Overview | |
---|---|
Dates of operation | 1853–1879 |
Successor | Chicago and Tomah Railroad |
Technical | |
Track gauge | 3 ft (914 mm) |
Length | 40 miles (64 km) |
The Galena and Southern Wisconsin Railroad Company was a railroad company in the United States. It constructed and operated a narrow gauge line between Galena, Illinois, and near Rewey, Wisconsin, via Platteville, Wisconsin. The railroad went through multiple reorganizations in the early 1880s before becoming part of the Chicago and North Western Railway system. The line was unified with that of the Chicago and Tomah Railroad and rebuilt as a 4 ft 8+1⁄2 in (1,435 mm) line. As the Platteville Subdivision of the Chicago and North Western, it was eventually abandoned in 1980.
The Galena and Southern Wisconsin Railroad was incorporated on January 26, 1853, in Illinois, and on March 2, 1857, in Wisconsin. [1] After obtaining financing, construction work began in 1872 on a 3 ft (914 mm) line. [2] The line was completely open between Galena, Illinois, and Platteville, Wisconsin, on January 1, 1875. [3] Also serving Platteville was the Dubuque, Platteville and Milwaukee Railroad (a forerunner of the Milwaukee Road), which had opened in 1870. [4] In 1877, the company extended its line further north toward–but short of–Montfort, Wisconsin. The line branched from the original line at Ipswich, Wisconsin, four miles east of Platteville. [3]
In 1879 the company was reorganized as the Galena and Wisconsin Railroad. Separate companies of that name were incorporated in Illinois and Wisconsin, each owning the property of the original company in those respective states. The two companies were then consolidated into a single company, again with the same name. The Galena and Wisconsin Railroad undertook no new construction before being consolidated with the Chicago and Tomah Railroad on August 31, 1880. [5]
The company's lines eventually became of the Chicago and North Western Railway's Platteville Subdivision (also known as the Galena branch). The connection with the Chicago and Tomah Railroad at Montfort was realized in 1880. [3] [6] The entirely of the former Galena and Southern Wisconsin Railroad line was converted to standard gauge in 1882. [3] The last remnant of the line was abandoned in 1980. [7]
As for the railroad itself, a Galena Gazette story dated April 9, 1874 indicates that the first of two engines was delivered. [8] It was named the Platteville and numbered as No.1. The description tells that the Platteville had 35,000 W.W.O., 6 drivers (drive wheels) each 3 feet (0.91 m) in diameter, and one pony truck in front. This makes it a Mogul-type engine, with a 2-6-0 configuration. Furthermore, the Platteville had 11-by-16-inch (280 by 410 mm) cylinders and tender water tank capacity of 1,100 US gallons (4,200 L). The tender had a pair of four-wheeled trucks. The Platteville was estimated to be able to pull 800 tons on a level grade, and at 75 feet per mile (1.42%), to draw 100 tons.
The Platteville3 ft (914 mm) gauge locomotive was manufactured in Connellsville, Pennsylvania, at the National Locomotive Works [9] [ irrelevant citation ]. It cost $7,000 and would be used in the extension and construction of the line to Platteville, Wisconsin, which would eventually be completed on 1 January 1875. The article also mentions a second locomotive, The Galena, which would be delivered sometime in September 1874.
One interesting story from 6 November 1874 [8] mentions an accident that involved the Platteville locomotive. "Mr. Geo W. Mortimer from the Steam Engine Works at Connellsville, Pa. where the Platteville was made" was slightly injured in a minor steam escape as he was overhauling the boiler.
Unlike The Platteville locomotive, The Galena was a 4-4-0 American-type engine. The Galena had 44-inch (1.1 m) drivers and a similar tender to that of the Platteville but which could hold 1,000 US gallons (3,800 L) of water, (100 less than the Platteville's tender) yet still more than enough for the 31 mile trip along the full length of the line, and the locomotive is reported to have had similar traction power to No. 1.
