Strathspey Railway (GNoSR)

Last updated

Strathspey Railway (GNoSR)
Overview
Locale Scotland
Dates of operation1 July 186330 July 1966
Successor Great North of Scotland Railway
Technical
Track gauge 1,435 mm (4 ft 8+12 in)
Strathspey Railway
BSicon CONTg.svg
BSicon KHSTxe.svg
Dufftown
BSicon exHST.svg
Craigellachie
BSicon exCONTgq.svg
BSicon exABZgr.svg
BSicon exHST.svg
Aberlour
BSicon exHST.svg
Dailuaine Halt
BSicon exABZg+l.svg
BSicon exKBSTeq.svg
Dailuaine distillery
BSicon exHST.svg
Carron
BSicon exHST.svg
Imperial Cottages Halt
BSicon exHST.svg
Knockando House Halt
BSicon exHST.svg
Gibley's Cottages Halt
BSicon exHST.svg
Knockando (Dalbeallie)
BSicon exHST.svg
Blacksboat
BSicon exHST.svg
Ballindalloch
BSicon exHST.svg
Advie
BSicon exHST.svg
Dalvey
(closed 1868)
BSicon exHST.svg
Dalvey Farm Halt
BSicon exABZg+l.svg
BSicon exKBSTeq.svg
Balmenach distillery
BSicon exHST.svg
Cromdale
BSicon exCONTg.svg
BSicon exSTR.svg
BSicon exSTR.svg
BSicon exHST.svg
Grantown-on-Spey (East)
BSicon exHST.svg
BSicon exSTR.svg
Grantown-on-Spey (West)
BSicon KHSTxa.svg
BSicon exSTR.svg
Broomhill
BSicon STR.svg
BSicon exHST.svg
Ballifurth Farm Halt
BSicon STR.svg
BSicon exHST.svg
Nethy Bridge
BSicon eKRWg+l.svg
BSicon exKRWr.svg
Boat of Garten Junction
BSicon HST.svg
Boat of Garten
BSicon CONTf.svg

The Strathspey Railway was a railway company in Scotland that ran from Dufftown (in Moray) to Boat of Garten (in Badenoch and Strathspey). It was proposed locally but supported by the larger Great North of Scotland Railway (GNoSR), which wanted to use it as an outlet towards Perth. The GNoSR had to provide much of the funding, and the value of traffic proved to be illusory. The line opened in 1863 to Abernethy, but for the time being was unable to make the desired connection to the southward main line. Although later some through goods traffic developed, the route never achieved its intended purpose.

Contents

In common with many rural railways, it lost business heavily to competing road transport, both passenger and freight, from the 1930s. In 1958 lightweight diesel railbuses were used on the line in an attempt to contain the fast-rising financial losses, but the novel form of vehicle failed to bring about the necessary profitability. The line was closed to passenger traffic in 1965, and to general goods services in 1968. A short section north of Aberlour remained in use until complete closure of the line in 1971.

Origin

Strathspey Railway System at the time of transfer to the GNoSR Speyside Railway System.png
Strathspey Railway System at the time of transfer to the GNoSR

A railway came to Aberdeen, from the south, in 1840. From that time there was a demand from interests in Inverness for a railway connection to Aberdeen that would give them a connection to Central Scotland and the south, albeit by a roundabout route. It proved difficult to find the money for this simple aspiration, and after a number of tentative moves, the Great North of Scotland Railway (GNoSR) extended a line from Aberdeen as far as Huntly, and then Keith; its line reached there in 1856. From the Inverness end, the Inverness and Aberdeen Junction Railway (I&AJR) reached Keith in 1858. A through connection was established, but for the time being passengers had to change trains at Keith, and any co-operation between the two companies was patchy. Moreover a lack of co-operation at Aberdeen meant that connections there, with the North British Railway, meant that through passenger journeys were unpredictable. [1]

The Morayshire Railway had established itself north of Elgin, connecting to Lossiemouth, and it developed a local scheme to connect Craigellachie into the emerging railway network. It opened a line from Orton on the I&AJR line between Elgin and Keith as far as Rothes on 23 August 1858, extending to its Craigellachie station on 24 December 1858. In fact the terminus was in Dandaleith, on the north-west bank of the River Spey; Craigellachie was over the river, on the south-east bank. [2]

