Dul Hasti Hydroelectric Plant

Last updated

Dul Hasti Dam
India Jammu and Kashmir Union Territory location map.svg
Red pog.svg
Location of Dul Hasti Dam in Jammu and Kashmir
India location map.svg
Red pog.svg
Dul Hasti Hydroelectric Plant (India)
Country India
Location Kishtwar, Jammu and Kashmir
Coordinates 33°22′09″N75°47′54″E / 33.3692°N 75.7984°E / 33.3692; 75.7984
PurposePower
StatusOperational
Construction began1985
Opening date2007;17 years ago (2007)
Dam and spillways
Type of dam Gravity
Impounds Chenab River
Height70 m (230 ft)
Length190 m (620 ft)
Elevation at crest1,250 metres (4,100 ft)
Spillway capacity8,000 m3/s (280,000 cu ft/s)
Dul Hasti Hydroelectric Plant
Coordinates 33°17′13″N75°45′44″E / 33.2869°N 75.7621°E / 33.2869; 75.7621
Commission date2007
Hydraulic head 200 metres (660 ft)
Turbines 3 x 130 MW Francis-type
Installed capacity 390 MW

Dul Hasti is a 390 MW hydroelectric power plant in Kishtwar district of Jammu and Kashmir, India built by NHPC. The power plant is a run-of-the-river type on the Chenab River, in a rugged, mountainous section of the Himalayas, and several hundred kilometers from larger cities in the Jammu Division. It consists of a 70 m (230 ft) tall gravity dam which diverts water through a 9.5 km (5.9 mi) long headrace tunnel to the power station which discharges back into the Chenab. The project provides peaking power to the Northern Grid with beneficiary states being Jammu and Kashmir, Punjab, Haryana, Uttar Pradesh, Uttarakhand, Rajasthan, Delhi and Union Territory of Chandigarh. It was constructed between 1985 and 2007. [1]

Contents

Design

The Dul Hasti Hydro-Electric Project (HEP) involves a dam and a tunnel ending in a power plant at a bend in the Chenab River in the vicinity of Kishtwar. The dam is located at the village of Dul and the power plant at the village of Hasti, giving the name "Dul Hasti" to the project. The drop in the elevation between Dul and Hasti gives a hydraulic head of 200 metres (660 ft) for power generation.

The Dam is 65 m high and 186 m long. [2] It is equipped with low-level gated spillways which can be used to flush silt load. [3] [4] [lower-alpha 1]

Background

Begun in 1985, the Dulhasti Power project, set in the northern Indian provinces of Jammu and Kashmir, represents an example of a disaster in project cost estimation and delivery. As initially conceived, the project's cost was estimated at 1.6 billion rupees (about $50 million). By the time the contract was let, the cost estimate had risen to 4.5 billion rupees and later successively to 8, 11, 16, and 24 billion rupees (nearly $750 million). The project became operational on 7 April 2007 and has been generating over 2000 Million Units of electricity per year. [6] [7] [2]

Contracting and design

The contract for the power generation project was first awarded to a French consortium at a price of $50 million, who almost immediately asked for an upward price revision. The site was intended to capitalize on the proximity to a large river systems capable of providing the water capacity needed to run a hydroelectric plant of Dulhasti's dimensions. Unfortunately, the site selected for the project came with some serious drawbacks as well. First, it was sited in the disputed border region between Pakistan and India. Jammu and Kashmir have been the epicenter of numerous and serious clashes between separatist forces demanding independence and Indian army . Constructing such an obvious target as a power plant in the disputed area was sure to provoke reaction by militant groups, using it as their chief means of opposition. Thus, the additional costs of providing security to the site quickly became prohibitively expensive. A second problem concerns the sheer geographical challenge of creating a large plant in a region almost totally devoid of supporting infrastructure, including an adequate logistics network (roads and rail lines). Building the plant in the foothills of the Himalayas may be scenic, but it is not cost effective, particularly as almost all supplies had to be brought in with air transportation, at exorbitant costs. All raw materials, including cement, wood, stone, and steel, had to be hauled by helicopter for miles over snowbound areas. Now it is the source of electricity for most of the states and the city.

See also

Notes

  1. The elimination of low-level spillways at the earlier Salal Dam has caused silt to build up, damaging the sustainability of the that project. Pakistan does not appear to have objected to the gated spillways at Dul Hasti. [5]

Related Research Articles

<span class="mw-page-title-main">Jhelum River</span> River in India and Pakistan

The Jhelum River is a river in the northern Indian subcontinent. It originates at Verinag and flows through the Indian union territory of Jammu and Kashmir, into Pakistan-administered Azad Kashmir, then the Pakistani province of Punjab. It is the westernmost of the five rivers of the Punjab region, and flows through the Kashmir Valley. It is a tributary of the Chenab River and has a total length of about 725 kilometres (450 mi).

