5600 West BRT

Last updated

5600 West BRT
Overview
StatusProposed
Owner Utah Transit Authority (UTA)
LocaleWestern Salt Lake County, Utah
United States
Termini
Stations7
Service
Type Bus rapid transit (BRT)
Route numberNot yet announced
Operator(s)UTA
Technical
Line length5.0 miles (8.0 km) (initial main corridor) [1]
16.0 miles (25.7 km) (total initial route)
24 miles (39 km) (final) [1]
Operating speed65 miles per hour (105 km/h)
(maximum posted speed limit)

5600 West BRT is a proposed bus rapid transit (BRT) line in western Salt Lake County, Utah, United States, that will be operated by the Utah Transit Authority (UTA) and will run along 5600 West (SR-172). Initially, it will only run along a short segment almost entirely within West Valley City, with a connection to Downtown Salt Lake City. However, it will eventually run from South Jordan to the Salt Lake City International Airport.) It is the fifth of several BRT lines that UTA either operates or has planned for in Utah County and the Salt Lake Valley. [2] UTA's BRT is described by UTA as "light rail on rubber tires". [3] While it was initially planned for phase 1 of the project to be completed in 2015, [1] the project is currently stalled.

Contents

Description

Phase 1 of the 5600 West BRT line will run along a 5-mile (8.0 km) segment of South 5600 West (SR-172) from 6200 South to 2700 West within Kearns and West Valley City. From the northern end of this segment, it will connect with Downtown Salt Lake City along a route (without any stops) following West 2700 North (Lake Park Boulevard), Bangerter Highway (SR-154), 21st South Freeway (SR-201), and Interstate 15 (I-15). The initial route is projected to include 6 stops and run at 10-15 minute intervals and cost $100 million. [1] UTA had anticipated having Phase 1 of the 5600 West BRT operational by the end of 2015. [1]

Phase 2 will extend the route to a total of 24 miles (39 km) [1] from Herriman to the Salt Lake City International Airport, with the bus connection to Downtown Salt Lake City being eliminated. Phase 2 will also include connections to four TRAX stations: the Airport station on the Green Line and the 5600 West Old Bingham Highway, South Jordan Parkway, and Daybreak Parkway stations on the Red Line. Phase 2 was originally estimated to be completed sometime before 2025. [1] Phase 3 calls for the eventual replacement of this BRT line with a TRAX light rail line along the entire Phase 2 corridor. There is no estimated completion date for Phase 3, except that it will not be until after Phase 2. [1]

History

In 2010, while expressing their support for the 5600 West BRT, West Valley City indicated that they do not ever foresee the need for a light rail line along South 5600 West. Of particular concern was UTA's plans to secure the additional right of way necessary for a future TRAX line. UTA responded to the objections by indicating that the TRAX line may not be built for several decades, but added that "It's always better to overplan and underconstruct than the other way around." [4]

At one point in the development stages, an additional stop further south in Herriman was planned. However, by 2013 this stop had been dropped from the plans. [5] [6]

Route

UTA has not yet assigned a route number to the 5600 West BRT.

Kearns

The initial route will begin with a stop at 6200 South (Bennion Boulevard/SR-173) on South 5600 West on the southern edge of Kearns. (This point is also the southern terminus of State Route-172.) A Park and Ride lot is planned in the area of this stop. From this stop it will head north along South 5600 West, crossing Lodestone Avenue (at about 6000 South) and West 5655 South (Plumbago Avenue/Vista Ridge Way), until it enters West Valley City.

West Valley City

Just after entering West Valley City the 5600 West BRT will reach the 5400 South stop at about 5400 South. Another Park and Ride lot is planned for the area of this stop as well. After crossing West 5400 South (SR-173), it will continue north along South 5600 West and will cross West 5200 South (Henley Drive/Westridge Boulevard), West 5100 South (Mountain Men Drive), West 4970 South (South Garden Ridge Road), and West 4700 South before arriving at the 4700 South stop. Continuing on along South 5400 West it will cross West 4470 South (Chantry Way), West 4420 South (Deercrest Drive), West 4360 South, before passing in front of Hunter High School and crossing over the Utah and Salt Lake Canal.

