Calgary Central Library | |
---|---|
Alternative names | New Central Library |
General information | |
Type | Public library |
Location | 800 3rd Street SE Calgary, Alberta |
Coordinates | 51°02′43″N114°03′18″W / 51.0453°N 114.0549°W |
Construction started | 2013 |
Completed | November 1, 2018 |
Cost | $245 million (CAD) |
Owner | Calgary Public Library |
Technical details | |
Floor count | 4 |
Floor area | 22,000 m2 (240,000 sq ft) |
Design and construction | |
Architecture firm | Snøhetta DIALOG |
Developer | Calgary Municipal Land Corporation |
Structural engineer | Entuitive |
Services engineer | SMP Engineering |
Main contractor | Stuart Olson |
Website | |
https://calgarylibrary.ca/ |
The Calgary Central Library, also known as the Calgary New Central Library (NCL), is a public library in Calgary, Alberta, Canada, and the flagship branch of the Calgary Public Library system. The building is located in the Downtown East Village neighbourhood and opened on November 1, 2018, replacing an earlier central branch built in the 1960s in Downtown Calgary.
The four-storey building cost CA$245 million to construct and was designed by American-Norwegian architecture firm Snøhetta and Canadian firm DIALOG after the two firms' joint bid won a design competition in 2013. Their design features an oval-like form and an interior with a large central atrium with a skylight. The building is elevated one floor above street level to accommodate a Calgary light rail trackway below, as well as a public plaza.
Planning for a new library began in 2004 and was finalized in 2011. Construction began in 2013 with the encapsulation of an existing CTrain light rail tunnel portal; above-ground construction of the library itself began in September 2015.
The Calgary Central Library is located along 3rd Street SE between 7th and 9th avenues in the Downtown East Village neighborhood. [1] The library is directly east of the Calgary Municipal Building and the connected City Hall Station for the CTrain. The Central Library shares its block with the historic King Edward Hotel to the southeast, which is connected to the National Music Centre with a skybridge to the east. [2] [3]
Planning began in 2004 for a new central library branch in Downtown Calgary to replace the previous structure which had been in use since 1964. The City of Calgary, working with the Calgary Municipal Land Corporation, proposed a site adjacent to the Calgary Municipal Building in the Downtown East Village neighborhood. Calgary City Council approved the project in 2011, providing $40 million for its construction. [4] Other sites in consideration, and subsequently rejected included the current Central Library site in Downtown, the former headquarters of the Calgary Board of Education, Olympic Plaza, and the former Telus World of Science centre in the Downtown West End. [5]
Funding for the Calgary Central Library project was budgeted at $245 million, with $175 million contributed by the City of Calgary, $70 million from the Calgary Municipal Land Corporation, a city-owned real estate developer. [6] The largest private donation for the project, via the Calgary Public Library Foundation, was a $1.5 million contribution from Nexen, a Calgary-based oil company and subsidiary to the Chinese state-run CNOOC, for the naming rights to a high-tech learning centre. [7]
The Calgary Central Library's design was unveiled to the public in September 2014 by architects Snøhetta (known for Bibliotheca Alexandrina) and DIALOG, who won a design competition in 2013. The entire building is oval-shaped and is elevated one floor above street level to cover a CTrain light rail tunnel and an open plaza, included with the intention of connecting Calgary's East Village to Downtown. The entrance is framed by wood-clad arches inspired by the shape of arched clouds made by Chinook winds in Alberta. Landscaping around the library and adjoining plaza consists of terracing inspired by the foothills of the Canadian Rockies. [8]
The exterior of the Calgary Central Library is wrapped in a textured façade, with translucent fritted glass panels used to shield private study areas and clear glass to make public areas viewable from the outside. [8] [9]
The 22,000-square-metre (240,000 sq ft) interior is centered around a four-storey central atrium topped by a skylight. The lower floors contain the library's meeting spaces and activity centres, while the upper floors feature book stacks with space for 450,000 titles and a reading room. At street level, one floor below the main lobby, is a 340-seat theatre, conference rooms, and small café. [1] [10]
The library features several sustainable design features, such as triple-pane windows to save energy on climate control and finishings made of low volatile organic compound materials. [11]
One notable absence from the new library is a connection to Calgary's +15 skybridge system that spans the central business district of Calgary, with the nearest connected structure at the Calgary Municipal Building. [1] A connection was considered, but ultimately rejected because of conflicts with the city hall's hours of operation as well as low predicted traffic. [2]
