Bellingham Square station

Last updated

Bellingham Sq
MBTA route SL3 bus at Bellingham Square station, July 2021.jpg
An inbound bus at Bellingham Square station in 2021
General information
LocationArlington Street and 6th Street
Chelsea, Massachusetts
Coordinates 42°23′45″N71°02′03″W / 42.3957°N 71.0342°W / 42.3957; -71.0342
Line(s)Silver Line busway
Eastern Route
Platforms2 side platforms
ConnectionsAiga bus trans.svg MBTA bus: 111, 112, 114, 116,  117
Construction
ParkingNo [1]
Bicycle facilitiesNone [1]
AccessibleYes
History
OpenedNovember 29, 1985 (commuter rail)
April 21, 2018 (Silver Line) [2]
ClosedNovember 15, 2021 (commuter rail)
Services
Preceding station MBTA.svg MBTA Following station
Chelsea
Terminus
Silver Line
SL3
Box District
Former services
Preceding station MBTA.svg MBTA Following station
North Station
Terminus
Newburyport/​Rockport Line
Relocated to Chelsea
River Works
Location
Bellingham Square station

Bellingham Square station (formerly Chelsea station) is a Massachusetts Bay Transportation Authority (MBTA) Silver Line bus rapid transit (BRT) station located near Bellingham Square slightly north of downtown Chelsea, Massachusetts. The station has two accessible side platforms for buses on the SL3 route. The Boston and Maine Railroad and predecessor Eastern Railroad served Chelsea station at the same location from the mid-1850s to 1958. The MBTA opened Chelsea station on the Newburyport/Rockport Line in 1985. Prior to its 2010 cancellation, the Urban Ring Project planned for a circumferential BRT line with a stop at Mystic Mall. Planning continued for the Chelsea segment; a Silver Line extension to Mystic Mall was announced in 2013. Construction began in 2015, and SL3 service to the renamed Bellingham Square station began on April 21, 2018. Commuter rail service moved to the newly constructed Chelsea station on November 15, 2021.

Contents

Station layout

The outbound Silver Line platform Outbound platform at Bellingham Square station, July 2021.jpg
The outbound Silver Line platform

The station is located between Sixth Street and Washington Avenue, about 800 feet (240 m) north of Bellingham Square. The Newburyport/Rockport Line and the adjacent Silver Line busway run roughly east-west at the station site, with the busway on the south side. The 12-by-60-foot (3.7 m × 18.3 m) outbound (westbound) bus platform is located adjacent to the Sixth Street/Arlington Street grade crossing; the inbound platform is located to the east, with a ramp structure leading to the Washington Avenue bridge. Both bus platforms have concrete canopies. Prior to its closure, the remaining commuter rail platform was located on the north side of the two tracks, with a metal shelter. The station is accessible for Silver Line buses. [3]

Five MBTA bus routes converge on Bellingham Square near the station. Routes 112 and 114 serve the station directly on 6th Street, while route 111 serves the station on Washington Avenue. Routes 116 and 117 run on Broadway to the east. [4]

History

Original station

Chelsea station on an early postcard Chelsea station postcard.JPG
Chelsea station on an early postcard

The freight-only Grand Junction Railroad opened through Everett and Chelsea in 1852 to serve the East Boston docks. [5] :336 On April 10, 1854, the Eastern Railroad opened a line from Revere to Boston, with trackage rights over the Grand Junction from Chelsea to Somerville. This replaced the Eastern's 1838-built mainline from Revere to East Boston – which required a ferry connection to reach downtown Boston – as the railroad's primary Boston entry. [6] A station at Chelsea opened with or soon after the new line. [7]

