Dul Hasti Hydroelectric Plant

Last updated

Dul Hasti Dam
India Jammu and Kashmir Union Territory location map.svg
Red pog.svg
Location of Dul Hasti Dam in Jammu and Kashmir
India location map.svg
Red pog.svg
Dul Hasti Hydroelectric Plant (India)
Country India
Location Kishtwar, Jammu and Kashmir
Coordinates 33°22′09″N75°47′54″E / 33.3692°N 75.7984°E / 33.3692; 75.7984 Coordinates: 33°22′09″N75°47′54″E / 33.3692°N 75.7984°E / 33.3692; 75.7984
PurposePower
StatusOperational
Construction began1985
Opening date2007;16 years ago (2007)
Dam and spillways
Type of dam Gravity
Impounds Chenab River
Height70 m (230 ft)
Length190 m (620 ft)
Elevation at crest1,250 metres (4,100 ft)
Spillway capacity8,000 m3/s (280,000 cu ft/s)
Dul Hasti Hydroelectric Plant
Coordinates 33°17′13″N75°45′44″E / 33.2869°N 75.7621°E / 33.2869; 75.7621
Commission date2007
Hydraulic head 200 metres (660 ft)
Turbines 3 x 130 MW Francis-type
Installed capacity 390 MW

Dul Hasti is a 390 MW hydroelectric power plant in Kishtwar district of Jammu and Kashmir, India built by NHPC. The power plant is a run-of-the-river type on the Chenab River, in a rugged, mountainous section of the Himalayas, and several hundred kilometers from larger cities in the Jammu Division. It consists of a 70 m (230 ft) tall gravity dam which diverts water through a 9.5 km (5.9 mi) long headrace tunnel to the power station which discharges back into the Chenab. The project provides peaking power to the Northern Grid with beneficiary states being Jammu and Kashmir, Punjab, Haryana, Uttar Pradesh, Uttarakhand, Rajasthan, Delhi and Union Territory of Chandigarh. It was constructed between 1985 and 2007. [1]

Contents

Design

The Dul Hasti Hydro-Electric Project (HEP) involves a dam and a tunnel ending in a power plant at a bend in the Chenab River in the vicinity of Kishtwar. The dam is located at the village of Dul and the power plant at the village of Hasti, giving the name "Dul Hasti" to the project. The drop in the elevation between Dul and Hasti gives a hydraulic head of 200 metres (660 ft) for power generation.

The Dam is 65 m high and 186 m long. [2] It is equipped with low-level gated spillways which can be used to flush silt load. [3] [4] [lower-alpha 1]

Background

Begun in 1985, the Dulhasti Power project, set in the northern Indian provinces of Jammu and Kashmir, represents an example of a disaster in project cost estimation and delivery. As initially conceived, the project's cost was estimated at 1.6 billion rupees (about $50 million). By the time the contract was let, the cost estimate had risen to 4.5 billion rupees and later successively to 8, 11, 16, and 24 billion rupees (nearly $750 million). The project became operational on 7 April 2007 and has been generating over 2000 Million Units of electricity per year. [6] [7] [2]

Contracting and design

The contract for the power generation project was first awarded to a French consortium at a price of $50 million, who almost immediately asked for an upward price revision. The site was intended to capitalize on the proximity to a large river systems capable of providing the water capacity needed to run a hydroelectric plant of Dulhasti's dimensions. Unfortunately, the site selected for the project came with some serious drawbacks as well. First, it was sited in the disputed border region between Pakistan and India. Jammu and Kashmir have been the epicenter of numerous and serious clashes between separatist forces demanding independence and Indian army . Constructing such an obvious target as a power plant in the disputed area was sure to provoke reaction by militant groups, using it as their chief means of opposition. Thus, the additional costs of providing security to the site quickly became prohibitively expensive. A second problem concerns the sheer geographical challenge of creating a large plant in a region almost totally devoid of supporting infrastructure, including an adequate logistics network (roads and rail lines). Building the plant in the foothills of the Himalayas may be scenic, but it is not cost effective, particularly as almost all supplies had to be brought in with air transportation, at exorbitant costs. All raw materials, including cement, wood, stone, and steel, had to be hauled by helicopter for miles over snowbound areas.Now it is the source of electricity for most of the states and the city.

See also

Map all coordinates using: OpenStreetMap  
Download coordinates as: KML

Notes

  1. The elimination of low-level spillways at the earlier Salal Dam has caused silt to build up, damaging the sustainability of the that project. Pakistan does not appear to have objected to the gated spillways at Dul Hasti. [5]

Related Research Articles

<span class="mw-page-title-main">Jhelum River</span> River in India and Pakistan

The Jhelum River (/dʒʰeːləm/) is a river in the northern Indian subcontinent. It originates at Verinag and flows through the Indian-administered territory of Jammu and Kashmir, into Pakistani-administered Azad Kashmir, then the Pakistani province of Punjab. It is the westernmost of the five rivers of the Punjab region, and flows through the Kashmir Valley. It is a tributary of the Chenab River and has a total length of about 725 kilometres (450 mi).

