French submarine Z

Last updated

Z
French submarine Z.jpg
Z being towed, c. 1905
Class overview
NameZ
OperatorsCivil and Naval Ensign of France.svg  French Navy
Preceded by Naïade class
Succeeded by Y
Built1902–1905
In service1905–1909
Completed1
History
Ordered10 June 1901
Builder Arsenal de Rochefort
Laid down16 August 1902
Launched28 March 1904
Completed1905?
Commissioned3 June 1904 (for trials)
Decommissioned1 March 1909
Stricken9 March 1910
FateSold for scrap, 9 July 1911
General characteristics
Type Submarine
Displacement
  • 202 long tons (205  t) (surfaced)
  • 222 long tons (226 t) (submerged)
Length42.03 m (137 ft 11 in)
Beam2.98 m (9 ft 9 in)
Draught2.82 m (9 ft 3 in)
Installed power
Propulsion1 × variable-pitch propeller
Speed
  • 7.9 knots (14.6 km/h; 9.1 mph) (surfaced)
  • 5.9 knots (10.9 km/h; 6.8 mph) (submerged)
Range
  • 500  nmi (930 km; 580 mi) at 5 knots (9.3 km/h; 5.8 mph)
  • 45 nmi (83 km; 52 mi) at 4 knots (7.4 km/h; 4.6 mph) (submerged)
Complement16 men
Armament2 × 450 mm (17.7 in) bow torpedo tubes

The French submarine Z was an experimental submarine built for the French Navy (Marine nationale) in the first decade of the 20th century. Designed by Gabriel Maugas, it was the first French submarine to be completed with a diesel engine and the only one with four sets of diving planes. It was commissioned for its sea trials in 1904, although its propulsion machinery was unreliable and it was never fit for service with the fleet. It may have been completed in 1905. An extensive refit for Z was planned in 1907, but this was cancelled as too expensive. Disposal of the submarine was first proposed the following year, although it was not stricken from the navy list until 1910. Z was sold for scrap in 1911.

Contents

Background and description

Z was a single-hull design by Gabriel Maugas based on the hull of the all-electric Farfadet-class submarine that was modified to use a diesel engine on the surface and to recharge its batteries. He estimated a maximum speed on the surface of 12 knots (22 km/h; 14 mph) and 7 knots (13 km/h; 8.1 mph) submerged, but the boat was considerably slower on the surface than he anticipated. [1]

The submarine had a surfaced displacement of 202 long tons (205  t ) and a submerged displacement of 222 long tons (226 t). It had an overall length of 42.03 metres (137 ft 11 in), with a beam of 2.98 metres (9 ft 9 in) and a draught of 2.82 metres (9 ft 3 in). Like the Farfadets, most of its ballast tanks were inside the hull and it was fitted with a pair of side-thrusting propellers (évolueurs) on the stern to help steering that were geared to the propeller shaft. Z had two rudders, one each above and below the stern [2] and was the only French submarine to be fitted with four sets of diving planes. Unlike the Farfadets, the boat was fitted with a free-flooding forward ballast tank above the hull and had a lengthy walking deck 2.3 metres (7 ft 7 in) above the hull that extended from forward of its conning tower to the telescoping funnel. A lower walking deck was installed aft of the funnel after 1905. Its crew consisted of 2 officers and 14 ratings. [1] Its armament comprised two 450-millimetre (17.7 in) torpedo tubes side-by-side in the bow. [3]

Z was equipped with a single variable-pitch propeller that was driven on the surface by a diesel engine built by Sautter-Harlé  [ fr ]; ordered on 8 May 1901, it was one of the earliest diesels built in France. [1] Based on the experimental engine installed on the canal barge Petit Pierre, it had two vertical cylinder with the flywheel located between them. [4] Although rated at 120 horsepower (89  kW ), it only produced 80 horsepower (60 kW) during its initial testing, [1] because of "excessive torsional vibration in the shaft connecting the two separate cylinder assemblies". [5] It was later replaced by a more powerful 190-horsepower (142 kW) model. An electric motor was used underwater. During the boat's comparative trials against the submarine Aigrette in early 1905, Z reached a speed of 7.9 knots (14.6 km/h; 9.1 mph) from 181 horsepower (135 kW) on the surface and 5.9 knots (10.9 km/h; 6.8 mph) from 180 horsepower (134 kW) while submerged. [6] The submarine had a designed surfaced range of 500 nautical miles (930 km; 580 mi) at 5 knots (9.3 km/h; 5.8 mph) and a submerged range of 45 nautical miles (83 km; 52 mi) at 4 knots (7.4 km/h; 4.6 mph). [3]

