West Station (MBTA)

Last updated

West Station
Beacon Park Rail Yard.jpg
The station will be located in the former Beacon Park Yard
General information
LocationAshford Street, Boston, Massachusetts
Coordinates 42°21′17.21″N71°7′17.62″W / 42.3547806°N 71.1215611°W / 42.3547806; -71.1215611
Line(s) Worcester Line
Platforms3 [1]
Tracks4
Construction
AccessibleYes
Other information
Fare zone1A
History
Opening2040 (planned) [2]
Planned services
Preceding station MBTA.svg MBTA Following station
Boston Landing
toward Worcester
Framingham/​Worcester Line
(planned)
Lansdowne
Framingham/​Worcester Line
(proposed)
Kendall/MIT
Location
West Station (MBTA)

West Station is a planned station on the MBTA Commuter Rail Framingham/Worcester Line, to be located in the former Beacon Park Yard in Allston, Massachusetts. It was initially proposed as part of a project to straighten the Massachusetts Turnpike through the yard, allowing much of the land to be redeveloped. Initially to serve solely as a conventional commuter rail station, West Station is designed to eventually serve high-frequency diesel multiple unit service on the inner Worcester Line and on the Grand Junction Railroad.

Contents

By July 2016, the state planned to file a Draft Environmental Impact Statement (DEIS) for the project in 2017 and hoped to break ground in 2019. It was then estimated to cost $25 million, to be split between Harvard University (which owns the surrounding land), the state, and a third party (intended to be Boston University pending negotiations). In December 2017, the state announced that the station cost had increased to $95 million, and that it would not open until 2040. In January 2018, Harvard increased its pledge to $50 million, with an additional $8 million incentive to build an interim station. [3]

History

Background

Beacon Park rail yard, upper left and Interstate 90 Allston interchange, center, facing south-west. Under proposed plans, I-90 would be moved closer to the MBTA mainline at the southern edge of the yard. West Station would be constructed near the large white building at top left. Beacon Park Yard aerial.JPG
Beacon Park rail yard, upper left and Interstate 90 Allston interchange, center, facing south-west. Under proposed plans, I-90 would be moved closer to the MBTA mainline at the southern edge of the yard. West Station would be constructed near the large white building at top left.

The Boston & Albany Railroad originally had a number of stations in the inner ring of suburbs, including stations at Allston (Cambridge Street) and Cottage Farms (Commonwealth Avenue). No station was built near the split with the Grand Junction Railroad as the Grand Junction did not carry passenger service. A large freight yard, Beacon Park Yard, was ultimately built just west of the split. All stations east of Newtonville were closed around 1962 when much of the main line was reduced from 4 to 2 tracks during the building of the Massachusetts Turnpike. The station closures left Allston and Brighton lacking commuter rail service.

In 1998, a new station in Allston-Brighton began to be considered as part of the Urban Ring planning process. In 2007, the City of Boston allocated $500,000 in funding for the Allston Multimodal Station Study. [4] The study analyzed both commuter rail and DMU local service along the corridor, with potential stops at Faneuil, Market Street, Everett Street, Cambridge Street, West (Ashford Street), and Commonwealth Avenue. [5] The final recommendation, for a commuter rail station at Everett Street with DMU stops added later at the other locations, sparked local controversy but was mostly well received. [6] [5]

In 2009 and 2010, the state negotiated a major agreement with CSX Transportation that involved the purchase of several rail lines, including purchasing the line between Framingham and Worcester. The agreement also included CSX moving its intermodal freight operations from Beacon Park Yard to a new yard in Worcester. The abandonment of Beacon Park Yard allows for an increase in MBTA service on the Framingham/Worcester Line; additionally, the elimination of the single-track bottleneck through the yard opened the possibility for a station to be built in Allston (possibly in conjunction with the Urban Ring project) while still allowing passing tracks. [7] However, with no funding source available, construction of a station was not pursued.

