Lawrence East station

Last updated

Lawrence East
TTC - Line 3 - Scarborough RT line.svg
Lawrence East Platform 2022.jpg
General information
Location2444 Lawrence Avenue East
Toronto, Ontario
Canada
Coordinates 43°45′01″N79°16′13″W / 43.75028°N 79.27028°W / 43.75028; -79.27028
Platforms Side platforms
Tracks2
Connections
  •  54  Lawrence East
  •  354 Symbol ksiezyc.svg   Lawrence East
  •  954  Lawrence East Express
Construction
Structure typeAt-grade
Parking90 spaces
Accessible
  • Yes (southbound platform)
  • No (northbound platform)
Other information
Website Official station page
History
OpenedMarch 22, 1985;38 years ago (1985-03-22)
ClosedJuly 24, 2023;4 months ago (2023-07-24)
Passengers
2019 [1] 9,105
Rank62 of 75
Services
Preceding station Logo of the Toronto Transit Commission.svg Toronto Transit Commission Following station
Kennedy
Terminus
Scarborough Ellesmere
towards McCowan
Location
Lawrence East station

Lawrence East was a rapid transit station on Line 3 Scarborough of the Toronto subway until the line's closure on July 24, 2023. It was the third-busiest station on Line 3, after Kennedy and Scarborough Centre.

Contents

History

Lawrence East opened in 1985, along with the rest of Line 3. All bus routes that operated along Lawrence Avenue East at the time were rerouted to serve the station on March 23, 1985, one day after the opening. [2]

The station was renovated between 2011 and 2012 to include automated sliding doors, allowing the southbound platform and the bus platform to be accessible.

In February 2021, the TTC recommended the closure of Line 3 in 2023 and its replacement by bus service until the completion of the Scarborough extension of Line 2 Bloor–Danforth. [3] However, the rail portion of this station permanently closed following a derailment on July 24, 2023. [4] A new Lawrence East station is planned to be built along the planned Line 2 extension on the southwest corner of Lawrence Avenue East and McCowan Road and is scheduled to open circa 2030. [5] [6]

Station description

Entrance to the underpass east of the station LawrenceEastUnderpass.jpg
Entrance to the underpass east of the station

The small station was built on two levels. The Line 3 platforms, bus platforms, and only entrance were located on ground level. The entrance was an automatic sliding door facing north with a sidewalk connecting to Lawrence Avenue East to the west side, and an underpass underneath both the Line 3 and GO rails towards the commuter parking lot, Access Road, and Prudential Drive. Below ground level in the interior of the station was an underpass connecting the entrance to the northbound platforms through the means of stairs and escalators. [7]

This station was a "half accessible" station, as all services within the station, except for the northbound platform, were accessible. The TTC suggested that people in need of accessible service onto the northbound platform take Line 3 southbound to Kennedy station and double back to Lawrence East. An accessible fare gate was also available inside the station at the main fare booth. [7]

The station had a bus terminal located underneath the elevated portion of Lawrence Avenue East, in the Midland Avenue and Kennedy Road corridor. At the time of its closure, 5 TTC bus routes (3 daytime routes and 2 Blue Night routes) served or passed near the station, including routes running along Kennedy Road. [7] After the Line 3 closure, the 954 Lawrence East Express bus continued to turn back at Lawrence East station until October 9, 2023, when it was rerouted to terminate at Kennedy station. [8]

Parking sign at Lawrence East station LawrenceEastParkingSign.jpg
Parking sign at Lawrence East station

A commuter parking lot for up to 90 vehicles is located just east of the station, also underneath the elevated section of Lawrence Avenue East. [7] Parking is managed by the Toronto Parking Authority.

Rapid transit infrastructure in the vicinity

Line 3 continued to travel on ground level, straight north after Lawrence East station, running parallel to the nearby railway tracks. South of the station, the line continued to travel on ground level but became elevated shortly before reaching Kennedy station, where it made a 90-degree turn.

Planned busway stop

The TTC plans to replace the Line 3 right-of-way with a busway between Kennedy and Ellesmere stations. According to a 2022 TTC report, the adjacent station's bus facilities would be retained along with a pedestrian underpass for the local community to use. Buses would serve customers at new stops on the south side of the former station. [9] :23

Future replacement station

The provincial transit agency Metrolinx plans to build a new subway station on Lawrence Avenue East, approximately 2 kilometres (1.2 mi) east of the Line 3 station. The underground station will be parallel to McCowan Road along a planned extension of Line 2 Bloor–Danforth. It will be on a north–south alignment to the west of the Scarborough General Hospital and the new bus terminal will be located on McCowan Road west of Lawrence Avenue East. The new station and bus terminal are expected to open in 2030. [10] [5]

Related Research Articles

<span class="mw-page-title-main">Line 3 Scarborough</span> Defunct light rapid transit line in Toronto, Canada

Line 3 Scarborough was a light rapid transit line that was part of the Toronto subway system in Toronto, Ontario, Canada. The line ran entirely within the eastern district of Scarborough, encompassing six stations and 6.4 kilometres (4.0 mi) of mostly elevated track. It connected with Line 2 Bloor–Danforth at its southwestern terminus, Kennedy, and terminated in the northeast at McCowan. In 2022, the system had a ridership of 4,720,000, or about 18,700 per weekday as of the second quarter of 2023.

