Calgary Municipal Building

Last updated
Calgary Municipal Building
Calgary city hall1.jpg
The Calgary Municipal Building dwarfs the Calgary City Hall in downtown Calgary.
Calgary Municipal Building
General information
Type City hall
Architectural style Postmodern architecture
Address800 Macleod Trail SE
Calgary, Alberta
T2G 5E6
Coordinates 51°02′44″N114°03′23″W / 51.0456°N 114.0565°W / 51.0456; -114.0565 Coordinates: 51°02′44″N114°03′23″W / 51.0456°N 114.0565°W / 51.0456; -114.0565
Construction started1982
CompletedOctober 1985
InauguratedOctober 18, 1985
Cost$97,000,000
($218 million in 2021 dollars [1] )
ClientCity of Calgary
OwnerCity of Calgary
Height56.26 m (185 ft)
Technical details
Floor count14 [2]
Floor area74,000m² (800,000ft²)
Design and construction
Architect(s)Chrisopher Ballyn
Architecture firm WZMH Architects
Structural engineerQuinn Dressel Jokinen
Main contractor EllisDon
References
Calgary Herald [3] Emporis [4]

The Calgary Municipal Building, often referred to as New City Hall is the seat of local government for the city of Calgary, Alberta, Canada. The building has been the centre for civic administration for the City of Calgary since it opened in 1985 to consolidate city administration, provide council chambers, and complement old Calgary City Hall, which is used as the offices of the mayor and councillors.

Contents

The structure currently houses 2,000 city employees [2] and is open to the public on weekdays.

History

Planning

Mayor Ross Alger's vision for a civic center, headlined by new municipal headquarters surrounded by a major hotel, park space and commercial real estate was put to the test in a 1979 plebiscite. The Calgary public responded by voting 51% against and 49% for Alger's vision. [5] Alger's successor, Ralph Klein, spearhead a different strategy to assess public opinion focused on whether the City of Calgary should continue to lease private office space, or consolidate employees in a single building. By 1982, city staff were spread across 10 buildings, costing the government $1.9 million per year in rent. [6]

Calgary City Council commissioned a poll of residents, spending $80,000 in 1980 to ask whether they would support a new city owned municipal building built on city owned land in the downtown core, and whether another plebiscite was necessary. The poll concluded with 13,245 responses which were generally in favor of constructing a city-owned municipal building near Old City Hall. [5] Klein received a mandate to construct the new municipal building following the second plebiscite was held on October 15, 1980, on whether the city should own or rent the future space, with an overwhelming majority of Calgary residents totaling 97,172 agreeing with the proposal and 38,120 in favor of leasing a building. [5]

The design of the Calgary Municipal Building endured significant criticism from residents, aldermen and others. During the Federation of Canadian Municipalities Conference in June 1985, two unnamed members of Toronto City Council were quoted by the Calgary Herald describing the Municipal Building as "a monstrosity", which was echoed by Gerald Forseth, the former president of the Alberta Architects Association. [7] The City of Toronto purchased an advertisement in the Calgary Herald on October 12, 1985, to congratulate the City of Calgary on completing the construction of the new Municipal Building. [8]

Design

Calgary City Hall as seen from MacLeod Trail. Calgary 'City Hall' (441036924).jpg
Calgary City Hall as seen from MacLeod Trail.

The new Municipal Building was designed through an open competition sponsored by the city council to select the design and architect for the new building. The competition opened in early 1981 to all registered architects in Alberta, with invitations to participate sent by the city to all members of the Alberta Association of Architects. The competition called for the design of a new municipal building, the restoration and inclusion of Old City Hall and the attached administration building, and a public open space on the site built in relationship with the three structures. [9]

A total of 62 architects entered the competition, following the first stage four finalists were announced, R. L. Wilkin, Eugene N. Dub (who would go on to design Edmonton City Hall), Gerald J. Gongos, and Christopher Ballyn. [9] On December 4, 1981, Christopher Ballyn in partnership with WZMH Architects was chosen as the design winner, and a contract was awarded by Calgary City Council. [10] [4]

Ballyn's design called for the new Municipal Building to serve as a FOIL to Old City Hall, providing a neutral backdrop while also displaying a fresh and unique civic image. The mirrored facade facing Old City Hall at a 45° angle was chosen to reflect the historic building and the new public plaza, while minimizing the Municipal Building's apparent volume. The lower floors of the Municipal Building feature molded limestone clad walls to reflect the spirit and material of the neighbouring City Hall, while the upper floors provide a sleek, sophisticated and intricate curtain wall in contrast. [9]

Construction

To finance the Municipal Building, Calgary City Council passed a borrowing bylaw enabling $124-million in borrowing capacity, which was above the estimated $92-million cost and $12-million in lifetime interest charges. [11]

Time capsule

During construction the City of Calgary installed a time capsule in the Municipal Building to be opened after 99 years in 2084. The capsule which sits below a bronze plaque and showcases life in Calgary in 1985, including pins, a key from the old Imperial Hotel, and designs for the Municipal Building. [12]

Architecture

The Calgary Municipal Building sits on a triangle footprint, with a silver reflective mirror glass curtain wall exterior [3] that expands from the narrowest point of the footprint upwards six steps. Limestone veneer paneling is present on the lower vertical walls. [3] Outside of the building is an ceremonial plaza which extends to the southern wall of Old City Hall.

