Vehicle Assembly Building

Last updated

Vehicle Assembly Building
VAB and SLS.jpg
The Artemis 1 Space Launch System vehicle rolling out from the VAB at Kennedy Space Center
USA Florida location map.svg
Red pog.svg
Location within Florida
Usa edcp location map.svg
Red pog.svg
Vehicle Assembly Building (the United States)
Former namesVertical Assembly Building
General information
TypeIntegration facility
Town or city Brevard County, Florida
CountryUnited States
Coordinates 28°35′11″N80°39′5″W / 28.58639°N 80.65139°W / 28.58639; -80.65139
Completed1966
Owner NASA
Height526 ft (160 m)
Dimensions
Diameter716 ft × 518 ft (218 m × 158 m)
Technical details
Floor count1
Floor area8 acres (32,000 m2)
Design and construction
Main contractor Morrison-Knudsen
Vehicle Assembly Building
Location Kennedy Space Center Florida, U.S.
Nearest city Titusville
Area8 acres (3 ha)
Built1966
Architect https://www.urbahn.com
Architectural styleIndustrial
MPS John F. Kennedy Space Center MPS
NRHP reference No. 99001642 [1]
Added to NRHPJanuary 21, 2000

The Vehicle Assembly Building (originally the Vertical Assembly Building), or VAB, is a large building at NASA's Kennedy Space Center (KSC) in Florida, designed to assemble large pre-manufactured space vehicle components, such as the massive Saturn V, the Space Shuttle and the Space Launch System, and stack them vertically onto one of three mobile launcher platforms used by NASA. As of March 2022, the first Space Launch System (SLS) rocket was assembled inside in preparation for the Artemis 1 mission, [2] launched on November 16, 2022.

Contents

At 129,428,000 cu ft (3,665,000 m3), it is the eighth-largest building in the world by volume as of 2022. [3] The building is at Launch Complex 39 at KSC, 149 miles (240 km) south of Jacksonville, 219 miles (352 km) north of Miami, and 50 miles (80 km) due east of Orlando, on Merritt Island on the Atlantic coast of Florida. [3]

The VAB is the largest single-story building in the world, [4] was the tallest building (526 ft or 160 m) in Florida until 1974, [5] and is the tallest building in the United States outside an urban area. [6]

History

The VAB, completed in 1966, was originally built for the vertical assembly of the ApolloSaturn V space vehicle and was originally referred to as the Vertical Assembly Building. In anticipation of post-Apollo projects such as the Space Shuttle program, it was renamed the Vehicle Assembly Building on February 3, 1965. [7] [8] It was subsequently used to mate the Space Shuttle orbiters to their external fuel tanks and solid rocket boosters. Once the complete space vehicle was assembled on a mobile launcher platform, a crawler-transporter moved it to Launch Complex-39A or 39B.

Before the destruction of Space Shuttle Columbia in 2003, NASA installed a sub-roof inside the VAB to deal with falling concrete debris due to the building's age. [9]

The VAB was designated as a National Historic Civil Engineering Landmark by the American Society of Civil Engineers in 2020. [10]

Construction

VAB during construction (1965) with the three Mobile Launchers for the Saturn V rocket. VABConstruction.jpg
VAB during construction (1965) with the three Mobile Launchers for the Saturn V rocket.

In 1963, NASA contracted Urbahn Architects to design and build the VAB. Construction began with driving the first steel foundation piles on Aug. 2, 1963. It was part of NASA's massive effort to send astronauts to the Moon for the Apollo program. Altogether, 4,225 pilings were driven down 164 feet to bedrock with a foundation consisting of 30,000 cubic yards (23,000 m3) of concrete. Construction of the VAB required 98,590 short tons (197,180,000 lb; 89,440,000 kg) of steel. [11] The building was completed in 1966. [12] The VAB is 526 feet (160.3 m) tall, 716 feet (218.2 m) long and 518 feet (157.9 m) wide. It covers 8 acres (32,000 m2), and encloses 129,428,000 cubic feet (3,665,000 m3) of space. [13] Located on Florida's Atlantic coast, the building was constructed to withstand hurricanes and tropical storms. Despite this, it has received damage from several hurricanes (see below).

Capabilities

A crane lowers Discovery toward the ET and SRBs in high bay 3 of the Vehicle Assembly Building for STS-124. Space Shuttle Discovery lowered toward external tank and solid rocket boosters (STS-124).jpg
A crane lowers Discovery toward the ET and SRBs in high bay 3 of the Vehicle Assembly Building for STS-124.