The rolling stock of the G&SWRR came mostly from the Litchfield Car Works, originally in Litchfield, Illinois. In 1889 this company moved to Mount Vernon, Illinois and changed its name to the Mount Vernon Car Company. The company had earlier built rolling stock for several railroads, such as the Gulf, California and Santa Fe Railway [10]
The Galena Gazette article of 27 November 1874 [8] mentions a passenger car costing $1,500 being the first such added to the line. By this time the line reached well into Wisconsin, as far up as Cuba City, Wisconsin, and passenger service was vital to the operation of the G&SWRR. The passenger car was reported as 40 feet (12 m) long, with 10 feet (3.0 m) of its length dedicated to baggage, express & post office use, whilst the other 30 feet (9.1 m) had a 28-seat passenger compartment. There was a report of a minor incident involving the passenger coach, whereby it left the tracks near the tunnel close to Buncombe P.O. and sustained a few scratches, but was quickly returned to service.
A "comfortable caboose" was also added for freight service. Most of the freight service seems to have been mainly livestock, although Wisconsin cheese and dairy as well as lead and zinc mined in the region would have been an important source of income. There are also mentions in the Galena Gazette of "hay, flour, and other goods" being transported along the line. With connections to the Illinois Central in Galena, local goods reached Chicago and beyond. In later years, goods and passengers could ride from Platteville and Ipswich, Wisconsin, (located southeast of Platteville), all the way to Milwaukee, Wisconsin.
Before the G&SWRR ceased to exist independently, General and President Grant and his wife rode the train from Galena to Platteville, as described in a Galena Gazette article.
During the late 1870s, the railroad began losing revenue as flooding and snow storms were regularly stopping all traffic along the line.
In 1878 the narrow gauge mainline stations in Illinois were Galena and Millbrig on the Galena River. Wisconsin stations were Buncombe, Benton, Cuba City, St. Rose, St. Elmo and Platteville. An 1877 extension ran from Phillips′ Corner, east of Platteville, to McCormick′s Corners via Grand View (Belmont). [11]
The old right-of-way, now abandoned, can still be seen in some places, tracing what was once a small but prosperous locally owned and operated railroad empire stretching between Galena, Illinois, and Platteville as well as Montfort, Wisconsin. The fate of the Platteville was reported by the Galena Gazette to have been sent to the C&NW Proviso yards after it sustained damage due to wear and tear, but the Galena locomotive's fate is unknown.
The track ran through Millbrig, also called Bell′s Station, by the 1862 stone grist mill that served as post office and depot. William Bell was the miller and postmaster. The mill has been restored and converted into a barn located at Millbrig Hollow on West Council Hill Road.
There is a short tunnel, still intact, near where the old Buncombe depot once stood. It was built and used by the G&SWRR, also the site of a spur leading uphill northwest to small station near Hazel Green, Wisconsin.
Only a few of the structures that served as stations and depots for the G&SWRR exist today. Some bridge abutments can still be found where the roadbed snaked along and across the Galena River (Illinois) (also known as the Fevre River). In Cuba City a caboose and a few items from the C&NW days are on display.
The Rountree Branch Trail in Platteville follows some of the right-of-way. There are several concrete bridge abutments near the trail.
Platteville is the largest city in Grant County, Wisconsin. The population was 11,836 at the 2020 census, up from 11,224 at the 2010 census. Much of this growth is likely due to the enrollment increase of the University of Wisconsin–Platteville. It is the principal city of the Platteville Micropolitan Statistical area, which has an estimated population of 51,938. Platteville is located atop the greater Platte River valley in the southern Driftless Region of Wisconsin, an area known for its karst topography and rolling hills.
The Chicago Great Western Railway was a Class I railroad that linked Chicago, Minneapolis, Omaha, and Kansas City. It was founded by Alpheus Beede Stickney in 1885 as a regional line between St. Paul and the Iowa state line called the Minnesota and Northwestern Railroad. Through mergers and new construction, the railroad, named Chicago Great Western after 1892, quickly became a multi-state carrier. One of the last Class I railroads to be built, it competed against several other more well-established railroads in the same territory, and developed a corporate culture of innovation and efficiency to survive.