In 1868, the Eastern built its own tracks on the north side of the Grand Junction tracks. [6] The Eastern Railroad was acquired by the Boston and Maine Railroad (B&M) in 1885. [6] The station building was originally on the south side of the tracks between Washington Avenue and Sixth Street; it was moved across the tracks and closer to Washington Avenue by the 1890s. [8] [9] [10] It was a two-story wooden structure with a small cupola, with a canopy on all sides. [11] The station was moved slightly north to face Heard Street in the 20th century. [12] [13]

On April 18, 1958, the B&M received permission from the Public Utilities Commission to drastically curtail its suburban commuter service, including abandoning branches, closing stations, and cutting trains. Among the approved cuts was the closure of all Eastern Division service south of Lynn, including the entirety of the Saugus Branch, plus mainline stations at East Somerville, Everett, Chelsea, and Forbes. [14] These areas were largely within the Metropolitan Transit Authority bus service area, acquired from the Eastern Massachusetts Street Railway in 1936. The Saugus Branch and mainline stations were closed on May 16, 1958. [6] [15]

MBTA Commuter Rail station

The platforms at Chelsea station in 2012 Chelsea station facing outbound, May 2012.JPG
The platforms at Chelsea station in 2012

The Massachusetts Bay Transportation Authority (MBTA) began subsidizing remaining B&M service on the line in 1965; it became the Newburyport/Rockport Line of the MBTA Commuter Rail system. [6] During the late 1960s and early 1970s, the MBTA reopened several inner-suburb commuter rail stations in response to community desire for service that was faster if less frequent than buses. In 1976, Chelsea station was considered for reactivation, but ridership was expected to be relatively small due to the nearby 111 and 112 buses. [16]

On September 4, 1985, the MBTA Board awarded a $412,000 contract to construct a new station at Chelsea. [17] The station opened on December 1, 1985, concurrent with the restoration of regular service on the line following the 1984 fire that destroyed the Danvers River drawbridge. [2] The station was built onto the existing right-of-way at the former station site, with the outbound platform paved over the disused Grand Junction track. It was one of the last non-accessible stations opened by the MBTA. [18] The MBTA was unable to secure an easement from Conrail to construct accessible platforms; the MBTA's failure to make the station accessible resulted in fines from the Massachusetts Architectural Access Board in 1989. [19]

The Grand Junction tracks in Chelsea were largely unused after the Chelsea Creek bridge burned in 1955. In 2002, CSX Transportation began the process of abandoning the Grand Junction from 2nd Street through Chelsea to East Boston; the proceedings were delayed by negotiations with the city of Chelsea to acquire the right-of-way. [20] [21]

Silver Line

Bellingham Square station under construction in June 2017 Chelsea (Bellingham Square) station during construction, June 2017.JPG
Bellingham Square station under construction in June 2017

Chelsea was a proposed stop on the Urban Ring Project – a planned circumferential bus rapid transit (BRT) line designed to connect the current radial MBTA rail lines. [22] Under draft plans released in 2008, a dedicated busway was to be built using the disused Grand Junction right-of-way, paralleling the active commuter rail tracks through Everett and Chelsea. The commuter rail platforms at Chelsea would have been extended to full length and raised for accessibility, with a new bus station built on the south side of the station. [23] The project was shelved in January 2010 due to high costs. [24]

That June, the Massachusetts Department of Transportation (MassDOT) purchased the disused Grand Junction right-of-way from 2nd Street to East Boston, to be landbanked for future transportation use. [20] [5] :337 Planning for some smaller corridors continued; the Chelsea–South Boston section was given high priority because Chelsea was densely populated yet underserved by transit. [25] A 2011 state study analyzed potential Chelsea transit improvements, including a Silver Line branch or improvements to the route 112 bus. One Silver Line alternative terminated at the Chelsea commuter rail station; the other ran on surface streets with a terminal in Bellingham Square. [26]

