Laird station

Last updated

Laird
TTC - Line 5.svg
Laird Station 2024.jpg
Laird station main entrance under construction in January 2024
General information
LocationEglinton Avenue & Laird Drive
Toronto, Ontario
Canada
Coordinates 43°42′48″N79°21′54″W / 43.71333°N 79.36500°W / 43.71333; -79.36500
Platforms Centre platform
Tracks2
Connections BSicon BUS1.svg TTC buses
Construction
Structure typeUnderground
AccessibleYes
Other information
StatusUnder construction
History
Opening2024(0 years ago) (2024) [1]
Services
Preceding station Logo of the Toronto Transit Commission.svg Toronto Transit Commission Following station
Leaside
towards Mount Dennis
Eglinton
(opens 2024)
Sunnybrook Park
towards Kennedy

Laird is an underground light rail transit (LRT) station under construction on Line 5 Eglinton, a new line that is part of the Toronto subway system. [2] It is located in the Leaside neighbourhood in East York at the intersection of Laird Drive and Eglinton Avenue. It is scheduled to open in 2024. [1]

Contents

This station's entrances are both on the south side of Eglinton. The main entrance is at the southwest corner of the Laird Drive intersection replacing a small strip mall and the secondary one is east of that in the Leaside Centre parking lot, just beyond the Pier 1 Imports store. [3]

On the east side of the station, there is a third track between the eastbound and westbound tracks, either to store a train or to allow a train to change direction due to an emergency or a change in service. On the west side of the station, there is a diamond crossover. [4] [5] Laird station is the easternmost underground station in the main tunnel; the line will emerge onto Eglinton about 250 metres (820 ft) east of Brentcliffe Drive and change to predominantly on-street operation in a dedicated right-of-way in the centre of the street east to Kennedy station.

Laird station Secondary entrance under construction in January 2024 Laird Station 2nd Entrance 2024.jpg
Laird station Secondary entrance under construction in January 2024

Destinations include the many commercial establishments to the southeast: Leaside Centre, the SmartCentres on Laird, and the Leaside Business Park on Eglinton.

Ontario Premier Kathleen Wynne officiated at the ground-breaking for the station on June 30, 2016. [6]

Construction

As of December 2021, the underground portion of the station is structurally complete [7] and was constructed by "mining", a technique more formally called sequential excavation method (SEM). Laird, Avenue and Oakwood stations were all constructed by this method, while the other underground Line 5 stations were built by cut-and-cover. According to Crosslinx, SEM is more common in Europe and the Crosstown is the first project to use the technique in Toronto. [8]

The station's mined cavern is 489 metres (1,604 ft) long because it contains a crossover and a storage track in addition to the train platforms. Both the station platforms and the adjacent switching track assemblies are contained within a single circular tube, and there are no support columns between the tracks. Using cut-and-cover would have disrupted approximately 500 metres (1,600 ft) of Eglinton Avenue. [8]

At Laird, two shafts were built on the south side of Eglinton Avenue on both the east and west sides of Laird Drive. From the vertical shafts, workers mined horizontally towards and above the twin tunnels created by the tunnel boring machines. Large pipe-like sections are used to support the roof of the excavation. Then, workers gradually excavated down to the liners of the twin tunnels, which were removed. When the excavation was finished, there was a multi-storey cavern with an arched ceiling, which provides enough strength to support the ground above. The tunnel walls were sprayed with shotcrete, a special concrete that cures in ten minutes. Excavation was done slowly, about 1.5 metres per day; mining work proceeded on a 24-hour, 7-day-a-week basis using two crews of ten workers each.

Surface connections

As of November 2023, the following are the proposed connecting routes that would serve this station when Line 5 Eglinton opens: [9]

RouteNameAdditional information
34EglintonWestbound to Mount Dennis station and eastbound to Kennedy station
51LeslieNorthbound to Steeles Avenue via Leslie station and southbound to Donlands station
88South LeasideWestbound to St. Clair station

Related Research Articles

<span class="mw-page-title-main">Eglinton West station</span> Toronto subway station

Eglinton West is a subway station on Line 1 Yonge–University in Toronto, Ontario, Canada. It is located in the median of Allen Road on the north side of Eglinton Avenue West.

<span class="mw-page-title-main">Eglinton station</span> Toronto subway station

Eglinton is a subway station on Line 1 Yonge–University of the Toronto subway. Located on Eglinton Avenue, it is central to the Yonge–Eglinton neighbourhood in Midtown Toronto. Eglinton station is the seventh busiest station of the Toronto Transit Commission (TTC).

<span class="mw-page-title-main">Kennedy station</span> Toronto subway station

Kennedy is the eastern terminal station on Line 2 Bloor–Danforth of the Toronto subway system. Opened in 1980, it is located east of the Kennedy Road and Eglinton Avenue intersection. With the adjacent Kennedy GO station on the Stouffville line of GO Transit, Kennedy is an intermodal transit hub and the fifth busiest station in the system, after Bloor–Yonge, St. George, Sheppard–Yonge, and Union, serving a total of approximately 113,961 customer trips a day.