Inverness people travelling to the south resented the long deviation through Aberdeen, and they decided to build their own line to reach Perth, starting out from Forres on the Inverness and Aberdeen Junction Railway. This new southward line, constructed by the nominally independent Inverness and Perth Junction Railway, ran to Perth via Dava Moor, using the Perth and Dunkeld Railway and a section of the Scottish North Eastern Railway at the southern end. That project was authorised in 1861 and it opened throughout in 1863. [3] The building of this line had the potential to abstract a huge volume of traffic from the GNoSR route via Aberdeen. A report submitted to the GNoSR board claimed that "the value of through traffic between stations on the Inverness line and the south is apt to be over-rated", but their true belief was revealed when they prepared a Parliamentary Bill for a 33 mile continuation of the Keith and Dufftown Railway line down the River Spey as far as Grantown-on-Spey, which was on the proposed I&PJR line to Perth. It was noted that there were large forests owned by Lord Seafield, that might generate timber traffic. [2] [4]

Formation of the Strathspey Railway

By October 1860 the scheme had developed into "The Strathspey Railway". The plan was to extend the Keith and Dufftown Railway to a more useful station for Dufftown at Balvenie, and to build the Strathspey Railway on from there via Craigellachie to Abernethy. A pact had been agreed with the Inverness and Perth Junction Railway not to oppose one another's Bills, so the Strathspey Railway Bill received Royal Assent on 17 May 1861; authorised capital was £270,000. The Inverness and Perth Junction Railway was incorporated on 22 July 1861. [5] At the same time the Morayshire Railway received parliamentary approval to extend its line across the river at Craigellachie from the original terminus to a junction with the Strathspey Railway. The Keith and Dufftown Railway opened on 21 February 1862. [6]

The Speyside line required two major crossings of the River Spey, at Carron and Ballindalloch. During the construction of the line, the health of the main contractor, Preston, failed, and he was unable to proceed, and after a delay, a new contractor was appointed. Colonel Yolland of the Board of Trade inspected the line, and approved it, while commenting that the curves and gradients required special care in operation; and that a quantity of second-hand rails should be changed without delay, as otherwise they "would set a precedent". [7]

Opening

Craigellachie railway station Craigellachie station.jpg
Craigellachie railway station

The line opened for traffic on 1 July 1863 between Dufftown and Abernethy (later Nethy Bridge), with stations at Aberlour, Carron, Blacksboat, Ballindalloch, Advie, Dalvey, Cromdale and Grantown. The passenger train service consisted of three trains each way daily, with an additional round trip on Saturday evenings. [8] On the same day the Morayshire Railway opened its extension across the River Spey from Dandaleith to Strathspey Junction, renamed Craigellachie on 1 June 1864. The GNoSR was now physically linked to the Morayshire Railway, gaining an independent route to Elgin; it started to work the smaller company's traffic. [7]

After a delay, the line was extended to meet up with the Inverness and Perth Junction Railway at Boat of Garten on 1 August 1866. The two lines converged at Tullochgorum, about 3 miles north of Boat of Garten, but did not make a junction: the two single lines ran alongside one another as far as Boat of Garten, with the railway connection taking place at the southern end of Boat of Garten station. When this extension was being proposed, the GNoSR had reservations, fearing that traffic heading south would run by the Aviemore route rather than via Aberdeen. [9]

The line just about covered its operating costs, but there was almost no surplus to pay dividends or the interest on loans. [10]

Amalgamations

Blacksboat Station in 1961 Blacksboat railway station 1821111 945d5071.jpg
Blacksboat Station in 1961

On 1 February 1865, the Inverness and Aberdeen Junction Railway and the Inverness and Perth Junction Railway amalgamated. On 29 June 1865, the combined undertaking was authorised to be known as the Highland Railway; this took effect on 1 August 1886. [11] [12]

Also on 1 August 1866 the Strathspey Railway and the Keith and Dufftown Railway were formally incorporated into the Great North of Scotland Railway. [8] [5]

During World War I the timber resources sought by the GNoSR came to be exploited. The Great North laid down a timber siding near Knockando, and two more at Nethy Bridge, one of which had a narrow gauge railway connecting it with the surrounding woods. [13]

Passenger train services

There appear to have been no regular through workings connecting the Strathspey line with the Perth, Dufftown or Elgin lines in either direction.