In March 2013, the MBTA began studying an extension of the Silver Line to Chelsea via a newly constructed bypass road in East Boston. Three alternatives were discussed for the Chelsea section. One would run up the disused section of the Grand Junction Railroad right-of-way from Eastern Avenue to Chelsea station with stops at Eastern Avenue, Highland/Box District, the existing Chelsea station, and Mystic Mall. The second alignment would follow the Grand Junction to just short of the existing station, then diverge onto surface roads to the square. The third alignment would run largely on surface streets, serving two stops on Central Avenue and four stops along a loop serving the existing station and the MGH Chelsea healthcare center near Mystic Mall. [27] In September 2013, the MBTA indicated that it would pursue the first alternative despite potential issues with bridge clearances and rebuilding Chelsea station. [28]

On October 30, 2013, MassDOT announced $82.5 million in state funding for a modified version of the first alternative to be constructed. The commuter rail station would be moved to the new Chelsea station (at Mystic Mall), where more room was available for platforms, with only the Silver Line stopping at the existing site near Bellingham Square. Service was then expected to begin in late 2015. [29] The Environmental Impact Report was issued in March 2014. [30] A $33.8 million construction contract was approved in September 2014, and construction began in March 2015. [31] [32] [33] The southern (outbound) commuter rail platform was removed to make room for the busway. [3] By June 2017, opening had been pushed back to April 2018. [34] Silver Line service to Chelsea on the SL3 route began on April 21, 2018. [35] Construction on the second phase of the project, which included the relocated Chelsea commuter rail station plus transit signal priority upgrades for the SL3, began in August 2019. [36] The new commuter rail platforms at Chelsea station opened on November 15, 2021, leaving Bellingham Square station served only by the Silver Line. [37] The remaining commuter rail platform at Bellingham Square was removed later in 2021. [38]

Related Research Articles

<span class="mw-page-title-main">Silver Line (MBTA)</span> Bus rapid transit system in Massachusetts, US

The Silver Line is a system of bus routes in Boston and Chelsea, Massachusetts, operated by the Massachusetts Bay Transportation Authority (MBTA). It is operated as part of the MBTA bus system, but branded as bus rapid transit (BRT) as part of the MBTA subway system. Six routes are operated as part of two disconnected corridors. As of 2023, weekday ridership on the Silver Line was 27,000.

<span class="mw-page-title-main">Kenmore station</span> Subway station in Boston, Massachusetts, US

Kenmore station is an underground light rail station on the MBTA Green Line, located under Kenmore Square in the Fenway/Kenmore neighborhood of Boston, Massachusetts, United States. It is served by the B, C, and D branches of the Green Line. The station has two island platforms, one for each direction. Kenmore is the primary station for Fenway Park, which is 1,000 feet (300 m) to the south. The station opened on October 23, 1932 as a one-station extension of the Boylston Street subway to relieve congestion in the square. It was renovated for accessibility in 2005–2010.

<span class="mw-page-title-main">Airport station (MBTA)</span> Rapid transit station in Boston, Massachusetts, US

Airport station is a rapid transit station in Boston, Massachusetts. It serves the MBTA Blue Line and the SL3 branch of the Silver Line. It is located in East Boston under the interchange between Interstate 90 and Massachusetts Route 1A. The station provides one of two mass transit connections to the nearby Logan International Airport, as well as serving local residents in East Boston. Shuttle buses connect the station with the airport terminals and other facilities.

<span class="mw-page-title-main">Porter station</span> Transit station in Cambridge, Massachusetts, US

Porter station is a Massachusetts Bay Transportation Authority (MBTA) transit station in Cambridge, Massachusetts. It serves the Red Line rapid transit line, the MBTA Commuter Rail Fitchburg Line, and several MBTA bus lines. Located at Porter Square at the intersection of Massachusetts and Somerville Avenues, the station provides rapid transit access to northern Cambridge and the western portions of Somerville. Porter is 14 minutes from Park Street on the Red Line, and about 10 minutes from North Station on commuter rail trains. Several local MBTA bus routes also stop at the station.

