Aigle–Sépey–Diablerets railway line

Last updated • 5 min readFrom Wikipedia, The Free Encyclopedia
Aigle–Sépey–Diablerets
Train Station, Les Diablerets Ski Resort, Swiss Alps.jpg
Les Diablerets railway station, 2008.
Overview
Owner Transports Publics du Chablais
Service
Operator(s)Transports Publics du Chablais
History
Opened22 December 1913 (1913-12-22)
Technical
Line length22.3 km (13.9 mi)
Track gauge Metre (3 ft 3+38 in)
Electrification 1500 V DC
Highest elevation1,175 m (3,855 ft)
Maximum incline 60‰
Route map

Contents

BSicon CONTg.svg
BSicon STR+l.svg
BSicon CONTfq.svg
BSicon BHF.svg
BSicon KBHFa-L.svg
BSicon KBHFa-M.svg
BSicon BHF-R.svg
BSicon BUS.svg
km 0.00
Aigle
alt. 404 m
BSicon CONTf.svg
BSicon ABZg+l.svg
BSicon ABZgr+l.svg
BSicon xABZgr.svg
BSicon eABZg+l.svg
BSicon eKRZ.svg
BSicon exSTRr.svg
2007 re-route of AOMC
BSicon CONTf.svg
BSicon STR.svg
BSicon HST.svg
0.6
Aigle-Place du Marché
alt. 415 m
BSicon BHF.svg
1.4
Aigle-Dépôt ASD
alt. 430 m
BSicon STR+l.svg
BSicon STRr.svg
BSicon STRl.svg
BSicon STR+r.svg
BSicon STR+l.svg
BSicon STR+r.svg
BSicon HST.svg
2.3
Aigle-Parc Aventure
BSicon STR.svg
BSicon TUNNEL2.svg
BSicon STR.svg
Verchiez tunnel (16 m)
BSicon BHF.svg
BSicon STR.svg
BSicon STR.svg
3.8
Verschiez
alt. 565 m
BSicon STR.svg
BSicon tSTRa.svg
BSicon tSTRa.svg
Grand-hôtel tunnel (119 m)
BSicon STR.svg
BSicon tSTRl.svg
BSicon tSTRr.svg
BSicon TUNNEL2.svg
Vanel tunnel (28 m)
BSicon hSTRae.svg
Vanel bridge (76 m)
BSicon BHF.svg
8.0
Plambuit
alt. 798 m
BSicon TUNNEL2.svg
Plambuit tunnel (39 m)
BSicon TUNNEL1.svg
Dard tunnel (202 m)
BSicon BHF.svg
10.2
Exergillod
alt. 863 m
BSicon HST.svg
11.2
Les Fontanelles
alt. 899 m
BSicon STR.svg
BSicon WASSER.svg
BSicon ABZl+l.svg
BSicon BHFq.svg
BSicon hKRZWaeq.svg
BSicon STR+r.svg
12.77
14.75
Les Planches
alt. 943 m
BSicon STR.svg
BSicon WASSER.svg
BSicon STR.svg
BSicon STR.svg
BSicon KBHFe.svg
13.78
Le Sepey
alt. 978 m
BSicon hSTRae.svg
BSicon TUNNEL2.svg
Joux-au-Craz tunnel (40 m)
BSicon hSTRae.svg
BSicon HST.svg
17.3
Les Échenards
alt. 1131 m
BSicon HST.svg
18.5
Sur le Buis
BSicon BHF.svg
19.7
Les Aviolats
alt. 1091 m
BSicon HST.svg
20.2
Les Nicolets
BSicon HST.svg
21.1
Plan Morier
BSicon BHF.svg
21.5
Vers-l'Église
alt. 1136 m
BSicon hKRZWae.svg
BSicon WASSERq.svg
BSicon HST.svg
22.2
Les Bovets
BSicon HST.svg
22.6
La Faverge
BSicon KBHFe.svg
23.3
Les Diablerets
alt. 1155 m
[1]

The Aigle–Sépey–Diablerets railway line is a railway line in the Chablais area of Vaud and Valais in Switzerland. It was built between 1913 and 1914 by the Chemin de fer Aigle-Sépey-Diablerets (ASD) and is today owned and operated by the Transports Publics du Chablais.

History

Share of the CdF Aigle-Sepey-Diablerets, issued 24. December 1911 Aigle-Sepey-Diablerets 1911.jpg
Share of the CdF Aigle-Sépey-Diablerets, issued 24. December 1911

Railways came to the Chablais area of Vaud and Valais in 1857 when the Lausanne – Simplon railway opened its line through Aigle. This was to act as the catalyst for other projects in the late 19th century which were designed to link the valley floor with communities in the mountains. The first scheme, which pre-dated the coming of the railway, was to link Aigle to Le Sepey by road. This opened in 1840 and services were provided by stagecoach.

