Reading Green Park railway station

Last updated

Reading Green Park
National Rail logo.svg
Reading Green Park opening day 26.jpg
The station entrance on the opening day in May 2023
General information
Location Reading, Berkshire
England
Coordinates 51°25′36″N1°0′5″W / 51.42667°N 1.00139°W / 51.42667; -1.00139
Grid reference SU695702
Owned by Network Rail
Managed by Great Western Railway
Platforms2
Other information
Station codeRGP
Key dates
Spring 2019Construction began
27 May 2023Opened
Location
Location map United Kingdom Reading.png
Red pog.svg
Reading Green Park
Location of Reading Green Park station in Reading

Reading Green Park railway station is a railway station in Green Park, Berkshire, England. The station serves the Green Park business area and the Madejski Stadium, as well as the Green Park Village residential development. It is on the Reading to Basingstoke Line, south of Southcote Junction. The station opened later than planned on 27 May 2023, due to construction delays caused by the COVID-19 pandemic.

Contents

Green Park Village, the Madejski Stadium and most of the Green Park business area all within the borough of Reading, as is the station car park, bus and taxi interchange, and only access road. However the station building and platforms are within the civil parish of Burghfield in the West Berkshire unitary authority. There is no access to the station from the Burghfield side of the line. [1]

History

Initial proposals

Station site in 2008 Green Park location.jpg
Station site in 2008

Plans were announced in July 2007 and approved by the Office of Rail Regulation in March 2009. Building was originally expected to begin in early 2009, and be completed in early 2010. However, by late November 2010 building had not begun. Submissions were made to extend the planning permission for the station, which were due to expire in late 2010 and early 2011. [2] [3] [4] [5]

It was reported that the extended applications for planning consent contain a clause which, if approved, would ensure the developer of Green Park Village pays a premium of £4.26 million to find an alternative developer for the station if work has not begun on it within two years. [6]

In October 2011, the owners of the business park, Prupim, announced that plans for the station had been suspended after a local housing development project had been scaled down. [7]

Resubmitted proposals

In December 2013, Reading Borough Council stated that it would re-submit planning proposals for the station in 2014. [8] It was reported in July 2014, that a £17 million Government investment in road and rail projects in Berkshire will include a sum for the station, enabling building work to start in 201516. [9] In November 2014, the total investment was cited as £21.4 million, and that the station would cost £6.  million. [10] In March 2015, this cost was revised to £8 million in planning submissions to Reading Borough Council. The first £6.4 million would be met by the local enterprise partnership and the remaining £1.6 million covered by Reading Borough Council. [11] In April 2015 the council's planning committee renewed planning permission for the station. [12] The station's funding was announced by the Government in 2017. [13]

The station was planned to open in 2018, which should have coincided with electrification of the Reading – Basingstoke Line and introduction of new or refurbished trains. [14] However, the electrification of the line was then put back until after 2019, [15] and by December 2022 has not been commenced. The proposed service was discussed at a meeting of Reading Borough Council's strategic environment, planning and transport committee in November 2015. Concern was expressed that delay to the electrification of the railway line between Southcote Junction and Basingstoke could adversely affect the proposed train service. [16]

The station was planned to be built in four phases, [17] with its facilities expanding as the business park and residential development are built. Each phase was built only when there is the required funding or demand:

In July 2016, the Berkshire Local Transport Body (BLTB) awarded an additional £3 million to the initial £6.4 million contract for Green Park Station after a review concluded "a significant increase in the forecast passenger demand for the station in comparison to the calculations undertaken in 2013". The additional funding would be for additional shelters and improved ticketing facilities. [21] The Department for Transport confirmed in July 2017 that Reading Green Park station would receive £2.3 million from the New Stations Fund towards a total project cost of £16.5 million. [22]

Construction

Station being constructed in March 2022, looking north from Kirtons Farm Road bridge. Reading Green Park railway station 2022-03-27 18.23.53.jpg
Station being constructed in March 2022, looking north from Kirtons Farm Road bridge.

Construction started on the station in the spring of 2019. [23] The station was originally due for opening in May 2020, [24] then brought forward to Summer 2019, [25] then set to open by the end of 2020, [26] before being delayed by the COVID-19 pandemic. [27] In October 2020, it was reported to be due to open in the late summer of 2021 "at the earliest". [28] In June 2021, Network Rail announced that the opening had been put back until April to June 2022. [29]

By 8 August 2021, work on the station buildings and platforms were largely complete, and the new station bridge had been lifted into place. Following the completion of the building works, a four- to six-month commissioning period was expected to follow, in order for the station to receive authorisation to be entered into service. The total cost was stated to be £20.077 million. [30] [23]

The station opened on 27 May 2023. [31]

Facilities

Station platforms pictured from footbridge Reading Green Park station overpass.jpg
Station platforms pictured from footbridge

The station has two 150-metre-long (490 ft) canopied platforms which can accommodate up to six-car trains, [32] which are connected by a 15-metre-long (49 ft) bridge, with lifts and stairs. The station has an interchange with the existing Green Park Park and Ride bus system, together with a taxi rank, surface level car park and cycle parking. [3] [23]

Services

All services at Reading Green Park are operated by Great Western Railway using Class 165 and 166 DMUs.