Construction and career

Z was ordered with the budget number Q36 from the Arsenal de Rochefort on 10 June 1901 and was laid down on 16 August 1902. When its propellers were delivered, their blades were judged defective, but the navy decided to accept them on 4 January 1904 when the manufacturer offered to lower their price. The boat was launched on 28 March and it was authorized to be commissioned for comparative trials on 3 June 1904, although it is uncertain if it was ever fully in commission. [1] Z cost F779,300. [3] The submarine was ordered on the following day to prepare for trials with Aigrette at the Arsenal de Cherbourg and arrived there on 19 July. The initial series of trials were prolonged when Z collided with the protected cruiser Chasseloup-Laubat on 13 October while conducting speed trials. The submarine's repairs were completed on 12 December. [1] [7] Gaston Thomson, the Navy Minister, ordered that the testing be repeated and four days of intensive trials were held on 10–15 March 1905, although they were not fully completed until 2 May. They revealed that Aigrette outperformed Z in every way; it was faster on the surface and underwater, more manoeuverable, dived faster and handled bad weather better. [8] [7]

Z sheared her propeller shaft on 24 May. [1] It remained unrepaired while a study was ordered to reconfigure her propulsion system on 7 July. The diesel engine broke on 1 June 1906 and its removal was requested on 23 June. Preparations for the installation of a new propulsion system began on 20 September. [7] The navy decided to thoroughly refit the submarine on 26 April 1907; this involved repairing the propeller shaft and propellers while replacing the diesel engine with a pair of kerosene-fuelled motor-generators converted by Sautter-Harlé from 120-horsepower (89 kW) diesels intended for the cancelled Guêpe-class submarines. Other issues that needed to be addressed were that Z had the same thin walls in its internal ballast tanks as the Farfadet-class submarines and these had to be reinforced to prevent their rupture if an intake valve jammed in the open position, as had caused the loss of the submarine Lutin in 1906 and that its batteries needed to be replaced. Reinforcing the ballast tanks was estimated to cost approximately half the value of the submarine and replacing the battery would cost more than that. The refit was suspended and the boat was nominated for condemnation on 26 February 1908. Z was decommissioned on 1 March 1909 and was struck from the navy list on 9 March 1910. The hulk was sold for scrap on 8 November 1911. [1]

See also

Related Research Articles

<i>Émeraude</i>-class submarine (1906)

The Émeraude-class submarines consisted of six submarines built for the French Navy during the first decade of the 20th century. One boat was sunk and another captured during the First World War and the survivors were scrapped after the war.

French submarine <i>Saphir</i> (1908)

Saphir was one of six Émeraude-class submarines built for the French Navy in the first decade of the 20th century.

French submarine <i>Mariotte</i> French Navys submarine

The French submarine Mariotte was a submarine built for the French Navy prior to World War I. Intended to accompany the fleet, she was designed for high speed on the surface. Although the navy was unsatisfied with her performance on the surface, the boat had a higher underwater speed than any French submarine before or during the following 35 years. Mariotte was plagued with engine problems during her construction and the navy spent years fixing the various issues before finally commissioning her five years after beginning construction. During the war, she participated in the Dardanelles Campaign, but had to be scuttled after she became entangled in the cables of a minefield on her first attempt to penetrate the Dardanelles.

French submarine <i>Topaze</i>

Topaze was one of six Émeraude-class submarines built for the French Navy in the first decade of the 20th century.

French submarine <i>Opale</i>

Opale was one of six Émeraude-class submarines built for the French Navy in the first decade of the 20th century.

<i>Circé</i>-class submarine (1907)

The Circé-class submarines consisted of a pair of submarines built for the French Navy during the first decade of the 20th century. One boat was sunk in a collision before the First World War and the other was torpedoed and sunk by a German submarine in the last year of the war.

French submarine <i>Calypso</i> (1907) Submarine

Calypso was one of two Circé-class submarines built for the French Navy in the first decade of the 20th century.

Circé was the lead boat of her class of two submarines built for the French Navy in the first decade of the 20th century.