<span class="mw-page-title-main">Chenab River</span> River in India and Pakistan

The Chenab River is a major river that flows in India and Pakistan, and is one of the 5 major rivers of the Punjab region. It is formed by the union of two headwaters, Chandra and Bhaga, which rise in the upper Himalayas in the Lahaul region of Himachal Pradesh, India. The Chenab flows through the Jammu region of Jammu and Kashmir, India into the plains of Punjab, Pakistan, before ultimately flowing into the Indus River.

<span class="mw-page-title-main">Mangla Dam</span> Multipurpose dam in Azad Kashmir, Pakistan

The Mangla Dam is a multipurpose dam situated on the Jhelum River in the Mirpur District of Azad Kashmir, Pakistan. It is the sixth-largest dam in the world. The village of Mangla, which sits at the mouth of the dam, serves as its namesake. In November 1961, the project's selected contractors were revealed; it was announced that Binnie & Partners, a British engineering firm, was going to serve as the lead designers, engineers, and inspectors for the construction of the dam. The project was undertaken by a consortium known as the Mangla Dam Contractors, which consisted of eight American construction firms sponsored by the Guy F. Atkinson Company based in South San Francisco, California.

<span class="mw-page-title-main">Tarbela Dam</span> Dam in Khyber Pakhtunkhwa, Pakistan

Tarbela Dam is an earth-filled dam along the Indus River in Pakistan's Khyber Pakhtunkhwa province. Located mainly in the Swabi district of the province, The dam is about 30 km (20 mi) from the city of Swabi, 105 km (65 mi) northwest of Islamabad, and 125 km (80 mi) east of Peshawar. It is the largest earth-filled dam in the world. The dam is 143 metres (470 ft) high above the riverbed and its reservoir, Tarbela Lake, has a surface area of approximately 250 square kilometres (97 sq mi).

<span class="mw-page-title-main">Baglihar Dam</span> Dam in Jammu and Kashmir, India

Baglihar Dam, also known as Baglihar Hydroelectric Power Project, is a run-of-the-river power project on the Chenab River in the Ramban district of Jammu and Kashmir, India. The first power project executed by the Jammu and Kashmir Power Development Corporation, it was conceived in 1992 and approved in 1996, with construction begun in 1999. The project was estimated to cost US$1 billion. The project consists of two-stage of 450MW each. The first stage of the project was completed in 2008-09 and was dedicated to the nation by the Prime Minister Manmohan Singh of India. The second stage of the project was completed in 2015–16, and was subsequently dedicated to the nation by the Prime Minister Narendra Modi of India.

<span class="mw-page-title-main">Salal Dam</span> Dam in Jammu and Kashmir

Salal Dam, also known as Salal Hydroelectric Power Station, is a run-of-the-river hydropower project on the Chenab River in the Reasi district of the Jammu and Kashmir. It was the first hydropower project built by India in Jammu and Kashmir under the Indus Water Treaty regime. After having reached a bilateral agreement with Pakistan in 1978, with significant concessions made to Pakistan in the design of the dam, reducing its height, eliminating operating pool, and plugging the under-sluices meant for sediment management, India completed the project in 1987. The concessions made in the interest of bilateralism damaged the long-term sustainability of the dam, which silted up in five years. It currently runs at 57% capacity factor. Its long-term future is uncertain.

<span class="mw-page-title-main">Marala Headworks</span> Barrage in Punjab, Pakistan

Marala Headworks is a headworks situated on the Chenab River near the city of Sialkot in Punjab, Pakistan. A weir was first built during 1906–1912 in British India to feed the Upper Chenab Canal, as part of the 'Triple Canals Project'. A new Marala Barrage was constructed in 1968 to feed the Marala–Ravi Link Canal in addition to the original Upper Chenab Canal.

<span class="mw-page-title-main">NHPC</span> Indian government hydropower board

NHPC Limited is an Indian government hydropower board under the ownership of Ministry of Power, Government of India that was incorporated in the year 1975 with an authorised capital of ₹2,000 million and with an objective to plan, promote and organise an integrated and efficient development of hydroelectric power in all aspects. Recently it has expanded to include other sources of energy like Solar, Geothermal, Tidal, Wind etc.

<span class="mw-page-title-main">Kishtwar district</span> District of Jammu and Kashmir, India

Kishtwar district is a district of the Indian union territory of Jammu and Kashmir. As of 2011, it is the largest and least populous district of Jammu and Kashmir.

<span class="mw-page-title-main">Jyotipuram</span> Town in Jammu and Kashmir, India

.

