Electrification of the New York, New Haven and Hartford Railroad

Last updated
A New Haven EP-1 electric locomotive, circa 1907. Note the small DC pantograph between the two larger AC pantographs. NH EP-1.png
A New Haven EP-1 electric locomotive, circa 1907. Note the small DC pantograph between the two larger AC pantographs.

The New York, New Haven and Hartford Railroad pioneered electrification of main line railroads using high-voltage, alternating current, single-phase overhead catenary. It electrified its mainline between Stamford, Connecticut, and Woodlawn, New York, in 1907 and extended the electrification to New Haven, Connecticut, in 1914. While single-phase AC railroad electrification has become commonplace, the New Haven's system was unprecedented at the time of construction. The significance of this electrification was recognized in 1982 by its designation as a Historic Mechanical Engineering Landmark by the American Society of Mechanical Engineers (ASME).

Contents

Initial experiments

NewHavenCatBridge.png

The New Haven tried several experiments with low-voltage DC electrification in the decade preceding their main line overhead electrification. These included:

The third rail system resulted, not surprisingly, in a number of accidents. It also resulted in a decree from the Connecticut Supreme Court on June 13, 1906 forbidding the use of third rail electrification within the state. [2] The New Haven was forced by this decision to design their main line electrification system using overhead catenary.

Several different systems combinations of voltage and frequency were considered in the initial design. Due to the relatively large distances involved, transmission at high voltages using alternate current was recognized as being unavoidable. An architecture similar to commercial DC utilities and urban railroads was considered using high voltage transmission lines, rotary converters, and overhead DC catenary. The studies of the time assumed an electrical efficiency of only 75 percent for this architecture.

The highest voltage for which generators could be reliably designed at this time was about 22 kV. An intermediate design was considered using 22 kV transmission lines, substations to reduce catenary voltage to between 3 and 6 kV, and transformers on the engines to the 560 V required by the traction motors. [2] The railroad realized that it could save significant capital cost if the intermediate substitution were omitted and locomotives received line voltage at around 11 kV.

Original 1907 direct-feed architecture

Direct-feed architecture implemented in 1907, and schematic of catenary bridge circuit breakers in the 1907 design. Interferencep962.png
Direct-feed architecture implemented in 1907, and schematic of catenary bridge circuit breakers in the 1907 design.

The New Haven's electrification was the first of its kind; no previous railroad had practical experience operating a high voltage distribution system above a steam railroad. Many of the system's ultimate specifications were the result of educated design decisions based on the state of the electrical technology in 1907.

Proposals were obtained from General Electric (GE) and Westinghouse. Both companies submitted a variety of AC and DC schemes, though GE favoured DC electrification. But New Haven chose single-phase AC at 11 kV, 25 Hz. as proposed by Westinghouse, who had been researching AC electrification of railroads since 1895 and in association with Baldwin supplied Baldwin-Westinghouse locomotives. [3] Later GE also supplied some locomotives.

Voltage

The designers considered several voltages for the transmission segment of the system including 3–6 kV, 11 kV, and 22 kV. Ultimately, the transmission and catenary systems were combined into a transformerless system, that utilized the same voltage from output of generator to catenary to locomotive pantograph. As 11 kV was the highest voltage that could be obtained directly from the output of the generators of 1907, 11 kV was selected as the transmission and catenary voltage of the system.

Frequency

The New Haven had considered two different operating frequencies for use in their electrification: 15 Hz, and 25 Hz. Although 15 Hz was desirable from an engineering perspective, as it would afford a reduced motor size, lower inductive losses, and a higher motor power factor, choosing that frequency was viewed by the railroad as akin to a "break in gauge", thus limiting the commercial prospects of their system. 25 Hz had by 1907 already become a commercial standard, and the railroad already operated a number of trolley power houses at 25 Hz and had equipped many of its shops with 25 Hz motors; thus, the railroad selected the 25 Hz standard.

Catenary

Derelict catenary along the New Haven Railroad main line in Mount Vernon, New York. The segment south of Pelham now uses a third rail. Mount Vernon East-11,000 Volts.JPG
Derelict catenary along the New Haven Railroad main line in Mount Vernon, New York. The segment south of Pelham now uses a third rail.

The New Haven had no precedent to follow when designing its catenary system. Overhead catenary had previously been the domain of trolleys, except for a few three-phase railways in Europe. No prior experience existed with operating high-speed railways with an overhead contact system. The catenary designed by the New Haven was a unique, relatively rigid triangular cross-section.