The typical off-peak service is two trains per hour in each direction between Reading and Basingstoke. On Sundays, the service is reduced to hourly in each direction. [33] [11]

Preceding station National Rail logo.svg National Rail Following station
Great Western Railway

Related Research Articles

<span class="mw-page-title-main">Reading, Berkshire</span> Town and borough in Berkshire, England

Reading is a town and borough in Berkshire, England. Most of its built-up area lies within the Borough of Reading, although some outer suburbs are parts of neighbouring unitary authority areas. Located in the Thames Valley at the confluence of the rivers Thames and Kennet, Reading is 40 miles (64 km) east of Swindon, 25 miles (40 km) south of Oxford, 40 miles (64 km) west of London and 16 miles (26 km) north of Basingstoke.

<span class="mw-page-title-main">Southcote, Berkshire</span> Human settlement in England

Southcote is a suburb of Reading in the English county of Berkshire. Located to the south-west of Reading town centre, Southcote has a population of about 8,500. The settlement lies primarily between the London-to-Bath road and the River Kennet.

<span class="mw-page-title-main">Reading railway station</span> Principal railway station in Berkshire, England

Reading railway station is a major transport hub in Reading, Berkshire, England; it is 36 miles (58 km) west of London Paddington. It is sited on the northern edge of the town centre, near to the main retail and commercial areas and the River Thames. It is the busiest station in Berkshire, and the third busiest in South East England.

<span class="mw-page-title-main">Reading West railway station</span> Railway station in the English town of Reading

Reading West railway station serves West Reading, Berkshire, about 1 mile (1.6 km) west from the town's main retail and commercial areas. The station is served by local services operated by Great Western Railway. It is 36 miles 75 chains down the line the zero point at London Paddington.

<span class="mw-page-title-main">Tilehurst railway station</span> Railway station in Berkshire, England

Tilehurst railway station serves the suburb and former village of Tilehurst, west of Reading, Berkshire, England. The station is on the extreme northern edge of Tilehurst and at a much lower level than most of that suburb. The railway line and station occupy a strip of land between the A329 road and the River Thames, with the up relief platform on an embankment above the river bank.

<span class="mw-page-title-main">Basingstoke railway station</span> Railway station in Hampshire, England

Basingstoke railway station serves the town of Basingstoke in the county of Hampshire in England. It is on the South West Main Line from London Waterloo, with local and fast services operated by South Western Railway. It is the terminus of Great Western Railway local services on the Reading to Basingstoke Line. Long-distance cross-country services operated by CrossCountry to Bournemouth from Birmingham, Manchester and further north, join the main line from the branch there.

<span class="mw-page-title-main">Winnersh Triangle railway station</span> Railway station in Winnersh, Berkshire, England

Winnersh Triangle railway station is one of two railway stations in Winnersh, Berkshire, England. It is served by South Western Railway services between London Waterloo and Reading. The station is on the west side of Winnersh, 39 miles 35 chains (63.5 km) from London Waterloo and 6.4 kilometres (4.0 mi) from Reading. It is situated on an embankment by which the railway crosses the valley of the River Loddon, and is some 500 metres (1,600 ft) east of the bridge across that river.

<span class="mw-page-title-main">Oxford railway station</span> Railway station in Oxfordshire, England

Oxford railway station is a mainline railway station, one of two serving the city of Oxford, England. It is about 0.5 miles (800 m) west of the city centre, north-west of Frideswide Square and the eastern end of Botley Road. It is the busiest station in Oxfordshire, and the fourth busiest in South East England.

<span class="mw-page-title-main">Reading Borough Council</span>

Reading Borough Council, formerly known as Reading Corporation, is the local authority for Reading in the county of Berkshire, England. Reading is a unitary authority with borough status. As a unitary authority the council has the powers of a county council and district council combined. Berkshire is purely a ceremonial county, with no administrative responsibilities.

<span class="mw-page-title-main">Ascot–Ash Vale line</span> Railway line in southern England

The Ascot–Ash Vale line is an 11-mile-58-chain (18.9 km) railway line in Berkshire and Surrey, England. It runs from Ascot station, on the Waterloo–Reading line, to Ash Vale, on the Alton line. There are intermediate stations at Bagshot, Camberley and Frimley, all three of which are in the Borough of Surrey Heath.