In June 2012, New Balance announced that it would build the Everett Street station, Boston Landing, as part of their Boston Landing development. The station opened on May 22, 2017. [8]

West Station

An MBTA train in Beacon Park Yard for the September 30, 2014 press conference MBTA train in Beacon Park Yard for West Station press conference, September 2014.JPG
An MBTA train in Beacon Park Yard for the September 30, 2014 press conference

In October 2013, MassDOT announced a $260 million plan to straighten the Mass Pike through Beacon Park Yard, replacing the existing toll booths with high-speed all-electronic tolling and allowing Harvard University and others to develop land currently cordoned off by the highway and its interchange ramps. The initial plans included the possibility of an 8 or 9-track commuter rail layover yard next to the Worcester main. [9]

In January 2014, MassDOT released its ten-year plan, which included a six-line DMU network called the Indigo Line proposed to be implemented by 2024. This included additional service on the Fairmount Line, the Newburyport/Rockport Line (to Lynn), the Lowell Line (to Anderson RTC), and the Worcester Line (to Riverside), as well as new service from Back Bay to the BCEC on Track 61 and from North Station along the Grand Junction to a new station near Boston University's West Campus. This new West Station would offer connections between the Grand Junction DMU route, the Riverside DMU route, and conventional commuter service on the Worcester Line. [10] [11] It was proposed to attract commercial development to the Beacon Park area, similar to Assembly Station and the Assembly Square development in Somerville, Massachusetts. [12]

However, no dedicated funding source was established for the Indigo Line plans, including West Station. [13] In May 2014, MassDOT announced that the station would not be included in the budget for the Turnpike project, placing it in an uncertain future. [14]

On September 30, 2014, a press conference was held in Beacon Park Yard to announce that the station would be constructed in concert with the Turnpike straightening. The cost of the $25 million station will be split between Harvard University, the state, and a third party to be determined. [15] In March 2015, the Boston Globe revealed that Boston University was to have been the final third; however, this was not finalized before Deval Patrick left office. BU's contribution would be dependent on a promise that automobile and bus traffic would not travel through BU's West Campus to reach the station, and instead use new roads being constructed during the Beacon Park project. [16] (BU later dropped this demand.) [17]

By 2016, the station was scheduled to begin construction in 2019 and to be completed along with the highway project. [18] Earlier estimates suggested a 3-4 year construction time. [15] State legislators representing communities along the Worcester Line have expressed concern that Boston Landing and West Station would slow down trips for suburban commuters. [19]

In December 2017, the state announced that the station would not be completed until 2040, after the Harvard-owned land has been redeveloped. The projected cost of the station had increased to $95 million by that time due to the addition of a bus transfer level and other scope increases. [2] In response to a plea from city and state politicians, in January 2018, Harvard University increased its pledge to pay $50 million of the cost, with an additional $8 million incentive to build an early action interim station. [3] [17] The Turnpike straightening is proceeding regardless due to the deteriorating state of the existing viaduct. [17]

Related Research Articles

<span class="mw-page-title-main">Transportation in Boston</span> Overview of transportation in Boston, Massachusetts, United States

Transportation in Boston includes roadway, subway, regional rail, air, and sea options for passenger and freight transit in Boston, Massachusetts. The Massachusetts Port Authority (Massport) operates the Port of Boston, which includes a container shipping facility in South Boston, and Logan International Airport, in East Boston. The Massachusetts Bay Transportation Authority (MBTA) operates bus, subway, short-distance rail, and water ferry passenger services throughout the city and region. Amtrak operates passenger rail service to and from major Northeastern cities, and a major bus terminal at South Station is served by varied intercity bus companies. The city is bisected by major highways I-90 and I-93, the intersection of which has undergone a major renovation, nicknamed the Big Dig.

<span class="mw-page-title-main">Massachusetts Turnpike</span> Toll road and Interstate Highway in Massachusetts, United States

The Massachusetts Turnpike is a controlled-access toll road in the US state of Massachusetts that is maintained by the Massachusetts Department of Transportation (MassDOT). It is concurrent with the entirety of Interstate 90 (I-90) within the state, and is the longest Interstate Highway in Massachusetts, spanning 138 miles (222 km) along an east–west axis.

