Formerly | Electricity Supply Corporation (1889) |
---|---|
Company type | Public limited company |
Industry | Energy: electricity generation and supply |
Founded | 12 June 1889 |
Founder | Sir John and Stefano Gatti |
Defunct | 31 March 1948 |
Fate | Nationalisation |
Successor |
|
Headquarters | 60 St. Martin's Lane, London |
Area served | City of London and West End |
Key people | see text |
Services | Generation, distribution and sales of electricity |
Revenue | see table in text |
Parent | London Power Company |
The Charing Cross and Strand Electricity Supply Corporation Limited was a British electricity undertaking. It was incorporated as a public company in 1889 to generate and supply electricity to parts of the City of Westminster, Holborn and later the City of London. From 1925 it worked jointly with other companies as part of the London Power Company. The company was abolished on 31 March 1948 when the British electricity industry was nationalised, and its assets were transferred to the British Electricity Authority and the London Electricity Board. The Charing Cross Corporation's Bow power station continued in operation until 1969.
The entrepreneurs Sir John Maria Emilio Gatti and his brother Rocco Joseph Stefano Gatti owned the Royal Adelphi theatre and the Adelaide restaurant in the Strand in the West End. [1] From September 1883 they provided electric lighting for the restaurant from a small generating plant in the basement of the building. The plant comprised two multi-tubular Field boilers providing steam to two Armington and Sims engines each driving two 150-lamp Edison bipolar dynamos. [2] [3] The system was capable of operating 330 lamps. By 1886 the plant was supplying lighting at the Adelphi theatre. With growing electricity demand a new generating station was built in 1888 at Bull Inn Court, between Maiden Lane and The Strand. [4] The station had three Babcock and Wilcox boilers providing steam at 140 psi (9.6 bar) to four compound Willans engines coupled to two 84 kW and two 50 kW Edison-Hopkinson dynamos. These machines generated direct current at 105 V. [4]
To extend supplies more widely in the area the Electric Supply Corporation was registered as an electricity undertaking on 12 June 1889 with statutory authority to supply electricity to parts of Holborn and Westminster. [3] These areas were: the southern part of Holborn Metropolitan Borough except Lincoln's Inn and Staple Inn; the Strand district and the parish of St. Martin in the Fields in the City of Westminster. [5] The Metropolitan Electric Supply Company Limited objected to the new undertaking as it already supplied the Strand district with electricity. The Charing Cross Company argued that it would provide low-tension current that would be an advantage for motive power over the high-tension supply from the Metropolitan Electric Supply Company. [6] The Gatti brothers were directors and shareholders of the new company. [7] The Electric Supply Corporation took over the ownership and operation of the Maiden Lane station, and soon after changed the company name to the Charing Cross and Strand Electricity Supply Corporation Limited. Further increases in demand were met by several extensions to the Maiden Lane station from 1892. [4]
To supplement electricity supplies the Charing Cross Company built a new power station in 1896 at 85 Commercial Road, Lambeth on the south of the River Thames. Electricity was transferred across the river through ducts in Hungerford and Waterloo Bridges. [4] The plant at Commercial Road had a capacity of 3,600 kW and operated at 1,000 V. The voltage was reduced to 200 V for distribution to customers by motor–generator sets located in local substations on the north side of the river. [4] These substations were located at Maiden Lane; Shorts Gardens, Drury Lane; and St. Martins Lane. [7]
In 1897 the plant had a generating capacity of 2,575 kW and the maximum load was 1,377 kW. A total of 2615.51 MWh of electricity was sold to 719 customers which powered 107,542 lamps, this provided an income to the company of £48,026-16-6d. The growth of the undertaking is demonstrated in the table. [8]
Year | No. of 8 candle power lamps | Gross revenue | Net revenue |
---|---|---|---|
1892 | 29,000 | £20,658 13 8 | £9,997 13 3 |
1893 | 34,570 | £22,303 19 2 | £8,654 8 4 |
1894 | 41,216 | £26,532 0 5 | £10,395 12 9 |
1895 | 51,302 | £28,571 0 1 | £12,587 3 11 |
1896 | 73,464 | £38,804 13 4 | £15,288 15 1 |
1897 | 107,542 | £48,880 17 9 | £18,907 2 11 |
In 1899 the company sought and received authority under the City of London Electric Lighting Act 1900 (63 & 64 Vict. c. lxxxviii) to supply electricity to the City of London. This supply was in competition with City of London Electric Lighting Company. [5] One of the conditions of the act was that the company would provide, within two years, a power station to supply the City with electricity. [7] Such an arrangement would allow the City Corporation to purchase a complete electricity supply system. [9] Accordingly, a new station was constructed at Bow in the Borough of West Ham, about 4 miles north east of Charing Cross. A separate operating undertaking within the Charing Cross Company was established to manage this supply.
