Centre Street South station

Last updated
Centre Street South
CTrain station
General information
Coordinates 51°02′32″N114°03′43″W / 51.042332°N 114.062028°W / 51.042332; -114.062028 (Centre Street South station) Coordinates: 51°02′32″N114°03′43″W / 51.042332°N 114.062028°W / 51.042332; -114.062028 (Centre Street South station)
Owned by Calgary Transit
PlatformsCentre loading
Tracks2
Construction
Structure typeUnderground
ParkingNone
Disabled accessYes
Other information
Fare zoneTBD
History
Opening2027 (2027)
Electrified Overhead catenary
Services
Preceding station CTrain Following station
7 Avenue SW
toward 16 Avenue N
Green Line 4 Street SE
toward Shepard

Centre Street South is a planned and approved CTrain light rail station in Calgary, Alberta, Canada part of the Green Line. Construction will begin in 2023 and complete in 2027 as part of construction stage one, segment 2A. [1] The station is located in the Beltline, immediately south of downtown Calgary.

The station will be located under 11 Avenue South, near Centre Street South and will have a concourse level above the platform. It will provide access to the urban community's high-density residential, commercial and retail buildings, as well as the Calgary Tower, the Central Library and the Sheldon M. Chumir Hospital. [2] The station and the surrounding streetscape will feature Crime Prevention Through Environmental Design principles to mitigate crime.

Related Research Articles

CTrain Light rail transit system in Calgary, Alberta

CTrain is a light rail rapid transit system in Calgary, Alberta, Canada. Most of the network functions as a light metro, though in the free-fare zone that runs through the downtown core the Red and Blue lines operate like a urban tramway. The CTrain began operation on May 25, 1981 and has expanded as the city has increased in population. The system is operated by Calgary Transit, as part of the Calgary municipal government's transportation department. In 2021, the system had a ridership of 35,522,200, or about 147,000 per weekday as of the fourth quarter of 2021, making it one of the busiest light rail transit systems in North America. About 45% of workers in Downtown Calgary take the CTrain to work.

Beltline, Calgary Neighbourhood in Calgary, Alberta, Canada

Beltline is a region of central Calgary, Alberta, Canada. The area is located immediately to the south of Calgary's downtown, and is sometimes considered part of downtown. The neighbourhood is bounded on the south by 17th Avenue, on the west by 14th Street West and on the east by the Elbow River. Beltline is one of Calgary's most densely populated neighbourhoods as well as the most urban, featuring many apartments, condominiums and offices. It has the reputation of being one of Calgary's primary areas for eclectic night-life, restaurants and urban culture.

Crescent Heights is a neighbourhood located in Calgary, Alberta. It is located in the inner city, immediately north from Downtown. It is bounded to the north by the Trans-Canada Highway, on the east by Edmonton Trail, on the west by 4th Street NW, and to the south by Memorial Drive and the Bow River.

Ramsay is a residential neighbourhood in the southeast quadrant of Calgary, Alberta. It is an inner city community, located east of the Elbow River, Macleod Trail, Stampede Grounds and the Scotiabank Saddledome arena and south of Inglewood. To the southeast, it borders the Alyth-Bonny Brook industrial area. The eastern half of the community consists primarily of older homes and there is an industrial area in the most eastern corner of the community.

Tuxedo Park is a residential neighbourhood in the northeast and northwest quadrants of Calgary, Alberta. The inner city community is bounded to the north by 32 Avenue N, by Edmonton Trail to the east, the Trans-Canada Highway to the south and 2 Street NW to the west. The community is bisected by Centre Street from north to south.

The Green Line is a future light rail transit (LRT) line planned to run between north-central and southeastern Calgary, Alberta, Canada. When completed, it will be the third line in the CTrain system and will be known as Route 203, connecting with the existing Red Line and the Blue Line in Downtown Calgary. The Green Line is the largest public infrastructure project in Calgary's history and will be the first rail line in Calgary to operate low-floor trains.