There are four entries to the bays located inside the building, which are the four largest doors in the world. [12] Each door is 456 feet (139.0 m) high, has seven vertical panels and four horizontal panels, and takes 45 minutes to completely open or close. The north entry that leads to the transfer aisle was widened by 40 feet (12.2 m) to allow entry of the shuttle orbiter. A central slot at the north entry allowed for passage of the orbiter's vertical stabilizer.

To lift the components of the Space Shuttle, the VAB housed five overhead bridge cranes, including two capable of lifting 325 tons, and 136 other lifting devices.

The building has air conditioning equipment, including 125 ventilators [3] on the roof supported by four large air handlers (four cylindrical structures west of the building) rated at a total 10,000 tons of refrigeration (120,000,000 BTU/hr, 35 MW) to keep moisture under control. Air in the building can be completely replaced every hour. The large doors can allow fog to roll into the building and become trapped, leading to incorrect rumors that the building has its own weather and can form clouds. [14]

Exterior

VAB in 1977, with the Bicentennial Star opposite the flag. The Bicentennial Star was painted over with the NASA insignia in 1998. Note the Space Shuttle Landing Facility at upper left. VAB aerial 1977.jpg
VAB in 1977, with the Bicentennial Star opposite the flag. The Bicentennial Star was painted over with the NASA insignia in 1998. Note the Space Shuttle Landing Facility at upper left.

The American flag painted on the building was the largest in the world when added in 1976 as part of United States Bicentennial celebrations, along with the star logo of the anniversary, later replaced by the NASA insignia in 1998. It is 209 feet (63.7 m) high and 110 feet (33.5 m) wide. Each of the stars on the flag is 6 feet (1.83 m) across, the blue field is the size of a regulation basketball court, and each of the stripes is 9 feet (2.74 m) wide. [15] Work began in early 2007 to restore the exterior paint on the immense facility. Special attention was paid to the enormous American flag and NASA "meatball" insignia. The work repaired visible damage from years of storms and weathering. The flag and logo had been previously repainted in 1998 for NASA's 40th anniversary. [16]

Repair work after Hurricane Frances Vehicle Assembly Building damage from Hurricane Frances night view.jpg
Repair work after Hurricane Frances

The most extensive exterior damage occurred during the storm season of 2004, when Hurricane Frances blew off 850 14-by-6-foot (4.3 m × 1.8 m) aluminum panels from the building, resulting in about 40,000 square feet (3,700 m2) of new openings in the sides. [16] [17] Twenty-five additional panels were blown off the east side by the winds from Hurricane Jeanne just three weeks later. Earlier in the season, Hurricane Charley caused significant but less serious damage, estimated to cost $700,000 to repair. Damage caused by these hurricanes was still visible in 2007. Some of these panels are "punch-outs", designed to detach from the VAB when a large pressure differential is created on the outside vs. the inside. This allows for equalization, and helps protect the structural integrity of the building during rapid changes in pressure such as in tropical cyclones.

The building has been used as a backdrop in several Hollywood movies including Marooned , SpaceCamp , Apollo 13 , Contact , and others.

Future

Discovery in the Vehicle Assembly Building waiting for a ferry flight to Dulles, Virginia, for permanent display at the Smithsonian's National Air and Space Museum. Space Shuttle Discovery in NASA's VAB.JPG
Discovery in the Vehicle Assembly Building waiting for a ferry flight to Dulles, Virginia, for permanent display at the Smithsonian's National Air and Space Museum.

Originally, after the Space Shuttle was intended to be retired in 2010, the VAB would have been renovated for stacking of the Ares I and Ares V launch vehicles for the Constellation program, however the Constellation program was cancelled in 2010. The Space Shuttle itself was retired in 2011 after which NASA temporarily (as early as 2012) offered public tours of the VAB. These tours were temporarily discontinued in February 2014 to allow for renovations to take place. [18]

The NASA FY2013 budget included US$143.7 million for Construction of Facilities (CoF) requirements in support of what is now known as the Artemis program and its vehicles, including the Space Launch System (SLS) and Orion spacecraft. NASA began modifying Launch Complex 39 at KSC to support the new SLS in 2014, beginning with major repairs, code upgrades and safety improvements to the Launch Control Center, Vehicle Assembly Building (VAB) and the VAB Utility Annex. This initial work is required to support any launch vehicle operated from Launch Complex 39 and will allow NASA to begin modernizing the facilities, while vehicle-specific requirements are being developed. [19]

