Location | Lira City, Northern Region, Uganda |
---|---|
Coordinates | 02°15′02″N32°54′02″E / 2.25056°N 32.90056°E |
Owner | Government of Uganda |
Capacity | 20,000 (expected) |
Surface | Grass |
Construction | |
Built | 2024–2027 (expected) |
Opened | 2027 (expected) |
Construction cost | USh470 billion (US$129 million) [1] |
Architect | ElRaeid Engineering Consultants Egypt |
Main contractors | SAMCO National Construction Company of Egypt |
The Akii Bua Stadium, also Akii-Bua Stadium, is a planned multi-purpose stadium in Lira, Uganda. It is intended to be used for the first time, during the 2027 Africa Cup of Nations soccer tournament. The stadium is one of the three stadia that Uganda plans to use during the tournament, that will be jointly hosted by Kenya, Tanzania and Uganda. [2]
The stadium is would be located in the city of Lira, in Lango sub-region, in the Northern Region of Uganda. The proposed stadium will sit on a piece of real estate in the city centre referred to as the John Akii Bua Playground, measuring approximately 18.455 hectares (45.60 acres). [1] The geographical coordinates of the stadium are: 2°15'02.0"N, 32°54'02.0"E (Latitude:2.250556; Longitude:32.900556). [3]
The stadium is named after John Akii-Bua (3 December 1949 – 20 June 1997), a native son who was the winner of the gold medal at the 1972 Summer Olympics in the 400 metres hurdles with a then world record time of 47.82 seconds. [4] The primary purpose of this stadium is to be part of the three host stadia that Uganda will use to host the 2027 Africa Cup of Nations in a tri-state-host tournament to be held in the East African countries of Kenya, Tanzania and Uganda. The stadium is mainly intended for soccer matches, although other sports such as athletics are also expected to be practiced here. [5]
In September 2023, the Confederation of African Football (CAF), announced the East Africa Pamoja bid by Kenya, Uganda and Tanzania as the winning bid to host the 2027 AFCON tournament. The bid beat out other bids by other countries including Algeria, Egypt, Botswana, Senegal and Nigeria. [6] [7]
At the bidding stage FUFA nominated Namboole Stadium, in metropolitan Kampala, Bihanga Stadium in Fort Portal, Akii Bua Stadium in Lira City and the proposed Hoima Sports Stadium in Hoima City. Training grounds proposed include Kampala International School Uganda (KISU), Nakivubo Stadium, Muteesa II Stadium, in Wankulukuku, Denver Godwin Stadium and St. Mary's Stadium Kitende. [2] [8]
The engineering, procurement and construction (EPC) contract was awarded to a joint venture company comprising SAMCO National Construction Company (Samco Egypt) and Khater Sport. The design consultant is ElRaeid Engineering Consultants, also of Egypt. The EPC contractor will fund the construction and be paid at or after commercial commissioning. As of March 2024, the contractor is waiting for a water source, electricity connection, a suitable road to the site and a signed EPC contract before beginning work. This is after the government of China withdrew its offer to fund Akii Bua Stadium in Lira and Buhinga Stadium in Fort Portal, in March 2023. [9] [10] [11] Construction is expected to start in Q4 2024. [12]
In December 2024, the EPC contract was signed in Kampala, between the government of Uganda and SAMCO National Construction Company. The construction cost is budgeted at $129 million (approx. USh 470 billion). Building the stadium is expected to last 20 months. [1]
Transport in Uganda refers to the transportation structure in Uganda. The country has an extensive network of paved and unpaved roads.
Lira is a city in the Northern Region of Uganda. It is the main municipal, administrative, and commercial centre of Lira District.
Hamz Stadium, formerly referred to as Nakivubo Stadium at Nakivubo War Memorial Grounds, is a multi-purpose stadium in Kampala, Uganda. Following extensive renovations led by businessman Hamis Kiggundu in partnership with the Ugandan government, the stadium has been upgraded to international standards. It is slated to host significant events like AFCON2027 and CHAN 2024. which will mark a new chapter in Uganda's sporting and community landscape. It was previously used mostly for football matches and served as the home venue of SC Villa. In the 2024/2025 season, two Uganda premier league clubs URA FC and Express FC used Hamz stadium as their home ground.The stadium had a capacity of about 21,000 people, but upon partial completion of the renovations started in 2017, President Museveni commissioned the stadium on 25 April 2024. It will have a total seating capacity of 15,000 people upon final completion.
