Jayadeva Hospital is a double-elevated interchange metro station on the North-South corridor of the Yellow Line and Pink Line [1] of Namma Metro in Bangalore, India. This metro station will be the first multi-elevated interchange metro station in the Namma Metro network. This metro station is named after the Sri Jayadeva Institute of Cardiovascular Sciences and Research which is located nearby and serves MICO Layout (BTM), Gurappanapalya, Jayanagar and JP Nagar 3rd Phase.
The Yellow Line is currently operational from 10 August 2025 and has been officially inaugurated by Prime Minister Narendra Modi [2] [3] [4] [5] [6] [7] [8] instead of May 2025 [9] [10] [11] which was announced by the Namma Metro Managing Director, Maheshwar Rao, previously mentioned by Karnataka Deputy Chief Minister and Bengaluru Development Minister DK Shivakumar and with four trainsets which will be ready for operations after arriving from Titagarh Rail Systems in Kolkata.
Meanwhile, the elevated section of Pink Line covering a distance of 7.5 km (Kalena Agrahara - Tavarekere), is expected to be operational around March 2026 [12] [13] [14] instead of December 2025. [15] [16] [17] [18] [19] [20]
In December 2016, the Bangalore Metro Rail Corporation Limited (BMRCL) issued a call for bids to construct the Jayadeva Hospital metro station along the 6.340 km Reach 5 – Package 3 section (Central Silk Board - Rashtreeya Vidyalaya Road) of the 18.825 km Yellow Line of Namma Metro. On 16 May 2017, HCC-URC Cementation JV was selected as the lowest bidder for this stretch, with their bid closely aligning with the original cost estimates. [21] Consequently, the contract was successfully awarded to the company, which then commenced construction of the metro station in accordance with the agreements.
This metro station currently consists of five levels from underground to the top level as given below:
Jayadeva Hospital track layout | ||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and two side platforms |
Jayadeva Hospital track layout (TBC) | ||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and two side platforms ** Construction yet to begin |
UG | Underpass level | Bilekahalli - Dairy Circle Underpass |
G | Street level | Exit/Entrance |
L1 | Flyover | Ragigudda - Silk Board Flyover |
L2 | Side platform | Doors will open on the left ![]() | |
Platform 2 Eastbound | Towards → Delta Electronics Bommasandra Next Station: BTM Layout | |
Platform 1 Westbound | Towards ← Rashtreeya Vidyalaya Road Next Station: Ragigudda | |
Side platform | Doors will open on the left ![]() | ||
L3 | Mezzanine | Automatic Fare Collection gates, station agent, crossover |
L4 | Side platform | Doors will open on the left ![]() | |
Platform # Southbound | Towards → Kalena Agrahara Next Station: JP Nagar 4th Phase Change at the next station for Orange Line ** (Under Construction) | |
Platform # Northbound | Towards ← Nagawara Next Station: Tavarekere | |
Side platform | Doors will open on the left ![]() | ||
L4 | Platform Numbers (TBC) | |