Bow power station (51°32'03"N 0°00'43"W) was built on a 7½ acre (3.04 ha) site in Marshgate Road, Bow, and was first commissioned in 1902. [4] It generated 3-phase alternating current at 10 kV and 50 Hz. [10] It was the first 3-phase plant in the UK. [4] Initially the equipment comprised two 800 kW and two 1600 kW Lahmeyer generating sets. [2] The 800 kW sets were driven by Bellis and Morcom high speed engines, and the 1600 kW sets by Sulzer Bros. engines. [11] The boilers were manufactured by Richard Hornsby. In 1904–05 a pair of 4 MW generators were added, these were then the largest generating machines in the country. They were driven by Sulzer three cylinder compound engines. Steam was from a pair of Hornsby vertical boilers with an output capacity of 140,000 lb/h (17.6 kg/s) at 160 psi (11.0 bar) for each 4 MW set. [11] Steam from the engines discharged into jet-condensers and cooling was by 16 fan driven circular steel cooling towers, 30 ft (11 m) in diameter and 85 ft (26 m) high. [2] [12] Coal was delivered to the power station by the River Lea and its channels.
The station transmitted electricity at 10 kV through underground cables through the districts of Poplar, Mile End and Whitechapel to four substations in the City and West End each with an 8.4 MW motor-generator. These were at Fenchurch Street, Upper Thames Street, Ludgate Hill and Beech Street. [7] The 350 kW synchronous generators giving 400–440 V across the outer wires, supply was eventually 2 × 200 V on a three-wire system. [11]
Following the First World War the reciprocating engines at Bow were gradually replaced with more efficient steam turbines. [2] New Babcock and Wilcox boilers supplied steam at 270 psi (18.6 bar) and 650 °F (343 °C). [2]
The company changed its name in February 1905 to the Charing Cross, West End and City Electricity Supply Company Limited to reflect its enlarged supply area in the City.
As new generating plant was commissioned so older and less efficient plant was retired: the advent of Bow power station led to the eventual closure of the Lambeth station by 1909. [4]
It was reported in 1910 that the City of Westminster had transferred electric street lighting, comprising 66 arc lamps run by the St. James Electric Light Company, to a gas company for conversion back to gas lighting. [13] The usual pattern at this period was the substitution of electricity in place of gas for street lighting. The Charing Cross Company confirmed they continued to operate 165 arc lamps in the City of Westminster. [13]
A summary of operating data for the Charing Cross Company from 1903 to 1936 is as follows: [5] [14] [15] [16] [17]
Year | Undertaking | Generating capacity, MW | Maximum load, MW | No. of Customers | Electricity generated, GWh | Electricity sold, GWh |
---|---|---|---|---|---|---|
1903 | West End | 4.4 | 4.28 | ? | 10.32 | 7.19 |
City | 8.0 | 5.71 | ? | 5.80 | 3.56 | |
1912–13 | West End | 3.76 | 6.33 | 3464 | 39.00 | 12.23 |
City | 19.72 | 7.38 | 4466 | 15.43 | ||
1919 | West End | 2.6 | 7.19 | ? | 41.90 | 12.65 |
City | 20.9 | 9.4 | ? | 17.54 | ||
1923–24 | West End | 2.60 | 10.92 | 4602 | 2.70 + 21.41 purchased | 18.98 |
City | 30.5 | 24.93 | 5696 | 52.13 | 45.02 | |
1931 | West End | ? | ? | ? | 3.72 + 46.57 purchased | 39.27 |
City | ? | ? | ? | 0 + 52.24 purchased | 43.50 | |
1936 | West End | 6.4 | 48.99 | 5394 | 55.08 + 133.8 purchased | 54.35 |
City | 6220 | 62.11 |
From the early 1920s interconnections between electricity undertakings enabled bulk supplies of electricity to be sold and purchased. For example, in 1923 the West End undertaking, in addition to its 2.6 MW generating capacity, had 10.7 MW of transformer capability enabling electricity to be imported. [16]