<span class="mw-page-title-main">JFK/UMass station</span> Transit station in Boston, Massachusetts, US

JFK/UMass station is a Massachusetts Bay Transportation Authority (MBTA) intermodal transfer station, located adjacent to the Columbia Point area of Dorchester, Boston, Massachusetts. It is served by the rapid transit Red Line; the Greenbush Line, Kingston/Plymouth Line, and Middleborough/Lakeville Line of the MBTA Commuter Rail system, and three MBTA bus routes. The station is named for the John F. Kennedy Presidential Library and Museum and the University of Massachusetts Boston, both located nearby on Columbia Point.

<span class="mw-page-title-main">MBTA bus</span> Greater Boston bus network

The Massachusetts Bay Transportation Authority (MBTA) operates 152 bus routes in the Greater Boston area. The MBTA has a policy objective to provide transit service within walking distance for all residents living in areas with population densities greater than 5,000 inhabitants per square mile (1,900/km2) within the MBTA's service district. Much of this service is provided by bus. In 2023, the system had a ridership of 91,459,700, or about 318,100 per weekday as of the second quarter of 2024.

<span class="mw-page-title-main">Forest Hills station (MBTA)</span> Transit station in Boston, Massachusetts, US

Forest Hills station is an intermodal transfer station in Boston, Massachusetts. It serves the MBTA rapid transit Orange Line and three MBTA Commuter Rail lines and is a major terminus for MBTA bus routes. It is located in Forest Hills, in the southern part of the Jamaica Plain neighborhood. Most Providence/Stoughton Line and Franklin/Foxboro Line trains, and all Amtrak Northeast Corridor trains, pass through the station without stopping. Forest Hills station is fully accessible on all modes.

<span class="mw-page-title-main">Ruggles station</span> Transit hub in Boston, Massachusetts, US

Ruggles station is an intermodal transfer station in Boston, Massachusetts. It serves Massachusetts Bay Transportation Authority (MBTA) rapid transit, bus, and commuter rail services and is located at the intersection of Ruggles and Tremont streets, where the Roxbury, Fenway–Kenmore, and Mission Hill neighborhoods meet. It is surrounded by the campus of Northeastern University. Ruggles is a station stop for the Orange Line subway, as well as the Providence/Stoughton Line, Franklin/Foxboro Line, and Needham Line of the MBTA Commuter Rail system. Thirteen MBTA bus routes stop at Ruggles.

The Grand Junction Railroad is an 8.55-mile (13.76 km) long railroad in the Boston, Massachusetts, area, connecting the railroads heading west and north from Boston. The line is notable for its railroad bridge over the Charles River that passes under the Boston University Bridge between Boston and Cambridge, Massachusetts.

<span class="mw-page-title-main">Sullivan Square station</span> Rapid transit station in Boston, Massachusetts, US

Sullivan Square station is a rapid transit station on the MBTA subway Orange Line, located adjacent to Sullivan Square in the Charlestown neighborhood of Boston, Massachusetts. It is a major transfer point for MBTA bus service, with 12 routes using a two-level busway. The station has two island platforms serving the two active Orange Line tracks plus an unused third track. The Haverhill Line and Newburyport/Rockport Line pass through the station on separate tracks but do not stop.

The Urban Ring was a proposed project of the Massachusetts Bay Transportation Authority and the Massachusetts Department of Transportation, to develop new public transportation routes that would provide improved circumferential connections among many existing transit lines that project radially from downtown Boston. The Urban Ring Corridor is located roughly one to two miles from downtown Boston, passing through the Massachusetts cities of Boston, Chelsea, Everett, Medford, Somerville, Cambridge, and Brookline. The project was expected to convert 41,500 car trips to transit trips daily.

<span class="mw-page-title-main">World Trade Center station (MBTA)</span> Bus rapid transit station in Boston, Massachusetts, US

World Trade Center station is an underground bus rapid transit station on the MBTA's Silver Line, located south of Congress Street on the South Boston Waterfront. The station is situated between the World Trade Center and the Boston Convention and Exhibition Center; it also serves Commonwealth Pier and nearby residential and commercial development. Like all Silver Line stations, World Trade Center station is accessible.