<span class="mw-page-title-main">Chenab River</span> River in India and Pakistan

The Chenab River is a major river that flows in India and Pakistan, and is one of the 5 major rivers of the Punjab region. It is formed by the union of two headwaters, Chandra and Bhaga, which rise in the upper Himalayas in the Lahaul region of Himachal Pradesh, India. The Chenab flows through the Jammu region of Jammu and Kashmir, India, into the plains of Punjab, Pakistan, before ultimately flowing into the Indus River. The Battle of Chenab was fought between Sikhs and Afghans on the bank of the river.

<span class="mw-page-title-main">Baglihar Dam</span> Dam in Jammu and Kashmir, India

Baglihar Dam, also known as Baglihar Hydroelectric Power Project, is a run-of-the-river power project on the Chenab River in the Ramban district of Jammu and Kashmir, India. The first power project executed by the Jammu and Kashmir Power Development Corporation, it was conceived in 1992 and approved in 1996, with construction begun in 1999. The project was estimated to cost US$1 billion. The project consists of two-stage of 450MW each. The first stage of the project was completed in 2008-09 and was dedicated to the nation by the Prime Minister Manmohan Singh of India. The second stage of the project was completed in 2015–16, and was subsequently dedicated to the nation by the Prime Minister Narendra Modi.

<span class="mw-page-title-main">Salal Dam</span> Dam in Jammu and Kashmir

Salal Dam, also known as Salal Hydroelectric Power Station, is a run-of-the-river hydropower project on the Chenab River in the Reasi district of the Jammu and Kashmir. It was the first hydropower project built by India in Jammu and Kashmir under the Indus Water Treaty regime. After having reached a bilateral agreement with Pakistan in 1978, with significant concessions made to Pakistan in the design of the dam, reducing its height, eliminating operating pool, and plugging the under-sluices meant for sediment management, India completed the project in 1987. The concessions made in the interest of bilateralism damaged the long-term sustainability of the dam, which silted up in five years. It currently runs at 57% capacity factor. Its long-term future is uncertain.

Hindustan Construction Company Limited(HCC) is an Indian multinational engineering and construction company headquartered in Mumbai, Maharashtra, India. The company was founded by Industrialist Seth Walchand Hirachand in 1926.

<span class="mw-page-title-main">NHPC</span> Indian public sector hydropower company

NHPC Limited is an Indian public sector hydropower company that was incorporated in 1975 to plan, promote and organise an integrated and efficient development of hydroelectric power. Recently it has expanded to include other sources of energy like solar, geothermal, tidal, and wind.

<span class="mw-page-title-main">Kishtwar district</span> District of Jammu and Kashmir, India

Kishtwar district is an administrative district of the Jammu division of Indian-administered Jammu and Kashmir in the Jammu Division. As of 2011, it is the largest and the least populous district of Jammu and Kashmir.

<span class="mw-page-title-main">Jyotipuram</span> Town in Jammu and Kashmir, India

.

Uri Dam is a 480 MW hydroelectric power station on the Jhelum River near Uri in Baramula district of the Jammu and Kashmir, India. It is located very near to the Line of Control, the de facto border between India and Pakistan. The station is largely built under a hill with a 10 km tunnel. It is of the run-of-the-river type without a large dam, since the Indus Waters Treaty gives Pakistan the exclusive right to regulate the Jhelum River. On 4 July 2014 a 240 MW Uri-II power project which is a new project located just downstream of Uri I, was inaugurated.

<span class="mw-page-title-main">Nimoo Bazgo Hydroelectric Plant</span> Dam

The Nimoo Bazgo Power Project is a run-of-the-river power project on the Indus River situated at Alchi village, 75 kilometres (47 mi) from Leh in the Indian Union Territory of Ladakh. The project was conceived on 1 July 2001 and approved on 8 June 2005, and construction began on 23rd Sept, 2006. The project involves construction of a 57-high m (187 ft) concrete dam with five spillway blocks of 13 m (43 ft) each having ogee profile.

<span class="mw-page-title-main">Neelum–Jhelum Hydropower Plant</span> Hydropower station in Azad Kashmir, Pakistan

The Neelum–Jhelum Hydropower Plant is part of a run-of-the-river hydroelectric power project in Azad Kashmir (AJK) designed to divert water from the Neelum River to a power station on the Jhelum River. The power station is located 42 km (26 mi) south of Muzaffarabad, and has an installed capacity of 969 MW. Construction on the project began in 2008 after a Chinese consortium was awarded the construction contract in July 2007. After many years of delays, the first generator was commissioned in April 2018 and the entire project was completed in August 2018 when the fourth and last unit was synchronized with the national grid on 13 August and attained its maximum generation capacity of 969 MW on 14 August 2018. It will generate 5,150 GWh per year at the levelised tariff of Rs 13.50 per unit for 30 years.