The central atrium spans 12-stories in height, walled by concrete and glass windows of employee offices, and capped with a rooftop skylight. [13] The atrium connects to the offices of various City of Calgary employees using escalators and glass elevators. The council chambers are housed within a large blue cube on the first floor with the councillors seated in a semi-circle facing the public, with four entrances and capacity for 300 people. [14] [13] A raised corridor connects the council chambers to Old City Hall, allowing councillors to enter and exit. [14]

An underground LRT station was constructed under the Calgary Municipal Building in the event the City Hall in the event the CTrain would be moved underground.[ citation needed ]

See also

Related Research Articles

<span class="mw-page-title-main">Wetaskiwin</span> City in Alberta, Canada

Wetaskiwin is a city in the province of Alberta, Canada. The city is located 70 kilometres (43 mi) south of the provincial capital of Edmonton. The city name comes from the Cree word wītaskiwinihk, meaning "the hills where peace was made".

<span class="mw-page-title-main">Scotiabank Saddledome</span> Multi-use indoor arena in Calgary

Scotiabank Saddledome is a multi-use indoor arena in Calgary, Alberta, Canada. Located in Stampede Park in the southeast end of downtown Calgary, the Saddledome was built in 1983 to replace the Stampede Corral as the home of the Calgary Flames of the National Hockey League, and to host ice hockey and figure skating at the 1988 Winter Olympics.

<span class="mw-page-title-main">Toronto City Hall</span> Canadian city hall, opened 1965

The Toronto City Hall, or New City Hall, is the seat of the municipal government of Toronto, Ontario, Canada, and one of the city's most distinctive landmarks. Designed by Viljo Revell and engineered by Hannskarl Bandel, the building opened in 1965. The building is located adjacent to Nathan Phillips Square, a public square at the northwest intersection of Bay Street and Queen Street, that was designed and officially opened alongside Toronto City Hall.

<span class="mw-page-title-main">1967 Alberta general election</span>

The 1967 Alberta general election was held on May 23, 1967, to elect members of the Legislative Assembly of Alberta to the 16th Alberta Legislature. The election was called after the 15th Alberta Legislature was prorogued on April 11, 1967, and dissolved on April 14, 1967.

<span class="mw-page-title-main">1971 Alberta general election</span>

The 1971 Alberta general election was held on August 30, 1971, to elect members of the Legislative Assembly of Alberta.

<span class="mw-page-title-main">Calgary (provincial electoral district)</span> Defunct provincial electoral district in Alberta, Canada

Calgary was a provincial electoral district in Alberta, Canada, mandated to return one to six members to the Legislative Assembly of Alberta from 1905 to 1913, and again from 1921 to 1959. The district largely encompassed the boundaries of the City of Calgary, and was revised accordingly as the city grew.

Lethbridge was a provincial electoral district in Alberta mandated to return a single member to the Legislative Assembly of Alberta from 1905 to 1909, and again from 1921 to 1971.

Cardston was a provincial electoral district in Alberta, Canada, mandated to return a single member to the Legislative Assembly of Alberta from 1905 to 1993.

<span class="mw-page-title-main">Mewata Armouries</span> Historic site in Alberta, Canada

Mewata Armoury is a Canadian Forces reserve armoury in Calgary, Alberta, Canada. Mewata ( is derived from the Cree word ᒥᔭᐋᐧᑕᒼ, meaning "Oh, be joyful".

Wetaskiwin was a provincial electoral district in Alberta, Canada, mandated to return a single member to the Legislative Assembly of Alberta from 1905 to 1971.

<span class="mw-page-title-main">Harry Hays</span> Canadian politician

Harry William Hays, was a Canadian politician, 27th Mayor of Calgary, Cabinet minister in the government of Lester Pearson, and Senator from Alberta.

<span class="mw-page-title-main">Bow Valley Square</span> Building Complex in Calgary, Alberta

Bow Valley Square is a four-tower office tower complex located in downtown Calgary, Alberta, Canada. The complex constructed in stages between 1972 and 1982 was home to Calgary's tallest building between 1974 and 1976. The complex is owned by Alberta Investment Management Corporation, OMERS and Oxford Properties Group.

<span class="mw-page-title-main">Calgary</span> Largest city in Alberta, Canada

Calgary is the largest city in the western Canadian province of Alberta and the largest metro area of the three Prairie Provinces. As of 2021, the city proper had a population of 1,306,784 and a metropolitan population of 1,481,806, making it the third-largest city and fifth-largest metropolitan area in Canada.