French submarine <i>Prairial</i> 1908 French submarine

Prairial was one of 18 Pluviôse-class submarines built for the French Navy in the first decade of the 20th century. During World War I, Priarial collided with the British steamer Tropic in the English Channel off Le Havre, France, and sank with the loss of 19 of her 26 crew.

French submarine <i>Germinal</i> Pluviôse-class submarine of the French Navy

Germinal was one of 18 Pluviôse-class submarines built for the French Navy in the first decade of the 20th century.

French submarine <i>Floréal</i>

Floréal was one of 18 Pluviôse-class submarines built for the French Navy in the first decade of the 20th century.

French submarine <i>Giffard</i>

Giffard was one of 18 Pluviôse-class submarines built for the French Navy in the first decade of the 20th century.

French submarine <i>Thermidor</i>

Thermidor was one of 18 Pluviôse-class submarines built for the French Navy in the first decade of the 20th century.

French submarine <i>Archimède</i> (1909) Early 20th century sub

Archimède was one of four experimental submarines ordered for the French Navy in 1906. Each boat was built to a different design and Archimède was optimized to maximize speed and range.

French submarine <i>Amiral Bourgois</i> Experimental French Navy vessel

Amiral Bourgois was one of four experimental submarines ordered for the French Navy in 1906. Each boat was built to a different design and Amiral Bourgois was intended to test a novel powerplant. The experimental diesel engines took over six years to build and greatly delayed the boat's completion until 1913. Although engine problems plagued the submarine throughout her service, she was commissioned shortly after the start of the First World War in 1914, but never made an operational patrol. Amiral Bourgois was under repair when the war ended in 1918, but the work was cancelled shortly afterwards. The boat was struck the following year and offered for sale in 1920. There were no offers and she was used for torpedo testing in 1924–1926. The submarine was sold for scrap in 1927.

French submarine <i>Charles Brun</i> 1906 experimental naval boat

Charles Brun was one of four experimental submarines ordered for the French Navy in 1906. Each boat was built to a different design and Charles Brun was intended to test a novel powerplant. Although the shore-based prototype installation was successful, it was a failure when evaluated aboard the submarine, and the boat was never commissioned for active service. Her hull was stripped of its equipment and was used to test a floating drydock in 1914. During the First World War, the hull was ordered to be converted into a water tank in 1916, but it is not certain if this was actually done before it was sold for scrap in 1920.

<i>Farfadet</i>-class submarine

The Farfadet class consisted of four submarines built for the French Navy at the beginning of the 20th century designed by Gabriel Maugas. Two boats were lost in diving accidents. All were disposed of prior to the outbreak of the First World War.

French submarine <i>Aigrette</i> Lead boat of the Aigrette-class submarines

Aigrette was the lead boat of the Aigrette-class submarines built for the French Navy between 1902 and 1905. Laid down in May 1902, she was launched in February 1904 and commissioned in 1908. She was essentially an experimental submarine, and although in service during World War I, saw no action. The class was designed by Maxime Laubeuf and used Drzewiecki drop collar launchers and external cradles to launch torpedoes.

French submarine <i>X</i> Experimental submarine, launched 1904

X was an experimental submarine built for the French Navy during the first decade of the 20th century. Designed by Gaston Romazzotti, she was shaped like the letter Y with two sterns, making her the first submarine with two propeller shafts. The boat was completed in 1905 and spent the next two years conducting her sea trials. X was renamed Dauphin (Dolphin) in 1911. Her internal-combustion engines proved unreliable and she was decommissioned in 1913 and struck from the navy list the following year. The submarine was not used during the First World War and was sold for scrap in 1922.

The French submarine Y was an experimental submarine built for the French Navy in the first decade of the 20th century. She was launched in 1905, but was only commissioned for her sea trials and remained in experimental status because her diesel engine could not be used underwater. A planned refit, which included adding an electric motor and batteries for underwater use in 1907 was cancelled as too expensive. Y was stricken from the navy list in 1909, but was retained for experimental purposes until 1911 when she was sold for scrap.

References

  1. 1 2 3 4 5 6 7 8 Roberts, p. 429
  2. Garier, p. 216
  3. 1 2 3 Smigielski, p. 207
  4. Cummins, pp. 477–478
  5. Cummins, p. 479
  6. Garier, p. 224
  7. 1 2 3 Garier, p. 218
  8. Roberts, p. 435

Bibliography