The Eglinton West line was a proposed east–west subway line in Toronto, Ontario, Canada, whose construction began in 1994 but was cancelled in 1995. It was to start from the existing Eglinton West station on the Toronto Transit Commission's Yonge–University–Spadina line, travel underneath Eglinton Avenue West, and terminate at Black Creek Drive in its initial phase.

<span class="mw-page-title-main">Eglinton Avenue</span> Road in Toronto and Mississauga, Canada

Eglinton Avenue is a major east–west arterial thoroughfare in Toronto and Mississauga in the Canadian province of Ontario. The street begins at Highway 407 at the western limits of Mississauga, as a continuation of Lower Baseline in Milton. It traverses the midsection of both cities and ends at Kingston Road. Eglinton Avenue is the only street to cross all six former cities and boroughs of Metropolitan Toronto.

<span class="mw-page-title-main">Line 5 Eglinton</span> Light rail line under construction in Toronto, Canada

Line 5 Eglinton is a light rail line that is under construction in Toronto, Ontario, Canada. Owned by Metrolinx and operated by the Toronto Transit Commission (TTC), the line will be part of the Toronto subway system as its fifth route. The first phase of the 19-kilometre (12 mi) line will include 25 stops along Eglinton Avenue, from Mount Dennis station mostly underground to Laird station, after which it will run predominantly at-grade within the street's median to Kennedy station, where it will connect underground with Line 2 Bloor–Danforth. The second phase, a 9.2-kilometre (5.7 mi) westward extension from Mount Dennis, will run mostly underground or elevated to Renforth station, with 7 new stops.

The Don Mills LRT was a proposed light rail line in Toronto, Ontario, Canada. It was part of the Transit City proposal announced March 16, 2007, to be operated by the Toronto Transit Commission (TTC). It was expected to cost approximately $675 million, with construction to begin in 2012, and an expected opening in 2016. It would have been the fifth of the seven Transit City lines to be complete after the Sheppard East, Finch West, Waterfront West, and Eglinton lines. Ridership was estimated to be 21.2 million trips in 2021.

The Eglinton East LRT (EELRT), also known as Line 7 Eglinton East and formerly known as the Scarborough Malvern LRT, is a proposed light rail line in Toronto, Ontario, Canada. The line would be entirely within the district of Scarborough. It was originally part of Transit City, a plan to develop new light rail lines along several priority transit corridors in the city.

<span class="mw-page-title-main">Line 6 Finch West</span> Under-construction light rail line in Toronto, Ontario, Canada

Line 6 Finch West, also known as the Finch West LRT, is a light rail line under construction in Toronto, Ontario, Canada, to be operated by the Toronto Transit Commission. The 10.3-kilometre (6.4 mi), 18-stop line is to extend from Finch West station on Line 1 Yonge–University to the North Campus of Humber College in Etobicoke. The line will operate in a dedicated above-ground right-of-way, much of it within Finch Avenue, segregated from street traffic. The line will use transit signal priority and standard gauge rather than the broad Toronto gauge. The line is forecast to carry about 14.6 million rides a year or 40,000 a day by 2031 and will replace the 36 Finch West bus route, which is one of the three busiest bus routes in Toronto. The line is expected to open within the first half of 2024, with an estimated cost of CA$2.5 billion. For budget purposes, the TTC made the assumption that Line 6 would open no earlier than September 2024.

<span class="mw-page-title-main">Hurontario LRT</span> Light rail line under construction in Mississauga and Brampton, Ontario, Canada

The Hurontario LRT is a light rail line under construction in the cities of Mississauga and Brampton, Ontario, Canada. The line will run along Hurontario Street from Mississauga's Port Credit neighbourhood north to Steeles Avenue in Brampton. The line will be built and operated as a public-private partnership by Mobilinx, a consortium of private European and Japanese companies, with provincial transit agency Metrolinx retaining ownership of the line. It will be the only street railway operating in the Greater Toronto Area outside Toronto proper.

<span class="mw-page-title-main">Eglinton Maintenance and Storage Facility</span> Rail yard for Line 5 Eglinton

The Eglinton Maintenance and Storage Facility is a rail yard and vehicle service centre for Line 5 Eglinton of the Toronto subway. The facility is located near the line's western terminus at Mount Dennis station, on lands formerly occupied by Kodak's Toronto campus.

<span class="mw-page-title-main">Mount Dennis station</span> Future transit terminal in Toronto, Canada

Mount Dennis is an intermodal transit terminal under construction in Toronto, Ontario, Canada. Located east of the intersection of Eglinton Avenue and Weston Road in the Mount Dennis neighbourhood in the district of York, the station will be the western terminus of the future Line 5 Eglinton as well as an intermediate station on the GO Transit Kitchener line and Union Pearson Express. The station has been designated as one of many "mobility hubs" in Greater Toronto. It is scheduled to open in 2024.

<span class="mw-page-title-main">Caledonia station</span> Future LRT station in Toronto, Canada

Caledonia is an underground light rail transit (LRT) station under construction on Line 5 Eglinton, a new line that is part of the Toronto subway system. It will be located along Eglinton Avenue between the GO Transit Barrie rail corridor and the entrance to the Westside Mall. This is about 200 metres (660 ft) west of Caledonia Road opposite Blackthorn Avenue.