Calgary mayor Naheed Nenshi described the library as a "new icon for the city" at the public unveiling of the final design in 2014. [12]
Public art for the library was selected in 2017, with one percent of the project budget dedicated to public art. [13]
The first stage of construction was the $25 million encapsulation of a 135-metre (443 ft) section of light rail used by Calgary Transit's Red Line, which emerges from a tunnel under the site. [14] The light rail encapsulation began in May 2014 and was completed in September 2015, allowing for construction of the above ground portion of the Central Library to begin. [15] [16]
The Calgary Central Library was opened to the public on November 1, 2018, with Canadian astronaut Chris Hadfield dedicating the building. [17] Following the opening ceremonies, special public events continued for four days, with a total of 52,000 people visited the new Central Library. [18] The library was praised for its design and its potential impact on Calgary's image amid a planned bid for the 2026 Winter Olympics. [19]
Prior to the Central Library's completion, the design was listed as one of Architectural Digest's twelve most anticipated buildings of 2018. [20] [21] The design won a 2020 Architecture Award from the American Institute of Architects, [22] a 2020 American Institute of Architects New York Design Award for outstanding architectural design by American Institute of Architects New York members, [23] and American Institute of Architects, American Library Association and Library Leadership and Management Association 2019 AIA/ALA Library Building Award. [24]
The Society for Experiential Graphic Designs awarded the Central Library with the Global Design Merit Award 2019 for Pathfinding, noting the simple, friendly approach to colours and shapes which provides information to patrons. [25] The Central Library would also win the Canadian Consulting Engineers Award of Excellence and CISC Alberta Steel Design Award for Building Communities, the Association of Consulting Engineering Companies 2019 CCE Award of Excellence, Canadian Architect Award of Merit, and Azure Magazine's Best Canadian Architecture of the Decade. [26] [27]
Calgary International Airport, branded as YYC Calgary International Airport, is an international airport that serves the city of Calgary, Alberta, Canada. It is located approximately 17 kilometres (11 mi) northeast of downtown and covers an area of 20.82 square kilometres. With 18.5 million passengers in 2023 and 124,108 aircraft movements in 2021, Calgary International is the busiest airport in Alberta and the fourth-busiest in Canada by passenger traffic. This airport is served by the Calgary International Airport Emergency Response Service for aircraft rescue and firefighting protection. The region's petroleum and tourism industries have helped foster growth at the airport, which has nonstop flights to an array of destinations in North and Central America, Europe, and Asia. Calgary serves as the headquarters and primary hub for WestJet.
The Southern Alberta Institute of Technology (SAIT) is a polytechnic institute in Calgary, Alberta, Canada. SAIT offers more than 110 career programs in technology, trades and business. Established in 1916, it is Calgary's second oldest post-secondary institution and Canada's first publicly funded technical institute.
CTrain is a light rail system in Calgary, Alberta, Canada. Much of the system functions as a high-capacity light metro, while in the downtown free-fare zone, trains run like a modern tram with a dedicated right-of-way. This subway-surface alignment is known as semi-metro.
Snøhetta is a Norwegian architectural firm headquartered in Oslo, Norway.
The Calgary Public Library (CPL) is a distributed library system featuring 21 branch locations including the Central Library. As of 2012, it is the second most used system in Canada and the sixth most used library system in North America. This is despite the fact that the Calgary Public Library has one of the lowest per capita funding in the country, receiving as little as half the money of other Canadian public libraries.
Brentwood Station is a Calgary C-Train light rail station on the Red Line, between University Station southbound and Dalhousie Station northbound. The station is located in the middle of Crowchild Trail, wedged between the communities of Brentwood to the north, and Varsity to the south. The station acts as a transfer point, connecting with the bus routes of MAX Orange, North Pointe, Foothills Medical Centre, Dalhousie, Chinook, Greenwood/Brentwood, Market Mall, Downtown West, Nolan Hill, and Valley Ridge.
The year 2009 in architecture involved some significant architectural events and new buildings.
Calgary is the largest city in the Canadian province of Alberta. It is the largest metro area within the three prairie provinces. As of 2021, the city proper had a population of 1,306,784 and a metropolitan population of 1,481,806, making it the third-largest city and fifth-largest metropolitan area in Canada.
