Beratena Agrahara metro station

Last updated

Beratena Agrahara
Namma Metro Logo.png Namma Metro station
Beratena Agrahara metro station (Apr '24).jpg
Final stages of this metro station as of April 2024
General information
LocationPragathi Nagar, Basapura, Bengaluru, Karnataka 560100
Coordinates 12°51′50″N77°39′29″E / 12.86385°N 77.65798°E / 12.86385; 77.65798
Owned by Bangalore Metro Rail Corporation Ltd (BMRCL)
Operated by Namma Metro
Line(s) Yellow Line
Platforms Side platform
Platform-1 → Central Silk Board / Rashtreeya Vidyalaya Road
Platform-2 → Bommasandra
Tracks2
Construction
Structure type Elevated, Double track
Platform levels(TBC)
Parking(TBC)
Accessible(TBC)
Other information
StatusFinal Stages before Operations
Station code(TBC)
History
OpeningDecember 2024;36 days' time (December 2024)(TBC)
Electrified750 V DC third rail
Services
Preceding station Namma Metro Logo.png Namma Metro Following station
Hosa Road Yellow Line
(Operational around December 2024)
Konappana Agrahara
towards Bommasandra
Location
Beratena Agrahara metro station

Beratena Agrahara is an upcoming elevated metro station on the North-South corridor of the Yellow Line of Namma Metro in Bangalore, India.

Contents

As per latest reports, the Yellow Line is stated to be operational around December 2024 due to the upcoming Indian general election which will occur during April–May 2024 and lots of trial runs along with more trainsets are required for commencement of operations. [1] [2] [3] [4] [5]

History

In December 2016, the Bangalore Metro Rail Corporation Limited (BMRCL) issued a call for bids to construct the Beratena Agrahara metro station along the 6.418 km Reach 5 – Package 1 section (Bommasandra - Hosa Road) of the 18.825 km Yellow Line of Namma Metro. On 25 March 2017, ITD-ITD Cementation JV was selected as the lowest bidder for this stretch, with their bid closely aligning with the original cost estimates. [6] Consequently, the contract was successfully awarded to the company, which then commenced construction of the metro station in accordance with the agreements.

Station layout

Station Layout (TBC)

Beratena Agrahara track layout (TBC)
BSicon vCONTgfa.svg
BSicon cPLT.svg
BSicon vSTR.svg
BSicon cPLT.svg
P1
BSicon cPLT.svg
BSicon vSTR.svg
BSicon cPLT.svg
P2
BSicon cPLT.svg
BSicon vSTR.svg
BSicon cPLT.svg
BSicon vCONTgfe.svg
Station with two tracks and two side platforms
GStreet levelExit/Entrance
L1MezzanineFare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Wheelchair symbol.svg
Platform 2
Southbound
Towards → Bommasandra
Next Station: Konappana Agrahara
Platform 1
Northbound
Towards ← Central Silk Board / Rashtreeya Vidyalaya Road
Next Station: Hosa Road
Side platform | Doors will open on the left Wheelchair symbol.svg
L2

Entry/Exits

See also

Related Research Articles

<span class="mw-page-title-main">Rashtreeya Vidyalaya Road metro station</span> Namma Metros Green & Yellow Line interchange station

Rashtreeya Vidyalaya Road is an elevated interchange metro station on the North-South corridor of the Green Line and the East-West corridor of the upcoming Yellow Line of Namma Metro serving the 5th and 8th Block of Jayanagar area of Bangalore, India. It was opened to the public on 18 June 2017.

The Pink Line of Namma Metro is under construction and will form part of the metro rail network for the city of Bangalore, Karnataka, India. The 21.25 km (13.20 mi) line connects Kalena Agrahara station on Bannerghatta Road in the south with Nagawara station on Outer Ring Road in the north. The Pink Line is mostly underground but also has a 6.98 km (4.34 mi) elevated section and a 0.48 km (0.30 mi) at-grade (surface) section. There are 18 stations on the line, including 12 underground and 6 elevated ones. Pink Line will have an interchange with the Purple Line at MG Road station. It will also have interchanges with the Yellow line at Jayadeva Hospital station and with the Blue Line at Nagawara. Both these lines are under construction.

