Swindon Works

Last updated

Swindon Works
Kings under construction at Swindon (CJ Allen, Steel Highway, 1928).jpg
King class locomotives under construction, 1928
Wiltshire UK location map.svg
Red pog.svg
Location in Wiltshire
General information
StatusRedeveloped
Town or city Swindon, Wiltshire
CountryEngland
Coordinates 51°33′43″N1°47′42″W / 51.562°N 1.795°W / 51.562; -1.795
Construction started1841
Completed1843
Demolished1986
Client Great Western Railway
Design and construction
Other designers Daniel Gooch
Isambard Kingdom Brunel
D1015 Western Champion in A Shop D1015 Western Champion in Swindon Works.jpg
D1015 Western Champion in A Shop

Swindon Works was opened by the Great Western Railway in 1843 in Swindon, Wiltshire, England. It served as the principal west England maintenance centre until closed in 1986.

Contents

History

In 1835, Parliament approved the construction of the Great Western Main Line between London and Bristol by the Great Western Railway (GWR). Its Chief Engineer was Isambard Kingdom Brunel.

From 1836, Brunel had been buying locomotives from various makers for the new railway. Brunel's general specifications gave the locomotive makers a free hand in design, although subject to certain constraints such as piston speed and axle load, resulting in a diverse range of locomotives of mixed quality. In 1837, Brunel recruited Daniel Gooch and gave him the job of rectifying the heavy repair burden of the GWR's mixed bag of purchased locomotives. [1]

It became clear that the GWR needed a central repair works, so in 1840 Gooch identified a site at Swindon because it was at the junction with the Golden Valley line and also a "convenient division of the Great Western line for engine working". With Brunel's support, Gooch made his proposal to the GWR directors, who, on 25 February 1841, authorised the establishment of the works at Swindon. Construction started immediately and they became operational on 2 January 1843.

Location

There are several stories relating to how the railway came to pass through Swindon. A well-circulated myth states that Brunel and Gooch were surveying a vale north of Swindon Hill and Brunel either threw a stone or dropped a sandwich and declared that spot to be the centre of the works. [2] [3] However, Swindon's midway point between GWR terminals and the topography of land near the town were more likely factors. [4] [5]

The GWR mainline was originally planned to cut through Savernake Forest near Marlborough, but the Marquess of Ailesbury, who owned the land, objected. The Marquess had previously objected to part of the Kennet and Avon Canal running through his estate (see Bruce Tunnel). With the railway needing to run near to a canal at this point, and as it was cheaper to transport coal for trains along canals at this time, Swindon was the next logical choice for the works, 20 miles (32 km) north of the original route.

The line was laid in 1840, but the location of the works was still undecided. Tracks were laid at Didcot in 1839 (chosen as Lord Wantage did not want the railway passing close to Abingdon) and for some time this seemed a more likely site.

Gooch noted that the nearby Wilts & Berks Canal gave Swindon a direct connection with the Somerset Coalfield. He also realised that engines needed to be changed at Swindon or close by, as the gradients from Swindon to Bristol were much more arduous than the relatively easy route between London and Swindon. Drawing water for the engines from the canals was also considered, and an agreement to this effect was completed in 1843. Gooch recorded at the time: [6]

I was called to report upon the best situation to build these works and, on full consideration, I reported in favour of Swindon, it being the junction with the Cheltenham branch and also a convenient division of the Great Western Line for the engine working. Mr. Brunel and I went to look at the ground, then only green fields, and he agreed with me as to its being the best place.

Once the plan was set for the railway to come to Swindon, it was at first intended to bring it closely along the foot of Swindon Hill, so as to be as close as possible to the town without entailing the excessive engineering works of building on the hill. However, the Goddard family (lords of the manor of Swindon) objected to having it near their property, so it was laid a couple of miles further north.

Early years

Watercolour of New Swindon in 1849, by Edward Snell Watercolour of New Swindon in 1849, by Edward Snell.jpg
Watercolour of New Swindon in 1849, by Edward Snell

With many of the early structures built and adorned by stone extracted from the construction of Box Tunnel, the first building – the locomotive repair shed – was completed in 1841 using contract labour, with the necessary machinery installed within it by 1842. Initially only employing 200 men, repairs began in 1843, with the first new locomotive, the "Premier", built in 1846 in under two weeks and renamed "Great Western". This was followed by six more, with the Iron Dukes, including The Lord of the Isles, considered the fastest broad-gauge engine of its day. By 1851, the works were employing over 2,000 men and were producing about one locomotive a week, with the first standard-gauge engine built in 1855. A rolling mill for manufacturing rails was installed in 1861, attracting workers from South Wales. Although some rolling stock was built at Wolverhampton (producing 800 standard-gauge locomotives up to 1908), Worcester and Saltney near Chester, most of the work was concentrated at Swindon.