Naheed Kurban Nenshi is a Canadian politician who has been serving as the leader of the Alberta New Democratic Party since being elected to the post on June 22, 2024. He was the 36th mayor of Calgary, Alberta, serving from 2010 to 2021.
Koning Eizenberg Architecture (KEA) is an architecture firm located in Santa Monica, California established in 1981. The firm is recognized for a range of project types including: adaptive reuse of historic buildings, educational facilities, community places, and housing. Principals Hank Koning, Julie Eizenberg, Brian Lane, and Nathan Bishop work collaboratively with developers, cities and not-for-profit clients. Their work has been published extensively both in the US and abroad, and has earned over 200 awards for design, sustainability and historic preservation.
Downtown East Village more commonly known as simply East Village, is a mixed-use neighbourhood within the eastern portions of downtown Calgary, Alberta, Canada. It is contained within the city's Rivers District. Containing the earliest-settled land in the Calgary area - Fort Calgary - East Village was for years a mixture of high-rise residential, commercial, and industrial development. Much of the parkland currently surrounding Fort Calgary was industrial as recently as the 1960s. Construction of the city's light rail transit Blue Line, coupled with the closure of 8th Avenue at Macleod Trail in the early 1980s by construction of the massive Calgary Municipal Building, resulted in East Village being "cut off," from the rest of downtown. It became home to many rundown properties and vacant lots over the years, and a severe crime problem.
Brookfield Place is a skyscraper located in downtown Calgary, Alberta, Canada. The complex is home to Brookfield Place East, a 56-storey 247 m (810 ft) office tower, which, upon its completion in 2017, became the tallest building in Calgary, exceeding The Bow. Its anchor tenant is the oil and gas company Cenovus.
The Calgary Municipal Building, often referred to as New City Hall, is the seat of local government for the city of Calgary, Alberta, Canada. The building has been the centre for civic administration for the City of Calgary since it opened in 1985 to consolidate city administration, provide council chambers, and complement old Calgary City Hall, which is used as the offices of the mayor and councillors.
Calgary City Hall, is the seat of government for Calgary City Council, located in the city's downtown core of Calgary, Alberta, Canada. The historic building completed in 1911 serves as the offices for Calgary City Council, consisting of the office of the Mayor, fourteen Councillors and municipal Clerk. Calgary City Hall originally housed the municipal council and portions of administration from its completion in 1911 until the construction of the Calgary Municipal Building adjacent to Old City Hall in 1985, which currently houses the offices of 2,000 civic administrators.
Craig Edward Dykers is an American architect and co-founder of the architecture firm, Snøhetta.
The Centennial Planetarium, located at 701 11 Street SW in Calgary, Alberta, was designed by Calgary architectural firm McMillan Long and Associates and opened in 1967 for the Canadian Centennial, it is one of Calgary's best examples of Brutalist architecture, winning several awards open its opening. As of 2019, the building houses Contemporary Calgary, a public art gallery.
Urban Design Associates is an international urban design and architecture firm headquartered in Pittsburgh, Pennsylvania, United States.
The Blue Line, also known as Route 202, is a light rail transit (LRT) line in Calgary, Alberta, Canada. Partnered with the Red Line, and future Green Line it makes up Calgary's CTrain network. Following its initial approval in 1976, the Red Line opened in 1981, with the first trains running on what is now the Blue Line in 1985.
The Red Line, also known as Route 201, is a light rail transit (LRT) line in Calgary, Alberta, Canada. Partnered with the Blue Line, and future Green Line it makes up Calgary's CTrain network. Following its initial approval in 1976, the Red Line opened in 1981, running from Anderson station in the southeast into downtown. The Red Line has gone through a series of expansions, which bring it to its current design. The Red Line services the northwest quadrant and south end of the city beginning at Tuscany station, runs through the downtown core on 7th Avenue, then proceeds southbound where it terminates at Somerset–Bridlewood station. The section of track running along 7th Avenue is shared with the Blue Line. Future expansion of the Red Line includes rerouting the downtown section below 8th Avenue, which would allow the operation of five-car trains, further increasing capacity.
The year 2021 in architecture involved some significant architectural events and new buildings.
{{cite web}}
: CS1 maint: unfit URL (link)