In 1923 the generating plant comprised the following. [18] At Bow there were 2 × 3.0 MW, 2 × 5.0 MW and 1 × 2.5 MW turbo generators, plus 2 × 4.0 MW reciprocating generators giving a total capacity of 36.52 MW. The maximum load on the system was 23,164 MW. These machines were supplied by boilers with a total steam output capacity of 575,000 lb/hr (72.45 kg/s). At St. Martins Lane there were 2 × 450 kV oil driven generators providing a DC supply, and at Shorts Gardens there were 4 × 450 kW and 2 × 530 kW oil driven generators also providing a DC supply. [18]
In 1928 the company installed new substations in Soho Square (1500 kW) and Aldwych (3000 kW), and a new 1200 kW diesel engine at Shorts Gardens. [19] The substation at Shorts Gardens was housed in a 3-storey red brick building (extant 2020) numbered 62–72 Shorts Gardens at the northeast end of Shorts Gardens near Drury Lane. [20]
It was noted in 1931 that major rebuilding work in the City and the West End particularly the construction of substantially larger buildings provided with ‘lavish’ lighting had increased the demand for electricity from the company. [21]
In 1935 the Charing Cross Company distributed electricity from 14 substations, these were located at: 12 Maiden Lane, Short's Gardens, St. Martins Lane, Chancery Lane, Soho Square, Aldwych, Trafalgar Buildings, 85 Fenchurch Street, 86 Upper Thames Street, 68/70 Ludgate Hill, Seacoal Lane, 9 Beech Street, Broad Street, and Smithfield Market. [4] By 1936–7 the substation in St. Martin's Lane was equipped with three generator sets of 575 kW, 750 kW and 1200 kW, in that year they generated 2.38 MWh of power. The substation was severely damaged during the war. [4]
In 1903 the Charing Cross Company charged 3.78 d./kWh for a private electricity supply and 1.77 d./kWh for public lighting. These were both less than that charged by the City of London Company: 3.87 and 1.98 d./kWh respectively. [5]
By 1912–3 a more complex charging system was used. [14] For the West End area the company charged 2.02 d./kWh for street lighting and 3.18 d./kWh for ‘other’ public lighting, it charged 3.15 d./kWh for private lighting, 1.22 d./kWh for power and heat to the Borough Council and 1.51 d./kWh for power and heat to private customers. For the City area the charges were 2.37 d./kWh other public lighting, 3.14 d./kWh for private lighting, 0.93 d./kWh for power and heat to the borough council, and 1.51 d./kWh for power and heat to private customers. [14]
For 1918 the charging system was less complex, for the West End the company charged 3.47 d./kWh for public lighting, 6.26 d./kWh for private light, 2.45 d./kWh for power and heat; for the City undertaking the charges were 6.64 d./kWh for private lighting and 2.31 d./kWh for power and heat. [15]
The financial revenue, expenditure and surplus over the period 1912–36 was as follows: [14] [15] [17] [22]
Year | Undertaking | Revenue | Expenditure | Gross surplus |
---|---|---|---|---|
1912–13 | West End | £146,265 | £57,564 | £79,801 |
City | £148,513 | £72,697 | £66,673 | |
1919 | West End | £262,950 | £152,911 | £96,789 |
City | £330,981 | £258,250 | £60,327 | |
1921 | West End | £312,500 | £212,116 | |
City | £438,772 | |||
1922 | West End | £333,000 | £187,000 | |
City | £437,002 | |||
1936 | West End | £410,674 | £296,735 | £190,740 |
City | £388,618 | £265,286 | £184,449 |
The increase in expenditure between 1913 and 1919 is partly due to the rise in commodity prices during this period. The company noted that the bill for coal in 1914 was less than £40,000 but by 1918 it was £108,000 and in 1919 was £157,000. [23]