The Kishanganga Hydroelectric Project is a run-of-the-river hydroelectric scheme in Jammu and Kashmir, India. Its dam diverts water from the Kishanganga River to a power plant in the Jhelum River basin. It is located near Dharmahama Village, 5 km (3 mi) north of Bandipore in the Kashmir valley and has an installed capacity of 330 MW.

<span class="mw-page-title-main">Chenab Valley</span> Valley and proposed administrative division in Jammu and Kashmir, India

The Chenab Valley is a river valley formed by the Chenab River. The term is also used collectively for Doda, Kishtwar and Ramban districts of Jammu Division in the Indian-administered Jammu and Kashmir. These districts were formerly part of a single district, called Doda.

The Ratle Hydroelectric Plant is a run-of-the-river hydroelectric power station, with permitted pondage under the Indus Water Treaty, currently under construction on the Chenab River, downstream of the village near Drabshalla in Kishtwar district of the Indian Union Territory of Jammu and Kashmir. The project includes a 133 m (436 ft) tall gravity dam and two power stations adjacent to one another. Water from the dam will be diverted through four intake tunnels about 400 m (0.25 mi) southwest to the power stations. The main power station will contain four 205 MW Francis turbines and the auxiliary power station will contain one 30 MW Francis turbine. The installed capacity of both power stations will be 850 MW. On 25 June 2013, Prime Minister Manmohan Singh laid the foundation stone for the dam. Pakistan has frequently alleged that it violates the Indus Waters Treaty.

The Pakal Dul Dam is an under construction concrete-face rock-fill dam on the Marusudar river, a tributary of the Chenab River, in Kishtwar district of the Indian Jammu and Kashmir. The primary purpose of the dam is hydroelectric power generation. It will divert water to the south through a 10 km (6.2 mi) long headrace tunnel and into power station on the reservoir of the Dul Hasti Dam, on the Chenab. In February 2014, the project was awarded to a consortium of domestic and foreign countries. It includes AFCONS, JP Prakash Associate Bharat Heavy Electricals. Pakistan, which relies on the Chenab downstream, views the dam as a violation of the Indus Water Treaty, whereas India states it is as per treaty provisions. Indian Commentator Harshil Mehta wrote that the project holds strategic interest for India, apart from utilising just Hydropower, along with Kiru and Ratle, and Ujh multipurpose project.

<span class="mw-page-title-main">Western Himalayas</span> Western section of the Himalayas

The Western Himalayas refers to the western half of the Himalayas, in northwestern India and northern Pakistan. Four of the five tributaries of the Indus River in Punjab rise in the Western Himalayas; while the fifth, the Sutlej cuts through the range after rising in Tibet.

<span class="mw-page-title-main">Thathri</span> A town and a tehsil in Jammu and Kashmir

Thathri is a town and a notified area committee in Doda district in the Indian union territory of Jammu and Kashmir. Thathri valley is located in the foothills of the Himalayan mountains, about 85 km from Batote. Apart from having ample forests, the town contains many small streams flowing through its various parts. It is located on the banks of the Chenab River and the town area is spread over 1.50 sq. Km².

<span class="mw-page-title-main">Marusudar River</span> River tributary in Jammu and Kashmir

Marusudar river or Maru Sudar river is the largest river tributary of the Chenab River, beginning at the Nunkun glacier of the Warwan Valley and joining the Chenab at Bhandarkoot in the Kishtwar district. As of 2021, 1000MW Pakal Dul Dam the 800MW Bursar Hydroelectric Project are under construction on this river.

<span class="mw-page-title-main">Kalnai River</span> Tributary of river Chenab in Jammu and Kashmir

The Kalnai River is a tributary of the Chenab River in the Bunjwah region bordering Kishtwar and Doda districts in Jammu and Kashmir. An under construction 48MW Lower Kalnai hydroelectric project is located at Donadi on this river.

References

  1. "Dul Hasti dam and Hydroelectric Power Project". Tractebel. Archived from the original on 25 November 2012. Retrieved 15 June 2013.
  2. 1 2 "Dulhasti". NHPC Limited. Retrieved 6 June 2021.
  3. The Big Brother, Kashmir Life, 23 June 2012.
  4. Annual Report 2006–07, Ministry of Power, 2007, p. 7.
  5. Dar, Power Projects in Jammu & Kashmir (2012), p. 18.
  6. Dar, Power Projects in Jammu & Kashmir (2012), p. 22.
  7. "Welcome to Dulhasti Power Station". NHPC Limited. Archived from the original on 27 November 2010.