Like most early railways, the GWR was built with gentle gradients and the minimum of curves, which meant that it was able to operate fast, lightweight 'single-wheelers', 2-2-2 and 4-2-2. However, from 1849 Gooch also built 4-4-0 saddle tanks for the hillier routes in Devon.

Railway village

Preserved housing, originally built for the railway workers Railway village houses.jpg
Preserved housing, originally built for the railway workers

The Works transformed Swindon from a small 2,500-population market town into a bustling railway town. Built to the north of the main town centre, the works had need for locally accessible housing and services for the workers. The development of the railway village was on the lines of similar Victorian-era socially-encompassing lifestyle concepts, such as that at Bournville, but architect/builder Rigby's were given license to create a commercially viable development by the GWR. [7] The completed village provided to the town medical and educational facilities that had been sorely lacking, together with the large St Mark's Church and the Bakers Arms public house, all completed before 1850. [7]

The terraced two-storey cottages were built on two blocks of four parallel streets, not dissimilar in appearance to passing trains. Each road was named after the destinations of trains that passed nearby: Bristol, Bath, Taunton, London, Oxford and Reading among them. Built in the nearby open area, named Emlyn Square after GWR director Viscount Emlyn (later known as John Campbell, 1st Earl Cawdor), was the Mechanics Institute, paid for via subscription by the workers. Designed and constructed by Edward Roberts, it was completed in 1855, contained the UK's first lending library and provided health services to workers; it was enlarged in 1892–93. Nye Bevan, mastermind of the National Health Service, later said "There was a complete health service in Swindon. All we had to do was expand it to the country". [8]

In the 1960s, Swindon Borough Council applied to demolish much of the village, but poet and railway enthusiast John Betjeman led a successful campaign to preserve it. Today much of the village is a conservation area, and many structures within it are listed buildings. [7] One of the last houses to be built, 34 Faringdon Road, originally 1 Faringdon Street, has been restored to the condition it was in around 1900 as a living museum. [9]

Expansion

Gooch followed a policy of taking in-house any railway engineering discipline that could be enabled to scale. Hence in addition to locomotive building, from 1850 standardised goods wagons were produced, and in 1867 Swindon was made the central workshop for the construction of carriages and wagons.

In 1864, when Joseph Armstrong took over, he took on the responsibility of improving the passenger stock, resulting in 1878 of a separate carriage and wagon works being built on land north of the station. The first Royal Saloon was built in 1874 and converted to standard gauge in 1899. 1875 saw the opening of the boiler and tender making shops, eventually used to also produce parts for locomotives, and marine engines for the GWR's fleet of ships and barges. The first GWR through corridor train was built in 1891, with electric lighting introduced in 1900.

In 1892, the GWR completed the process of converting their lines to standard gauge. 13 miles (21 km) of new broad gauge sidings were laid to accommodate the influx of rolling stock, so that by 21/22 May 1892 195 locomotives, 748 carriages and 3,400 wagons and vans were stored for conversion to the new gauge. Those that could not be converted were scrapped on site. By the turn of the century, the works were employing an estimated three-quarters of Swindon's entire workforce.

An early GWR Saint class, in the period when these were taper-boilered 4-4-2 Atlantics (1905-12), in the testing shop Ahrons (1921) Steam Locomotive Construction and Maintenance Fig45.jpg
An early GWR Saint class, in the period when these were taper-boilered 4-4-2 Atlantics (1905–12), in the testing shop

George Churchward's tenure, first as Assistant Chief Superintendent in 1897, then Locomotive Superintendent in 1902, produced heavier locomotives, firstly the 4-4-0 City class, then the County class. Later in 1906, "North Star", originally 4-4-2, was rebuilt as the first four-cylinder 4-6-0. More four-cylindered 4-6-0 engines were built, and in 1908 the first 4-6-2 "Pacific" entered service, the only tender engine of that type in Britain until 1922. It was later rebuilt as a 4-6-0. From 1914 the works turned to aiding the war effort, producing twelve howitzers by the end of the year.

