Auburndale | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
General information | |||||||||||||
Location | 477 Lexington Street Auburndale, Newton, Massachusetts | ||||||||||||
Coordinates | 42°20′45″N71°15′01″W / 42.3458°N 71.2503°W | ||||||||||||
Line(s) | Worcester Line | ||||||||||||
Platforms | 1 side platform | ||||||||||||
Tracks | 2 | ||||||||||||
Construction | |||||||||||||
Parking | 35 spaces ($4.00 daily) | ||||||||||||
Bicycle facilities | Racks available | ||||||||||||
Other information | |||||||||||||
Fare zone | 2 | ||||||||||||
History | |||||||||||||
Opened | Early 1850s [1] | ||||||||||||
Rebuilt | 1881, 1961 | ||||||||||||
Passengers | |||||||||||||
2018 | 248 (weekday average boardings) [2] | ||||||||||||
Services | |||||||||||||
| |||||||||||||
| |||||||||||||
|
Auburndale station is an MBTA Commuter Rail station in Auburndale, Massachusetts. It serves the Framingham/Worcester Line. It is located next to the Massachusetts Turnpike near Lasell College. The modern station platform, built around 1961, replaced a highly acclaimed 1881 depot building designed by H. H. Richardson. A full renovation of the station for accessibility is planned.
The Boston and Worcester Railroad opened the segment from West Newton to Wellesley Hills in July 1834. [3] A second track was added in 1839, and in 1843 the railroad began offering season fares for around $60, making it one of the first commuter rail systems. [3] Due to the popularity of the other Newton stops, a station at Auburn Dale (soon Auburndale) was opened by the late 1840s. [1] [4] [5] A new station building was constructed in 1850–51 at an expense of $1,219. [6] [7] It was located on the south side of the tracks in a large open area at the intersection of Auburn Street, Lexington Street, and several other roads. [8] In 1867, the Boston & Worcester joined with the Western Railroad to become the Boston & Albany Railroad. [3]
Beginning in 1881, the Boston & Albany began a massive improvement program that included the building of over 30 new stations along its main line as well as the Highland branch, which it bought in 1883. Acclaimed architect H. H. Richardson was hired to design several stations (eventually nine) along the line, starting with Auburndale. Although not as grand as some of his other B&A works like Framingham and Palmer stations, the Auburndale station's design was highly praised. Henry-Russell Hitchcock called it "the best he ever built" in The Architecture of H.H. Richardson and His Time, and a 1904 architecture journal claimed that Richardson's depots at Auburndale and Chestnut Hill "created a new standard of way-station construction." [9] [10]
The 1881 station was constructed in Richardson's signature Richardsonian Romanesque style, with influence from Japanese architecture as well as Romanesque Revival architecture. The one-story building was built from "red and light grey granite", with "heavy masonry and dominant roof." [9] The interior was divided into a pair of waiting rooms for men and women, with a ticket counter between. [11] The platform was shaded by a canopy, which wrapped around the east end of the building into a porte-cochère. [9] [10] Construction, by the Norcross Brothers firm, cost $16,290. [11] As with a number of other stations on the line, Frederick Law Olmsted designed the landscaping, which included large trees, shrubs, and Japanese ivy. [9] [10] [11] A replica of the station, still standing, was built by the Buffalo, Rochester and Pittsburgh Railway in 1911 in Orchard Park, New York.
Despite the accolades, H. H. Richardson's depot was torn down in 1961 after 80 years in service. The extension of the Massachusetts Turnpike from Route 128 to downtown Boston involved removing two of the line's four tracks from Auburndale to downtown. The historic stations at Auburndale, West Newton, Newtonville, Newton Corner, and Brighton were demolished; only the Allston depot survived. Auburndale, West Newton, and Newtonville stayed in service, but with extremely diminished facilities – bare asphalt platforms with simple metal shelters. The single side platform provides access to only one of the line's two tracks; passengers use short asphalt strips to access trains on the other track. The 1961-built platform stretches from Woodland Street to Auburn Street, just west of the previous station locations.
Service to West Newton and Auburndale stations was reduced to one daily round trip on January 30, 1981, as part of a series of service cuts due to a budget crisis. [12] [13] Normal service resumed to the two stations on March 16, 1981. [12]
The bare platform and steep metal stairs make Auburndale station inaccessible. In the future, the station is planned to be rebuilt with a high-level platform and elevators or ramps to street level to meet ADA guidelines. In April 2004, the Boston Regional Metropolitan Planning Organization voted to add $368,000 (funded by a federal earmark) for planning Auburndale renovations to its 2004-2008 spending plan. [14] However, the project was not pursued at that time.
