlake Publishing, Catrine, 2003, ISBN   978 184 033 2353
  11. M E Quick, Railway Passenger Stations in England Scotland and Wales—A Chronology, The Railway and Canal Historical Society, 2002

Sources