16 Avenue North | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
CTrain station | |||||||||||
General information | |||||||||||
Coordinates | 51°04′00″N114°03′45″W / 51.066748°N 114.062498°W | ||||||||||
Owned by | Calgary Transit | ||||||||||
Line(s) | Green Line (Calgary) | ||||||||||
Platforms | Centre loading platform | ||||||||||
Tracks | 2 | ||||||||||
Connections | MAX Orange 300 North BRT / Airport 301 North BRT / North Pointe Airdrie Transit Intercity Express | ||||||||||
Construction | |||||||||||
Structure type | At grade | ||||||||||
Parking | None | ||||||||||
Accessible | Yes | ||||||||||
Other information | |||||||||||
Fare zone | Fare paid | ||||||||||
History | |||||||||||
Opening | 2027 | ||||||||||
Electrified | Overhead catenary | ||||||||||
Services | |||||||||||
|
16 Avenue North is a planned and approved CTrain light rail station in Calgary, Alberta, Canada part of the Green Line. Construction is expected to begin in 2024 and complete in 2027 as part of construction stage one, phase two. [1] The station serves as the northern terminus station for stage one of construction and is expected to be one of the busiest stations on opening day. [2] It will serve as a transfer point between the Green Line and MAX Orange BRT, connecting riders to the city's northwest, northeast, the Southern Alberta Institute of Technology, the University of Calgary, the Foothills Medical Centre, the Alberta Children's Hospital and future Calgary Cancer Centre.
The station will be directly south of 16 Avenue North in the community of Crescent Heights. It is planned to be a low-profile urban station with curb height platforms, at-grade boarding, and will be in the median of Centre Street. The station will not include a park and ride. The area surrounding the station is instead expected to be redeveloped with high-density transit oriented development. [3] As of 2015, there were 6,250 residents and 3,250 jobs within walking distance of the station. That number is expected to increase to 13,400 residents and 5,050 jobs after the station opens for service in 2027. [4]
The station was planned as an underground station in the city's 2017 recommendations, but was modified to an at-grade station with the city's 2020 alignment update. [5]
CTrain is a light rail rapid transit system in Calgary, Alberta, Canada. Much of the system functions as a high-capacity light metro, while in the downtown free-fare zone, trains transition into a tram with a dedicated right-of-way. The CTrain began operation on May 25, 1981 and has expanded as the city has increased in population. The system is operated by Calgary Transit, as part of the Calgary municipal government's transportation department. In 2022, the system had a ridership of 61,889,500, or about 228,800 per weekday as of the fourth quarter of 2022, making it one of the busiest light rail transit systems in North America. Approximately 45% of workers in Downtown Calgary take the CTrain to work.
Beltline is a region of central Calgary, Alberta, Canada. The area is located immediately to the south of Calgary's downtown, and is sometimes considered part of downtown. The neighbourhood is bounded on the south by 17th Avenue, on the west by 14th Street West and on the east by the Elbow River. Beltline is one of Calgary's most densely populated neighbourhoods as well as the most urban, featuring many apartments, condominiums and offices. It has the reputation of being one of Calgary's primary areas for eclectic night-life, restaurants and urban culture.
Alberta Provincial Highway No. 201, officially named Stoney Trail and Tsuut'ina Trail, is an approximately 92-kilometre (57 mi) freeway in Calgary, Alberta. It forms part of the CANAMEX Corridor which connects Calgary to Edmonton and Interstate 15 in the United States via Highways 2, 3, and 4. Planned for a total length of 101 kilometres, the final segment of the ring road is currently under construction to be completed by 2024 at the latest, delayed from an original target of 2022. The freeway serves as a bypass for the congested routes of 16 Avenue N and Deerfoot Trail through Calgary. At its busiest point near Beddington Trail in north Calgary, the six-lane freeway carried nearly 79,000 vehicles per day in 2019.
Crescent Heights is a neighbourhood located in Calgary, Alberta. It is located in the inner city, immediately north from Downtown. It is bounded to the north by the Trans-Canada Highway, on the east by Edmonton Trail, on the west by 4th Street NW, and to the south by Memorial Drive and the Bow River.
Tuxedo Park is a residential neighbourhood in the northeast and northwest quadrants of Calgary, Alberta. The inner city community is bounded to the north by 32 Avenue N, by Edmonton Trail to the east, the Trans-Canada Highway to the south and 2 Street NW to the west. The community is bisected by Centre Street from north to south.