Beginning in 2008, Representative Barney Frank secured $3 million in funding for design of the replacement station. 30% design plans were released in July 2013, at which point construction was estimated to cost $11.5 million. [15] 100% design was completed in January 2017, with construction scheduled for April 2017. [16]
The 100% design was unveiled at a public meeting in February 2017. It includes a full-length high-level platform on the north side of the tracks, with ramps to provide an accessible route to the village center. Because the platform would be on the opposite side of the tracks from the other Newton stations, a new interlocking would be added east of the station. [17] Although the improved access to the village center was popular with residents, the new station design was criticized by transit advocates because it would likely degrade service on the line. Trains switching tracks to access Auburndale station would prevent trains from passing in the opposite direction, which could reduce the number of trains that could be operated on the line. The MBTA did not perform traffic modeling to determine whether the station design would cause operational issues. [17]
The proposal was abandoned due to service impacts. [18] A new set of accessibility plans, with all three Newton stations receiving identical new platforms on the north side, were announced in 2019. Design reached 30% in November 2020 and was expected to be complete in spring 2022. [19] The designs were later changed to have two platforms to reduce operational impacts. The new design reached 30% completion in early 2022, with design completion expected in February 2024. [20] Drilling for geotechnical surveying took place in October–December 2022. [21] [22] Design work for the Newton stations was paused at 75% completion in September 2023 because project costs had risen to $255 million. [23] In April 2024, the MBTA indicated that it would proceed with Newtonville before the two other stations. [24]
The MBTA Commuter Rail system serves as the commuter rail arm of the Massachusetts Bay Transportation Authority's (MBTA's) transportation coverage of Greater Boston in the United States. Trains run over 394 mi (634 km) of track to 135 stations. It is operated under contract by Keolis, which took over operations on July 1, 2014, from the Massachusetts Bay Commuter Railroad Company (MBCR).
Boston College station is a light rail station on the MBTA Green Line B branch. It is located at St. Ignatius Square on the Boston College campus near the intersection of Commonwealth Avenue and Lake Street, on the border between the Brighton neighborhood of Boston and the Chestnut Hill neighborhood of Newton, Massachusetts. Originally opened in 1896, it has been the terminus of the Commonwealth Avenue line since 1900. The current station is planned to be replaced by a new station located in the median of Commonwealth Avenue just east of Lake Street.
Riverside station is a Massachusetts Bay Transportation Authority (MBTA) Green Line light rail station located in the Auburndale village of Newton, Massachusetts. It is the western terminal of the Green Line D branch service. The station is located near the interchange of Interstate 95 and the Massachusetts Turnpike (I-90) and serves as a regional park and ride station. West of the station is Riverside Yard, the main maintenance facility and largest storage yard for the Green Line. The station is fully accessible.
The Framingham/Worcester Line of the MBTA Commuter Rail system runs west from Boston, Massachusetts to Worcester, Massachusetts through the MetroWest region, serving 17 station stops in Boston, Newton, Wellesley, Natick, Framingham, Ashland, Southborough, Westborough, Grafton, and Worcester. It is the third longest and third busiest line in the MBTA Commuter Rail system. Service on the line is a mix of local and express trains serving Worcester plus short-turn Framingham locals.
Waban station is a surface-level light rail station on the Massachusetts Bay Transportation Authority's Green Line D branch, located just south of Beacon Street at Waban Square in the Waban section of Newton, Massachusetts. The station is located below grade; access to both platforms is via Wyman Street on the outbound side of the tracks or a stairway from Beacon Street. Waban is not accessible.
Fenway station is a light rail stop on the MBTA Green Line D branch, located under Park Drive near the Riverway in the Fenway–Kenmore neighborhood of Boston, Massachusetts. It opened along with the rest of the D branch on July 4, 1959, when trolleys replaced Highland branch commuter rail service. The station is fully accessible from Park Drive via the Landmark Center parking lot, as well as from Miner Street. Named after the Fenway neighborhood rather than Fenway Park, it is slightly further from the stadium than Kenmore, though still heavily used during events.
Brookline Village station is a light rail station on the MBTA Green Line D branch, located in the Brookline Village neighborhood of Brookline, Massachusetts, United States. It was originally a commuter rail station on the Boston and Albany Railroad's Highland branch; it closed with the rest of the line in 1958 and reopened on July 4, 1959 as a light rail station. With 3,230 daily boardings, it is the third-busiest surface station on the D branch and the sixth-busiest surface station overall. Brookline Village station has raised platforms for accessibility with low-floor light rail vehicles.
