Jayadeva Hospital metro station

Last updated

Jayadeva Hospital
Namma Metro Logo.png Namma Metro station
Jayadeva Hospital metro station (Mar '25).jpg
Front Entrance of this metro station under Yellow Line and Pink Line of Namma Metro as of March 2025
General information
LocationJayadeva Junction, BHBCS Layout, BTM Layout Stage 2, Bengaluru, Karnataka 560076
Coordinates 12°55′00″N77°36′00″E / 12.916744°N 77.600117°E / 12.916744; 77.600117
Elevation39 m (128 ft) from Underground
Owned by Bangalore Metro Rail Corporation Ltd (BMRCL)
Operated by Namma Metro
Line(s) Yellow Line Pink Line
Platforms  Side platform
Platform-1 → Rashtreeya Vidyalaya Road
Platform-2 → Delta Electronics Bommasandra
  Side platform
Platform-3 → Kalena Agrahara
Platform-4 → Nagawara
Platform numbers (TBC)
Tracks4
Construction
Structure type Elevated, Double track x2
Platform levels4
AccessibleYes Wheelchair symbol.svg
Architect HCC - URC Construction JV
Other information
Status  Operational and Staffed
  Under Construction
History
Opened  10 August 2025;1 day ago (10 August 2025)
Opening  March 2026;6 months' time (March 2026)(TBC)
Electrified750 V DC third rail
Services
Preceding station Namma Metro Logo.png Namma Metro Following station
Ragigudda Yellow Line BTM Layout
Tavarekere
towards Nagawara
Pink Line
(Operational around March 2026)
JP Nagar 4th Phase
Location
Jayadeva Hospital metro station

Jayadeva Hospital is a double-elevated interchange metro station on the North-South corridor of the Yellow Line and Pink Line [1] of Namma Metro in Bangalore, India. This metro station will be the first multi-elevated interchange metro station in the Namma Metro network. This metro station is named after the Sri Jayadeva Institute of Cardiovascular Sciences and Research which is located nearby and serves MICO Layout (BTM), Gurappanapalya, Jayanagar and JP Nagar 3rd Phase.

Contents

The Yellow Line is currently operational from 10 August 2025 and has been officially inaugurated by Prime Minister Narendra Modi [2] [3] [4] [5] [6] [7] [8] instead of May 2025 [9] [10] [11] which was announced by the Namma Metro Managing Director, Maheshwar Rao, previously mentioned by Karnataka Deputy Chief Minister and Bengaluru Development Minister DK Shivakumar and with four trainsets which will be ready for operations after arriving from Titagarh Rail Systems in Kolkata.

Meanwhile, the elevated section of Pink Line covering a distance of 7.5 km (Kalena Agrahara - Tavarekere), is expected to be operational around March 2026 [12] [13] [14] instead of December 2025. [15] [16] [17] [18] [19] [20]

History

Yellow Line

In December 2016, the Bangalore Metro Rail Corporation Limited (BMRCL) issued a call for bids to construct the Jayadeva Hospital metro station along the 6.340 km Reach 5 – Package 3 section (Central Silk Board - Rashtreeya Vidyalaya Road) of the 18.825 km Yellow Line of Namma Metro. On 16 May 2017, HCC-URC Cementation JV was selected as the lowest bidder for this stretch, with their bid closely aligning with the original cost estimates. [21] Consequently, the contract was successfully awarded to the company, which then commenced construction of the metro station in accordance with the agreements.

Station layout

This metro station currently consists of five levels from underground to the top level as given below:

Jayadeva Hospital track layout
BSicon vCONTgfa.svg
BSicon cPLT.svg
BSicon vSTR.svg
BSicon cPLT.svg
P1
BSicon cPLT.svg
BSicon vSTR.svg
BSicon cPLT.svg
P2
BSicon cPLT.svg
BSicon vSTR.svg
BSicon cPLT.svg
BSicon vCONTgfe.svg
Station with two tracks and two side platforms
Jayadeva Hospital track layout (TBC)
BSicon vCONTgfa.svg
BSicon cPLT.svg
BSicon vSTR.svg
BSicon cPLT.svg
P#
BSicon cPLT.svg
BSicon vSTR.svg
BSicon cPLT.svg
P#
BSicon cPLT.svg
BSicon vSTR.svg
BSicon cPLT.svg
BSicon vCONTgfe.svg
Station with two tracks and two side platforms
** Construction yet to begin
UG Underpass level Bilekahalli - Dairy Circle Underpass
GStreet levelExit/Entrance
L1 Flyover Ragigudda - Silk Board Flyover
L2 Side platform | Doors will open on the left Wheelchair symbol.svg
Platform 2
Eastbound
Towards → Delta Electronics Bommasandra
Next Station: BTM Layout
Platform 1
Westbound
Towards ← Rashtreeya Vidyalaya Road
Next Station: Ragigudda
Side platform | Doors will open on the left Wheelchair symbol.svg
L3MezzanineAutomatic Fare Collection gates, station agent, crossover
L4 Side platform | Doors will open on the left Wheelchair symbol.svg
Platform #
Southbound
Towards → Kalena Agrahara
Next Station: JP Nagar 4th Phase
Change at the next station for Orange Line ** (Under Construction)
Platform #
Northbound
Towards ← Nagawara
Next Station: Tavarekere
Side platform | Doors will open on the left Wheelchair symbol.svg
L4Platform Numbers (TBC)