<span class="mw-page-title-main">Yellow Line (Namma Metro)</span> Line of Bengalurus Namma Metro

The Yellow Line of Namma Metro is almost complete and will form part of the metro rail network for the city of Bangalore, Karnataka, India. The 18.82 km (11.69 mi) line connects R.V. Road with Bommasandra, and is fully elevated with 16 stations. R.V. Road station is the terminal station on the city side where an interchange is being provided with the Green Line. Jayadeva Hospital station will serve as another elevated interchange station with the Pink Line that is also under construction in Phase 2 of Namma Metro's expansion. Upon its opening, the Jayadeva Station will be the tallest and largest metro station in Bengaluru, with five levels of transport, including the metro lines. Central Silk Board station will be another interchange station between the Yellow Line and Blue Line. The other end of the Yellow Line will terminate at Bommasandra. The line was scheduled to open in June 2023, but due to construction delays the new date was estimated to be July 2024. As per the latest reports, the Yellow Line will be operational from November 2024. This postponement has been attributed to a delay in the delivery of coaches from China.

<span class="mw-page-title-main">Ragigudda metro station</span> Upcoming Namma Metro station under Yellow Line

Ragigudda is an upcoming elevated metro station on the North-South corridor of the Yellow Line of Namma Metro in Bangalore, India. Located in between Jayanagar 9th Block & J.P. Nagar 2nd Phase, this metro station is named after the Ragigudda Anjaneya Temple.

<span class="mw-page-title-main">Jayadeva Hospital metro station</span> Upcoming Namma Metro interchange station under Arjun Yellow and Pink Lines

Jayadeva Hospital is an upcoming double-elevated interchange metro station on the North-South corridor of the Yellow Line and Pink Line of Namma Metro in Bangalore, India. This metro station will be the first multi-elevated interchange metro station in the Namma Metro network. This metro station is named after the Sri Jayadeva Institute of Cardiovascular Sciences and Research which is located nearby and serves MICO Layout (BTM), Guruppanpalya, Jayanagar and JP Nagar 3rd Phase.

<span class="mw-page-title-main">BTM Layout metro station</span> Upcoming Namma Metro station under Yellow Line

BTM Layout is an upcoming elevated metro station on the North-South corridor of the Yellow Line of Namma Metro in Bengaluru, India.

<span class="mw-page-title-main">Central Silk Board metro station</span> Upcoming Namma Metro station under Yellow Line

Central Silk Board is an important, upcoming elevated interchange metro station on the North-South corridor of the Yellow Line and Blue Line of Namma Metro in Bengaluru, India. This metro station serves the Central Silk Board area.

<span class="mw-page-title-main">Hongasandra metro station</span> Upcoming Namma Metro station under Yellow Line

Hongasandra is an upcoming elevated metro station on the North-South corridor of the Yellow Line of Namma Metro in Bangalore, India.

<span class="mw-page-title-main">Kudlu Gate metro station</span> Upcoming Namma Metro station under Yellow Line

Kudlu Gate is an upcoming elevated metro station on the North-South corridor of the Yellow Line of Namma Metro in Bangalore, India.

<span class="mw-page-title-main">Singasandra metro station</span> Upcoming Namma Metro station under Yellow Line

Singasandra is an upcoming elevated metro station on the North-South corridor of the Yellow Line of Namma Metro in Bangalore, India.

<span class="mw-page-title-main">Hosa Road metro station</span> Upcoming Namma Metro station under Yellow Line

Hosa Road is an upcoming elevated metro station on the North-South corridor of the Yellow Line of Namma Metro in Bangalore, India.

<span class="mw-page-title-main">Konappana Agrahara metro station</span> Upcoming Namma Metro station under Yellow Line

Electronic city is an upcoming important elevated metro station on the North-South corridor of the Yellow Line of Namma Metro in Bangalore, India. Infosys Foundation contributed 115 crore (US$14 million) for Konappana Agrahara Station, that included 100 crore (US$12 million) for station construction and 15 crore (US$1.8 million) for installation of half-height Platform screen doors.