Dividends to shareholders were paid throughout the operational life of the company. Dividends as a percentage of the total capital raised in a given year were as shown, together with the average dividends paid by the London company electricity undertakings. [14] [15]
Year | 1892 | 1893 | 1894 | 1895 | 1896 | 1897 | 1898 | 1899 | 1900 | 1901 | 1902 | 1903 | 1904 | 1905 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
West End dividend % | 4.75 | 4.62 | 4.66 | 5.01 | 5.47 | 6.19 | 6.25 | 7.43 | 6.95 | 6.66 | 5.78 | 5.66 | 5.37 | 4.52 |
City dividend % | – | – | – | – | – | – | – | – | – | 3.65 | 3.80 | 3.17 | 3.26 | 3.30 |
London average dividend % | 2.10 | 2.68 | 3.40 | 4.01 | 4.66 | 5.54 | 5.10 | 5.15 | 4.60 | 5.29 | 5.55 | 5.51 | 5.79 | 5.65 |
Year | 1906 | 1907 | 1908 | 1909 | 1910 | 1911 | 1912 | 1913 | 1914 | 1915 | 1916 | 1917 | 1918 | 1919 |
West End dividend % | 4.50 | 4.48 | 4.48 | 4.48 | 4.48 | 4.48 | 4.48 | 4.80 | 4.48 | 4.48 | 4.48 | 4.16 | 4.16 | 5.12 |
City dividend % | 3.46 | 3.38 | 3.66 | 3.27 | 3.34 | 3.37 | 3.37 | 3.37 | 3.37 | 3.37 | 3.37 | 3.37 | 3.37 | 3.37 |
London average dividend % | 5.40 | 5.14 | 5.12 | 5.07 | 5.07 | 5.11 | 5.18 | 5.33 | 5.10 | 4.87 | 4.68 | 5.32 | 4.96 | 5.76 |
In 1920 the company was one of nine electricity undertakings which formed the London Electricity Joint Committee to oppose schemes proposed by the Electricity Commissioners for reorganisation of electricity supplies in London. [24] The Joint Committee acquired Bow generating station and the transmission system. In 1924 the company changed its name to the Charing Cross Electricity Supply Company Limited and was an authorised distribution supplying an electricity supply in bulk to Smithfield Markets Electric Supply Company. [16]
In 1925 the Charing Cross Company and other undertakings formed, under the provisions of the London Electricity (No. 2) Act 1925 (15 & 16 Geo. 5. c. lxiii), the London Power Company. [25] The LPC amalgamated the ownership and management of the generating stations, but left the supply of electricity to customers with the constituent companies. [26]
From 1 January 1937 the Charing Cross Company acquired five other undertakings to coordinate the distribution of electricity in their areas of London. [26] The other undertakings were: Brompton and Kensington Electricity Supply Company Limited; Chelsea Electricity Supply Company Limited; Kensington and Knightsbridge Electric Lighting Company Limited; St. James and Pall Mall Electric Light Company Limited; and Westminster Electric Supply Corporation Limited. [26] The Charing Cross Company changed its name again to Central London Electricity Limited. All the shares of Central London Electricity were held by a non-statutory company known as London Associated Electricity Undertakings Limited. [17] The company's supply area now included Chelsea, City of London, Holborn (south), Kensington (south), Westminster (east). However, the company failed to attract a wider range of London companies to the merger and therefore planning of London's electricity remained un-integrated. [27]
Upon nationalisation of the electricity industry in 1948 the Central London Electricity Limited undertaking was abolished and its generation and main transmission assets, including Bow power station, was transferred to the British Electricity Authority (1948–55), [11] then to the Central Electricity Authority (1955–57), and finally to the Central Electricity Generating Board (1958–69). The electricity distribution and sales to customer assets of the Central London Electricity Limited were vested in the London Electricity Board.