Heyday

Charles Collett, Chief Mechanical Engineer from 1921 to 1941, greatly improved the works' boiler making and its facilities for working heavy gauge sheet metal. In 1927 the GWR's most powerful and largest locomotive, the King class, was introduced to become the "flagship" of the GWR fleet. The Kings had been developed from the Castle Class which, along with the Halls, were the foundation of the GWR's reputation and image.

Evocation of wartime in Swindon Works Evocation.jpg
Evocation of wartime in Swindon Works

This was the heyday of Swindon Works, when 14,000 people were employed and the main locomotive fabrication workshop, the A Shop was, at 11.25 acres (45,500 m2), one of the largest covered areas in the world.

During World War II, Swindon was again involved with military hardware, producing various types of gun mountings. Loco wheel-turning lathes were also ideally suited for making turret rings for tanks. The works also built landing craft and parts for midget submarines.

Nationalisation

Locomotives outside Swindon Works in the snow in November 1964 Swindon Locomotive Works geograph-2165969.jpg
Locomotives outside Swindon Works in the snow in November 1964
Locomotives awaiting scrapping outside the Works Scrap locos outside works.jpg
Locomotives awaiting scrapping outside the Works

At the nationalisation of British Railways (BR) in 1948, the works were still producing 60 new locomotives in the year, falling to 42 in 1954. From 1948 to 1956, the works made 452 steam engines to GWR designs, partly in parallel with producing 200 BR standard classes from 1951 until 1960.

The decision in 1960 to move BR's main motive power from steam to diesel brought the works both new lines of employment and an end to an old one. The works became the southern UK's regional hub for the storage and scrapping of steam locomotives and rolling stock, a role which later expanded to all scrap railwayana in light of the Beeching axe. However, it also brought about an end to steam locomotive production, with the works producing BR's last steam locomotive 92220 Evening Star, by which time the works only employed 5,000.

Much of the original design and specification for the first Mark 2 carriages and bogies was carried out by the Engineering drawing office at Swindon in the early 1960s. The B4 bogie used on this carriage provided more reliable high speed running than that under the previous generation Mark 1 carriage and heralded the higher running speeds brought in with the start of InterCity services and the West Coast Main Line electrification.

Decline and closure

The future of the works had been defined by the GWR's post-WW2 choice to develop its new diesel-powered experimental locomotives using diesel-hydraulic transmission systems rather than diesel-electric. As a result, from 1957 the works produced 38 "Warship" class D800s and 30 Western class D1000s. However, early diesel production followed previous steam locomotive construction strategy, resulting in numerous classes with short production runs and a resultant high maintenance cost in traffic. With the Beeching Axe strategy of reshaping BR towards inter-city traffic, the need for many of these diesel-powered classes was removed. A decision was also made to specify all new classes of locomotive with diesel-electric transmission, making the works' specialist diesel-hydraulic knowledge redundant.

As a result, with scrapping rolling stock keeping employment levels at the works high, a decision was made to cease building new locomotives at Swindon, and to reassign the works to become a heavy repair facility. Building of locomotives finished in 1965 with construction of the Class 14 diesel-hydraulic locomotives. Locomotive repairs and carriage and wagon work continued, though the original carriage and wagon workshop was sold.

After the works became part of BR's integrated British Rail Engineering Ltd (BREL), it won less and less maintenance business against the internal competition of Crewe and Derby Works. With the town of Swindon expanding and needing land close to its centre for development, the decision was made to close the works. The final day of operation was 26 March 1986.

Between 2000 and 2006, the rolling chassis of GWR No. 7200 was restored in the former iron foundry (J Shop), making it the final Great Western steam locomotive to receive attention at the works.

Present

The former Pattern Store Pattern Store Bar.jpg
The former Pattern Store

The redevelopment of the works took account of the listed building status of the original core infrastructure. One building houses the Museum of the Great Western Railway, dedicated to the works and the GWR. The engineers' office is now the headquarters of English Heritage, with most of the remaining buildings redeveloped as part of the Designer Outlet Village. The rest of the site's extensive railway yard was redeveloped on a mixed-use basis, some for housing and some for commercial buildings including purpose-built storage for the English Heritage Archive and the National Trust's central office building, known as Heelis. [10]

Superintendents and Chief Engineers

Organisation

A great many different activities were carried out within the works and most of the components used to make locomotives, carriages and wagons were made on site. The works were organised into a number of shops:-