The Chicago Tunnel Company was the builder and operator of a 2 ft narrow-gauge railway freight tunnel network under downtown Chicago, Illinois. This was regulated by the Interstate Commerce Commission as an interurban even though it operated entirely under central Chicago, did not carry passengers, and was entirely underground. It inspired the construction of the London Post Office Railway.
The Chicago and North Western was a Class I railroad in the Midwestern United States. It was also known as the "North Western". The railroad operated more than 5,000 miles (8,000 km) of track at the turn of the 20th century, and over 12,000 miles (19,000 km) of track in seven states before retrenchment in the late 1970s. Until 1972, when the employees purchased the company, it was named the Chicago and North Western Railway.
The Illinois Central Railroad, sometimes called the Main Line of Mid-America, was a railroad in the Central United States. Its primary routes connected Chicago, Illinois, with New Orleans, Louisiana, and Mobile, Alabama, and thus, the Great Lakes to the Gulf of Mexico. Another line connected Chicago west to Sioux City, Iowa (1870), while smaller branches reached Omaha, Nebraska (1899) from Fort Dodge, Iowa, and Sioux Falls, South Dakota (1877), from Cherokee, Iowa. The IC also ran service to Miami, Florida, on trackage owned by other railroads.
The Grand Trunk Western Railroad Company was an American subsidiary of the Grand Trunk Railway, later of the Canadian National Railway operating in Michigan, Illinois, Indiana, and Ohio. Since a corporate restructuring in 1971, the railroad has been under CN's subsidiary holding company, the Grand Trunk Corporation. Grand Trunk Western's routes are part of CN's Michigan Division. Its primary mainline between Chicago and Port Huron, Michigan serves as a connection between railroad interchanges in Chicago and rail lines in eastern Canada and the Northeastern United States. The railroad's extensive trackage in Detroit and across southern Michigan has made it an essential link for the automotive industry as a hauler of parts and automobiles from manufacturing plants.
The EMD FP7 is a 1,500 horsepower (1,100 kW), B-B dual-service passenger and freight-hauling diesel locomotive produced between June 1949 and December 1953 by General Motors' Electro-Motive Division and General Motors Diesel. Final assembly was at GM-EMD's La Grange, Illinois plant, excepting locomotives destined for Canada, in which case final assembly was at GMD's plant in London, Ontario. The FP7 was essentially EMD's F7A locomotive extended by four feet to give greater water capacity for the steam generator for heating passenger trains.
Dinky line is a nickname sometimes used to describe a short railroad line, usually operated with short trains. The term may come from "dinkey", which is "a small locomotive for hauling cars, shunting, etc. in a railroad yard" and is driven by "Rail Yard Engineers, Dinkey Operators, and Hostlers".
The Michigan Central Railroad was originally chartered in 1832 to establish rail service between Detroit, Michigan, and St. Joseph, Michigan. The railroad later operated in the states of Michigan, Indiana, and Illinois in the United States and the province of Ontario in Canada. After about 1867 the railroad was controlled by the New York Central Railroad, which later became part of Penn Central and then Conrail. After the 1998 Conrail breakup, Norfolk Southern Railway now owns much of the former Michigan Central trackage.
The Mid-Continent Railway Museum is a railroad museum in North Freedom, Wisconsin, United States. The museum consists of static displays as well as a 7-mile (11 km) round trip ride aboard preserved railroad cars.
The Lackawanna Cut-Off was a rail line built by the Delaware, Lackawanna and Western Railroad (DL&W). Constructed from 1908 to 1911, the line was part of a 396-mile (637 km) main line between Hoboken, New Jersey, and Buffalo, New York. It ran west for 28.45 miles (45.79 km) from Port Morris Junction in Port Morris, New Jersey, near the south end of Lake Hopatcong about 45 miles (72 km) west-northwest of New York City, to Slateford Junction in Slateford, Pennsylvania near the Delaware Water Gap.