In 1954 the working capacity of the generators at Bow power station was 51.5 MW. The steam capacity of the chain gate stoked boilers was 785,000 lb/hr (98.9 kg/s) and the steam conditions at the turbine stop-valves was 250 psi (17.2 bar) and 343 °C. In 1954 the station burned 23,600 tons of coal. [28] In 1954 the overall thermal efficiency of the station was 13.6 per cent, this had fallen to 9.84 percent in the final year of operation. [28]
The electricity output of the station, in GWh, over the period 1946–68 was: [29] [30] [28] [31] [32] [33]
Graphs are unavailable due to technical issues. There is more info on Phabricator and on MediaWiki.org. |
Bow power station ceased generating electricity in 1969 and was subsequently demolished. [4]
The Shorts Gardens substation continued to generate electricity until the early 1960s, using internal combustion engines. There was one 550 kW and two 1,125 kW oil engines. [34] It was used as a peak shaving plant: in 1954 it had a capacity 2.8 MW, was run for 604 hours and delivered 287 MWh. [28] In 1961 the station had a capacity of 2.8 MW, it was run for 170 hours and delivered 62 MWh. [31] In 1961/2 it generated 118 MWh, and in 1962/3 it delivered 252 MWh. [35] The building is used (in 2020) by UK Power Networks. [36]
The Directors of the Charing Cross Company in 1903 were: [7]
The Company Secretary was Edward Wilmot Seale, later Cecil G. Stanesby
The Engineer-in-Chief was W.H. Patchell.
The company office was at 60 St. Martin's Lane, London, WC.
The Gatti family, and their role in electricity supply, are commemorated on a Green Plaque in the Strand. [38]
In summary the various names of the company were:
Berwick Power Station was a small coal-fired power station situated at the mouth of the River Tweed, at Berwick-upon-Tweed in Northumberland, North East England. It operated from 1903 until the early 1940s.
Acton Lane Power Station was a power station in London NW10. The station, also known as Willesden power station, was located to the south of the Euston to Birmingham railway on a site bounded by Acton Lane, the Grand Union Canal and the Dudding Hill railway line. In later years the site was extended to the south side of the canal. The entire site is now occupied by Willesden Grid Supply Point buildings.
The London Power Company was an electricity generating and bulk supply company in London, England, formed in 1925 by the merger of ten small electricity companies. In 1948 Britain's electricity supply industry was nationalised under the Electricity Act 1947 and the company was absorbed into the British Electricity Authority.
The City of London Electric Lighting Company Limited (CLELCo) was a British electricity undertaking. It was formed in July 1891 to generate and supply electricity to the City of London and part of north Southwark. It owned and operated Bankside power station on the south bank of the river Thames. The company provided and stimulated demand for electricity, increased its generating capacity, and competed and co-operated with other electricity undertakings in London. The company was dissolved on 1 April 1948 when the British electricity industry was nationalised.
The St. Pancras Power Stations were two electricity generating stations, also known as the Regent’s Park Power Station and the King’s Road Power Station, which supplied electricity to the district of St. Pancras in north London from 1891 to 1968.
The Norwich power stations were a sequence of electricity generating stations that provided electric power to the City of Norwich and the wider area between 1893 and 1986. The first station in Duke Street began operating in 1893, a new power station at Thorpe was in service from 1926 to 1967, this was supplemented with a 'high pressure' station, 1937–1975, and finally a gas turbine station operated from 1964–1986.
Derby power station supplied electricity to the town of Derby and the surrounding area from 1893 to 1969. The power station was built and operated by Derby Corporation and started generating electricity in October 1893. It was located in Silkmill Lane in the town centre adjacent to the River Derwent from which it drew its cooling water. The power station was extended in the 1920s and 1940s. It was closed in 1969 and was subsequently demolished.
The Percival Lane power station in Runcorn was built and operated by the Mersey Power Company Limited. It comprised two stations A and B commissioned in 1921 and 1941. The station supplied electricity to commercial, industrial and domestic users over a wide area of 95 square miles around the River Mersey including Widnes, Ellesmere Port and Runcorn.
