Gautami Combined Cycle Power Plant is located at Peddapuram in Kakinada district in state of Andhra Pradesh. The power plant is one of the gas-based power plants of GVK Group.

In Jun 2003, GVK secured an amended 15yr PPA with APDISCOM for the Gautami project not far from Jegurupadu in Peddapuram, Kakinada district. Financial closure was in Mar 2004. The project was originally developed by Satyam Construction Co (later acquired by Nagarjuna Construction) with Maytas Infra and IJM (India) Infrastructure Ltd. GVK successively bought out most of the Nagarjuna stake and is the controlling shareholder. Equipment was ordered on a turnkey basis from Alstom in Jul 2004 for €180mn. Construction was started with completion expected in Jun 2006. In the event, Gautami did not commission until Jun 2009. The original budget was about Rs1300 Cr and the plant came in at Rs1450 cr. Gautami has a Ground Support Agreement with GAIL for the term of the PPA. In May 2010, GVK awarded a contract to a consortium including Siemens, Hyundai, and L&T for two 392-MW blocks to extend Gautami. These blocks are expected to cost Rs3,200cr

Capacity

The power plant has installed capacity of 469 MW. [1]

Related Research Articles

Kakinada is the sixth largest city of the Indian state of Andhra Pradesh and serves as the district headquarters of the Kakinada District. It lies on the coast of the Bay of Bengal. J.N.T.U. College of Engineering Kakinada, established in 1946, is the oldest and popular Government college in the state of Andhra Pradesh. The First Polytechnic college of Andhra Pradesh, Andhra Polytechnic was established here in 1946. It was also the origin point of Buckingham Canal where goods used to be transported by boats during the British rule. It was once home for Asia's largest sea port. Many people from the city migrated from this sea port to countries like Burma, Mauritius, Fiji and various southeast Asian countries to work there as workers where they were called as Coringas.

<span class="mw-page-title-main">NLC India Limited</span> Central Public Sector Undertaking

NLC India Limited (NLC) is a central public sector undertaking under the administrative control of the Ministry of Coal, Government of India. It annually produces about 30 million tonnes of lignite from opencast mines at Neyveli in the state of Tamil Nadu in southern India and at Barsingsar in Bikaner district of Rajasthan state. The lignite is used at pithead thermal power stations of 3640 MW installed capacity to produce electricity. Its joint venture has a 1000 MW thermal power station using coal. Lately, it has diversified into renewable energy production and installed 1404 MW solar power plant to produce electricity from photovoltaic (PV) cells and 51 MW electricity from windmills.

<span class="mw-page-title-main">Nagarjuna Sagar Dam</span> Dam in Andhra Pradesh & Nalgonda district, Telangana

Nagarjuna Sagar Dam is a masonry dam across the Krishna River at Nagarjuna Sagar which straddles the border between Palnadu district in Andhra Pradesh and Nalgonda district in Telangana. The dam provides irrigation water to the districts of Palnadu, Guntur, Nalgonda, Prakasam, Khammam, Krishna, and parts of West Godavari. It is also a source of electricity generation for the national grid.

<span class="mw-page-title-main">Peddapuram</span> Town in Andhra Pradesh, India

Peddapuram is a town in the Kakinada district of Andhra Pradesh in South India. The town also forms a part of Godavari Urban Development Authority.

<span class="mw-page-title-main">NextEra Energy Resources</span> American electricity supplier

NextEra Energy Resources, LLC (NEER) is a wholesale electricity supplier based in Juno Beach, Florida. NEER is a subsidiary of NextEra Energy, a Fortune 200 company. Prior to 2009, NextEra Energy Resources was known as FPL Energy.

Veresen Inc. was a Calgary, Alberta-based energy infrastructure company with three main lines of business: pipelines, natural gas and power generation. It was a publicly-traded company on the Toronto Stock Exchange, and was known as Fort Chicago Energy Partners L.P. In 2017, it was acquired by Pembina Pipeline for $9.7 billion.

Lanco Infratech was a large Indian conglomerate that became insolvent in 2017. It was involved in construction, power, real estate, and several other segments. One of the first Independent Power Producers (IPP) in India, in 2011 it became the largest private power provider in India.

<span class="mw-page-title-main">Adani Power</span> Indian multinational Electricity company in Ahmedabad, India

Adani Power is an Indian multinational power and energy company, subsidiary of Adani Group and based in Khodiyar in Ahmedabad, India. It is a private thermal power producer, with a capacity of 12,450 MW and operates a mega solar plant of 40 MW at Naliya, Bitta, Kutch, Gujarat. Adani Godda Power is implementing a 1,600 MW plant at Jharkhand. The company has signed long term power purchase agreements of about 9,153 MW with the government of Gujarat, Maharashtra, Haryana, Rajasthan, Karnataka, and Punjab.