<span class="mw-page-title-main">Line 4 Sheppard</span> Subway line in Toronto, Ontario, Canada

Line 4 Sheppard is the newest and shortest subway line of the Toronto subway system, operated by the Toronto Transit Commission (TTC). It opened on November 22, 2002, and has five stations along 5.5 kilometres (3.4 mi) of track, which is built without any open sections in the district of North York along Sheppard Avenue East between Yonge Street and Don Mills Road. All stations are wheelchair accessible and are decorated with unique public art.

<span class="mw-page-title-main">Toronto subway</span> Rapid transit system in Ontario, Canada

The Toronto subway is a rapid transit system serving Toronto and the neighbouring city of Vaughan in Ontario, Canada, operated by the Toronto Transit Commission (TTC). As of September 2023, the subway system is a rail network consisting of three heavy-capacity rail lines operating predominantly underground. As of December 2022, three new lines are under construction: two light rail lines and one light metro line.

<span class="mw-page-title-main">Line 2 Bloor–Danforth</span> Subway line in Toronto, Ontario, Canada

Line 2 Bloor–Danforth is a subway line in the Toronto subway system, operated by the Toronto Transit Commission (TTC). It has 31 stations and is 26.2 kilometres (16.3 mi) in length. It opened on February 26, 1966, and extensions at both ends were completed in 1968 and again in 1980.

<span class="mw-page-title-main">Finch station</span> Toronto subway station

Finch is the northern terminus subway station of the eastern section of Line 1 Yonge–University in Toronto, Ontario, Canada. It is located under Yonge Street, north of Finch Avenue.

<span class="mw-page-title-main">Don Mills station</span> Toronto subway station

Don Mills is a subway station that is the eastern terminus of Line 4 Sheppard in Toronto, Ontario, Canada. The station is at the northeast corner of Sheppard Avenue East and Don Mills Road, within the residential communities of Don Valley Village and Henry Farm, adjacent to Fairview Mall shopping centre. The station is close to Highways 401 and 404, as well as the Don Valley Parkway. Other nearby landmarks include Fairview Mall, Georges Vanier Secondary School, and the Fairview district branch of the Toronto Public Library.

<span class="mw-page-title-main">Kennedy station</span> Toronto subway station

Kennedy is the eastern terminal station on Line 2 Bloor–Danforth of the Toronto subway system. Opened in 1980, it is located east of the Kennedy Road and Eglinton Avenue intersection. With the adjacent Kennedy GO station on the Stouffville line of GO Transit, Kennedy is an intermodal transit hub and the fifth busiest station in the system, after Bloor–Yonge, St. George, Sheppard–Yonge, and Union, serving a total of approximately 113,961 customer trips a day.

<span class="mw-page-title-main">Ellesmere station</span> Toronto subway station

Ellesmere was a rapid transit station on Line 3 Scarborough of the Toronto subway in Toronto, Ontario, Canada. It was located at Ellesmere Road, between Kennedy Road and Midland Avenue.

<span class="mw-page-title-main">Midland station (Toronto)</span> Toronto subway station

Midland was a rapid transit station on Line 3 Scarborough of the Toronto subway in Toronto, Ontario, Canada. It is located on Midland Avenue between Ellesmere Road and Progress Avenue.

<span class="mw-page-title-main">Scarborough Centre station</span> Toronto subway station

Scarborough Centre is a bus terminal in Toronto, Ontario, Canada, serving multiple bus routes of the Toronto Transit Commission (TTC) and one Durham Regional Transit (DRT) bus route. It was also a rapid transit station serving Line 3 Scarborough of the Toronto subway system until Line 3's closure on July 24, 2023. It is located north of Ellesmere Road between Brimley and McCowan Roads, just south of Highway 401. It was adjacent to the former Scarborough Centre Bus Terminal, which was a station for GO Transit buses and other intercity coach services until the TTC modified the facility for TTC buses.

<span class="mw-page-title-main">McCowan station</span> Toronto subway station

McCowan was a terminal station on Line 3 Scarborough of the Toronto subway. The closed station is located at 1275 McCowan Road, just north of Ellesmere Road at Bushby Drive/Town Centre Court.

<span class="mw-page-title-main">Kipling station</span> Toronto subway station

Kipling is the western terminus station of Line 2 Bloor–Danforth of the Toronto subway system. The station is served by buses and subway trains operated by the Toronto Transit Commission and is adjacent to the Kipling GO Station on the Milton line of GO Transit and the Kipling Bus Terminal, where passengers can connect with MiWay and GO Transit bus services. It is located in the Islington–City Centre West neighbourhood on St. Albans Road at Aukland Road, west of the overpass of Kipling Avenue, after which the station is named. The 900 Airport Express bus route connects Kipling to the Toronto Pearson International Airport.