<span class="mw-page-title-main">Lougheed House</span> Canadian Historic Victorian mansion in Calgary, Alberta

Lougheed House, or as it was originally known Beaulieu, is a National Historic Site located in the Beltline district of Calgary, Alberta. Originally constructed in 1891 as a home for Senator James Alexander Lougheed KCMG PC KC and his spouse Isabella Clarke Hardisty, the structure has since become an iconic heritage building in Calgary. Lougheed House is operated by Lougheed House Conservation Society, an independent, non-profit society devoted to the restoration and public enjoyment of the historic house and its Gardens.

<span class="mw-page-title-main">Calgary City Hall</span> Town hall in Calgary, Alberta

Calgary City Hall, is the seat of government for Calgary City Council, located in the city's downtown core of Calgary, Alberta, Canada. The historic building completed in 1911 serves as the offices for Calgary City Council, consisting of the office of the Mayor, fourteen Councillors and municipal Clerk. Calgary City Hall originally housed the municipal council and portions of administration from its completion in 1911 until the construction of the Calgary Municipal Building adjacent to Old City Hall in 1985, which currently houses the offices of 2,000 civic administrators.

<span class="mw-page-title-main">Calgary Central Library</span> Public library in Calgary, Alberta

The Calgary Central Library, also known as the Calgary New Central Library (NCL), is a public library in Calgary, Alberta, Canada, and the flagship branch of the Calgary Public Library system. The building is located in the Downtown East Village neighborhood and opened on November 1, 2018, replacing an earlier central branch built in the 1960s in Downtown Calgary.

<span class="mw-page-title-main">2021 Calgary municipal election</span> Local elections

The 2021 Calgary municipal election was held on October 18, 2021, to elect a mayor and fourteen councillors to the Calgary City Council.

On October 18, 2021, a referendum was held in Alberta, Canada on two questions, whether equalization payments should be eliminated from the Constitution of Canada, and whether the province should observe daylight saving time year-round. The referendum was held as part of the 2021 Alberta municipal elections and the Senate nominee election.

The 1998 Calgary municipal election was held on October 19, 1998 to elect a Mayor and 14 Aldermen to Calgary City Council.

<span class="mw-page-title-main">Huff Bremner Estate</span> Neighbourhood in Edmonton, Alberta, Canada

Huff Bremner Estate is a neighborhood in northwest Edmonton, Alberta, Canada. Throughout the early twentieth century, Huff Bremner was advertised as a desirable residential neighborhood and it was home to a number of Edmonton families. Beginning in 1952, however, Huff Bremner began to be rezoned as an industrial district. The neighborhood is now sometimes referred to as Huff Bremner Estate Industrial. As of 2022, Huff Bremner contains one municipally-designated heritage building, as well as several restaurants, office buildings, and industrial warehouses.

References

  1. 1688 to 1923: Geloso, Vincent, A Price Index for Canada, 1688 to 1850 (December 6, 2016). Afterwards, Canadian inflation numbers based on Statistics Canada tables 18-10-0005-01 (formerly CANSIM 326-0021) "Consumer Price Index, annual average, not seasonally adjusted". Statistics Canada. Retrieved April 17, 2021. and table 18-10-0004-13 "Consumer Price Index by product group, monthly, percentage change, not seasonally adjusted, Canada, provinces, Whitehorse, Yellowknife and Iqaluit". Statistics Canada. Retrieved April 17, 2021.
  2. 1 2 "City of Calgary page". Archived from the original on 2013-10-31. Retrieved 2014-03-07.
  3. 1 2 3 "Facts and figures for new city hall". Calgary Herald . October 12, 1985. p. G8. Retrieved July 23, 2020.
  4. 1 2 "Calgary Municipal Building". Emporis. Archived from the original on March 7, 2016. Retrieved 22 July 2020.
  5. 1 2 3 Bergan, Bob (October 12, 1985). "Project created jobs in recession". Calgary Herald . p. G9. Retrieved July 23, 2020.
  6. Warden, Kathryn (February 25, 1982). "New city hall may soon be too small". Calgary Herald . p. E3.
  7. Birnie, Peter (June 8, 1985). "More critics take shots at city hall". Calgary Herald . p. B1.
  8. Eggleton, Art (October 12, 1985). "Greetings City of Calgary". Calgary Herald . p. G5. Retrieved July 23, 2020.
  9. 1 2 3 "Architectural Competition for the Design of a Municipal Building in Calgary". Canadian Competitions Catalogue. Université de Montréal . Retrieved July 29, 2020.
  10. City of Calgary (May 2, 1981). "Architectural Competition for the Design of a Municipal Building in Calgary". Calgary Herald . p. B4.
  11. Morton, Peter (January 19, 1983). "Klein would cut out frills from building". Calgary Herald . p. B2. Retrieved July 23, 2020.
  12. "Capsule will describe 1985". Calgary Herald . October 12, 1985. p. G4. Retrieved July 23, 2020.
  13. 1 2 Liverant, Bettina (October 12, 1985). "Municipal Building successful, but falls short at symbolic level". Calgary Herald. p. G6. Retrieved July 23, 2020.
  14. 1 2 Bryden, Joan (October 12, 1985). "Press, politicians get elbow room". Calgary Herald . p. G8. Retrieved July 23, 2020.