On 24 October 1898 both Houses of the Swiss Parliament approved a concession application by the ASD to build and operate a railway between Aigle, Le Sépey and Leysin. Nine months later both Houses of the Swiss Parliament awarded a concession for a railway, not only linking Aigle, Le Sépey and Leysin but beyond, to Les Diablerets, Pillon and Saanen. However, following a new series of projects and concession applications, on 23 May 1905 the Berne Government finally approved the construction of a line between Aigle, Le Sépey and Les Diablerets on the left bank of the Grande Eau. The Federal Council accepted the railway's articles of incorporation on 28 February 1911.[ citation needed ] The line opened between Aigle and Le Sépey on 22 December 1913, and between Le Sépey and Les Diablerets on July 7 of the following year. [3] The line was electrified from the start of operation, at 1500 V d.c. [4]

The ASD put forward many railway projects in the early 20th century: a link with Gstaad via the Col du Pillon, connections with Chesières and Villars forming part of a grand Boulevard des Alpes linking Interlaken with Chamonix. Another project, like the previous examples, which met with fierce opposition, involved a link between Gryon and the highest point at Les Diablerets at an elevation of more than 3000 m.

The line is built to 1,000 mm (3 ft 3+38 in) gauge and has a length of 22.33 km with power, at 1500 V d.c., supplied by the Société des Forces Motrices de la Grande Eau from its plant at Pont de la Tine. Its lowest elevation is at the station at Aigle, 404 m (1,325 ft) above sea level, rising to 1,157 m (3,796 ft) at Les Diablerets Station, a total climb of 753 m (2,470 ft).

The Great Fire

On the night of 26 June 1940, a fire destroyed the ASD depot. The railway's facilities destroyed, and three electric railcars and 4 passenger cars were lost. Following the tragedy there was speculation that the railway might be abandoned. However, a decision was made to save and restore as much as possible. ASD was able to lease rolling stock from other companies in order to ensure the continuation of the service.

At the same time, a Westinghouse system replaced the existing braking equipment so enabling the rolling stock to travel on the Chemin de fer Aigle-Ollon-Monthey-Champéry line.

Consolidation

In 1975 the four local railway companies, Aigle-Leysin (AL); Aigle-Ollon-Monthey-Champéry (AOMC); Aigle-Sépey-Diablerets (ASD) and Bex-Villars-Bretaye (BVB) formed Transports Publics du Chablais Operating Community (TPC). This brought about increased co-operation between the companies in the provision of community-based services.

In 1985, the Federal Government informed ASD, and other privately operated railways, that it would cease all funding the following year, however they renewed a federal concession for a further period of 50 years. An agreement was signed between the Canton of Vaud, the communities served by the railway and the ASD and its partners to renew rolling stock and upgrade the track.

In the mid-1990s, faced with greatly increased operating costs, the Canton of Vaud and the communities served by the railway petitioned the Federal Government to revoke its 1985 decision. The Federal Government did so and in 1996, recognizing the importance of this regional line as a public transportation carrier, awarded the line with a contract to provide a public transportation service. This brought about, in 1999, the founding of Transports Publics du Chablais as the parent body of local public transportation with the four local railway companies as founding members.

Railcars and rolling stock

Details from official stock lists, May 2006.

NumberNameClassBuilders Details.Date CompletedNotes
1BDe 4/4SWS/BBC1913Painted Alpine Livery
2BDe 4/4SWS/BBC1913Painted Alpine Livery
401Ormonts DessusBDe 4/4ACMV/BBC1987
402Ormonts DessousBDe 4/4ACMV/BBC1987
403OllonBDe 4/4ACMV/BBC1987From Summer 2010 liveried in new tpc two tone green scheme.
404AigleBDe 4/4ACMV/BBC1987
34B2r191324 seat trailer car
35B2191324 seat trailer car (1)
421Ars1966Ex-BTB No.62. Rebuilt 1984, Painted with alpine meadow scene
431Chez RoseBt1966Ex-BTB No.26. Rebuilt 1984, Painted, alpine rose livery
432Bt Schindler/BBC1966Ex-BTB No.21. Rebuilt 1984
433ArstSchindler/BBC1966Ex-BTB No.27. Rebuilt 1984 as "salon bar" coach
434BtSchindler/BBC1966Ex-AOMC, Rebuilt 2000
881-9By1994
884-3By1995

Abbreviations:

Notes:

Notes

  1. Eisenbahnatlas Schweiz. Cologne: Schweers + Wall. 2012. pp. 74–75. ISBN   978-3-89494-130-7.
  2. Alex Witula: Le Più Belle Azioni D'Epoca, p. 290; ISBN   978-88-95848-10-5
  3. Wägli & Jacobi 2010, p. 27.
  4. Wägli & Jacobi 2010, p. 65.

References