The VAB could be used to some extent for assembly and processing of any future vehicles using Launch Complex 39, in addition to renovations for SLS capabilities. On June 16, 2015, NASA released an announcement for proposals (AFP) seeking interest in using the VAB High Bay 2 and other complex facilities for commercial use in "assembling, integration, and testing of launch vehicles". This move is in line with the intent to migrate KSC towards acting as a spaceport accessible to both government and commercial ventures. [20]

On April 21, 2016, NASA announced the selection of Orbital ATK (bought by Northrop Grumman as of 2019) to begin negotiations for High Bay 2. The "potential agreement" included an existing mobile launcher platform. [21] NASA subsequently completed the agreement in August 2019 to lease High Bay 2 and Mobile Launcher Platform 3 to Northrop Grumman for use with their OmegA launch vehicle. [22] However, development of OmegA was subsequently cancelled in September 2020. Northrop Grumman had yet to make any modifications to High Bay 2, and were using it for the storage of OmegA hardware. This hardware was scheduled to be removed from the VAB and returned to Northrop Grumman by the end of September 2020. [23]

Related Research Articles

<span class="mw-page-title-main">Kennedy Space Center</span> United States space launch site in Florida

The John F. Kennedy Space Center, located on Merritt Island, Florida, is one of the National Aeronautics and Space Administration's (NASA) ten field centers. Since December 1968, KSC has been NASA's primary launch center of American spaceflight, research, and technology. Launch operations for the Apollo, Skylab and Space Shuttle programs were carried out from Kennedy Space Center Launch Complex 39 and managed by KSC. Located on the east coast of Florida, KSC is adjacent to Cape Canaveral Space Force Station (CCSFS). The management of the two entities work very closely together, share resources and operate facilities on each other's property.

<span class="mw-page-title-main">Space Shuttle</span> Partially reusable launch system and space plane

The Space Shuttle is a retired, partially reusable low Earth orbital spacecraft system operated from 1981 to 2011 by the U.S. National Aeronautics and Space Administration (NASA) as part of the Space Shuttle program. Its official program name was Space Transportation System (STS), taken from a 1969 plan for a system of reusable spacecraft where it was the only item funded for development.

<span class="mw-page-title-main">Space Shuttle program</span> 1972–2011 United States human spaceflight program

The Space Shuttle program was the fourth human spaceflight program carried out by the U.S. National Aeronautics and Space Administration (NASA), which accomplished routine transportation for Earth-to-orbit crew and cargo from 1981 to 2011. Its official name, Space Transportation System (STS), was taken from a 1969 plan for a system of reusable spacecraft of which it was the only item funded for development. It flew 135 missions and carried 355 astronauts from 16 countries, many on multiple trips.

<span class="mw-page-title-main">Michoud Assembly Facility</span> NASA rocket manufacturing complex in Michoud, New Orleans

The Michoud Assembly Facility (MAF) is an 832-acre manufacturing complex owned by NASA in New Orleans East, a section of New Orleans, Louisiana, in the United States. Organizationally it is part of NASA's Marshall Space Flight Center, and is currently a multi-tenant complex to allow commercial and government contractors, as well as government agencies, to use the site.

<span class="mw-page-title-main">Crawler-transporter</span> NASA rocket transport vehicle

The crawler-transporters, formally known as the Missile Crawler Transporter Facilities, are a pair of tracked vehicles used to transport spacecraft from NASA's Vehicle Assembly Building (VAB) along the Crawlerway to Launch Complex 39. They were originally used to transport the Saturn IB and Saturn V rockets during the Apollo, Skylab and Apollo–Soyuz programs. They were then used to transport Space Shuttles from 1981 to 2011. The crawler-transporters carry vehicles on the mobile launcher platforms used by NASA, and after each launch return to the pad to take the platform back to the VAB.

<span class="mw-page-title-main">Kennedy Space Center Launch Complex 39</span> Historic Apollo Moonport

Launch Complex 39 (LC-39) is a rocket launch site at the John F. Kennedy Space Center on Merritt Island in Florida, United States. The site and its collection of facilities were originally built as the Apollo program's "Moonport" and later modified for the Space Shuttle program.