<span class="mw-page-title-main">Community College station</span> Rapid transit station in Charlestown, Massachusetts, US

Community College station is a rapid transit station on the MBTA Orange Line in Boston, Massachusetts. It is located in the Charlestown neighborhood off Austin Street near New Rutherford Avenue (MA-99), under the double-decked elevated structure carrying Interstate 93 to the Zakim Bunker Hill Bridge. The station is named for the adjacent Bunker Hill Community College. The station opened in April 1975, replacing the City Square and Thompson Square stations of the Charlestown Elevated. It was made accessible around 2005.

<span class="mw-page-title-main">Wonderland station</span> Rapid transit station in Revere, Massachusetts, US

Wonderland station is a transit station in Revere, Massachusetts located adjacent to Revere Beach. It is the northern terminus of the MBTA Blue Line rapid transit line, as well as a major bus transfer station for Revere and the North Shore area, serving MBTA bus routes 110, 116, 117, 411, 424, 426W, 439, 441, 442, 450W, and 455. The station is fully accessible.

<span class="mw-page-title-main">Lynn station</span> MBTA rail station in Lynn, Massachusetts, US

Lynn station is an intermodal transit station in downtown Lynn, Massachusetts. It is a station on the MBTA Commuter Rail Newburyport/Rockport Line and a hub for the MBTA bus system.

<span class="mw-page-title-main">South Station (subway)</span> Subway station in Boston, Massachusetts, US

South Station is a transfer station on the MBTA rapid transit Red Line and bus rapid transit Silver Line, located at Summer Street and Atlantic Avenue in downtown Boston, Massachusetts. It is a part of the complex of the same name, the second busiest transportation center in New England. Eight MBTA Commuter Rail and three Amtrak intercity rail services terminate at South Station; many of those passengers then transfer to the rapid transit lines to reach other destinations in the city. With 24,639 daily boardings in 2019, South Station is the busiest station on the MBTA rapid transit system.

<span class="mw-page-title-main">Bicycling and the MBTA</span>

The Massachusetts Bay Transportation Authority operates subway, bus, commuter rail, and ferry service in the Greater Boston region. Boston has some of the highest rates of non-motorized commuting in the United States, including high bicycle usage. The MBTA offers certain provisions for riders wishing to make part of their trips by bicycle. The agency allows bicycles to be carried on all fixed-route services except the Green Line and the Ashmont-Mattapan High Speed Line light rail lines, although they are restricted on the commuter rail and heavy rail subway services at peak hours. Bicycle storage areas are offered at many stations, with "Pedal and Park" locking bicycle cages at certain high-usage stations.

<span class="mw-page-title-main">Chelsea station (MBTA)</span> Intermodal transit station in Chelsea, Massachusetts, US

Chelsea station is a Massachusetts Bay Transportation Authority (MBTA) intermodal transit station located adjacent to the Mystic Mall in Chelsea, Massachusetts. It is the terminus of the SL3 route of the MBTA Silver Line bus rapid transit (BRT) network, and is served by the Newburyport/Rockport Line of the MBTA Commuter Rail. The accessible station has a loop with two small platforms for the Silver Line, and two full-length side platforms for commuter rail trains.

<span class="mw-page-title-main">Box District station</span> Bus rapid transit station in Chelsea, Massachusetts

Box District station is a bus rapid transit station on the Massachusetts Bay Transportation Authority (MBTA) Silver Line system, located in Chelsea, Massachusetts. The accessible station has two side platforms under an arched canopy, with street access from Broadway and from Highland Street. Plans for the Urban Ring Project called for a busway along the former Grand Junction Branch, but without a station in the Box District neighborhood. After the Urban Ring was cancelled in 2010, new plans for a busway with a Box District stop were announced in 2013. Construction began in 2015, with route SL3 service beginning on April 21, 2018.