The triangular cross-section of catenary used in the original electrification was only repeated by one other railway. The London, Brighton and South Coast Railway used a similar triangular catenary from 1909 until 1929. [4] The New Haven's 1914 extensions dispensed with the triangular catenary design.

Catenary support spacing was set at 300 feet (91 m). This was based on keeping the straight line deviation from center of track to within 8.5 inches (220 mm) with a curve radius of 3 degree, which was the tightest curve between the original system's termini at Woodlawn and Stamford.

Generators

The generators at the Cos Cob Power Station were designed to supply single-phase power directly to the catenary. They were also required to supply three-phase power both to the New Haven itself for use along the lines, [5] and to the New York Central's (NYC) Port Morris generating station to compensate the NYC for the power consumed by New Haven trains on the NYC's third-rail supplied line to Grand Central Terminal. [2] The Cos Cob generators were three-phase machines, but wired to supply both three phase and single phase power simultaneously.

Revised 1914 autotransformer architecture

Diagram of New Haven system following 1914 implementation of autotransformer substations. Interferencep962b.png
Diagram of New Haven system following 1914 implementation of autotransformer substations.

Although the railroad considered the 1907 electrification highly successful, two problems required an ultimate redesign of the transmission system. The first was electromagnetic interference in adjacent, parallel telegraph and telephone wires caused by the high currents in the traction power system.

The second was that the system's geographic growth and the evolving state of electrical technology created a need for higher transmission voltages. The railroad could have simply raised the operating voltage of the entire system, however this would have required all the catenary insulators to be upgraded to withstand a higher potential, and replacement of all the locomotive high voltage equipment. And while higher transmission voltages had become common in the seven years since the initial electrification, generators were still limited by economics to a maximum output voltage of around 11 kV.

The solution decided upon by the railroad, after several years of study, was a balanced autotransformer system.

Remarkably, the railroad changed transmission system architectures within four hours, although preliminary work had taken the preceding 18 months. On Sunday, January 25, 1914, the railroad shut down the entire power system at 2 am. Gangs of workers throughout the system reconfigured the transmission lines over the next 70 minutes. System startup was commenced and by 5:30 am, electric trains were running over the new, autotransformer supplied system. [6]

Substations

Schematic of catenary bridge circuit breakers and autotransformer after 1914 upgrade. Interferencep963.png
Schematic of catenary bridge circuit breakers and autotransformer after 1914 upgrade.
New York, New Haven, and Hartford Electrification System Substations [7]
Substation No.Catenary Bridge No.NameBuiltCoordinatesComments
New Haven Line
1114Cedar Hill
1104Mill River (Section Break)
1060Cedar St. 41°17′37″N72°55′50″W / 41.2937°N 72.9305°W / 41.2937; -72.9305 (Cedar St. Substation (New Haven))
962Woodmont
863Devon
814Bishop Ave
736Burr Road
633Green's Farms
524South Norwalk
465Darien 41°04′38″N73°28′07″W / 41.0773°N 73.4686°W / 41.0773; -73.4686 (Darien Substation (New Haven))
374Stamford
296Greenwich
245Port Chester 41°00′19″N73°39′21″W / 41.0053°N 73.6559°W / 41.0053; -73.6559 (Port Chester Substation (New Haven))
193Rye
126Mamaroneck 40°56′48″N73°44′41″W / 40.9467°N 73.7446°W / 40.9467; -73.7446 (Mamaroneck Substation (New Haven))
SS2272New Rochelle1914 40°54′46″N73°46′57″W / 40.9127°N 73.7826°W / 40.9127; -73.7826 (New Rochelle Substation (New Haven)) Converted to 60 Hz c. 1986
0Woodlawn
Hell Gate Line
ATK 47211HAmtrak New Rochelle1987 40°54′25″N73°47′24″W / 40.9069°N 73.7900°W / 40.9069; -73.7900 (New Rochelle Substation 47)
SS14149HBaychester/Pelham Bridge1914–1987
SS12139HWestchester/Pelham Parallel1914–1987 40°49′00″N73°53′36″W / 40.8167°N 73.8933°W / 40.8167; -73.8933 (Westchester Substation (New Haven))
ATK 46Amtrak Van Nest1987 40°50′31″N73°51′48″W / 40.8420°N 73.8633°W / 40.8420; -73.8633 (Van Nest Substation 46)
SS884HWest Farms Junction1914-1987. 40°50′05″N73°52′46″W / 40.8347°N 73.8794°W / 40.8347; -73.8794 (West Farms Substation (New Haven)(demolished)) Supplied from Sherman Creek; later from Con Ed Hell Gate GS. [8] The substation and adjacent passenger station have been demolished; an impound lot occupies the site.
SS458HOak Point1914–1987 40°48′27″N73°54′18″W / 40.8075°N 73.9049°W / 40.8075; -73.9049 (Oak Point Substation (New Haven))
SS342HBungay St1914?-1987NH 3ph power supplied to NYC's Port Morris GS [9] to compensate for NH's consumption on NYC DC lines.
SS12HHarlem River1914-19??
New York, Westchester and Boston Railway
Columbus Ave Mt Vernon
White Plains
New York Connecting Railroad
ATK 45C68Bowery Bay1918 40°45′51″N73°54′19″W / 40.7643°N 73.9054°W / 40.7643; -73.9054 (Bowery Bay Substation 45)
Long Island Rail Road Bay Ridge Branch
55Fresh Pond1927-19??
2 East New York (FC)1927-19??Connects the single phase to/from PT&T/LIRR's 3 phase 25 Hz.
54East New York Swg.1927-19??
53New Lots Ave1927-19??
52Manhattan Beach1927-19??
514th Ave Bay Ridge1927-19??