<span class="mw-page-title-main">Mobile launcher platform</span> Structure used to support large rockets

A mobile launcher platform (MLP), also known as mobile launch platform, is a structure used to support a large multistage space vehicle which is assembled (stacked) vertically in an integration facility and then transported by a crawler-transporter (CT) to a launch pad. This becomes the support structure for launch.

<span class="mw-page-title-main">Kennedy Space Center Visitor Complex</span> Science museum on Merritt Island, Florida

The Kennedy Space Center Visitor Complex is the visitor center at NASA's Kennedy Space Center on Merritt Island, Florida. It features exhibits and displays, historic spacecraft and memorabilia, shows, two IMAX theaters, and a range of bus tours of the spaceport. The "Space Shuttle Atlantis" exhibit contains the Atlantis orbiter and the Shuttle Launch Experience, a simulated ride into space. The center also provides astronaut training experiences, including a multi-axial chair and Mars Base simulator. The visitor complex also has daily presentations from a veteran NASA astronaut. A bus tour, included with admission, encompasses the separate Apollo/Saturn V Center. There were 1.7 million visitors to the visitor complex in 2016.

<span class="mw-page-title-main">Launch Control Center</span> United States historic place

The Rocco A. Petrone Launch Control Center is a four-story building at NASA's Kennedy Space Center on Merritt Island, Florida, used to manage launches of launch vehicles from Kennedy Space Center Launch Complex 39. Attached to the southeast corner of the Vehicle Assembly Building, the LCC contains offices; telemetry, tracking, and instrumentation equipment; and firing rooms.

<span class="mw-page-title-main">Launch Complex 39 Press Site</span> United States historic place

The Launch Complex 39 Press Site is a news media facility at Launch Complex 39 at the John F. Kennedy Space Center (KSC) on Merritt Island, Florida where journalists have observed every U.S. crewed space launch since Apollo 8 in 1968. The site is just south of the Vehicle Assembly Building (VAB); 3 miles (4.8 km) west-southwest of Pad A, and 3.4 miles (5.4 km) southwest of Pad B.

<span class="mw-page-title-main">Operations and Checkout Building</span> Historic American spaceflight facility in Cape Canaveral, Florida

The Neil Armstrong Operations and Checkout Building (O&C) is a historic building on Merritt Island, Florida, United States. The five-story structure is in the Industrial Area of NASA's Kennedy Space Center. Its has twin-block facilities that include the crew quarter dormitories for astronauts, suit-up preparations prior to their flights, and the other is a large spacecraft workshop used for manufacturing and checking activities on crewed spacecraft. On January 21, 2000, it was added to the U.S. National Register of Historic Places.

<span class="mw-page-title-main">Kennedy Space Center Launch Complex 39B</span> Historic launch pad operated by NASA

Launch Complex 39B (LC-39B) is the second of Launch Complex 39's three launch pads, located at NASA's Kennedy Space Center in Merritt Island, Florida. The pad, along with Launch Complex 39A, was first designed for the Saturn V launch vehicle, which at the time was the United States' most powerful rocket. Typically used to launch NASA's crewed spaceflight missions since the late 1960s, the pad is currently configured for use by the agency's Space Launch System rocket, a Shuttle-derived launch vehicle which is currently used in the Artemis program and subsequent Moon to Mars campaigns. The pad had also been leased by NASA to aerospace company Northrop Grumman, for use as a launch site for their Shuttle-derived OmegA launch vehicle, for National Security Space Launch flights and commercial launches, before the OmegA program was cancelled.

<span class="mw-page-title-main">NASA Railroad</span> Short-line railroad at the Kennedy Space Center

The NASA Railroad is a Class III industrial short-line railroad at the Kennedy Space Center in Cape Canaveral, Florida. The railroad consists of 38 miles (61 km) of track connecting the mainline of the Florida East Coast Railway and trackage at the Cape Canaveral Space Force Station. NASA uses the railroad to deliver large or bulk materials to support its operations, particularly solid rocket boosters and chemicals such as helium and oxygen for rocket fuel.

<span class="mw-page-title-main">Space Shuttle retirement</span> End of NASAs Space Shuttle spacecraft system in 2011

The retirement of NASA's Space Shuttle fleet took place from March to July 2011. Discovery was the first of the three active Space Shuttles to be retired, completing its final mission on March 9, 2011; Endeavour did so on June 1. The final shuttle mission was completed with the landing of Atlantis on July 21, 2011, closing the 30-year Space Shuttle program.