According to Bradshaw's Guide of May 1864, there were three trains each way between Strathspey Junction (renamed Craigellachie Junction the following month) and Abertheny on weekdays, with an additional train each way on Saturday evenings. The journey took around 1 hour 40 minutes. [14] In December 1895, there were three trains each way between Craigellachie Junction (renamed Craigellachie in 1897) and Boat of Garten, supplemented by two short workings between Craigellachie Junction and Ballindalloch. [15] Services in April 1910 followed a similar pattern. [16] In July 1922, there were four trains each way, although one of the southbound trains ran from Craigellachie to Ballindalloch only. [17] In 1938 there were three daily trains supplemented by two southbound and one northbound on Saturdays. [18] None of these timetables show a Sunday service. From 1910 Ballindalloch is indicated as the station "for Tomintoul, 15 miles distant."

Grouping and Nationalisation

In 1923, the Great North of Scotland Railway became part of the new London & North Eastern Railway (LNER). Most of the railways of Great Britain were "grouped"; in this process they were transferred into one or other of four new large companies, following the Railways Act 1921. The GNoSR was a "constituent" of the new LNER. [19] The grouping had limited impact on the Speyside line, [20] and in 1948 a second Government-imposed reorganisation took place, when the railways were taken into national ownership under British Railways.

Since the 1930s road transport had become increasingly attractive for passenger and goods transport in rural and remote areas, and had abstracted much from already barely-profitable train services. This resulted in increasing financial losses, which the Government required British Railways to control. In 1955 it was proposed to withdraw passenger services between Ballindalloch and Boat of Garten, the most lightly used part of the line, but hardship to travellers, especially in the winter months, was put forward as an objection, and for the time being the proposal was deferred. [21]

In an attempt to stem the increasing losses on this and other lines, four-wheel diesel railbuses were introduced on some passenger services. This operation started on 3 November 1958, when a real attempt was made to make the service more attractive. Four new request stops were opened on 15 June 1959; they were ground level platforms, and passengers had to negotiate retractable steps to board the train. While the railbuses had a very modern feel to them, in those days there was a considerable volume of non-passenger business forwarded by passenger trains, including individual livestock, and these all had to be transferred to goods services, which were not always suitable. Moreover the railbuses were extremely unreliable, and when substituted by a conventional train, the ground level halts were impossible to use. [22]

In fact the railbuses did nothing to halt the decline in the line's finances, and this was brought to a head when the entire line was closed to passengers on 18 October 1965. [23] On the same day the Highland line between Aviemore and Forres via Dava was closed. [24]

Blacksboat Station - June 2010 - Now part of the Speyside Way Blackboat-Station.jpg
Blacksboat Station - June 2010 - Now part of the Speyside Way

Goods trains continued for a further three years, mainly to carry coal to, and whisky from the distilleries in the Spey valley. However, on 1 November 1968 these services too ceased, the final train being drawn by Bo-Bo Type 2 diesel locomotive D5114. [25] The track was lifted the following year, except for the short section between Aberlour and Dufftown, which remained open for goods traffic until the end of 1971. [26]

Present day

Although the two stations at either end of the line are open, serving two heritage railways, (the Keith and Dufftown Railway at Dufftown, and the (second) Strathspey Railway at Boat of Garten on the Highland Railway's Aviemore to Forres route), no part of the original Strathspey Railway has been preserved. However, the section between Ballindalloch and Craigellachie has now been converted into part of the Speyside Way, which runs between Ballindalloch and Spey Bay.