<span class="mw-page-title-main">Heathrow Airtrack</span> Proposed airport express rail service between Waterloo, Surrey and Berkshire

Heathrow Airtrack was a proposed railway link in the United Kingdom which would link Heathrow Airport in west London to London Waterloo railway station in Central London.

<span class="mw-page-title-main">Reading–Basingstoke line</span> Railway line in England, linking Reading and Basingstoke

The Reading–Basingstoke line is a railway link between the South West Main Line and the Great Western Main Line, constructed by the Great Western Railway between 1846 and 1848. The line is served by GWR local services between Reading and Basingstoke, stopping at the intermediate stations of Reading West, Reading Green Park, Mortimer and Bramley. The line is also an important through route for longer distance passenger and freight services: CrossCountry services from Bournemouth and Southampton to Birmingham and the North of England and freight trains between the Port of Southampton and the Midlands use the line. South Western Railway weekend workings also operate between Reading and Salisbury.

<span class="mw-page-title-main">Bermuda Park railway station</span> Railway station in Warwickshire, England

Bermuda Park railway station is a railway station in the Bermuda area of Nuneaton, Warwickshire, England. It serves the Bermuda Park Industrial Estate, on the Coventry to Nuneaton Line between the existing stations at Nuneaton and Bedworth. Funding for the new station was approved in December 2011, along with that for the new Coventry Arena railway station. Both stations opened on 18 January 2016.

<span class="mw-page-title-main">Great Western Main Line upgrade</span> Major electrification project by Network Rail

In the 2010s Network Rail modernised the Great Western Main Line, the South Wales Main Line, and other associated lines. The modernisation plans were announced at separate times but their implementation overlapped in the 2010s.

<span class="mw-page-title-main">MetroWest (Bristol)</span> Project to improve the rail services in Bristol

MetroWest, formerly known as the Greater Bristol Metro, is a project to improve the rail services in Bristol, England, and the surrounding region. It was first proposed at First Great Western's Stakeholder Event in March 2008. The aim of the project is to develop half-hourly services through central Bristol which will also serve the surrounding West of England region. Transport campaigning groups Friends of Suburban Bristol Railways (FoSBR) and Transport for Greater Bristol are actively supporting the proposal, as are the three unitary authorities under the West of England Combined Authority and North Somerset Council.

The Windsor Link Railway was a proposed new railway in Windsor, Berkshire, connecting the Great Western and South Western franchise areas and linking both to London Heathrow Airport.

<span class="mw-page-title-main">Transport in Reading, Berkshire</span>

Reading's location in the Thames Valley at the confluence of the River Thames and River Kennet, and on both the Great Western Main Line and the M4 motorway, some 40 miles (64 km) west of London has made the town an important location in the nation's transport system.

<span class="mw-page-title-main">Beam Park railway station</span> Planned railway station to serve Beam Park, London

Beam Park railway station is a planned railway station to serve the new community of Beam Park. Intended to serve a redeveloped former industrial area with extremely poor access to public transport, plans for the station have been in development since at least 2002. Beam Park is a large housing development that extends from the London Borough of Havering, where the new station is proposed to be sited, into the London Borough of Barking and Dagenham. The construction costs of the station have been met by developers in the area and the Greater London Authority. The station received planning permission in February 2019. As of August 2023 the Department for Transport has not authorised the introduction of passenger services at the station and is unwilling to do so until 2024.

<span class="mw-page-title-main">Worcestershire Parkway railway station</span> Railway station in Worcestershire, England

Worcestershire Parkway is a split-level railway station where the Cotswold and Cross Country lines cross near Norton, Worcester, England. It opened on 23 February 2020.

<span class="mw-page-title-main">Western Rail Approach to Heathrow</span> Proposed rail link in England

The Western Rail Approach to Heathrow is a proposed bi-directional link westward from London's Heathrow Airport to the Great Western Main Line. It would thus run, in council areas, from Greater London under Iver, South Bucks, Buckinghamshire to Langley, Slough. Beginning at Heathrow Terminal 5 station, it would run via a tunnel to a junction east of Langley station, therefore allowing trains to run to and from destinations in the west: Slough, Reading and beyond. When completed, it would improve rail connections to Heathrow from the Thames Valley as well as from South West England, South Wales and The Midlands. It would also reduce congestion at London Paddington station by removing the need, which presently exists, for passengers from Heathrow who are bound for those regions, to travel to Hayes and Harlington and then change at Reading or to make their interchange at Paddington, central London. Paddington would remain an interchange for services to/from Euston, Saint Pancras and London generally and a little of the Great Western Main Line would gain rail capacity as many services would take the resultant side loop via Heathrow.