Railway stations in Uganda include:
Stanbic Bank Uganda Limited (SBU) is a commercial bank in Uganda and is licensed by the Bank of Uganda, the central bank and national banking regulator.
KCB Bank Uganda Limited, also KCB Bank Uganda, is a commercial bank in Uganda. It is licensed by the Bank of Uganda, the central bank and national banking regulator.
The Uganda Oil Refinery is a planned crude oil refinery in Kabaale village, on the Eastern shore of Lake Albert along the Hoima–Kaiso–Tonya Road, Buseruka Sub-county, Hoima District, Western Region, Uganda, near the border with the Democratic Republic of the Congo. It has been planned since 2010. Community opposition was repressed early on. After 5 years of negotiations the Albertine Graben Refinery Consortium (AGRC) formed in 2018 and agreed to design and build the refinery.
The Uganda National Roads Authority (UNRA) is a government agency mandated to develop and maintain the national roads network, advise the government on general roads policy, contribute to the addressing of national transport concerns, and perform certain other functions. UNRA is charged with, among other things, the selection of contractors, the supervision of construction, the scheduling of maintenance, and the prioritization of national road works.
The East African Crude Oil Pipeline (EACOP), also known as the Uganda–Tanzania Crude Oil Pipeline (UTCOP), is a 1,443 km crude oil pipeline in planning since 2013, with a foundation stone nominally under construction since 2017, and is intended to transport crude oil from Uganda's Tilenga and Kingfisher oil fields to the Port of Tanga, Tanzania on the Indian Ocean.
Kabalega International Airport, also Hoima International Airport, is an airport under construction in Hoima District, Uganda. It is part of the infrastructure under construction as Uganda prepares to develop its nascent petroleum industry. When completed, it would be Uganda's second international airport, besides Entebbe International Airport. The new airport is expected to facilitate mobilization of equipment for construction of the Uganda Oil Refinery and assist in the development of agriculture and tourism in Uganda's Western Region.
Allan Okello is a Ugandan footballer who plays for Vipers SC, the Uganda national team, as an attacking midfielder. He was the Fufa Airtel Footballer of the Year 2019. He is regarded to be one of the best players in the UPL of this generation.
The 2027 Africa Cup of Nations, also referred to as AFCON 2027 or CAN 2027, is scheduled to be the 36th edition of the biennial African football tournament organised by the Confederation of African Football (CAF). It will be hosted by Uganda, Kenya, and Tanzania, in June and July 2027. For the first time, the tournament will take place in three countries.
The 2027 Africa Cup of Nations bids entails the bids for the 2027 Africa Cup of Nations. The winners were Kenya, Tanzania and Uganda.
The Hoima Sports Stadium, formerly FUFA Rujumba Stadium Hoima, is a multi-purpose stadium under construction in Uganda. It is intended to be used for the first time, during the 2027 Africa Cup of Nations soccer tournament. The stadium is one of the three stadia that Uganda plans to use during the tournament, that will be jointly hosted by Kenya, Tanzania and Uganda.
Talanta Sports Stadium, also Talanta Sports City is a sports stadium under construction, in the city of Nairobi, the capital of Kenya. It is intended to be used during the 2027 Africa Cup of Nations soccer tournament. The stadium is one of the stadia that Kenya plans to use during the tournament, that will be jointly hosted by Tanzania, Uganda and Kenya.
The Arusha Sports Stadium, is a planned multi-purpose stadium in Tanzania. It is intended to be used for the first time, during the 2027 Africa Cup of Nations soccer tournament. The stadium is one of the stadia that Tanzania plans to use during the tournament, that will be jointly hosted by Uganda, Kenya and Tanzania.
Samia Suluhu Hassan is a sports stadium under construction, in the city of Arusha, Tanzania. It is intended to be used during the 2027 Africa Cup of Nations soccer tournament. The stadium is one of the stadia that Tanzania plans to use during the tournament, that will be jointly hosted by Tanzania, Uganda and Kenya.
Lamex Omara Apitta is a Ugandan Civil Servant, economist, policy analyst and a sports administrator/organizer. He was the commissioner of Physical Education and Sports at the Ministry of Education and Sports. He is currently serving as a member at Uganda Human Rights Commission after his appointment by the President of Uganda.
The Masaka Sports Stadium, also Masaka Recreation Ground, is a planned multi-purpose stadium in Uganda. It is intended to be used for soccer matches and athletic completions. In addition, facilities for volleyball and basketball will be constructed. A swimming pool is planned to be erected at the site.