See also

References

  1. "Namma Metro Pink Line: Route, Status, Completion Date & More". timesproperty. Retrieved 15 December 2023.
  2. Mishra, Anupriya (10 August 2025). "As PM Narendra Modi Inaugurates Namma Metro Yellow Line, Here's All About This New Route". Curly Tales. Retrieved 10 August 2025.
  3. "PM Modi to inaugurate Bengaluru metro Yellow Line, launch Phase-3 expansion on August 10". The Indian Express. 3 August 2025. Retrieved 3 August 2025.
  4. "Namma Metro Yellow Line Updates, Metro Delay Bengaluru: Yellow Line Launch Pushed to July-End Amid Snags | Bengaluru Metro News". Deccan Herald. Retrieved 27 May 2025.
  5. "Bengaluru's Yellow Line Metro faces further delay, unlikely to open before July-end: Report". Hindustan Times. 27 May 2025. Retrieved 27 May 2025.
  6. "Bengaluru Namma Metro Update: Yellow Line Operations To Start In June | Check Status, Key Stations". English Jagran. 6 April 2025. Retrieved 6 April 2025.
  7. "Bengaluru Metro Yellow Line: Operations To Start By June? Check Current Status & Key Stations". Times Now. 5 April 2025. Retrieved 6 April 2025.
  8. Parangi, Shankrappa (6 April 2025). "Namma Metro Yellow line: ಏಪ್ರಿಲ್ ಅಂತ್ಯಕ್ಕೆ 3ನೇ ರೈಲು, ಹಳದಿ ಮಾರ್ಗ ಕಾರ್ಯಾಚರಣೆ ಅಪ್ಡೇಟ್". kannada.oneindia.com (in Kannada). Retrieved 6 April 2025.
  9. "Bengaluru Metro Yellow Line To Become Operational By May 2025, Pink Line To Be Ready For Public Use By..." Times Now. 11 March 2025. Retrieved 12 March 2025.
  10. "Bengaluru: Namma Metro Yellow Line From RV Road To Bommasandra, Connecting Electronics City, Set To Open By May 2025". English Jagran. 10 March 2025. Retrieved 12 March 2025.
  11. "Bengaluru Metro plans to open yellow line in April with 4 trains, 30-min headway". Deccan Herald. Retrieved 7 January 2025.
  12. "Namma Metro Pink Line Opening Delayed: When Will It Finally Open For Bengaluru Residents?". Times Now. 14 May 2025. Retrieved 15 May 2025.
  13. B.P, Darshan Devaiah (13 May 2025). "Namma Metro's Pink Line deadline pushed to 2026". The Hindu. ISSN   0971-751X . Retrieved 15 May 2025.
  14. "Bengaluru Metro's Reach 6 Line Likely To Be Commissioned In Sept 2026; See Which Areas It Will Connect". Times Now. 13 May 2025. Retrieved 15 May 2025.
  15. "Bengaluru: Namma Metro pushes Pink Line deadline to December 2026". Deccan Herald. Retrieved 4 November 2024.
  16. "Namma Metro's Pink line likely to open in phases". The Hindu. 4 August 2024. ISSN   0971-751X . Retrieved 7 August 2024.
  17. "Namma Metro's Pink Line: This Upcoming Corridor Is Set To Redefine The City Commute". TimesNow. 25 June 2023. Retrieved 15 December 2023.
  18. "Namma Metro Phase 2 In Bengaluru To Be Operational By 2025, Announces Karnataka Deputy CM". TimesNow. 10 February 2024. Retrieved 12 February 2024.
  19. "Namma Metro: Bengaluru's Under-Construction Pink Line Slated To Achieve 2 Milestones In a Week". TimesNow. 31 January 2024. Retrieved 1 February 2024.
  20. "Namma Metro's Pink line likely to open in phases". The Hindu. 4 August 2024. ISSN   0971-751X . Retrieved 7 August 2024.
  21. "HCC-URC JV Lowest Bidder for Bangalore Metro's RV Rd - HSR Layout". The Metro Rail Guy. 16 May 2017. Retrieved 23 October 2024.