Just north of the canal the 5600 West BRT will cross West 4100 South and then continue north to West 3500 South (SR-171) and the 3500 South stop. The 3500 South stop was to include a connection with the (now discontinued) 3500 South MAX and is anticipated to include as Park and Ride lot as well. After crossing West 3500 South it will continue north along 5600 West and will cross West 3100 South before reaching West 2700 South (Parkway Boulevard/Lake Park Boulevard) and the 2700 South stop. This stop is also anticipated to include a Park and Ride lot. While Phase 2 of the 5600 West MAX will have the 5600 West BRT continue north from this point (along South 5600 West), Phase 1 will have it turning east along West 2700 South (Lake Park Boulevard). (In Phase 1, the 2700 South stop will be the last one along the route until it reaches Downtown Salt Lake City.)

Heading east along West 2700 South, the 5600 West MAX will cross High Commons Drive before reaching the roundabout with Dabury Drive. East of the roundabout the route follows Lake Park Boulevard as it jogs slightly to the north before continuing east again, after another roundabout with South 5370 West. Continuing its course to the east the route follows the road as it passes through roundabouts with Highbury Parkway and South 4800 West (Corporate Park Drive) before it reaches about 4060 West. At this point Lake Park Boulevard curves to the north and then to the east again at 2400 South until it reaches Bangerter Highway SR 154. At Bangerter Highway, the 5600 West MAX will turn north to cross West 2100 South before reaching the 21st South Freeway (Utah State Route 201) and entering Salt Lake City.

Salt Lake City

After the 5600 West BRT enters Salt Lake City, it will head east on the 21st South Freeway, crossing over South 3230 West, Interstate 215, Redwood Road (South 1700 West/SR-68), and South 900 West before it reaches Interestate 15 (I-15) at the Spaghetti Bowl. Upon reaching I-15, it will head north along this freeway, crossing West 2100 South, West 1700 South, West 1300 South, Fayette Avenue, West 900 South, and West 800 South, until it exits I-15 at 400 South (University Boulevard).

After heading east on West 400 South, the route of the 5600 West BRT is a little unclear. UTA's map appears to indicate that it will continue east as far as 300 West (US-89), crossing South 800 West, crossing over South 700 West and South 600 West, and then crossing South 500 West and South 400 West, but where its stop will be is unclear. Being in such close proximity to the Salt Lake Intermodal Hub, it may well somehow connect with that station, but so far UTA has not provided sufficient clarification.

Stops

Initially six stops are planned for the 5600 West BRT. [5] [7] The stops indicated are based upon the best information available so far and are subject to change before the project is finalized. All stops in Phase 1, except the one in Downtown Salt Lake City, will are anticipated to be built in the center of South 5600 West. [8]

5600 West BRT (West Valley City – Salt Lake City)
Stop Name
[Note 1]
CitySouthbound StationNorthbound Station UTA Bus
Connections
[Note 2]
Park and
Ride Lot
Notes & Other Connections
Southern end of the line (Phase 1)
6200 South Kearns 52, 54, F556Yes
5400 South West Valley City 54, F556
4700 South47, F556No
3500 South35, 556YesFormerly  35M  3500 South MAX BRT line
2700 South513, F556
Downtown
Salt Lake City
Salt Lake City   701   TRAX Blue Line
Northern end of the line (Phase 1)

Future stops

In Phase 2, eleven additional stops/stations are planned. Six of the planned stops will be in Salt Lake City (to the north of the initial corridor) and will connect with the Salt Lake City International Airport and the TRAX Green Line. The other five planned stops will stretch across several cities (to the south of the initial corridor), as far south as Herriman, and will connect with the TRAX Red Line.