Wandsworth power station supplied electricity to the London district of Wandsworth and to Putney, Tooting Graveney, Streatham and Clapham from 1897 to 1964. It was owned and operated by the County of London Electric Lighting Company Limited until the nationalisation of the British electricity supply industry in 1948. The power station was redeveloped during its operational life until it was decommissioned in 1964.
The County of London Electric Supply Company Limited (C.L.E.S.Co) was a British electricity undertaking. It was incorporated as a public company in 1891 to generate and supply electricity to parts of south west London and two parishes adjacent to the City of London. It owned and operated power stations at Wandsworth and City Road. From 1925 it cooperated with three other London companies, with the intention of centralising electricity generation in the new, high thermal efficiency, power station at Barking. The company was abolished in March 1948 upon the nationalisation of the British electricity supply industry.
The South Metropolitan Electric Light and Power Company Limited was a British electricity undertaking. It was established in 1904 upon the amalgamation of two south London companies which had supplied electricity in south east London since 1893. It owned and operated a power station at Blackwell Point and one at Penge. From 1925 it formed an association with three other London companies, with the intention of centralising electricity generation in the new, high thermal efficiency, power station at Barking. The South Metropolitan Company was abolished in March 1948 upon the nationalisation of the British electricity supply industry.
The South London Electric Supply Corporation Limited was a British electricity undertaking. It was established in 1896 to supply electricity to the parish/borough of Lambeth in south London. The Corporation owned and operated a power station at Loughborough Junction. From 1925 it formed an association with three other London companies to centralise electricity generation in the new, high thermal efficiency, power station at Barking. The South London Electric Corporation was abolished in March 1948 upon the nationalisation of the British electricity supply industry.
Reading power station, Berkshire, England supplied electricity to the town of Reading and the surrounding area from 1895 to the 1960s. It was initially owned and operated by the Reading Electric Supply Company Limited, then from 1933 by the Reading Corporation until the nationalisation of the British electricity supply industry in 1948. The power station was redeveloped several times with new equipment replacing retired plant. The station was decommissioned in the late 1960s.
Greenhill power station supplied electricity to the town of Oldham, England and the surrounding area from 1921 to 1960. It replaced the older Rhodes Bank generating station and was superseded by Chadderton B power station. Greenhill power station was owned and operated by Oldham Corporation until the nationalisation of the British electricity supply industry in 1948. The power station was built over the period 1921–24 and was decommissioned in 1960.
Aberystwyth power station supplied electricity to the town of Aberystwyth from 1895 to the 1970s. The oil-engine station was operated by a succession of private and public owners including Aberystwyth Corporation prior to the nationalisation of the electricity industry in 1948. The power station, with an ultimate capacity of 5 MW, was redeveloped as demand for electricity grew and old plant was replaced.
The Macclesfield group power stations are three relatively small electric power stations at Alderley Edge, Buxton, and Macclesfield, England. They supplied electricity to their respective towns from 1890s to the 1960s. The oil-engine stations were operated by a succession of private and public owners prior to the nationalisation of the British electricity industry in 1948. The power stations were redeveloped as a group in the 1950s as demand for electricity grew and old plant was replaced.
Nelson power station supplied electricity to the town of Nelson, Lancashire and the surrounding area from 1892 to 1960. The power station was owned and operated by Nelson Corporation prior to the nationalisation of the British electricity supply industry in 1948. It was redeveloped in 1922 to 1925 to meet the increased demand for electricity.
Newbury power station supplied electricity to the town of Newbury, Berkshire and the surrounding area from 1905 to 1970. It was owned and operated by a succession of public and private organisations. It comprised, at various times, hydro-electric, gas engine and diesel engine powered plant with a maximum output capacity of 2.57 MW.
Woking power station supplied electricity to the Borough of Woking and the surrounding area from 1890 to 1960. The power station was operated by the Woking Electric Supply Company Limited until the nationalisation of the British electricity industry in 1948. It was redeveloped after the First World War to meet the increased demand for electricity.
Guildford power station supplied electricity to the town of Guildford and the surrounding area from 1896 to 1967. The power station was built and operated by the Guildford Electricity Supply Company Limited. In 1921 it was acquired by the Guildford Corporation which operated it until the nationalisation of the British electricity supply industry in 1948.