<span class="mw-page-title-main">Allston</span> Neighborhood of Boston in Suffolk, Massachusetts, United States

Allston is an officially recognized neighborhood within the City of Boston, Massachusetts, United States. It was named after the American painter and poet Washington Allston. It comprises the land covered by the zip code 02134. For the most part, Allston is administered collectively with the adjacent neighborhood of Brighton. The two are often referred to together as Allston–Brighton. Boston Police Department District D-14 covers the Allston-Brighton area and a Boston Fire Department Allston station is located in Union Square which houses Engine 41 and Ladder 14. Engine 41 is nicknamed "The Bull" to commemorate the historic stockyards of Allston.

<span class="mw-page-title-main">MBTA Commuter Rail</span> Greater Boston commuter rail system

The MBTA Commuter Rail system serves as the commuter rail arm of the Massachusetts Bay Transportation Authority's (MBTA's) transportation coverage of Greater Boston in the United States. Trains run over 394 mi (634 km) of track to 134 stations. It is operated under contract by Keolis, which took over operations on July 1, 2014, from the Massachusetts Bay Commuter Railroad Company (MBCR).

<span class="mw-page-title-main">North–South Rail Link</span> Proposed rail tunnel connecting Bostons North and South Stations

The North–South Rail Link (NSRL) was a proposed rail tunnel, or pair of tunnels, that would connect North Station and South Station in downtown Boston, Massachusetts, linking rail networks that serve the city's northern suburbs, New Hampshire, and Maine with the rest of the country. The project would build new underground stations near the existing stations, connect them with about 1.5 miles (2.4 km) of tunnels, and add other tunnels to link up with existing surface tracks.

<span class="mw-page-title-main">Riverside station (MBTA)</span> Light rail station in Newton, Massachusetts, US

Riverside station is a Massachusetts Bay Transportation Authority (MBTA) Green Line light rail station located in the Auburndale village of Newton, Massachusetts. It is the western terminal of the Green Line D branch service. The station is located near the interchange of Interstate 95 and the Massachusetts Turnpike (I-90) and serves as a regional park and ride station. West of the station is Riverside Yard, the main maintenance facility and largest storage yard for the Green Line. The station is fully accessible.

<span class="mw-page-title-main">Hynes Convention Center station</span> Subway station in Boston, Massachusetts, US

Hynes Convention Center station is an underground light rail station on the Massachusetts Bay Transportation Authority (MBTA) Green Line. It is located at the intersection of Newbury Street and Massachusetts Avenue near the western end of the Back Bay neighborhood of Boston, Massachusetts. The station is named for the Hynes Convention Center, which is located about 700 feet (210 m) to the east along Boylston Street. It has two side platforms serving the two tracks of the Boylston Street subway, which are used by the Green Line B branch, C branch, and D branch. The main entrance to the station from Massachusetts Avenue leads to a fare lobby under the 360 Newbury Street building.

The Grand Junction Railroad is an 8.55-mile (13.76 km) long railroad in the Boston, Massachusetts, area, connecting the railroads heading west and north from Boston. The line is notable for its railroad bridge over the Charles River that passes under the Boston University Bridge between Boston and Cambridge, Massachusetts.

<span class="mw-page-title-main">Green Line B branch</span> Light rail line in Boston, Massachusetts

The B branch, also called the Commonwealth Avenue branch or Boston College branch, is a branch of the MBTA Green Line light rail system which operates on Commonwealth Avenue west of downtown Boston, Massachusetts. One of four branches of the Green Line, the B branch runs from Boston College station down the median of Commonwealth Avenue to Blandford Street. There, it enters Blandford Street portal into Kenmore station, where it merges with the C and D branches. The combined services run into the Boylston Street subway and Tremont Street subway to downtown Boston. B branch service has terminated at Government Center since October 2021. Unlike the other branches, the B branch runs solely through the city limits of Boston. The Green Line Rivalry between Boston College and Boston University is named in reference to the B branch, which runs to both universities.

<span class="mw-page-title-main">Fairmount Line</span> MBTA Commuter Rail line

The Fairmount Line or Dorchester Branch is a line of the MBTA Commuter Rail system in Boston, Massachusetts, USA. Except for a short portion in Milton, it lies entirely within Boston, running southwest from South Station through the neighborhoods of Dorchester, Mattapan and Hyde Park. Weekend service began on November 29, 2014. Most trains reverse direction at the south end at Readville, but some Franklin/Foxboro Line trains use the Fairmount Line rather than the Northeast Corridor.