5600 West BRT (South Jordan – Salt Lake City International Airport)
Stop Name
[Note 3]
CitySouthbound StationNorthbound Station UTA Bus
Connections
[Note 2]
Park and
Ride Lot
Notes & Other Connections
Northern end of the line (Phases 2 & 3)
Airport Salt Lake City 700 North Terminal Drive453, 454, 551NoServes Salt Lake International Airport
  704   TRAX Green Line
International Center453, 551
International Center453, 551
International Center551
1300 South
2100 South513
Phase 1 of the 5600 West BRT
7800 South West Jordan Yes
9000 SouthNo
5600 West
Old Bingham Highway
5651 West Old Bingham HighwayYes  703   TRAX Red Line
South Jordan
Parkway
South Jordan 10605 South Grandville AvenueServing northern Daybreak Community
  703   TRAX Red Line
Daybreak Parkway 11405 South Grandville AvenueF504, F518,
F547
Serving southern Daybreak Community
  703   TRAX Red Line
Southern end of the line (Phases 2 & 3)

See also

Notes

  1. Stop names are only tentative/suggested and are not yet finalized.
  2. 1 2 Bus connection routes are current as of Change Day, April 13, 2014
  3. Stop names are only tentative/suggested and are not yet finalized (except the TRAX stations).

Related Research Articles

<span class="mw-page-title-main">Magna, Utah</span> Metro Township in Utah, United States

Magna is a metro township in Salt Lake County, Utah, United States. The current population of the township stands at 29,251 according to the 2020 census, a 10.4% increase over 26,505 in 2010.

<span class="mw-page-title-main">TRAX (light rail)</span> Light rail system in the Salt Lake Valley, Utah, United States

TRAX is a light rail system in the Salt Lake Valley of Utah, in the United States, serving Salt Lake City and many of its suburbs throughout Salt Lake County. The official name of Transit Express is rarely, if ever, used. The system is operated by the Utah Transit Authority (UTA). All TRAX trains are electric, receiving power from overhead wires.

<span class="mw-page-title-main">Utah Transit Authority</span> Public transportation operator northern Utah, United States

The Utah Transit Authority (UTA) is a special service district responsible for providing public transportation throughout the Wasatch Front of Utah, in the United States, which includes the metropolitan areas of Ogden, Park City, Provo, Salt Lake City and Tooele. It operates fixed route buses, flex route buses, express buses, ski buses, three light rail lines in Salt Lake County (TRAX), a streetcar line in Salt Lake City, and a commuter rail train (FrontRunner) from Ogden through Salt Lake City to Provo. UTA is headquartered in Salt Lake City with operations and garages in locations throughout the Wasatch Front, including Ogden, Midvale and Orem. Light rail vehicles are stored and maintained at yards at locations in South Salt Lake and Midvale. UTA's commuter rail equipment is stored and serviced at a facility in Salt Lake City. In 2021, the system had a ridership of 23,960,100, or about 100,300 per weekday as of the third quarter of 2022.

Transportation in Salt Lake City consists of a wide network of roads, an extensive bus system, a light rail system, and a commuter rail line. Although Salt Lake City, Utah, is a traditionally car-oriented city, the rapidly growing public transit system has a high number of riders for a city of its size, and public transit is widely supported by its residents and businesses.

<span class="mw-page-title-main">Mountain View Corridor</span> State highway in Utah and Salt Lake counties in Utah, United States

The Mountain View Corridor is a freeway under construction in northern Utah that will run along the western periphery of Salt Lake County and south into northwest Utah County. Except for the last several miles on its southern end the Mountain View Corridor is numerically designated as State Route 85 (SR-85) in the Utah state highway system. The entire Mountain View Corridor will be maintained by the Utah Department of Transportation (UDOT).

<span class="mw-page-title-main">Blue Line (TRAX)</span> Light rail line in Salt Lake City, Utah, USA

The Blue Line is a light rail line on the TRAX system in the Salt Lake Valley of Utah, in the United States, operated by the Utah Transit Authority (UTA). It is the first line of the TRAX system completed. The line opened on December 4, 1999, one year ahead of schedule after two years of construction. In addition to Salt Lake City, it also serves the communities of South Salt Lake, Murray, Midvale, Sandy and Draper. The line was known as the North/South Line or the Sandy/Salt Lake Line until color names were adopted for each TRAX line in August 2011. An extension of the line to Draper began service on August 18, 2013.