16 Avenue North is a planned and approved CTrain light rail station in Calgary, Alberta, Canada part of the Green Line. Construction is expected to begin in 2024 and complete in 2027 as part of construction stage one, segment 2B. The station serves as the northern terminus station for stage one of construction and is expected to be one of the busiest stations on opening day. It will serve as a transfer point between the Green Line and MAX Orange BRT, connecting riders to the city's northwest, northeast, the Southern Alberta Institute of Technology, the Foothills Medical Centre, the Alberta Children's Hospital and future Calgary Cancer Centre.

9 Avenue North is a planned and approved CTrain light rail station in Calgary, Alberta, Canada part of the Green Line. Construction is expected to begin in 2024 and complete in 2027 as part of construction stage one, segment 2B.

2 Avenue SW is a planned and approved CTrain light rail station in Calgary, Alberta, Canada part of the Green Line. Construction is expected to begin in 2022 and complete in 2027 as part of construction stage one, segment 2A. The station is located in the high density urban community of Eau Claire, immediately north of downtown Calgary.

7 Avenue Southwest is a planned and approved CTrain light rail station in Calgary, Alberta, Canada part of the Green Line. Construction will begin in 2024 and complete in 2027 as part of construction stage one, segment 2B.

4 Street Southeast is a planned and approved CTrain light rail station in Calgary, Alberta, Canada part of the Green Line. Construction will begin in 2023 and complete in 2027 as part of construction stage one, segment 2A. The station is located in the Beltline, immediately southeast of downtown Calgary near the confluence of the Bow River and Elbow River.

Ramsay/Inglewood is a planned and approved CTrain light rail station in Calgary, Alberta, Canada part of the Green Line. Construction will begin in 2022 and complete in 2027 as part of construction stage one, segment one. The station serves some of Calgary's oldest, most historic areas located in the urban inner-city communities of Ramsay and Inglewood.

26 Avenue SE is a planned and approved CTrain light rail station in Calgary, Alberta, Canada part of the Green Line. Construction will begin in 2022 and complete in 2027 as part of construction stage one, segment one. The station is located in Alyth/Bonnybrook/Manchester near Barlow Trail.

Highfield is a planned and approved CTrain light rail station in Calgary, Alberta, Canada part of the Green Line. Construction will begin in 2022 and complete in 2027 as part of construction stage one, segment one. The station is located in Calgary's oldest industrial area.

Lynnwood/Millican is a planned and approved CTrain light rail station in Calgary, Alberta, Canada part of the Green Line. Construction will begin in 2022 and complete in 2027 as part of construction stage one, segment one. The station is located in the districts of Lynnwood and Millican Estates in the community of Ogden, at the junction of Ogden Road SE and Millican Road SE, adjacent to the Pop Davies Athletic Park.

Ogden is a planned and approved CTrain light rail station in Calgary, Alberta, Canada part of the Green Line. Construction will begin in 2022 and complete in 2027 as part of construction stage one, segment one. The station is located in the community of Ogden.

South Hill is a planned and approved CTrain light rail station in Calgary, Alberta, Canada part of the Green Line. Construction will begin in 2022 and complete in 2027 as part of construction stage one, segment one. The station is located in the north-western corner of Shepard Industrial, directly nearby Glenmore Trail and the suburban residential community of Riverbend.

Quarry Park is a planned and approved CTrain light rail station in Calgary, Alberta, Canada part of the Green Line. Construction will begin in 2022 and complete in 2027 as part of construction stage one, segment one. The station is located in the largely commercial community of Quarry Park and will also serve the suburban communities of Douglas Glen and Riverbend.

Douglas Glen is a planned and approved CTrain light rail station in Calgary, Alberta, Canada part of the Green Line. Construction will begin in 2022 and complete in 2027 as part of construction stage one, segment one. The station is located in the suburban residential and commercial community of Douglasdale/Douglasglen.

Shepard is a planned and approved CTrain suburban light rail station in Calgary, Alberta, Canada part of the Green Line. Construction will begin in 2022 and complete in 2027 as part of construction stage one, segment one. The station is located at the South Trail Crossing shopping centre and will serve as the southern terminus station for stage one of construction. It is expected to be one of the busiest stations on opening day.

References

  1. Communications, Customer Service &. "Green Line - Segment 2 :: Green Line Stage One". Engage. Retrieved 2020-07-21.
  2. Transportation. "Centre Street S. Green Line Station". www.calgary.ca. Retrieved 2020-07-23.