<span class="mw-page-title-main">Electronic City metro station</span> Upcoming Namma Metro station under Yellow Line

Electronic City phase 2 is an upcoming elevated metro station on the Yellow Line of the Namma Metro in southern Bengaluru, India, being built to serve the Information technology hub in Anekal suburb. This will be the first metro station in the Namma Metro network to feature Platform screen doors (PSDs).

<span class="mw-page-title-main">Huskur Road metro station</span> Upcoming Namma Metro station under Yellow Line

Huskur Road is an upcoming elevated metro station on the North-South corridor of the Yellow Line of Namma Metro in Bangalore, India.

<span class="mw-page-title-main">Hebbagodi metro station</span> Upcoming Namma Metro station under Yellow Line

Biocon Hebbagodi is an upcoming elevated metro station on the Yellow Line of the Namma Metro serving the Hebbagodi suburban area.

<span class="mw-page-title-main">Bommasandra metro station</span> Upcoming Namma Metro station under Yellow Line

Delta Electronics - Bommasandra is the upcoming elevated southern-east terminal metro station on the Yellow Line of the Namma Metro serving the Bommasandra neighbourhood with its Industrial Area and Heelalige railway station connected in this area. The station has been named after the popular Electronics Company located close to it.

<span class="mw-page-title-main">Kalena Agrahara metro station</span> Upcoming Namma Metro station under Pink Line

Kalena Agrahara is an upcoming elevated southern terminal metro station on the North-South corridor of the Pink Line of Namma Metro in Bangalore, India. This metro station serves residential properties and a few other locations including Prestige Elysian, Holy Spirit School (ICSE), Doddakammanahalli suburban area and Decathlon.

<span class="mw-page-title-main">JP Nagar 4th Phase metro station</span> Upcoming Namma Metro interchange station for Pink and Orange Lines

JP Nagar 4th Phase is an upcoming elevated interchange metro station on the North-South corridor of the Pink Line and the ORR-West corridor of the Orange Line of Namma Metro in Bengaluru, India. This station is located near the popular Vega City Mall and serves the residential areas of BTM Layout and JP Nagar 3rd & 4th Phase. This metro station will also act as the terminal station of the proposed Orange Line under Namma Metro Phase 3.

Kadugundanahalli is an upcoming underground metro station on the North-South corridor of the Pink Line of Namma Metro in Bangalore, India. This metro station will consist of the main Arabic College followed by other prime neighbouring suburban areas like Venkateshpuram, Nagavara, Hennur and Rashad Nagar.

<span class="mw-page-title-main">Bommanahalli metro station</span> Upcoming Namma Metro station under Yellow Line

Bommanahalli is an upcoming elevated metro station on the North–South corridor of the Yellow Line of Namma Metro in Bangalore, India.

References

  1. "Bengaluru Metro's Yellow Line to Open in November 2024, Tejasvi Surya Shares Key Details". TimesNow. 9 March 2024. Retrieved 10 March 2024.
  2. DHNS. "Bengaluru metro's Yellow Line to start only after general elections". Deccan Herald. Retrieved 14 December 2023.
  3. "RV Road-Bommasandra Metro stretch to open by April: CM Siddaramaiah". The New Indian Express. Retrieved 11 November 2023.
  4. "Metro Yellow Line to E-City & extended Green Line to open by April 2024: CM Siddramaiah". The Times of India. 21 October 2023. ISSN   0971-8257 . Retrieved 11 November 2023.
  5. "Bengaluru metro's yellow line connecting Bommasandra to Silk Board to open by February 2024, says MP Tejasvi Surya". Hindustan Times. 6 October 2023. Retrieved 11 November 2023.
  6. "ITD-ITD Cem JV Lowest Bidder for B'lore Metro's Bomasandra-HosaRd". The Metro Rail Guy. 25 March 2017. Retrieved 23 October 2024.