Uri Dam is a 480 MW hydroelectric power station on the Jhelum River near Uri in Baramula district of the Jammu and Kashmir, India. It is located very near to the Line of Control, the de facto border between India and Pakistan. The station is largely built under a hill with a 10 km tunnel. It is of the run-of-the-river type without a large dam, since the Indus Waters Treaty gives Pakistan the exclusive right to regulate the Jhelum River. On 4 July 2014 a 240 MW Uri-II power project which is a new project located just downstream of Uri I, was inaugurated.

The Kishanganga Hydroelectric Project is a run-of-the-river hydroelectric scheme in Jammu and Kashmir, India. Its dam diverts water from the Kishanganga River to a power plant in the Jhelum River basin. It is located near Dharmahama Village, 5 km (3 mi) north of Bandipore in the Kashmir valley and has an installed capacity of 330 MW.

<span class="mw-page-title-main">Chenab Valley</span> Valley and proposed administrative division in Jammu and Kashmir, India

The Chenab Valley is a river valley formed by the Chenab River. The term is also used collectively for Doda, Kishtwar and Ramban districts of Jammu Division in Jammu and Kashmir, India. These districts were formerly part of a single district, called Doda.

The Ratle Hydroelectric Plant is a run-of-the-river hydroelectric power station currently under construction on the Chenab River, downstream of the village near Drabshalla in Kishtwar district of the Indian Union Territory of Jammu and Kashmir. The project includes a 133 m (436 ft) tall gravity dam and two power stations adjacent to one another. Water from the dam will be diverted through four intake tunnels about 400 m (0.25 mi) southwest to the power stations. The main power station will contain four 205 MW Francis turbines and the auxiliary power station will contain one 30 MW Francis turbine. The installed capacity of both power stations will be 850 MW. On 25 June 2013, Prime Minister Manmohan Singh laid the foundation stone for the dam. Pakistan has frequently alleged that it violates the Indus Waters Treaty.

The Pakal Dul Dam is an under construction concrete-face rock-fill dam on the Marusudar river, a tributary of the Chenab River, in Kishtwar district of the Indian Jammu and Kashmir. The primary purpose of the dam is hydroelectric power generation. It will divert water to the south through a 10 km (6.2 mi) long headrace tunnel and into power station on the reservoir of the Dul Hasti Dam, on the Chenab. In February 2014, the project was awarded to a consortium of domestic and foreign countries. It includes AFCONS, JP Prakash Associate Bharat Heavy Electricals. Pakistan, which relies on the Chenab downstream, views the dam as a violation of the Indus Water Treaty, whereas India states it is as per treaty provisions. Indian Commentator Harshil Mehta wrote that the project holds strategic interest for India, apart from utilising just Hydropower, along with Kiru and Ratle, and Ujh multipurpose project.

<span class="mw-page-title-main">Western Himalayas</span> Western section of the Himalayas

The Western Himalayas refers to the western half of the Himalayas, in northern Pakistan and northwestern India. It is also known as the Punjab Himalayas. Four of the five tributaries of the Indus River in Punjab rise in the Western Himalayas; while the fifth, the Sutlej cuts through the range after rising in Tibet.

<span class="mw-page-title-main">Thathri</span> A town and a tehsil in Jammu and Kashmir

Thathri is a town and a notified area committee in Doda district in the Indian union territory of Jammu and Kashmir. Thathri valley is located in the foothills of the Himalayan mountains, about 85 km from Batote. Apart from having ample forests, the town contains many small streams flowing through its various parts. It is located on the banks of the Chenab River and the town area is spread over 1.50 sq. Km².

The Nachtigal Hydroelectric Power Station is a 420 megawatt run-of-the-river hydroelectric power station under development in Cameroon across the Sanaga River, which harnesses the energy of the Nachtigal Falls. The development rights were granted to Nachtigal Hydro Power Company (NHPC), a company owned by a consortium comprising (a) Électricité de France (b) International Finance Corporation and (c) the Government of Cameroon. A 35-year power purchase agreement is in place, between Eneo Cameroon S.A. and NHPC.

<span class="mw-page-title-main">Marusudar River</span> River tributary in Jammu and Kashmir

Marusudar river or Maru Sudar river is the largest river tributary of the Chenab River, beginning at the Nunkun glacier of the Warwan Valley and joining the Chenab at Bhandarkoot in the Kishtwar district. As of 2021, 1000MW Pakal Dul Dam the 800MW Bursar Hydroelectric Project are under construction on this river.

References

  1. "Dul Hasti dam and Hydroelectric Power Project". Tractebel. Archived from the original on 25 November 2012. Retrieved 15 June 2013.
  2. 1 2 "Dulhasti". NHPC Limited. Retrieved 6 June 2021.
  3. The Big Brother, Kashmir Life, 23 June 2012.
  4. Annual Report 2006–07, Ministry of Power, 2007, p. 7.
  5. Dar, Power Projects in Jammu & Kashmir (2012), p. 18.
  6. Dar, Power Projects in Jammu & Kashmir (2012), p. 22.
  7. "Welcome to Dulhasti Power Station". NHPC Limited. Archived from the original on 27 November 2010.

Bibliography

Further reading