References

  1. Election Maps (Map). Ordnance Survey . Retrieved 27 May 2023.
  2. "Reading Green Park Station, Berkshire" (PDF). Office of Rail Regulation. Archived from the original (PDF) on 11 November 2010. Retrieved 26 November 2010.
  3. 1 2 "GreenParkVillage – Railway station". GreenParkVillage. Archived from the original on 18 November 2010. Retrieved 26 November 2010.
  4. "Planning application details – 10/01905/FUL". Reading Borough Council. Archived from the original on 24 August 2011. Retrieved 26 November 2010.
  5. "Planning documents – Case Number: 10/02603/XCOMIN". West Berkshire Council. Archived from the original on 22 January 2016. Retrieved 26 November 2010.
  6. "Planners talk Green Park railway". Reading Post . Trinity Mirror. 13 October 2010. Archived from the original on 27 October 2010. Retrieved 26 November 2010.
  7. Millward, David (27 October 2011). "Green Park station plan hits the buffers". Reading Post. Trinity Mirror. Archived from the original on 4 April 2012. Retrieved 27 October 2011.
  8. "New railway station plan for Reading's Madjeski Stadium". BBC News. 3 December 2013.
  9. Millward, David (9 July 2014). "Plans for Green Park railway station on track following £17 million cash injection". Reading Post. Trinity Mirror. Archived from the original on 5 August 2014. Retrieved 10 July 2014.
  10. "Green Park train station funding approved for Reading". News. BBC. 20 November 2014.
  11. 1 2 Vashisht, Rahul (20 March 2015). "Green Park train station plans submitted". Reading Post. Trinity Mirror. Archived from the original on 22 March 2015. Retrieved 20 March 2015.
  12. "Green Park railway station approved for Reading". News. BBC. 30 April 2015. Archived from the original on 3 May 2015. Retrieved 30 April 2015.
  13. "New Stations Fund". Network Rail. Archived from the original on 6 January 2020. Retrieved 20 November 2019.
  14. Fort, Linda (29 April 2015). "Green Park Station: expired plan to be looked at again". Reading Post. Trinity Mirror. Archived from the original on 30 July 2015. Retrieved 29 April 2015.
  15. Macdonald-Read, Neil (26 November 2015). "Green Park station blow as electrification delayed until after 2019". Archived from the original on 22 July 2016. Retrieved 19 July 2016.
  16. Reading Chronicle, 26 November 2015, page 19
  17. Director of Environment and Neighbourhood Services 2015, p. 5.
  18. Director of Environment and Neighbourhood Services 2015, p. 14.
  19. Director of Environment and Neighbourhood Services 2015, pp. 14–15.
  20. 1 2 Director of Environment and Neighbourhood Services 2015, p. 15.
  21. "Reading Green Park railway station cost increases by £3m". BBC News. 22 July 2016. Archived from the original on 27 July 2016. Retrieved 22 July 2016.
  22. "New station boost for passengers thanks to £16 million government investment". DfT. 28 July 2017. Archived from the original on 28 July 2017. Retrieved 29 July 2017.
  23. 1 2 3 "Green Park Station Takes Shape". Reading Borough Council. Archived from the original on 5 April 2022. Retrieved 5 April 2022.
  24. "Green Park Station plans given green light by government". News. GetReading. 28 July 2017. Archived from the original on 19 October 2017. Retrieved 19 October 2017.
  25. Aldridge, James (23 March 2018). "Green Park Station in Reading to open one year ahead of schedule". InYourArea. Archived from the original on 10 July 2018. Retrieved 22 July 2018.
  26. Markson, Tevye (24 October 2019). "New Reading station Green Park opens in 2020 - final details confirmed". The Reading Chronicle. Archived from the original on 28 October 2019. Retrieved 20 November 2019.
  27. "Food waste bin collection and Green Park station delayed". The Reading Chronicle. 23 April 2020. Archived from the original on 30 April 2020. Retrieved 28 May 2020.
  28. Markson, Tevye (14 October 2020). "Reading: Green Park Station delayed until 2021 – this is when it could open". The Reading Chronicle. Archived from the original on 28 October 2020. Retrieved 26 November 2020.
  29. Markson, Tevye (25 June 2021). "Opening of Reading's Green Park station faces further delays". Berkshire Live. Retrieved 27 June 2021.
  30. "Breath-taking aerial footage shows entirety of new Reading Green Park Station". Network Rail. 10 November 2022.
  31. "Reading's new Green Park Station welcomes first passengers". BBC News. 25 May 2023. Retrieved 27 May 2023.
  32. Fletcher, Steve. "THE RAILWAYS (INTEROPERABILITY) REGULATIONS 2011, AS AMENDED READING GREEN PARK STATION" (PDF). ORR. Retrieved 30 May 2023.
  33. Table 122 National Rail timetable, December 2023

Sources