Hell Gate Line

Map showing substation locations along the New York Connecting Railroad. Electrification System of New York Connecting Railroad map.png
Map showing substation locations along the New York Connecting Railroad.
Schematic of the New Lots Substation along the New York Connecting Railroad. NewLotsSubstation.png
Schematic of the New Lots Substation along the New York Connecting Railroad.

The New Haven's system was extended across the Hell Gate Bridge to the New York Connecting Railroad upon the construction of the Hell Gate Line. The system of electrification was an extension of the New Haven's revised 11/22 kV autotransformer architecture. The original electrification extended from the New Haven's main line, across the Hell Gate Bridge, to the Bay Ridge yard. The line south of Bowery Bay Junction was de-electrified in the 1950s. The line between New Rochelle and the Harold Interlocking was transferred to Amtrak in 1976 upon dissolution of Penn Central. The electrification system continued to be controlled as a portion of the ex-New Haven system until the 1987 conversion to 60 Hz operation.

When the New Haven main line was converted by Metro-North to 60 Hz operation, the Amtrak section of the Hell Gate Line was also converted, but as an isolated system powered from the Van Nest substation. Control of the catenary system was transferred from Cos Cob to the Load Dispatcher at New York Penn Station. Although conversion occurred subsequent to the PRR-era electrification, Amtrak substation numbers 45–47 were assigned for consistency with the rest of the PRR numbering scheme.

Electrification extension to Boston

An AEM-7 electric locomotive brings an Amtrak train into South Station, Boston, in 2001 Amt930-bostonMA.jpg
An AEM-7 electric locomotive brings an Amtrak train into South Station, Boston, in 2001

Since 2000, Amtrak’s 60 Hz traction power system extends electrification along the Northeast Corridor between New Haven [note 1] and Boston, Massachusetts. This system was built by Amtrak in the late 1990s and supplies locomotives with power from an overhead catenary system at 25 kV alternating current with at 60 Hz, the standard frequency in North America. Its construction allowed all-electric passenger trains to operate the entire way between Washington, D.C. and Boston, completing the project begun in 1907 and eliminated a lengthy stop at New Haven station for locomotive changes.

See also

Footnotes

  1. "New Canaan Railroad History". www.vizettes.com. Retrieved 2024-01-07.
  2. 1 2 3 McHenry (1907).
  3. William D. Middleton (1974). When the steam railroads electrified. Kalmbach Books. p. 76. ISBN   0-89024-028-0.
  4. Savchak (1990).
  5. Westinghouse figure 19 shows three-phase substations at South Norwalk, Stamford, Greenwich, Port Chester, Van Nest Shops, and Oak Point Float Bridge
  6. Arthur (1914).
  7. based on Fig. 21 from Westinghouse Publication 1968.
  8. The Hell Gate Generating Station was located here: 40°47′55″N73°54′34″W / 40.7987°N 73.9095°W
  9. The New York Central's Port Morris Generating Station was located here: 40°48′17″N73°54′08″W / 40.8048°N 73.9021°W

Related Research Articles

<span class="mw-page-title-main">Overhead line</span> Cable that provides power to electric railways, trams, and trolleybuses

An overhead line or overhead wire is an electrical cable that is used to transmit electrical energy to electric locomotives, electric multiple units, trolleybuses or trams. The generic term used by the International Union of Railways for the technology is overhead line. It is known variously as overhead catenary, overhead contact line (OCL), overhead contact system (OCS), overhead equipment (OHE), overhead line equipment, overhead lines (OHL), overhead wiring (OHW), traction wire, and trolley wire.