<span class="mw-page-title-main">FrontRunner</span> Commuter rail along the Wasatch Front in Utah, United States

FrontRunner is a commuter rail train operated by the Utah Transit Authority that operates along the Wasatch Front in north-central Utah with service from the Ogden Intermodal Transit Center in central Weber County through Davis County, Salt Lake City, and Salt Lake County to Provo Central station in central Utah County. In 2021, the system had a ridership of 2,062,400, or about 12,600 per weekday as of the third quarter of 2022.

<span class="mw-page-title-main">Utah State Route 171</span>

State Route 171 (SR-171) is a state highway in the Salt Lake City metropolitan area in northern Utah that runs from SR-111 in Magna in the west side of the city to Interstate 215 in the city of Millcreek in the eastern part valley. In its sixteen-mile span, the route is named 3500 South and 3300 South.

<span class="mw-page-title-main">Red Line (TRAX)</span> Light rail line in Salt Lake City, Utah, USA

The Red Line is a light rail line on the TRAX system in the Salt Lake Valley of Utah operated by the Utah Transit Authority (UTA). It originally began operation in December 2001 as the peak-hour-only Sandy/University Line, running from the University of Utah south to Sandy Civic Center on the Blue Line. It was later rerouted to South Jordan and renamed the Red Line in August 2011, running as an all-day route. The current line runs from the University of Utah Medical Center in Salt Lake City through the south end of Downtown Salt Lake City, South Salt Lake, Murray, Midvale, West Jordan, and South Jordan to the University of Utah's South Jordan Medical Center in Daybreak.

<span class="mw-page-title-main">MAX (Utah Transit Authority)</span>

MAX is a bus rapid transit (BRT) service operated by Utah Transit Authority (UTA) along the Wasatch Front in Utah, United States. It is described by UTA as "light rail on rubber tires". As of January 2023, there is one line in service in Utah County, one discontinued line in Salt Lake County, two new routes planned for Salt Lake County, and one under construction in Weber County.

<span class="mw-page-title-main">Green Line (TRAX)</span> Light rail line in Salt Lake City, Utah, USA

The Green Line is a light rail line on the Utah Transit Authority's (UTA) TRAX system in Salt Lake City, Utah, in the United States, operated by the Utah Transit Authority (UTA). It opened on August 7, 2011, and runs between Airport Station at the Salt Lake City International Airport and West Valley Central Station in West Valley City serving a total of eighteen stations: thirteen in Salt Lake City, one in South Salt Lake, and four in West Valley City.

<span class="mw-page-title-main">S Line (Utah Transit Authority)</span> Streetcar line in Salt Lake County, Utah, United States

The S Line, or S-Line, is a public transit streetcar line in northeastern Salt Lake County, Utah, in the United States, that connects the business district of the Sugar House neighborhood of Salt Lake City with the neighboring city of South Salt Lake, as well as the Utah Transit Authority's (UTA) TRAX light rail system. It is a joint project between UTA, Salt Lake City, and South Salt Lake. It opened for service on December 8, 2013. It is operated by UTA and is UTA's first streetcar line.

<span class="mw-page-title-main">5600 West Old Bingham Highway station</span>

5600 West Old Bingham Highway station is a light rail station in West Jordan, Utah, United States, served by the Red Line of the Utah Transit Authority's (UTA) TRAX light rail system. The Red Line provides service from the University of Utah to the Daybreak community of South Jordan.

<span class="mw-page-title-main">West Valley Central station</span>

West Valley Central station is a light rail station in West Valley City, Utah served by the Green Line of the Utah Transit Authority's (UTA) TRAX light rail system. The Green Line provides service from the Salt Lake City International Airport to this station.

<span class="mw-page-title-main">Provo Central station</span> Commuter rail station in Provo, Utah, US

Provo Central station is an intermodal transit station in Provo, Utah, United States. It is served by the Utah Transit Authority's (UTA) FrontRunner commuter rail line as well as local, intra-county, and interstate buses. It is the southern terminus of the commuter rail system, with service running north as far as Ogden. The station is also known as Provo Intermodal Hub, Provo Station, or Provo CRS. It is part of the FrontRunner South extension.