Beaconsfield station is an MBTA light rail station in Brookline, Massachusetts. It serves the Green Line D branch. It is located off Dean Road and Beaconsfield Road just south of Beacon Street. Like the other stops on the line, it was a commuter rail station on the Boston and Albany Railroad's Highland branch until 1958, when the line was closed and converted to a branch of what is now the Green Line. The station reopened along with the rest of the line in 1959. Beaconsfield is not accessible, though a reconstruction for accessibility is planned.
Natick Center station is an MBTA Commuter Rail station in Natick, Massachusetts served by the Framingham/Worcester Line. The station, located below grade in a wide cut adjacent to North Main Street, has two side platforms serving the line's two tracks. The second-busiest non-accessible station on the system, it is undergoing a major accessibility renovation and modernization from 2020 to 2024.
Newton Highlands station is a surface-level light rail station located in Newton, Massachusetts on the Green Line D branch of the Massachusetts Bay Transportation Authority.
Woodland station is a light rail stop on the MBTA Green Line D branch, located off Washington Street (MA-16) between the Newton Lower Falls and Auburndale villages of Newton, Massachusetts, United States. It serves as access to the Newton-Wellesley Hospital, as well as a park and ride station for nearby Route 128.
Lansdowne station is an MBTA Commuter Rail station in Boston, Massachusetts. It serves the Framingham/Worcester Line. Lansdowne is located next to the Massachusetts Turnpike in the Fenway–Kenmore neighborhood near Kenmore Square, below grade between Beacon Street and Brookline Avenue.
Brookline Hills station is a light rail station on the Massachusetts Bay Transportation Authority (MBTA) Green Line D branch in the Brookline Hills neighborhood of Brookline, Massachusetts. The station has two side platforms serving the line's two tracks. It was closed from April 2021 to January 2022 as part of adjacent construction on a Brookline High School building, which included renovations to make the station accessible.
Newtonville station is a commuter rail station on the MBTA Commuter Rail Framingham/Worcester Line, located between the Massachusetts Turnpike and Washington Street at Newtonville Square in the village of Newtonville in Newton, Massachusetts. Stairway entrances are located on the bridges over the Turnpike at Walnut Street and Harvard Street. Newtonville station is not accessible; renovations for accessibility are planned.
West Newton station is an MBTA Commuter Rail station in Newton, Massachusetts. It serves the Framingham/Worcester Line, and is located inside the Massachusetts Turnpike Exit 16 rotary in the village of West Newton. West Newton has had continuous rail service since 1834. The station consists of a single low side platform serving one of the line's two tracks, with small crossings to access trains on the far track. West Newton is not accessible; a renovation for accessibility is planned.
Wellesley Hills station is an MBTA Commuter Rail station in Wellesley, Massachusetts, United States. It serves the Framingham/Worcester Line. It is located off Washington Street (MA-16) in Wellesley, Massachusetts. Wellesley Hills has two low platforms serving the line's two tracks; it is not accessible. Designed in 1885 and completed in 1886, the station was the last of nine stations that H.H. Richardson designed for the Boston and Albany Railroad. It replaced a previous station, built in 1834 with the completion of the Boston and Worcester Railroad.
Wellesley Square station is a commuter rail station on the MBTA Commuter Rail Framingham/Worcester Line, located just north of the MA 16-MA 135 intersection in downtown Wellesley, Massachusetts. It serves both walk-up and park-and-ride commuters, with a 224-space parking lot for the latter group. The station has low-level platforms and is not accessible.
Chestnut Hill station is a light rail station on the MBTA Green Line D branch, located off Hammond Street north of Massachusetts Route 9 in the Chestnut Hill neighborhood of Newton, Massachusetts. The station has two side platforms serving the line's two tracks. Chestnut Hill station is not accessible, but renovations are planned.
Union Station is a railway station located at Washington Square in downtown Worcester, Massachusetts. It is the western terminus of the MBTA Commuter Rail Framingham/Worcester Line and a stop for the Amtrak Lake Shore Limited service. A bus terminal adjacent to the station is the hub for Worcester Regional Transit Authority (WRTA) local bus service; it is also used by PVTA, MART, Peter Pan, and Greyhound intercity buses.
Back Bay station is an intermodal passenger station in Boston, Massachusetts. It is located just south of Copley Square in Boston's Back Bay and South End neighborhoods. It serves MBTA Commuter Rail and MBTA subway routes, and also serves as a secondary Amtrak intercity rail station for Boston. The present building, designed by Kallmann McKinnell & Wood, opened in 1987. It replaced the New Haven Railroad's older Back Bay station – which opened in 1928 as a replacement for an 1899-built station – as well as the New York Central's Huntington Avenue and Trinity Place stations which had been demolished in 1964.