Shops in the Locomotive Works, in 1950
ShopDescription
AErectors, Boilermakers, Painters, Machine and Wheel Shop
BErectors, Boilermakers, Painters and Tender Shop
BSEEngine Reception and Preparation
CConcentration Yard (recovery of scrap metal)
DCarpenters and Masons
EElectrical Shop
FSmiths, Springsmiths and Chainmakers
GMillwrights
HPattern makers
JIron Foundry
J2Chair Foundry
KCoppersmiths and Sheet Metal Workers
L2Tank Shop
MElectric Sub-Station
NBolt Shop
OTool Room
P1Steaming and Boiler Mounting
PL Platelayers; Loco. Works, Rails, Roads and Water Mains Maintenance
QAngle Iron Smiths
RFitters, Turners and Machinemen
SPSpringsmiths
TBrass finishers
THTesting House
UBrass Foundry
VBoilermakers
WTurners and Machinemen
XPoints and Crossings, Fittings for Permanent Way
ZTransport
Shops in the Carriage and Wagon Works, in 1950
ShopDescription
1Sawmill (West End)
2Sawmill
3Fitting and Machines
4Carriage Body Building
5Electric Train Lighting
7Carriage Finishing and Polishers
8Carriage Painting
9Carriage Trimming
9aLining Sewers (female)
10Laundry (female)
11General Labourers
12Carpenters
13Wagon Frame Building
13aCarriage Frame Repairs
14Smiths
15Fitting, Machining, Plumbers, Gas and Steam Fitters, Sheet Metal Workers and Coppersmiths
16Wheel
17Road Vehicle Building and Repairing
18Stamping
19aCarriage Trimmers Repairs
19bCarriage Finishers Repairs
19cCarriage Lifters
19dVacuum Brake and Carriage Bogie Repairs
20Horse Box and Carriage Truck Repairs
21Wagon Building and Repairs
22Oil and Grease Works
23Platelayers’ Yard, Maintenance and Breaking-up Yard
24Carriage Repairs

See also

Related Research Articles

<span class="mw-page-title-main">Great Western Railway</span> British railway company (1833–1947)

The Great Western Railway (GWR) was a British railway company that linked London with the southwest, west and West Midlands of England and most of Wales. It was founded in 1833, received its enabling Act of Parliament on 31 August 1835 and ran its first trains in 1838 with the initial route completed between London and Bristol in 1841. It was engineered by Isambard Kingdom Brunel, who chose a broad gauge of 7 ft —later slightly widened to 7 ft 14 in —but, from 1854, a series of amalgamations saw it also operate 4 ft 8+12 in standard-gauge trains; the last broad-gauge services were operated in 1892.

<span class="mw-page-title-main">Didcot Railway Centre</span> Operational Railway museum in Oxfordshire, England

Didcot Railway Centre is a railway museum and preservation engineering site in Didcot, Oxfordshire, England. The site was formerly a Great Western Railway engine shed and locomotive stabling point.

George Jackson Churchward was an English railway engineer, and was chief mechanical engineer of the Great Western Railway (GWR) in the United Kingdom from 1902 to 1922.

<span class="mw-page-title-main">Daniel Gooch</span> English railway locomotive and transatlantic cable engineer

Sir Daniel Gooch, 1st Baronet was an English railway locomotive and transatlantic cable engineer. He was the first Superintendent of Locomotive Engines on the Great Western Railway from 1837 to 1864 and its chairman from 1865 until his death in 1889.

<span class="mw-page-title-main">Locomotives of the Great Western Railway</span> List of railway locomotives used by the Great Western Railway

The first Locomotives of the Great Western Railway (GWR) were specified by Isambard Kingdom Brunel but Daniel Gooch was soon appointed as the railway's Locomotive Superintendent. He designed several different 7 ft 14 in broad gauge types for the growing railway, such as the Firefly and later Iron Duke Class 2-2-2s. In 1864 Gooch was succeeded by Joseph Armstrong who brought his standard gauge experience to the workshops at Swindon. To replace some of the earlier locomotives, he put broad gauge wheels on his standard gauge locomotives and from this time on all locomotives were given numbers, including the broad gauge ones that had previously carried just names.

<span class="mw-page-title-main">Museum of the Great Western Railway</span> Industrial museum

STEAM – Museum of the Great Western Railway, also known as Swindon Steam Railway Museum, is housed in part of the former railway works in Swindon, England – Wiltshire's 'railway town'. The 6,500-square-metre (70,000 sq ft) museum opened in 2000.

<span class="mw-page-title-main">GWR Banking Class</span>

The Banking Class were five 0-6-0ST Brunel gauge steam locomotives for assisting ("banking") trains up inclines on the Great Western Railway. Designed by Daniel Gooch, they were tank engine versions of his Standard Goods class, and mainly built at Swindon Works.