<span class="mw-page-title-main">NTPC Limited</span> National Thermal Power Corporation, Central Public Sector Undertaking

NTPC Limited, formerly known as National Thermal Power Corporation, is an Indian central Public Sector Undertaking under the ownership of the Ministry of Power and the Government of India, who is engaged in the generation of electricity and other activities. The headquarters of the PSU are situated at New Delhi. NTPC's core function is the generation and distribution of electricity to State Electricity Boards in India. The body also undertakes consultancy and turnkey project contracts that involve engineering, project management, construction management, and operation and management of power plants.

<span class="mw-page-title-main">G. V. Krishna Reddy</span> Indian businessman

Gunapati Venkata Krishna Reddy is a philanthropist and entrepreneur. GVK Reddy is the founder and chairman of GVK Group, a business conglomerate with a predominant focus on infrastructure development.

<span class="mw-page-title-main">GVK Industries</span> Indian conglomerate company

GVK Industries Limited or GVK Group is an Indian conglomerate headquartered in Hyderabad with interests in several sectors including energy, airports, hospitality, transportation, real estate, pharmaceuticals and technology. After acquiring Australian coal mines in Queensland for US$1.26 billion, GVK forecasts an investment of US$10 billion in mine, rail and port project. Its flagship company GVK Power & Infrastructure Limited is listed on both Bombay Stock Exchange (BSE) and National Stock Exchange (NSE) as NSE: GVKPIL.

Udupi Power Plant is a coal based thermal power station in Karnataka, India, established in 2008. It is located to the north of Mangalore, west of Belmannu, and just to the northeast of Padubidri in the village of Yellur, Udupi district, close to the Shambhavi River, roughly 7 or 8 km from the coast from where the imported coal for the power plant is transported to plant through rail line.

<span class="mw-page-title-main">Simhadri Super Thermal Power Station</span> Building in India

Simhadri Super Thermal Power Plant is a coal-fired power plant located in the outskirts of Visakhapatnam city in the Indian state of Andhra Pradesh. The power plant is one of the coal fired power plants of NTPC, a Government of India enterprise. The coal for the power plant is sourced from Kalinga Block of Talcher Coal fields in Odisha. The plant is a national asset, and power generated is shared between multiple states, as the operator is national. Power generated by units 1 and 2, making up for 1,000 MW, is dedicated to power distribution companies owned by the Government of Andhra Pradesh and Telangana. The remaining 1,000 MW, generated by units 3 and 4, is allocated to the states of Odisha, Tamil Nadu, Karnataka, Andhra Pradesh, Telangana and Puducherry as per their shares as decided in PPA.

The Ratle Hydroelectric Plant is a run-of-the-river hydroelectric power station, with permitted pondage under the Indus Water Treaty, currently under construction on the Chenab River, downstream of the village near Drabshalla in Kishtwar district of the Indian Union Territory of Jammu and Kashmir. The project includes a 133 m (436 ft) tall gravity dam and two power stations adjacent to one another. Water from the dam will be diverted through four intake tunnels about 400 m (0.25 mi) southwest to the power stations. The main power station will contain four 205 MW Francis turbines and the auxiliary power station will contain one 30 MW Francis turbine. The installed capacity of both power stations will be 850 MW. On 25 June 2013, Prime Minister Manmohan Singh laid the foundation stone for the dam. Pakistan has frequently alleged that it violates the Indus Waters Treaty.

Maithon Power Limited (MPL) is a joint venture of Tata Power & Damodar Valley Corporation, which has implemented the 1050 MW in Nirsa District Dhanbad in the state of Jharkhand in India. This project is India’s first 525 MW unit thermal power plants using subcritical technology, coal-based thermal power plant in the country and the first PPP venture plant in the country. This project is India's first Public Private power project.

Jegurupadu Combined Cycle Power Plant is located at Jegurupadu in East Godavari district in state of Andhra Pradesh. The power plant is one of the gas based power plants of GVK Group. It was commissioned in 1997.

Neyveli Uttar pradesh Power Limited-Ghatampur Thermal Power Project is an upcoming coal-based thermal power plant located in Ghatampur in Kanpur district, Uttar Pradesh. The power plant is owned by the Neyveli Uttar Pradesh Power Limited a joint venture between Neyveli Lignite Corporation (51%) and Uttar Pradesh Rajya Vidyut Utpadan Nigam (49%).

<span class="mw-page-title-main">Energy in Rwanda</span>

Energy use in Rwanda is undergoing rapid change at the beginning of the 21st century.

Srinagar Hydro electric Power Project in, Srinagar, in Pauri Garhwal district, Uttarakhand, is a hydroelectric power plant built on Alaknanda River. The power plant is owned by Alaknanda Hydro Power Corporation Limited a GVK Group company. Bharat Heavy Electricals supplied the major equipments.

References

  1. "GVK | Our Business - Enegry - CCPP (Gas & Naptha)".