<span class="mw-page-title-main">1940 West North Temple station</span>

1940 West North Temple station is a light rail station in Salt Lake City, Utah serviced by the Green Line of the Utah Transit Authority's (UTA) TRAX system. The Green Line provides service from the Salt Lake City International Airport to West Valley City, and connects with the rest of the TRAX system, as well as UTA's FrontRunner commuter rail and S Line streetcar.

<span class="mw-page-title-main">3500 South MAX</span> Former bus rapid transit service in Salt Lake County, Utah, United States

3500 South MAX was a bus rapid transit (BRT) line in northwestern Salt Lake County, Utah, United States, operated by the Utah Transit Authority (UTA) that ran between Magna, West Valley City, and South Salt Lake. It opened for service on July 14, 2008 and was the first of several BRT lines that UTA is planning in the Salt Lake Valley, Weber County, and Utah County.

<span class="mw-page-title-main">Utah Valley Express</span> Bus rapid transit line in Utah County, Utah, US

Utah Valley Express, also known as UVX, is a bus rapid transit (BRT) line in central Utah County, Utah, United States. The line is operated by the Utah Transit Authority (UTA) and runs between southwest Orem to south central Provo by way of Utah Valley University (UVU) and Brigham Young University (BYU). It began service with a soft opening on August 13, 2018 while the station platforms were being finished and was formally opened on January 9, 2019. It is the second of several BRT lines that UTA has or is planning in Utah County and the Salt Lake Valley.

The Midvalley Connector is a planned bus rapid transit (BRT) line anticipated to run between Murray and West Valley City in Utah, United States, that will be operated by the Utah Transit Authority (UTA). It will connect the main campus of Salt Lake Community College (SLCC) in Taylorsville with both the TRAX light rail system and the FrontRunner commuter rail. It is the fourth of several BRT lines that UTA is planning in Utah County and the Salt Lake Valley. Bus Rapid Transit is described by UTA as "light rail on rubber tires".

Ogden Express (OGX), is an under construction 5.3-mile (8.5 km) bus rapid transit (BRT) line in southern Ogden, Utah, United States. The line will be operated by the Utah Transit Authority (UTA) and will run between the Ogden Intermodal Transit Center to the McKay-Dee Hospital, by way of Weber State University (WSU). It is anticipated to be completed by 2023. It is the third of UTA's BRT lines along the Wasatch Front. The line partially opened on August 29, 2022 between Weber State Central station and Dee Events Center station as line 602.

References

  1. 1 2 3 4 5 6 7 8 "Utah Transit Authority". rideuta.com. March 15, 2015. Archived from the original on March 15, 2015. Retrieved June 21, 2022.
  2. Salt Lake Tribune (July 13, 2008). "UTA set to unveil speedy MAX bus route". Salt Lake City: ksl.com . Retrieved July 13, 2008.
  3. "Bus Rapid Transit" (PDF). rideuta.com. Utah Transit Authority. Archived from the original (PDF) on January 21, 2013. Retrieved March 10, 2014.
  4. Palmer, Rebecca (March 22, 2010). "West Valley leaders say no rail on 5600 West". Deseret News . Salt Lake City: Deseret Digital Media . Retrieved May 1, 2014. Quote is from UTA's spokesman, Gary Carpenter.
  5. 1 2 "Transit Alignment-Dedicated Right of Way Transit Option" (PDF) (Map). udot.utah.gov. Utah Department of Transportation. Archived from the original (PDF) on January 14, 2011. Retrieved May 1, 2014.
  6. "Mountain View Corridor Area Map" (PDF) (Map). udot.utah.gov. Utah Department of Transportation. February 2013. Archived from the original (PDF) on January 24, 2014. Retrieved May 1, 2014.
  7. "Mountain View Corridor: Phase 1 Bus Rapid Transit" (PDF) (Map). rideuta.com. Utah Transit Authority. February 10, 2010. Archived from the original (PDF) on November 25, 2013. Retrieved May 1, 2014.
  8. Davidson, Lee (January 19, 2011). "Bus rapid transit coming to 5600 West —but when?". The Salt Lake Tribune . Salt Lake City: MediaNews Group . Retrieved May 1, 2014.