<span class="mw-page-title-main">GWR 5700 Class</span> Class of 0-6-0 pannier tank steam locomotives

The GWR 5700 Class, or 57xx class, is a class of 0-6-0 pannier tank steam locomotive built by the Great Western Railway (GWR) and British Railways (BR) between 1929 and 1950. With 863 built, they were the most prolific class of the GWR, and one of the most numerous classes of British steam locomotive.

<span class="mw-page-title-main">Newton Abbot railway station</span> Railway station in Devon, England

Newton Abbot railway station serves the market town of Newton Abbot in Devon, England. It is 214 miles 5 chains (345 km) from London Paddington. The station today is managed by Great Western Railway, who provide train services along with CrossCountry.

<span class="mw-page-title-main">Caerphilly railway works</span> Former engineering facility in Wales

Caerphilly railway works in Caerphilly in the county of Glamorgan was the only main railway works in Wales.

Wolverhampton railway works was in the city of Wolverhampton in the county of Staffordshire, England. It was almost due north of the city centre, and is commemorated with a small display of level crossing gates and a plaque. Known as the Stafford Road Works, it was opened by the Shrewsbury and Birmingham Railway in 1849 to maintain bought-in locomotives.

<span class="mw-page-title-main">Doncaster Works</span> Railway Engineering Works

Doncaster Railway Works is a railway workshop located in Doncaster, England.

<span class="mw-page-title-main">Archibald Sturrock</span> Scottish mechanical engineer

Archibald Sturrock was a Scottish mechanical engineer who was born at Petruchie, Angus, Scotland. He was locomotive superintendent of the Great Northern Railway from 1850 until c. 1866, having from 1840 been Daniel Gooch's assistant on the Great Western Railway.

<span class="mw-page-title-main">Joseph Armstrong (engineer)</span> English locomotive engineer

Joseph Armstrong was an English locomotive engineer and the second locomotive superintendent of the Great Western Railway. His younger brother George and one of his sons also became outstanding engineers in the employment of the GWR.

<span class="mw-page-title-main">Stratford Works</span>

Stratford Works was the locomotive-building works of the Great Eastern Railway situated at Stratford, London, England. The original site of the works was located in the 'V' between the Great Eastern Main Line and the Stratford to Lea Bridge route and in the early years was also the home of Stratford Locomotive Depot. The final part of the works closed in 1991.

The Daniel Gooch standard gauge locomotives comprise several classes of locomotives designed by Daniel Gooch, Superintendent of Locomotive Engines for the Great Western Railway (GWR) from 1837 to 1864.

Between 1854 when the Shrewsbury and Chester and Shrewsbury and Birmingham Railways were absorbed by the Great Western Railway, and 1864 when he moved south to Swindon Works, Joseph Armstrong occupied the post of the GWR's Locomotive Superintendent, Northern Division, at Wolverhampton Works. For ten years the task of providing new locomotives for the GWR's newly acquired standard gauge lines fell jointly to Armstrong and to his superior Daniel Gooch, the railway's principal Locomotive Superintendent who was based at Paddington.

<span class="mw-page-title-main">North Dorset Railway</span>

North Dorset Railway is a heritage railway based at Shillingstone railway station on the former Somerset and Dorset Joint Railway.

Cathays railways works was a railway engineering development by the Taff Vale Railway to provide its main carriage and wagon works, as well as its main railway depot for the entire TVR system, located in the Cathays suburb of Cardiff, South Wales.

References

  1. Jackson, pp. 90–91.
  2. Jackson, p. 90.
  3. Melhuish, Martin (1986). The Supertramp Book. Toronto, Canada: Omnibus Press. p. 17. ISBN   0-9691272-2-7.
  4. Child, Mark (2002). Swindon: An Illustrated History. United Kingdom: Breedon Books Publishing. ISBN   1-85983-322-5.
  5. Swindon Works, and its Place in British Railway History. London: Railway Executive (Western Region). 1950.
  6. "The World's Finest Railway Works". SwindonWeb. Retrieved 25 January 2013.
  7. 1 2 3 "Life in a Railway Village". Swindon Web. 7 August 2006. Retrieved 2 January 2013.
  8. "Swindon Mechanics' Institute". Victorian Society. Archived from the original on 26 September 2013. Retrieved 30 August 2013.
  9. Swindon Railway Village Museum. Swindon: Borough of Thamesdown. 1980. p. 4.
  10. "Heelis - Visitor information". National Trust. Retrieved 22 March 2015.

Further reading