<span class="mw-page-title-main">Eastern Avenue station</span> Bus rapid transit station in Chelsea, Massachusetts, US

Eastern Avenue station is a bus rapid transit station on the Massachusetts Bay Transportation Authority (MBTA) Silver Line system, located in Chelsea, Massachusetts near Chelsea Creek. The accessible station has two side platforms, with street access from Eastern Avenue and Central Avenue. Plans for the Urban Ring Project called for a busway along the former Grand Junction Branch, but with a station further north at Griffin Way. After the Urban Ring was cancelled in 2010, new plans for a busway with an Eastern Avenue stop were announced in 2013. Construction began in 2015, with route SL3 service beginning on April 21, 2018.

References

  1. 1 2 "Bellingham Square station". Massachusetts Bay Transportation Authority . Retrieved January 14, 2024.
  2. 1 2 Belcher, Jonathan. "Changes to Transit Service in the MBTA district" (PDF). Boston Street Railway Association.
  3. 1 2 "Silver Line Gateway: Extension of Silver Line Bus Rapid Transit (BRT) to Chelsea and East Boston: Public Informational Meeting: Chelsea, MA" (PDF). Massachusetts Department of Transportation. August 18, 2014. pp. 7, 28. Archived from the original (PDF) on March 31, 2018.
  4. "2023–24 System Map". Massachusetts Bay Transportation Authority. December 17, 2023.
  5. 1 2 Karr, Ronald Dale (2017). The Rail Lines of Southern New England (2 ed.). Branch Line Press. ISBN   9780942147124.
  6. 1 2 3 4 5 Humphrey, Thomas J.; Clark, Norton D. (1985). Boston's Commuter Rail: The First 150 Years. Boston Street Railway Association. p. 77. ISBN   9780685412947.
  7. Barrett, Richard C. (1996). Boston's Depots and Terminals. Railroad Research Publications. p. 213. ISBN   9781884650031.
  8. "Plate E". Atlas of the county of Suffolk, Massachusetts. Vol. 4. G.M. Hopkins & Co. 1874. pp. 26–27.
  9. "Plate D". Atlas of the city of Chelsea and the towns of Revere and Winthrop. G.W. Bromley & Co. 1886.
  10. "Plate 7". Atlas of the city of Chelsea and the towns of Revere & Winthrop, Massachusetts. G.W. Bromley & Co. 1896.
  11. "Chelsea, Mass. station". Boston and Maine Railroad Historical Society. c. 1911 via Flickr.
  12. Sanborn Fire Insurance Map from Chelsea, Suffolk County, Massachusetts. Sanborn Map Company. 1911. Plate 33.
  13. Sanborn Fire Insurance Map from Chelsea, Suffolk County, Massachusetts. Sanborn Map Company. 1955. Plate 33.
  14. "Drastic Service Cuts Approved on Five B.& M. Divisions". Daily Boston Globe. April 19, 1958. p. 11 via Newspapers.com. Open Access logo PLoS transparent.svg
  15. "B.&M. Closes Saugus Branch, 3 Other Lines". Daily Boston Globe. May 17, 1958. p. 3 via Newspapers.com. Open Access logo PLoS transparent.svg
  16. Massachusetts Executive Office of Transportation and Construction (April 22, 1976). Capital needs developed at the corridor level: core and west (Report). Massachusetts Executive Office of Transportation and Construction. pp. 101–102.
  17. "Light at the end of the tunnel for Harvard Sq. T Riders". Boston Globe. September 5, 1985 via Newspapers.com. Open Access logo PLoS transparent.svg
  18. Ackerman, Jerry (March 8, 1989). "T pressured to open all routes to disabled". Boston Globe. pp. 1, 16 via Newspapers.com. (second page, third page) Open Access logo PLoS transparent.svg
  19. "Another day, another $100". Boston Globe. May 22, 1989. p. 20 via Newspapers.com. Open Access logo PLoS transparent.svg