The Green Line is a light rail (LRT) line under construction in Calgary, Alberta, Canada. The line will run between Calgary’s north-central and southeastern boundaries, connecting with the Red Line and Blue Line in the city’s downtown. The Green Line is the largest public infrastructure project in Calgary's history and will be the first rail line in the city to operate low-floor trains. When completed, the Green Line will comprise 29 stations spanning 46 kilometres (29 mi). This will bring the total number of CTrain stations in Calgary to 74.
MAX Purple, also known as Route 307 or the 17 Avenue SE BRT, is a bus rapid transit line in Calgary, Alberta. Part of Calgary Transit's MAX network, it largely travels east along 17 Avenue SE from downtown Calgary.
9 Avenue North is a planned and approved CTrain light rail station in Calgary, Alberta, Canada part of the Green Line. Construction is expected to begin in 2024 and complete in 2027 as part of construction stage one, phase two.
Eau Claire is a planned and approved CTrain light rail station in Calgary, Alberta, Canada part of the Green Line. Construction is expected to begin in 2022 and complete in 2027 as the northern terminus of construction phase one. The station is named for and located in the high density urban community of Eau Claire, immediately north of downtown Calgary.
7 Avenue Southwest is a planned and approved CTrain light rail station in Calgary, Alberta, Canada part of the Green Line. Construction will begin in 2024 and complete in 2027 as part of construction stage one, phase one.
Centre Street South is a planned and approved CTrain light rail station in Calgary, Alberta, Canada part of the Green Line. Construction will begin in 2023 and complete in 2027 as part of construction stage one, segment 2A. The station is located in the Beltline, immediately south of downtown Calgary.
4 Street Southeast is a planned and approved CTrain light rail station in Calgary, Alberta, Canada part of the Green Line. Construction will begin in 2023 and complete in 2027 as part of construction stage one, segment 2A. The station is located in Beltline, immediately southeast of downtown Calgary near the confluence of the Bow River and Elbow River.
Ramsay/Inglewood is a planned and approved CTrain light rail station in Calgary, Alberta, Canada part of the Green Line. Construction will begin in 2022 and complete in 2027 as part of construction stage one, segment one. The station serves some of Calgary's oldest, most historic areas located in the urban inner-city communities of Ramsay and Inglewood.
26 Avenue SE is a planned and approved CTrain light rail station in Calgary, Alberta, Canada part of the Green Line. Construction will begin in 2022 and complete in 2027 as part of construction stage one, segment one. The station is located in Alyth/Bonnybrook/Manchester near Barlow Trail.
Highfield is a planned and approved CTrain light rail station in Calgary, Alberta, Canada part of the Green Line. Construction will begin in 2022 and complete in 2027 as part of construction stage one, segment one. The station is located in Calgary's oldest industrial area.
Ogden is a planned and approved CTrain light rail station in Calgary, Alberta, Canada part of the Green Line. Construction will begin in 2022 and complete in 2027 as part of construction stage one, segment one. The station is located in the community of Ogden.
South Hill is a planned and approved CTrain light rail station in Calgary, Alberta, Canada part of the Green Line. Construction will begin in 2022 and complete in 2027 as part of construction stage one, segment one. The station is located in the north-western corner of Shepard Industrial, directly nearby Glenmore Trail and the suburban residential community of Riverbend.
Quarry Park is a planned and approved CTrain light rail station in Calgary, Alberta, Canada part of the Green Line. Construction will begin in 2022 and complete in 2027 as part of construction stage one, segment one. The station is located in the largely commercial community of Quarry Park and will also serve the suburban communities of Douglas Glen and Riverbend.
Douglas Glen is a planned and approved CTrain light rail station in Calgary, Alberta, Canada part of the Green Line. Construction will begin in 2022 and complete in 2027 as part of construction stage one, segment one. The station is located in the suburban residential and commercial community of Douglasdale/Douglasglen.
Shepard is a planned and approved CTrain suburban light rail station in Calgary, Alberta, Canada part of the Green Line. Construction will begin in 2022 and complete in 2027 as part of construction stage one, segment one. The station is located at the South Trail Crossing shopping centre and will serve as the southern terminus station for stage one of construction. It is expected to be one of the busiest stations on opening day.