<span class="mw-page-title-main">Space Launch System</span> NASA super heavy-lift expendable launch vehicle

The Space Launch System (SLS) is an American super heavy-lift expendable launch vehicle used by NASA. As the primary launch vehicle of the Artemis Moon landing program, SLS is designed to launch the crewed Orion spacecraft on a trans-lunar trajectory. The first SLS launch was the uncrewed Artemis 1, which took place on 16 November 2022.

<span class="mw-page-title-main">Artemis 1</span> 2022 uncrewed Moon-orbiting NASA mission

Artemis 1, officially Artemis I and formerly Exploration Mission-1 (EM-1), was an uncrewed Moon-orbiting mission. As the first major spaceflight of NASA's Artemis program, Artemis 1 marked the agency's return to lunar exploration after the conclusion of the Apollo program five decades earlier. It was the first integrated flight test of the Orion spacecraft and Space Launch System (SLS) rocket, and its main objective was to test the Orion spacecraft, especially its heat shield, in preparation for subsequent Artemis missions. These missions seek to reestablish a human presence on the Moon and demonstrate technologies and business approaches needed for future scientific studies, including exploration of Mars.

<span class="mw-page-title-main">OmegA</span> Canceled US launch vehicle

OmegA was a medium-lift to heavy-lift launch vehicle concept that spent several years in development by Northrop Grumman during 2016–2020, with that development substantially funded by the U.S. government. OmegA was intended for launching U.S. national security satellites, as part of the U.S. Department of the Air Force National Security Space Launch (NSSL) replacement program.

<span class="mw-page-title-main">Exploration Ground Systems</span> NASA program for launch vehicle support

NASA's Exploration Ground Systems (EGS) Program is one of three programs based at NASA's Kennedy Space Center in Florida. EGS was established to develop and operate the systems and facilities necessary to process and launch rockets and spacecraft during assembly, transport and launch. EGS is preparing the infrastructure to support NASA's Space Launch System (SLS) rocket and its payloads, such as the Orion spacecraft for Artemis I. Artemis I is the first to launch in a series of increasingly complex missions that will enable human exploration to the Moon and Mars.

<span class="mw-page-title-main">Multi-Payload Processing Facility</span> Spacecraft and payload processing facility at NASAs Kennedy Space Center

The Multi-Payload Processing Facility (MPPF) is a facility at Kennedy Space Center constructed by NASA in either 1994 or 1995 and used for spacecraft and payload processing. Prior to being assigned the role of processing the Orion spacecraft, the MPPF was used to process solely non-hazardous payloads.

<span class="mw-page-title-main">Space Launch System core stage</span> Main stage of the NASA Space Launch System rocket

The Space Launch System core stage, or simply core stage, is the main stage of the American Space Launch System (SLS) rocket, built by The Boeing Company in the NASA Michoud Assembly Facility. At 65 m (212 ft) tall and 8.4 m (27.6 ft) in diameter, the core stage contains approximately 987 t (2,177,000 lb) of its liquid hydrogen and liquid oxygen cryogenic propellants. Propelled by 4 RS-25 engines, the stage generates approximately 7.44 MN (1,670,000 lbf) of thrust, about 25% of the Space Launch System's thrust at liftoff, for approximately 500 seconds, propelling the stage alone for the last 375 seconds of flight. The stage lifts the rocket to an altitude of approximately 162 km (531,380 ft) before separating, reentering the atmosphere, and splashing down in the Pacific Ocean.