Grantown East: Highland Heritage & Cultural Centre Grantown East.png
Grantown East: Highland Heritage & Cultural Centre

Many of the railway's attractive stone-built station buildings still exist today; some have been converted for private usage, while others are near derelict. The former station building at Aberlour has been converted into a tearoom and visitor centre. Knockando station buildings have been restored as part of the neighbouring former Tamdhu distillery and are listed buildings. The former Grantown East Station has been completely renovated, reopening exactly fifty years after the last train passed through as the Highland Heritage & Cultural Centre. [27]

Two of the three bridges over the Spey still survive: the joint road/rail cast-iron Carron Bridge and the impressive lattice girder bridge at Ballindalloch, both of which are designated as Category A listed buildings. [28] [29] Only the piers of the bridge at Tomachrochar, to the west of Nethybridge survive.

The bridge at Abernethy (Nethy Bridge) over the River Nethy has completely disappeared, with abutments still visible in the undergrowth.

The line is closed in its entirety between Boat of Garten and Dufftown.

Stations

Related Research Articles

<span class="mw-page-title-main">Grantown-on-Spey</span> Human settlement in Scotland

Grantown-on-Spey is a town in the Highland Council Area, historically within the county of Moray. It is located on a low plateau at Freuchie beside the river Spey at the northern edge of the Cairngorm mountains, about 20 miles (32 km) south-east of Inverness.

<span class="mw-page-title-main">Highland Railway</span> Former British railway company

The Highland Railway (HR) was one of the smaller British railways before the Railways Act 1921, operating north of Perth railway station in Scotland and serving the farthest north of Britain. Based in Inverness, the company was formed by merger in 1865, absorbing over 249 miles (401 km) of line. It continued to expand, reaching Wick and Thurso in the north and Kyle of Lochalsh in the west, eventually serving the counties of Caithness, Sutherland, Ross & Cromarty, Inverness, Perth, Nairn, Moray and Banff. Southward it connected with the Caledonian Railway at Stanley Junction, north of Perth, and eastward with the Great North of Scotland Railway at Boat of Garten, Elgin, Keith and Portessie.

<span class="mw-page-title-main">River Spey</span> River in Scotland

The River Spey is a river in the northeast of Scotland. At 98 mi (158 km) it is the ninth longest river in the United Kingdom, as well as the third longest and fastest-flowing river in Scotland. It is important for salmon fishing and whisky production.

<span class="mw-page-title-main">Great North of Scotland Railway</span> Former Scottish railway company

The Great North of Scotland Railway (GNSR) was one of the two smallest of the five major Scottish railway companies prior to the 1923 Grouping, operating in the north-east of the country. Formed in 1845, it carried its first passengers the 39 miles (63 km) from Kittybrewster, in Aberdeen, to Huntly on 20 September 1854. By 1867 it owned 226+14 route miles (364.1 km) of line and operated over a further 61 miles (98 km).

The Strathspey Railway (SR) in Badenoch and Strathspey, Highland, Scotland, operates a ten-mile (16 km) heritage railway from Aviemore to Broomhill, Highland via Boat of Garten, part of the former Inverness and Perth Junction Railway which linked Aviemore with Forres. It is one of only a handful of former primary/secondary main lines to be preserved in Britain today.

<span class="mw-page-title-main">Morayshire Railway</span> Former railway in Scotland

The Morayshire Railway was the first railway to be built north of Aberdeen, Scotland. It received royal assent in 1846 but construction was delayed until 1851 because of the adverse economic conditions existing in the United Kingdom. The railway was built in two phases with the section from Elgin to Lossiemouth completed in 1852. When the Inverness and Aberdeen Junction Railway (I&AJR) reached Keith via Elgin, the Morayshire was able to complete the Speyside second phase by connecting the Craigellachie line at Orton. Initially, the Morayshire ran its own locomotives on the I&AJR track between Elgin and Orton but this was short-lived and the Morayshire carriages were then hauled to Orton by the I&AJR. Disagreements with the I&AJR eventually forced the Morayshire into constructing a new section of track between its stations at Elgin and Rothes; this was completed in 1862. The Morayshire accomplished its final enlargement by connecting to the new Great North of Scotland Railway (GNoSR) Craigellachie station in 1863. Crippling debt forced the company into an arrangement with the GNoSR for it to assume operation of the track in 1866. By 1881, the Morayshire had greatly reduced its liabilities and its long-sought-after amalgamation with the GNoSR finally took place.