  20. 1 2 Fay, Spofford & Thorndike (June 2011). "CSX ROW Multi-Use Path Feasibility/Conceptual Design Study" (PDF). City of Chelsea, MA. p. 43. Archived from the original (PDF) on December 20, 2016.
  21. New York Central Lines, LLC; CSX Transportation, Inc. (March 8, 2002). "Docket No. AB-565 (Sub-No. 7X)" (PDF). Surface Transportation Board. Archived from the original (PDF) on November 2, 2021.
  22. "Urban Ring Phase 2 FACT SHEET" (PDF). Massachusetts Executive Office of Transportation. January 2009. Archived from the original (PDF) on July 8, 2011.
  23. "The Urban Ring Phase 2: Revised Draft Environmental Impact Report/Statement" (PDF). Massachusetts Executive Office of Transportation. November 2008. Archived from the original (PDF) on May 14, 2017.
  24. Mullan, Jeffery B. (January 22, 2010). "Re: Urban Ring Phase 2, EOEEA #12565" (PDF). Massachusetts Executive Office of Energy and Environmental Affairs. Archived from the original (PDF) on March 23, 2020.
  25. Quackenbush, Karl H. (November 1, 2012). "Work Program for: MBTA Silver Line to Chelsea: Alternatives Analysis, Phase 2" (PDF). Central Transportation Planning Staff.
  26. Peterson, Scott. "Analysis of Silver Line Service to Airport Station and Chelsea" (PDF). Central Transportation Planning Staff. Archived from the original (PDF) on August 20, 2015.
  27. "Silver Line Gateway Alternatives Analysis" (PDF). Massachusetts Department of Transportation. June 19, 2013. Archived from the original (PDF) on August 26, 2015.
  28. Hamwey, Scott (September 18, 2013). "Silver Line Gateway Alternatives Analysis: Public Meeting – September 18, 2013" (PDF). Massachusetts Department of Transportation. Archived from the original (PDF) on August 20, 2015.
  29. "Governor Patrick Announces MBTA Silver Line Expansion" (Press release). Massachusetts Department of Transportation. October 30, 2013. Archived from the original on November 5, 2013. Retrieved November 5, 2013.
  30. Silver Line Gateway Service to Chelsea, East Boston & the Blue Line: Single Environmental Impact Report (Single EIR): EEA # 15124 (PDF). Massachusetts Department of Transportation. March 31, 2014. Archived from the original (PDF) on October 23, 2014.
  31. "MBTA Silver Line to Chelsea Approved" (Press release). Massachusetts Department of Transportation. September 17, 2014. Archived from the original on March 26, 2018. Retrieved March 17, 2018.
  32. "Silver Line Gateway" (PDF). Massachusetts Department of Transportation. June 5, 2017. p. 3.
  33. "Silver Line Gateway Project Overview". Massachusetts Department of Transportation. March 2018. Archived from the original on March 15, 2018.
  34. Vaccaro, Adam (June 6, 2017). "Silver Line service to Chelsea to begin next spring". Boston Globe. Archived from the original on June 6, 2017.
  35. "Silver Line 3 Update" (PDF). Massachusetts Bay Transportation Authority. March 12, 2018.
  36. "Baker-Polito Administration Celebrates Beginning of Chelsea Commuter Rail Construction" (Press release). Massachusetts Department of Transportation. September 16, 2019. Archived from the original on September 24, 2019. Retrieved November 9, 2021.
  37. "New Chelsea Commuter Rail Station Opens November 15" (Press release). Massachusetts Bay Transportation Authority. November 1, 2021.
  38. "Chelsea Commuter Rail Station". Massachusetts Bay Transportation Authority. Retrieved February 11, 2022.