References

  1. "National Register Information System  (#99001642)". National Register of Historic Places . National Park Service. July 9, 2010.
  2. Barker, Nathan; Gebhardt, Chris (March 17, 2022). "NASA moon rocket SLS rolls out to "rebuilt" LC-39B ahead of Artemis 1 rehearsal". NASASpaceFlight.com . Archived from the original on November 16, 2022. Retrieved March 18, 2022.
  3. 1 2 3 NASA (1999). "Vehicle Assembly Building". NASA. Archived from the original on December 29, 2017. Retrieved September 23, 2007.
  4. "Groundbreaking Digital Experience for Endeavour Shuttle Launch" (Press release). Redmond, Washington: Microsoft. August 5, 2007. Archived from the original on November 29, 2023. Retrieved September 23, 2007.
  5. Taylor, George Lansing (September 20, 1988). "NASA Vehicle Assembly Building, Cape Canaveral, FL". UNF Digital Commons. University of North Florida. Archived from the original on July 31, 2023. Retrieved January 28, 2023.
  6. Aguiar, Laura (January 10, 2020). "The Many Stories of the VAB" (PDF). Spaceport Magazine. Vol. 7, no. 1. NASA. Archived (PDF) from the original on February 19, 2024. Retrieved January 28, 2023.
  7. Benson, Charles Dunlap; Faherty, William Barnaby (1978). "VAB Nears Completion". Moonport: A History of Apollo Launch Facilities and Operations. NASA. SP-4204. Archived from the original on October 25, 2023. Retrieved September 25, 2014. The new name, it was felt, would more readily encompass future as well as current programs and would not be tied to the Saturn booster.
  8. "America's Spaceport" (PDF). NASA. 2010. p. 13. Archived (PDF) from the original on February 19, 2024. Retrieved February 22, 2013.
  9. Gehman, Harold W.; Barry, John L.; Deal, Duane W.; Hallock, James N.; Hess, Kenneth W.; Hubbard, G. Scott; Logsdon, John M.; Osheroff, Douglas D.; Ride, Sally K.; Tetrault, Roger E.; Turcotte, Stephen A.; Wallace, Steven B.; Widnall, Sheila E. (August 2003). Columbia Accident Investigation Board, Report Vol. 1 (PDF). p. 114. ISBN   978-0-16-067904-9. Archived (PDF) from the original on September 18, 2023.
  10. "Vehicle Assembly Building at KSC Designated as National Civil Engineering Landmark". Florida Today . January 10, 2020. Archived from the original on January 11, 2020. Retrieved August 20, 2022.
  11. Granath, Bob (July 18, 2013). "Vehicle Assembly Building Prepared for Another 50 Years of Service" (Press release). Archived from the original on September 29, 2016. Retrieved February 4, 2018.
  12. 1 2 "Vehicle Assembly Building" (PDF). NASA . 2012. FS-2012-06-121-KSC. Archived (PDF) from the original on February 3, 2024.
  13. Marquardt, Sarah (August 14, 2017). "An Exclusive Look Inside The Secretive Building Where NASA Makes Rockets". futurism.com. Archived from the original on September 24, 2023. Retrieved January 28, 2023.
  14. Cardona, Carolina (July 3, 2019). "Inside the VAB at Kennedy Space Center". WKMG. Graham Media Group. Archived from the original on January 27, 2023. Retrieved March 14, 2021.
  15. Stuckey, Jeff (May 27, 2005). "Vehicle Assembly Building's American flag flies again" (PDF). Spaceport News. Vol. 44, no. 12. NASA. Archived (PDF) from the original on February 19, 2024.
  16. 1 2 Mansfield, Cheryl L. (January 11, 2007). "Restoring Old Glory and a Massive Meatball". NASA. Archived from the original on March 4, 2021. Retrieved July 11, 2007.
  17. O'Brien, Miles (September 6, 2004). "Frances tears panels from NASA shuttle hangar". CNN . Archived from the original on December 20, 2022. Retrieved September 23, 2007.
  18. Pearlman, Robert Z. (January 22, 2014). "Rocket Renovations Will End Public Tours of NASA's Vehicle Assembly Building". Space.com . Archived from the original on December 8, 2023.
  19. "NASA FY13 Budget" (PDF). Archived from the original (PDF) on March 4, 2016. Retrieved June 9, 2012.
  20. Schierholz, Stephanie; Chevalier, Mary Ann, eds. (June 15, 2015). "NASA Solicits Proposals for Use of Kennedy Space Center's Vehicle Assembly Building High Bay 2" (Press release). NASA. Archived from the original on February 19, 2024.
  21. Chevalier, Mary Ann, ed. (April 21, 2016). "NASA Selects Orbital ATK to Begin Negotiations for Space in Iconic Vehicle Assembly Building" (Press release). NASA. Archived from the original on February 19, 2024. Retrieved June 29, 2016.
  22. Pearlman, Robert Z. (August 16, 2019). "Apollo to OmegA: NASA signs over legacy launcher for new rocket". collectspace.com. Archived from the original on September 23, 2023. Retrieved November 20, 2021.
  23. Bergin, Chris (September 11, 2020). "OmegA Launch Tower to be demolished as KSC 39B fails to become a multi-user pad". NASASpaceFlight.com . Archived from the original on June 3, 2023. Retrieved November 20, 2021.
Records
Preceded by Tallest Building in Florida
1965–1974
520 feet (160 m)
Succeeded by