<span class="mw-page-title-main">Cromdale</span> Human settlement in Scotland

Cromdale is a village in Strathspey, in the Highland council area of Scotland, and one of the ancient parishes which formed the combined ecclesiastical parish of Cromdale, Inverallan and Advie in Morayshire.

<span class="mw-page-title-main">Inverness and Nairn Railway</span> Scottish railway line

The Inverness and Nairn Railway was a railway company that operated between the burghs in the company name. It opened its line in 1855 and its passenger business was instantly successful. At first it was not connected to any other line. However it was seen as a first step towards connecting Inverness and Central Scotland, via Aberdeen and when feasible, directly southwards.

<span class="mw-page-title-main">Inverness and Perth Junction Railway</span>

The Inverness and Perth Junction Railway (I&PJR) was a railway company that built a line providing a more direct route between Inverness and the south for passengers and goods. Up to the time of its opening, the only route was a circuitous way through Aberdeen. The I&PJR was built from a junction with the friendly Inverness and Aberdeen Junction Railway at Forres to the Perth and Dunkeld Railway at Dunkeld.

The Perth and Dunkeld Railway was a Scottish railway company. It was built from a junction with the Scottish Midland Junction Railway at Stanley, north of Perth, to a terminus at Birnam, on the south bank of the River Tay opposite Dunkeld.

The Inverness and Aberdeen Junction Railway (I&AJR) was a railway company in Scotland, created to connect other railways and complete the route between Inverness and Aberdeen. The Inverness and Nairn Railway had opened to the public on 7 November 1855 and the Great North of Scotland Railway (GNoSR) was building from Aberdeen to Keith. The I&AJR opened, closing the gap, on 18 August 1856.

The Keith and Dufftown Railway was a railway company in Scotland. Its line ran between Dufftown and Keith on the main line between Inverness and Aberdeen. The company was formed in 1857, but it struggled to attract investors and for some years was unable to proceed with construction.

Aberlour railway station served the village of Aberlour, Scotland, from 1863 to 1965.

<span class="mw-page-title-main">Castle Grant platform railway station</span> Former railway station in Scotland

Castle Grant platform railway station was a railway station serving Castle Grant, in Strathspey in Scotland.

Grantown-on-Spey (West) railway station was opened with the Inverness and Perth Junction Railway in 1863. Originally appearing on timetables as 'Grantown', the name was changed by British Railways. At the same time, the former GNSR station 'Grantown-on-Spey' was renamed similarly as 'Grantown-on-Spey (East)'.

<span class="mw-page-title-main">Broomhill railway station</span>

Broomhill railway station or Broomhill for Nethy Bridge railway station is a reconstructed railway station on the former Highland Railway main line which was originally built to serve the small villages of Nethy Bridge and Dulnain Bridge in Strathspey. It is at present the eastern terminus of the Strathspey Steam Railway.

The Banff, Portsoy and Strathisla Railway was a Scottish railway company that connected the Aberdeenshire ports of Banff and Portsoy with the main line of the Great North of Scotland Railway (GNoSR) main line at Grange, a place some distance east of Keith. The railway opened in 1859, and was renamed the Banffshire Railway in 1863 when the GNoSR began running services.

<span class="mw-page-title-main">Dava Way</span> Trail in Moray, Scotland, UK

The Dava Way is a 38 km (24 mi) long-distance path that mostly follows the route of the former Highland Railway between Grantown and Forres. The railway line, built as a route between Inverness and Perth, opened in 1863 and closed in 1965. The route was reopened as a long distance path in 2005. It is listed as one of Scotland's Great Trails by NatureScot, and links directly to two further Great Trails: the Moray Coast Trail and the Speyside Way. It is currently the shortest of the Great Trails, but can be combined with sections of the Moray Coast Trail and Speyside Way to form a 153 km (95 mi) circular route known as the Moray Way. About 5,000 people use the path every year, of whom about 400 complete the entire route.