<span class="mw-page-title-main">Indigo Line</span> Canceled Greater Boston regional rail service

The Indigo Line was a proposed rapid transit service of the Massachusetts Bay Transportation Authority that would have incorporated parts of the former Grand Junction Railroad, the Seaport District's Track 61, a spur to Riverside station and other MBTA Commuter Rail lines.

<span class="mw-page-title-main">Framingham/Worcester Line</span> MBTA commuter railroad line

The Framingham/Worcester Line of the MBTA Commuter Rail system runs west from Boston, Massachusetts to Worcester, Massachusetts through the MetroWest region, serving 17 station stops in Boston, Newton, Wellesley, Natick, Framingham, Ashland, Southborough, Westborough, Grafton, and Worcester. It is the third longest and third busiest line in the MBTA Commuter Rail system. Service on the line is a mix of local and express trains serving Worcester plus short-turn Framingham locals.

<span class="mw-page-title-main">Fitchburg Line</span> MBTA Commuter Rail line

The Fitchburg Line is a branch of the MBTA Commuter Rail system which runs from Boston's North Station to Wachusett station in Fitchburg, Massachusetts. The line is along the tracks of the former Fitchburg Railroad, which was built across northern Massachusetts, United States, in the 1840s. Winter weekend service includes a specially equipped seasonal "ski train" to Wachusett Mountain.

<span class="mw-page-title-main">Lansdowne station (MBTA)</span> Railway station in Boston, Massachusetts, US

Lansdowne station is an MBTA Commuter Rail station in Boston, Massachusetts. It serves the Framingham/Worcester Line. Lansdowne is located next to the Massachusetts Turnpike in the Fenway–Kenmore neighborhood near Kenmore Square, below grade between Beacon Street and Brookline Avenue.

<span class="mw-page-title-main">History of the MBTA</span> Story of mass transit in the Boston US area

The history of the Massachusetts Bay Transportation Authority (MBTA) and its predecessors spans two centuries, starting with one of the oldest railroads in the United States. Development of mass transportation both followed existing economic and population patterns, and helped shape those patterns.

<span class="mw-page-title-main">Auburndale station (MBTA)</span> Commuter rail station in Newton, Massachusetts

Auburndale station is an MBTA Commuter Rail station in Auburndale, Massachusetts. It serves the Framingham/Worcester Line. It is located next to the Massachusetts Turnpike near Lasell College. The modern station platform, built around 1961, replaced a highly acclaimed 1881 depot building designed by H. H. Richardson. A full renovation of the station for accessibility is planned.

<span class="mw-page-title-main">Talbot Avenue station</span> Train station in Dorchester, Boston, US

Talbot Avenue station is an MBTA Commuter Rail station in Boston, Massachusetts. It serves the Fairmount Line. It is located near Codman Square in the Dorchester neighborhood. The station includes two full-length high-level platforms located north of Talbot Avenue, which are also accessible from Park Street and West Park Street. The station opened on November 12, 2012 as the first of four new stations on the Fairmount Line. Talbot Avenue was the first completely new rail station to open in the City of Boston since Yawkey opened in 1988.

<span class="mw-page-title-main">Boston Landing station</span> Railway station in Brighton, Massachusetts, US

Boston Landing station is an MBTA Commuter Rail station in Boston, Massachusetts, United States. It serves the Framingham/Worcester Line. It is located in the Brighton neighborhood just west of the Everett Street bridge, next to the Massachusetts Turnpike. It serves the Allston-Brighton area as well as the Boston Landing development including Warrior Ice Arena. The station is fully accessible, with a single full-length high-level island platform. Elevators and stairs lead to Arthur Street and to the Everett Street bridge.