The East Tennessee & Western North Carolina Railroad, affectionately called the "Tweetsie" as a verbal acronym of its initials (ET&WNC) but also in reference to the sound of its steam whistles, was a primarily 3 ft narrow gauge railroad established in 1866 for the purpose of serving the mines at Cranberry, North Carolina.
The D&RG Narrow Gauge Trestle, also known as the Cimarron Canyon trestle, is a narrow-gauge railroad deck truss bridge crossing the Cimarron River near Cimarron, Colorado. Located within the Curecanti National Recreation Area, the trestle is the last remaining railroad bridge along the Denver & Rio Grande Railroad's Black Canyon route, a narrow-gauge passenger and freight line that traversed the famous Black Canyon of the Gunnison between 1882 and the 1940s.
Standard gauge was favored for railway construction in the United States, although a fairly large narrow-gauge system developed in the Rocky Mountains of Colorado and Utah. Isolated narrow-gauge lines were built in many areas to minimize construction costs for industrial transport or resort access, and some of these lines offered common carrier service. Outside Colorado, these isolated lines evolved into regional narrow-gauge systems in Maine, New York, Pennsylvania, Ohio, Iowa, Hawaii, and Alaska.
Silver City, Pinos Altos and Mogollon Railroad was a 2 ft narrow gauge railway serving copper mines along the Continental Divide in the mountains of southwestern New Mexico. The communities of Silver City and Pinos Altos developed as 19th century miners recovered easily extracted gold and silver from ore deposits of the area. Standard-gauge Santa Fe Railroad reached Silver City in 1886, and SC, PA&M was incorporated 24 August 1889 to build a railway north to Mogollon, New Mexico. Construction was limited to 5 miles (8.0 km) of grading until Wisconsin-based Comanche Mining and Smelting purchased the railroad and the Pinos Altos mining claims of George Hearst in 1903 after horse-drawn ore transport became uneconomical. The Silver City smelter burned shortly after purchase, but was rebuilt with three blast furnaces and a reverberatory furnace to handle 225 tons of ore per day. Two Shay locomotives were moved to Silver City in August 1905 from the Gilpin tramway of Gilpin County, Colorado. The railroad was built through iron and limestone mines on Chloride Flat west of Silver City. The limestone was used as a flux for smelting the copper ore.
Tunnel City is an unincorporated census-designated place in the town of Greenfield, Monroe County, Wisconsin, United States, named after the train tunnel through a hill just to the west of town.
The Chicago and Tomah Railroad was a railroad company in the United States. It was incorporated in 1872 and was intended to connect the northern forests of Wisconsin around Tomah with Freeport and Chicago, Illinois. The company constructed a 3 ft narrow gauge line between Woodman and Montfort, Wisconsin, with a branch to Lancaster. The company came under Chicago and North Western Railway control in 1880, which built a connection with the narrow gauge Galena and Wisconsin Railroad. Both were consolidated into the Milwaukee and Madison Railway. None of the Chicago and Tomah's network exists today.
The Wisconsin & Michigan Railway (W&M) was incorporated October 26, 1893, under the general laws of Wisconsin for the purpose of constructing, maintaining, and operating a railroad as described in its articles of incorporation.
The Platteville Subdivision, also known as the Galena branch, was a railway line in the states of Illinois and Wisconsin. It ran approximately 46 miles (74 km) from Galena, Illinois, to Montfort, Wisconsin, with a 4-mile (6.4 km) branch from Ipswich, Wisconsin, to Platteville, Wisconsin. The line was initially built by the Galena and Southern Wisconsin Railroad as a 3 ft line; it was subsequently rebuilt as a 1,435 mmstandard gauge line. The line opened in 1874 and was fully abandoned in 1980.