<span class="mw-page-title-main">Ballindalloch Railway Bridge</span> 19th century railway bridge in Moray, Scotland

The Ballindalloch Railway Bridge is a former railway bridge on the crossing the River Spey at Ballindalloch in Moray, Scotland. Built in 1863 as a part of the Strathspey Railway, it was in use until the line was closed in 1968. It is now designated as a Category A listed building, and carries pedestrians and cyclists over the river as a part of the Speyside Way.

References

  1. Thomas, John & Turnock, David (1989). A Regional History of the Railways of Great Britain, Volume 15: North of Scotland. Newton Abbot: David and Charles, 1989. pp. 166–170. ISBN   0946537038.
  2. 1 2 Jackson & Fenwick (2012) , p. 5
  3. Vallance (1985) , p. 25
  4. Ross (2015) , p. 52
  5. 1 2 Carter, E. F. (1959). An Historical Geography of the Railways of the British Isles. London: Cassell. p. 328.
  6. Jackson & Fenwick (2012) , p. 7
  7. 1 2 Jackson & Fenwick (2012) , p. 9
  8. 1 2 Jackson & Fenwick (2012) , p. 11
  9. Jackson & Fenwick (2012) , p. 10
  10. Jackson & Fenwick (2012) , p. 13
  11. Ross (2015) , p. 44
  12. Vallance (1985) , p. 29
  13. Jackson & Fenwick (2012) , p. 16
  14. "Bradshaw's General Railway and Shipping Guide, for Great Britain and Ireland". No. 370. London: W. J. Adams. May 1864. pp. 202–203 via Internet Archive.{{cite magazine}}: Cite magazine requires |magazine= (help)
  15. Bradshaw's Rail Times for Great Britain and Ireland, December 1895. Midhurst: Middleton Press. 2011 [1895]. ISBN   9781908174116.
  16. Bradshaw's April 1910 Railway Guide. Newton Abbot: David & Charles. 1986 [1910]. p. 888. ISBN   0715342460 via HathiTrust.
  17. Bradshaw's July 1922 Railway Guide. Newton Abbot: David & Charles. 1985 [1922]. ISBN   0715387081.
  18. Bradshaws July 1938 Railway Guide. Newton Abbot: David & Charles. 1969 [1938]. ISBN   0715346865.
  19. Wragg, David (2011). LNER Handbook: The London & North Eastern Railway 1923–1947. Yeovil: Haynes Publishing. p. 12. ISBN   9781844258277.
  20. Jackson & Fenwick (2012) , p. 17
  21. Jackson & Fenwick (2012) , p. 18
  22. Jackson & Fenwick (2012) , p. 20–21
  23. Jackson & Fenwick (2012) , p. 23
  24. Vallance (1985) , p. 188
  25. Lamb, Ian (2014). "Last Train on Speyside". Great North Review. Vol. 51, no. 202. Great North of Scotland Railway Association. p. 16. ISSN   0307-3319.
  26. Jackson & Fenwick (2012) , p. 24–25
  27. "Tamdhu Distillery, Former Knockando Railway Station Ticket Office/Waiting Room and Signal Box". Historic Scotland. Retrieved 27 February 2019.
  28. Historic Environment Scotland. "Ballindalloch, Former Railway Bridge Over River Spey (Category A Listed Building) (LB8466)" . Retrieved 7 July 2019.
  29. Historic Environment Scotland. "Carron Bridge Over River Spey (Category A Listed Building) (LB8495)" . Retrieved 7 July 2019.
  30. Quick, Michael (2022). Railway Passenger Stations in England, Wales and Scotland: A Chronology (PDF). Version 5.04 (5th ed.). London: Railway and Canal Historical Society.
  31. Cobb, Michael H. (2003). The Railways of Great Britain – A Historical Atlas. Shepperton: Ian Allan. ISBN   0711030030.

Sources

  • Jackson, Dick & Fenwick, Keith (2012). The Speyside Line: A History and Guide to the Railway from Craigellachie to Boat of Garten. Great North of Scotland Railway Association. ISBN   9780902343245.
  • Ross, David (2015). The Great North of Scotland Railway: A New History. Catrine: Stenlake Publishing. ISBN   9781840337013.
  • Vallance, H. A. (1985) [1938]. The Highland Railway (Extended ed.). Newton Abbot: David & Charles. ISBN   0946537240.