<span class="mw-page-title-main">Third rail</span> Method of providing electric power to a railway train

A third rail, also known as a live rail, electric rail or conductor rail, is a method of providing electric power to a railway locomotive or train, through a semi-continuous rigid conductor placed alongside or between the rails of a railway track. It is used typically in a mass transit or rapid transit system, which has alignments in its own corridors, fully or almost fully segregated from the outside environment. Third-rail systems are usually supplied from direct current electricity.

<span class="mw-page-title-main">Electric locomotive</span> Locomotive powered by electricity

An electric locomotive is a locomotive powered by electricity from overhead lines, a third rail or on-board energy storage such as a battery or a supercapacitor. Locomotives with on-board fuelled prime movers, such as diesel engines or gas turbines, are classed as diesel-electric or gas turbine-electric and not as electric locomotives, because the electric generator/motor combination serves only as a power transmission system.

<span class="mw-page-title-main">Railway electrification</span> Conversion of railways to use electricity for propulsion

Railway electrification is the use of electric power for the propulsion of rail transport. Electric railways use either electric locomotives, electric multiple units or both. Electricity is typically generated in large and relatively efficient generating stations, transmitted to the railway network and distributed to the trains. Some electric railways have their own dedicated generating stations and transmission lines, but most purchase power from an electric utility. The railway usually provides its own distribution lines, switches, and transformers.

<span class="mw-page-title-main">Kálmán Kandó</span> Hungarian engineer and inventor of phase converter (1869-1931)

Kálmán Kandó de Egerfarmos et Sztregova was a Hungarian engineer, the inventor of phase converter and a pioneer in the development of AC electric railway traction.

<span class="mw-page-title-main">New York Connecting Railroad</span> Freight rail line in New York City

The New York Connecting Railroad or NYCR is a rail line in the borough of Queens in New York City. It links New York City and Long Island by rail directly to the North American mainland. Amtrak, CSX, Canadian Pacific Kansas City, Providence and Worcester Railroad and New York and Atlantic Railway (NYAR) currently use the line. It runs from the Hell Gate Bridge over the East River to Fresh Pond Junction yard in Glendale in Queens. It was completed in 1917. Amtrak uses the northernmost section of the line from Sunnyside Junction in the Woodside section of Queens to the Hell Gate Bridge into the Bronx from which it follows the line north to Boston.

<span class="mw-page-title-main">Traction power network</span> Electricity grid for the supply of electrified rail networks

A traction network or traction power network is an electricity grid for the supply of electrified rail networks. The installation of a separate traction network generally is done only if the railway in question uses alternating current (AC) with a frequency lower than that of the national grid, such as in Germany, Austria and Switzerland.

<span class="mw-page-title-main">Traction substation</span>

A traction substation, traction current converter plant, rectifier station or traction power substation (TPSS) is an electrical substation that converts electric power from the form provided by the electrical power industry for public utility service to an appropriate voltage, current type and frequency to supply railways, trams (streetcars) or trolleybuses with traction current.

<span class="mw-page-title-main">25 kV AC railway electrification</span> Standard current and voltage settings for most high-speed rail

Railway electrification systems using alternating current (AC) at 25 kilovolts (kV) are used worldwide, especially for high-speed rail. It is usually supplied at the standard utility frequency, which simplifies traction substations. The development of 25 kV AC electrification is closely connected with that of successfully using utility frequency.

<span class="mw-page-title-main">15 kV AC railway electrification</span> Standard current and voltage settings for much of Central Europes train transport

Railway electrification using alternating current (AC) at 15 kilovolts (kV) and 16.7 hertz (Hz) are used on transport railways in Germany, Austria, Switzerland, Sweden, and Norway. The high voltage enables high power transmission with the lower frequency reducing the losses of the traction motors that were available at the beginning of the 20th century. Railway electrification in late 20th century tends to use 25 kV, 50 Hz AC systems which has become the preferred standard for new railway electrifications but extensions of the existing 15 kV networks are not completely unlikely. In particular, the Gotthard Base Tunnel still uses 15 kV, 16.7 Hz electrification.

