Power System Operation Corporation

Last updated

Grid Controller of India Limited
ग्रिड कंट्रोलर ऑफ इंडिया लिमिटेड
Type Division of Ministry of Power, Government of India
IndustrySystem Operation, Power Market Regulation
FoundedMarch 2009
Headquarters
New Delhi, India
Area served
India
Key people
Mr.S.R Narasimhan , Chairman and Managing Director
(CMD)
Owner Ministry of Power, Government of India
Website posoco.in

Grid Controller of India Limited (GRID-INDIA) is a division of the Ministry of Power, Government of India. The new name of Power System Operation Corporation Limited (POSOCO) is Grid Controller of India Limited (Grid-India) since 09th November 2022. [1] It is responsible to monitor and ensure round the clock integrated operation of Indian Power System. It consists of 5 Regional Load Despatch Centres (RLDCs) and the National Load Despatch Centre (NLDC).

Contents

The load despatch functions, earlier handled by Power Grid Corporation of India Limited (PGCIL), have been entrusted to Grid-India (previously known as POSOCO).

History

Central Government, through Ministry of Power in exercise of the power conferred by sub-section (3) of Section 26 and sub-section (2) of Section 27 of the Electricity Act, 2003 by notification dt. 27 September 2010 in the Gazette of India, notified that the Power System Operation Corporation Ltd (POSOCO), a wholly owned subsidiary of the Power Grid Corporation of India Limited (a Government Company), shall operate National Load Despatch Centre and the five Regional Load Despatch Centers, with effect from 1 October 2010.

The subsidiary was set up on the recommendations of a government committee headed by Mr. G.B. Pradhan (additional secretary) in the Union Ministry of Power. To make load despatch centres, financially self-reliant and autonomous, the committee recommended independent and sustainable revenue streams. The move to separate the two functions is in keeping with the provisions of the Electricity Act, 2003, which seeks to separate commercial interests from load management functions. The Pradhan Committee report had recommended setting up a separate representative board structure overseeing the functions of the five regional load despatch centres (RLDCs) run by PGCIL—the northern, eastern, north-eastern, western and southern regions at that time. The subsidiary was eventually made a separate company effective from 2 January 2017.

Several steps were taken by Central Government and Regulators in formation of POSOCO. Some of the major milestones [2] are listed below.

• Pre 1994: RLDCs were operated by CEA with budgetary support from Government of India.
• 1994–1996: RLDCs transferred in a progressive manner to POWERGRID. Budgetary support from GOI stopped.
• July 1998: CEA finalized an Ad hoc arrangement for reimbursement of RLDC expenses (Rs. 12 Crores for 1996–97)
• 8 May 2003: CERC approved RLDC fees and charges from 2000–2001 (Rs. 21.52 Crores in the starting year)
• 2005 onwards: ULDC scheme charges merged with RLDC fees & charges and approved by CERC
• 22 August 2006: Meeting among Committee of Secretaries to discuss upon constitution of Wholly Owned Govt. of India corporation to carry out all functions as an Independent System Operator.
• 5 November 2007: Interactive session convened by Ministry of Power with Forum of Regulators and State Government. Pradhan Committee on Ring fencing of LDCs constituted in Feb 2008 after this meeting.
• 4 July 2008: MoP Directive for creation of POSOCO, with Board Structure & gradual separation after 5 years.
• 11 August 2008: Gireesh B. Pradhan Committee Report on "Manpower, Certification and Incentives for System Operation and Ring-fencing Load Despatch Centres" [3] submitted. Report accepted and a meeting called on 7 October 2008 by Secretary Power. [4]
• 15 November 2008: Forum of Regulators (FOR) approves formation of ‘Forum of Load Despatchers (FOLD) and approves FOLD charter in Jan 2009.
• November 2008: Report of "Open Access-Theory and Practice", endorsed by Forum of Regulators.
• 20 March 2009: Power System Operation Corporation Ltd. Established with the objective of ring-fencing operation; incorporated as a 100% subsidiary of POWERGRID with authorized share capital of Rs.200 crores.
• March 2009: Satnam Singh Task force report on "Capital Expenditure and Issues Related to Emoluments for Personnel in Load Despatch Centres" submitted. [5]
• June 2009: Rakesh Nath Committee Report on "Manpower Selection, Recruitment Procedure and Tenures for Personnel in SLDCs"
• 18 September 2009: CERC Regulations for the Fees and Charges as envisaged under the Electricity Act 2003, thus providing financial autonomy of POSOCO. [6]
• 19 March 2010: Dhiman Committee Report on "Training and Certification of System Operators" submitted.
• 23 March 2010: Commencement of Business by POSOCO.
• 1 June 2010: Transfer of manpower from POWERGRID to POSOCO on secondment basis.
• 9 June 2010: Ministry of Power designated National Power Training Institute (NPTI) as the Certification Authority for executives of SLDCs, RLDCs and NLDC for an initial period of 3 yrs. i.e. up to 31 March 2013
• 26 September 2010: Gazette notification by Central Govt. of India that the POSOCO a wholly owned subsidiary of POWERGRID shall operate RLDCs/NLDC w.e.f. 1 Oct 2010.
• 1 October 2010: POSOCO notified for operation of NLDC/RLDCs.
• April 2011 – September 2011: 6 batches basic certification training at PSTI Bengaluru
• November 2011: First online certification test completed leading to 266 certified operators.
• 15 March 2015: Sanction by President for setting up of POSOCO as Govt. owned company.
• 19 December 2016: Gazette notification by Central Govt. of India notifying POSOCO as a wholly owned Government company with effect from 3 January 2017. [7]
• October 2018: Report on Capacity Building of Indian Load Despatch Centres by Forum of Regulators [8]

• 09 November 2022: Name of POSOCO changed to Grid Controller of India Limited (Grid-India).