<span class="mw-page-title-main">Pape station</span> Toronto subway station

Pape is a subway station on Line 2 Bloor–Danforth in Toronto, Ontario, Canada. The station opened in 1966 and is located in Toronto's Greektown neighbourhood at the northeast corner of Pape Avenue and Lipton Avenue, just north of Danforth Avenue. Wi-Fi service is available at this station. It is located at the site of the former Lipton loop.

<span class="mw-page-title-main">Agincourt GO Station</span> GO Transit railway station in Ontario, Canada

Agincourt GO Station is a GO Transit railway station in Toronto, Ontario, Canada. The Stouffville line station serves the Agincourt neighbourhood of the former suburb of Scarborough.

<span class="mw-page-title-main">Transit City</span> Proposed Toronto public transit plan

Transit City was a plan for developing public transport in Toronto, Ontario, Canada. It was first proposed and announced on 16 March 2007 by Toronto mayor David Miller and Toronto Transit Commission (TTC) chair Adam Giambrone. The plan called for the construction of seven new light rail lines along the streets of seven priority transit corridors, which would have eventually been integrated with existing rapid transit, streetcar, and bus routes. Other transit improvements outlined in the plan included upgrading and extending the Scarborough RT line, implementing new bus rapid transit lines, and improving frequency and timing of 21 key bus routes. The plan integrated public transportation objectives outlined in the City of Toronto Official Plan, the TTC Ridership Growth Strategy and Miller's 2006 election platform.

The Sheppard East LRT was a proposed light rail line in Toronto, Ontario, Canada. It was first announced as part of the Transit City proposal in 2007. The Sheppard East LRT as proposed was to be 13 kilometres (8.1 mi) long, travel along Sheppard Avenue from Don Mills subway station to east of Morningside Avenue, and be operated by the Toronto Transit Commission (TTC).

The Eglinton East LRT (EELRT), also known as Line 7 Eglinton East and formerly known as the Scarborough Malvern LRT, is a proposed light rail line in Toronto, Ontario, Canada. The line would be entirely within the district of Scarborough. It was originally part of Transit City, a plan to develop new light rail lines along several priority transit corridors in the city.

<span class="mw-page-title-main">Scarborough Centre Bus Terminal</span> Bus station in Toronto, Ontario, Canada

Scarborough Centre Bus Terminal is a regional and intercity bus terminal in Scarborough City Centre in Toronto, Ontario, Canada, located near its namesake rapid transit station on Line 3 Scarborough of the Toronto subway. It is served by GO Transit buses. The terminal is near the Scarborough Town Centre shopping mall and the Scarborough Civic Centre. Until 2022, Megabus, and other private coach services used the terminal, but have moved to temporary on-street locations nearby due to subway construction.

SmartTrack is a municipal proposal to enhance GO Transit rail service within Toronto, Ontario, Canada. It takes advantage of the province's existing GO Transit Regional Express Rail plans. SmartTrack has evolved since it was originally proposed by Toronto mayor John Tory as the centrepiece of his 2014 mayoral election campaign.

References

  1. "Subway ridership, 2019" (PDF). Toronto Transit Commission. Archived (PDF) from the original on November 28, 2022. Retrieved January 30, 2023. This table shows the typical number of customer-trips made on each subway on an average weekday and the typical number of customers travelling to and from each station platform on an average weekday.
  2. Kay, Jeffrey. "54 Lawrence East - Transit Toronto". Transit Toronto. Archived from the original on October 22, 2014. Retrieved August 21, 2014.
  3. Spurr, Ben; Pagliaro, Jennifer (February 4, 2021). "TTC recommends seven years of shuttle buses on Scarborough RT ahead of 2030 subway opening". Toronto Star . Archived from the original on February 4, 2021. Retrieved February 4, 2021.
  4. Reporter, Lex Harvey Transportation (August 24, 2023). "TTC ends Scarborough RT service permanently". Toronto Star. Retrieved August 24, 2023.
  5. 1 2 "Search begins for teams interested in building Scarborough Subway Extension stations". Metrolinx. September 17, 2021. Archived from the original on September 18, 2021. Retrieved September 18, 2021.
  6. "Metrolinx releases new station maps for Scarborough Subway Extension - Metrolinx News". March 7, 2022. Archived from the original on April 15, 2022. Retrieved April 15, 2022.
  7. 1 2 3 4 "TTC Lawrence East Station". Toronto Transit Commission. Archived from the original on August 20, 2023. Retrieved August 20, 2023.
  8. "October (2023) service adjustments". Toronto Transit Commission. October 9, 2023. Archived from the original on October 3, 2023. Retrieved October 3, 2023.
  9. "Line 3 Bus Replacement Study Final Recommendations" (PDF). Toronto Transit Commission. April 14, 2022. Archived (PDF) from the original on April 7, 2022.
  10. Jennifer Pagliaro (July 6, 2018). "Design changes to Scarborough subway come with unknown costs". Toronto Star . Archived from the original on July 7, 2018. Retrieved July 6, 2018.