<span class="mw-page-title-main">Beacon Park Yard</span> Rail freight yard in Boston planned for redevelopment

Beacon Park Yard was a CSX Transportation rail yard in Allston, Boston, now owned by Harvard University. The yard opened in 1890 on the site of a former trotting park, from which it took its name. It was closed in 2013 following the relocation of the yard's container operations to Worcester, Massachusetts and opening of a transload facility in Westborough, Massachusetts. Plans for the yard include relocation of the Massachusetts Turnpike Allston exit, construction of a new MBTA commuter rail station and layover yard, and a major real estate development.

<span class="mw-page-title-main">Track 61 (Boston)</span> Industrial rail terminal track in South Boston, Massachusetts

Track 61 is an industrial rail terminal track in South Boston, Massachusetts, also known as the Boston Terminal Running Track. Track 61 is the last remnant of the vast rail yards that once covered much of the South Boston waterfront. Track 61 legally begins at Summer Street, while the line from Bay Junction to Summer Street is the Boston Terminal Running Track and Terminal Yard. However, the names are frequently used interchangeably.

References

  1. I-90 Allston Interchange, A Multimodal Transportation Project (MassDOT/FMCB Joint Meeting), June 22, 2020, retrieved June 29, 2020
  2. 1 2 Vaccaro, Adam (December 2, 2017). "Transit station delayed for big Mass. Pike project". Boston Globe.
  3. 1 2 Ramos, Dante (January 24, 2018). "So, this is promising news: In letter today to @MassDOT @Steph_Pollack, Harvard ups commitment to West Station to $50m, plus $8M for "early action" commuter station.pic.twitter.com/cnOgzAKu0G". @danteramos. Retrieved January 24, 2018.
  4. Elowitt, Karen (April 26, 2007). "Allston could get commuter rail station". Wicked Local. Retrieved June 7, 2012.
  5. 1 2 "Allston Multimodal Station Study" (PDF). Massachusetts Executive Office of Transportation. June 15, 2009. Archived from the original (PDF) on July 9, 2015. Retrieved June 7, 2012.
  6. Trachtenberg, Mark D. (June 11, 2009). "Perspective: Commuter rail for Allston at last". Wicked Local. Archived from the original on October 2, 2014. Retrieved October 2, 2014.
  7. Dyer, John (June 16, 2010). "Much is riding on Worcester rail deal". Boston Globe. Retrieved June 8, 2012.
  8. "Spring Commuter Rail schedules will go into effect on Monday, May 22, 2017" (Press release). Massachusetts Bay Transportation Authority. April 12, 2017.
  9. Rocheleau, Matt (October 23, 2014). "Photos: Conceptual designs of project to straighten Mass. Pike in Allston". Boston Globe. Retrieved October 2, 2014.
  10. Annear, Steve (January 9, 2014). "Take A Ride On The MBTA's 'New Indigo Line' In 2024". Boston Magazine. Archived from the original on October 23, 2017. Retrieved October 2, 2014.
  11. Quinn, Garrett (January 10, 2014). "MassDOT five-year plan includes introduction of Indigo Line, extension of Green Line". Springfield Republican . Retrieved March 11, 2014.
  12. McMorrow, Steve (January 14, 2014). "Allston rail yard is ripe for growth". Boston Globe. Retrieved October 2, 2014.
  13. Powers, Martine (April 9, 2014). "Straighter Mass. Pike may dramatically redefine Allston". Boston Globe. Retrieved October 2, 2014.
  14. Powers, Martine (May 27, 2014). "Allston rail station plan scrapped for now: MassDOT says new station too costly". Boston Globe. Retrieved October 2, 2014.
  15. 1 2 Dungca, Nicole (September 30, 2014). "New transit station to connect Allston to downtown". Boston Globe. Retrieved October 1, 2014.
  16. Levenson, Michael (March 16, 2015). "BU had planned to contribute to West Station project, record shows". BostonGlobe.com. Boston Globe . Retrieved March 16, 2015.
  17. 1 2 3 Harvard ups financial commitment for West Station, calls for interim train stop in Allston
  18. Gross, Nick (July 2016). "Placemaking Output Meeting Notes of June 27, 2016" (PDF). Howard Stein Hudson. p. 9.
  19. BBrown (October 19, 2014). "Relief coming to Wellesley Mass Pike, train commuters". The Swellesley Report. Retrieved October 20, 2014.