<span class="mw-page-title-main">Head-end power</span> Electric power supply to trains by locomotives

In rail transport, head-end power (HEP), also known as electric train supply (ETS), is the electrical power distribution system on a passenger train. The power source, usually a locomotive at the front or 'head' of a train, provides the electricity used for heating, lighting, electrical and other 'hotel' needs. The maritime equivalent is hotel electric power. A successful attempt by the London, Brighton and South Coast Railway in October 1881 to light the passenger cars on the London to Brighton route heralded the beginning of using electricity to light trains in the world.

Railroad electrification in the United States began at the turn of the 20th century and comprised many different systems in many different geographical areas, few of which were connected. Despite this situation, these systems shared a small number of common reasons for electrification.

<span class="mw-page-title-main">Amtrak's 25 Hz traction power system</span> Railroad power system

Amtrak's 25 Hz traction power system is a traction power network for the southern portion of the Northeast Corridor (NEC), the Keystone Corridor, and several branch lines between New York City and Washington D.C. The system was constructed by the Pennsylvania Railroad between 1915 and 1938 before the North American power transmission grid was fully established. This is the reason the system uses 25 Hz, as opposed to 60 Hz, which is the standard frequency for power transmission in North America. The system is also known as the Southend Electrification, in contrast to Amtrak's 60 Hz traction power system that runs between Boston and New Haven, which is known as the Northend Electrification system.

<span class="mw-page-title-main">Cos Cob Power Station</span> United States historic place

Cos Cob Power Station was a historic power station near the Metro-North Railroad tracks, the Mianus River and Sound Shore Drive in the Cos Cob area of Greenwich, Connecticut.

<span class="mw-page-title-main">SEPTA's 25 Hz traction power system</span>

The Southeastern Pennsylvania Transportation Authority (SEPTA) operates a 25 Hz traction power system in the vicinity of Philadelphia, that it inherited from the Reading Company. This system is separate from, but similar to, the system built by the Pennsylvania Railroad (PRR), which is now operated by Amtrak. SEPTA's trains can run over either system because the voltage and frequency presented to the locomotive are essentially identical. However, the ex-Reading system is not electrically connected to the ex-PRR system.

<span class="mw-page-title-main">South African Class 1E</span>

The South African Railways Class 1E of 1925 was an electric locomotive.

<span class="mw-page-title-main">Amtrak's 60 Hz traction power system</span> Northeast Corridor railroad power system

Amtrak’s 60 Hz traction power system operates along the Northeast Corridor between New Haven, Connecticut, and Boston, Massachusetts. This system was built by Amtrak in the late 1990s and supplies locomotives with power from an overhead catenary system at 25 kV alternating current with at 60 Hz, the standard frequency in North America. The system is also known as the Northend Electrification, in contrast to Amtrak's 25 Hz traction power system that runs between New York City and Washington, D.C., which is known as the Southend Electrification system.

<span class="mw-page-title-main">Multi-system (rail)</span>

A multi-system locomotive, also known as a multi-system electric locomotive, multi-system electric multiple unit, or multi-system train, is an electric locomotive which can operate using more than one railway electrification system. Multi-system trains provide continuous journeys over routes which are electrified using more than one system.

<span class="mw-page-title-main">Baldwin-Westinghouse electric locomotives</span>

Baldwin, the locomotive manufacturer, and Westinghouse, the promoter of AC electrification, joined forces in 1895 to develop AC railway electrification. Soon after the turn of the century, they marketed a single-phase high-voltage system to railroads. From 1904 to 1905 they supplied locomotives carrying a joint builder's plate to a number of American railroads, particularly for the New Haven line from New York to New Haven, and other New Haven lines. Westinghouse would produce the motors, controls, and other electrical gear, while Baldwin would produce the running gear, frame, body, and perform final assembly.

<span class="mw-page-title-main">Great Northern Z-1</span>

The Great Northern Z-1 was a class of ten electric locomotives built for the Great Northern Railway They were used to work the route through the second Cascade Tunnel. They were built between 1926–1928 by Baldwin Locomotive Works, with Westinghouse electrics, and stayed in service until dieselisation in 1956. Each was of 1,830 horsepower (1,360 kW) with a 1-D-1 wheel arrangement, although they were always used in coupled pairs.

References

Early Experiments with Electrical Traction

1907 Electrification

1914 Autotransformer Upgrade

Later Articles

  1. Specifically, Amtrak's 25 kV system begins at the Mill River Interlocking about two miles north of New Haven Union Station 41°18′41″N72°54′42″W / 41.311281°N 72.911775°W