<span class="mw-page-title-main">Oakwood station (Toronto)</span> Future underground LRT station in Toronto, Canada

Oakwood is an underground light rail transit (LRT) station under construction on Line 5 Eglinton, a new line that is part of the Toronto subway system. It will be located in the Little Jamaica neighbourhood at the intersection of Oakwood Avenue and Eglinton Avenue. It is scheduled to open in 2024.

<span class="mw-page-title-main">Avenue station</span> Future underground LRT station in Toronto, Canada

Avenue is an underground light rail transit (LRT) station under construction on Line 5 Eglinton, a new line that is part of the Toronto subway system. The station is located in North Toronto on Eglinton Avenue between Avenue Road and Highbourne Road. It is the deepest underground station on the line. Destinations include the Chaplin Estates neighbourhood, Marshall McLuhan Catholic Secondary School, the Eglinton Theatre, and Eglinton Park. The station is scheduled to open in 2024.

<span class="mw-page-title-main">Mount Pleasant station (Toronto)</span> Future underground LRT station in Canada

Mount Pleasant is an underground light rail transit (LRT) station under construction on Line 5 Eglinton, a new line that is part of the Toronto subway system. The station will be located in North Toronto at the intersection of Mount Pleasant Road and Eglinton Avenue. Nearby destinations include Northern Secondary School, North Toronto Collegiate Institute, and the Davisville Village neighbourhood. It is scheduled to open in 2024.

<span class="mw-page-title-main">Leaside station</span> Future underground LRT station in Toronto, Canada

Leaside is an underground light rail transit (LRT) station under construction on Line 5 Eglinton, a new line that is part of the Toronto subway system. It is located in the Leaside neighbourhood at the intersection of Bayview Avenue and Eglinton Avenue. It is scheduled to open in 2024.

<span class="mw-page-title-main">Science Centre station</span> Future underground LRT station in Toronto, Canada

Science Centre is an underground light rail transit (LRT) station and mobility hub under construction on Line 5 Eglinton, a new line that is part of the Toronto subway system. It will be located in the Flemingdon Park neighbourhood at the intersection of Don Mills Road and Eglinton Avenue. It is scheduled to open in 2024.

<span class="mw-page-title-main">Sunnybrook Park stop</span> Future LRT stop in Toronto, Canada

Sunnybrook Park is a surface light rail transit stop under construction on Line 5 Eglinton, a future line that will be part of the Toronto subway system. It will be located at the intersection of Leslie Street and Eglinton Avenue. The intersection is largely surrounded by park lands in the valley of the West Branch of the Don River, which includes destinations such as E.T. Seton Park, Serena Gundy Park, Wilket Creek Park, Sunnybrook Park and Edwards Gardens. This will be the westernmost at-grade surface stop. The station is scheduled to open in 2024.

<span class="mw-page-title-main">Renforth station</span> Bus station in Mississauga, Ontario

Renforth, referred to during planning as Renforth Gateway, is a bus station on the border of the cities of Mississauga and Toronto, in Ontario, Canada. Located at Eglinton Avenue and Renforth Drive, it is the eastern terminus of the Mississauga Transitway and is close to the interchange between Highway 401 and Highway 427.

References

  1. 1 2 Spurr, Ben (February 17, 2020). "Eglinton Crosstown faces another setback, delayed until 2022 | The Star". Toronto Star. Retrieved February 18, 2020.
  2. "Laird Station". Eglinton Crosstown. Retrieved June 24, 2017.
  3. "Laird LRT stop will replace long-time Bagel maker". The South Bayview Bulldog. November 20, 2013. Retrieved June 24, 2017. The main entrance will be built on the site of the strip mall on the southwest corner. Across Laird to the east, a second entrance will be built on the parking lot of the RioCan-owned Laird Centre on the southeast corner.
  4. "Vehicle Ride: Laird Station to EMSF". Metrolinx. November 30, 2021. p. 0:25.
  5. "Eglinton Crosstown LRT Updates – July 2017". Metrolinx. July 14, 2017. Retrieved November 1, 2017.
  6. "Ontario Breaks Ground on Laird Station on Eglinton Crosstown LRT". Government of Ontario. June 30, 2016. Retrieved June 30, 2016. Work is beginning on Laird Station, located near the midpoint of the 19-kilometre Light Rail Transit (LRT) line. Construction began in March on Keelesdale, the first underground station. By the end of the summer, more than half of the underground stations on the 25-station line will be under construction.
  7. "Crosstown's Laird Station sees all structural work on the cavern completed–Take a look inside". Metrolinx. February 22, 2021. Retrieved December 3, 2021.
  8. 1 2 Spurr, Ben (April 29, 2018). "Underground Eglinton Crosstown LRT stations take shape with unique mining technique". Toronto Star . Retrieved April 30, 2018.
  9. "2024 Annual Service Plan" (PDF). Toronto Transit Commission. November 17, 2023. p. 106.