Cikubang railway bridge | |
---|---|
![]() Cikubang railway bridge viewed from the Cipularang Toll Road, 2017 | |
Coordinates | 6°46′48″S107°26′31″E / 6.78°S 107.442°E |
Crosses | Jakarta - Cikampek - Bandung railway line |
Locale | Cipatat, West Bandung Regency, West Java |
Begins | Gambir & Pasar Senen, Jakarta |
Ends | Bandung |
Characteristics | |
Height | 80 meters |
Rail characteristics | |
Track gauge | 1067 mm |
History | |
Built | 1903 |
Opened | 1906 |
Rebuilt | 1963 (bridge reinforcement) |
Location | |
![]() |
Cikubang railway bridge is an railway bridge that linked between Jakarta & Bandung along with the Cipularang Toll Road since 2005 that located in Cipatat, West Bandung Regency, West Java. The bridge has four steel pillars weighing around 110 tons. Now, the Cikubang railway bridge operator by Kereta Api Indonesia & KAI Commuter.
For the difference along with the Cikubang Toll Road Bridge, left of the Cikubang railway bridge heading to Jakarta from Bandung, while right of the Cikubang railway bridge heading to Bandung from Jakarta.
The Cikubang Bridge has been in use since 1906 and still stands strong today, standing 80 meters above the Cikubang River. The construction of this bridge is related to the construction of the Cikubang, Karawang-Purwakarta-Bandung City railway line, which began between 1881 and 1884 by the Staatsspoorwegen (SS) railway company. [1]
The bridge structure was further reinforced with semicircular metal arches along the rails at the bottom of the sleepers in 1953. This reinforcement coincided with the introduction of diesel locomotives. The Cikubang Bridge is clearly visible from the highway between Plered and Padalarang, and tourists often stop to watch the trains passing over it. [2]
The Cikubang railway bridge isn't as the longest railway bridge in Indonesia, instead the Cikubang railway bridge itself as the 2nd longest railway bridge in Indonesia after the Serayu Maos railway bridge (BH 1549) which stretches over the Serayu River, precisely at km 388+850 of the road section between Kasugihan–Maos, Maos with a span of 380 meters, and began to be used in 2018. [3]
BH 513 | |
---|---|
Name Bridge | Cikubang |
Name River | Cikubang |
Built | 1903 |
Strengthening | 1953 |
Location | KM 109/110 (Cipularang Toll Road) |
Here is a train that crossing the Cikubang Railway Bridge:
Southern railway Service
Northern railway service
Commuter Line