The POSOCO was formed as an umbrella organization to give a corporate structure to RLDCs and NLDC to ensure integrated operation of Regional and National Power Systems to facilitate transfer of electric power within and across the regions and transnational exchange of power.

Mandate for Load Despatch Functions

The Load Despatch functions in India derives its mandate from Electricity Act 2003, [9] which acted as a major reform in the Power Sector for optimum scheduling and despatch of electricity. The relevant extracts of Electricity Act 2003 are listed below.

EA 2003, Section 26:Central Government may establish a centre at the national level, to be known as the National Load Despatch Centre for optimum scheduling and despatch of electricity among the Regional Load Despatch Centres.”

EA 2003, Section 27(2): “The Regional Load Despatch Centre shall be operated by a Government Company or any authority or corporation established or constituted by or under any Central Act, as may be notified by the Central Government”

EA 2003, Section 28(1):The Regional Load Despatch Centre shall be the apex body to ensure integrated operation of the power system in the concerned region.”

Even the National Electricity Policy 2005 [10] released by Govt. of India also put emphasis on Independent System Operation through NLDC, RLDCs and SLDCs. The relevant extract of the National Electricity Policy 2005 is listed below.
National Electricity Policy 2005, Section 5.3.7:“The spirit of the provisions of the Act is to ensure independent system operation through NLDC, RLDCs and SLDCs.”

Leadership and management

At present followings are the full-time functional directors on the board of POSOCO [11] :-

  1. Sh. S.R.Narasimhan, Chairman and Managing Director
  2. Sh. Sudhanshu Sekhar Barpanda, Director (Market Operation)

POSOCO has the following offices: [12]

In order to facilitate the management of large scale renewable (mainly wind and solar) integration in the grid including respective generation-scheduling and generation-forecasting, four Renewable Energy Management Centres (REMCs) are under development: Northern Regional-REMC (co-located with NRLDC), Western Regional-REMC (co-located with WRLDC), Southern Regional-REMC (co-located with SRLDC) and National-REMC (co-located in NLDC premises).

National Load Despatch Centre

On 25th February 2009, the National Load Despatch Centre (NLDC) was inaugurated by Sushilkumar Shinde (Former Union Minister of Power) and Sheila Dixit (Former Chief Minister, NCT of Delhi). National Load Despatch Centre (NLDC) has been constituted as per Ministry of Power (MOP) notification, New Delhi dated 2 March 2005 and is the apex body to ensure integrated operation of the National Power System.

Regional Load Despatch Centers (RLDCs) and the State Transmission Systems under them

The five RLDCs oversee the interstate transmission for the following states:

Each RLDC maintains their own dedicated website where scheduling and despatch of power within their respective control areas are handled round the clock.

POWERGRID transmission network failure

The Northern Region Grid, which provides power to 9 states in Northern India including Delhi, experienced a widespread outage due to a grid disturbance that occurred at about 2.35 a.m on 30 July 2012.

Restoration work started immediately under the direction of CEO, POSOCO and POWERGRID's chairman & managing director. A team of engineers tried to find out a way for restoring the normal supply of power immediately, so that Railways, Metro, Airports and other power users deemed essential could get immediate restoration of electricity. With the coordinated efforts of the whole team of engineers and constituent state utilities, power supply to the essential services and other essential loads in northern India was restored by about 8.00 a.m. and about 60% of load of the Northern Region was restored by 11:00 am. This was possible by gearing up the power supply from hydroelectric sources and also extending power from the Eastern and Western regions for start-up supply for thermal generating units of the Northern Region. Thus the associated problems for want of power supply could be partially overcome by this time. Later, power supply was restored progressively and by 12:30 p.m. power was extended to most of the cities and towns through POWERGRID sub-stations. The Northern Grid was brought back to normalcy to meet the demand of about 30 GW at 7:00 p.m.

On 31 July 2012, the northern grid collapsed for a second time, hours after the power supply was restored in the entire northern region following a disruption on the previous day. The eastern transmission lines also failed, disrupting power supply in Delhi, Uttar Pradesh, Haryana, West Bengal, Assam and Punjab, among other states. [13]

Power Minister Veerappa Moily said that transmission grids will be independently audited in three months to ensure that the grids are fail-safe. [14]


Related Research Articles

The Central Electricity Generating Board (CEGB) was responsible for electricity generation, transmission and bulk sales in England and Wales from 1958 until privatisation of the electricity industry in the 1990s.

<span class="mw-page-title-main">National Grid (Great Britain)</span> High-voltage electric power transmission network in Great Britain

The National Grid is the high-voltage electric power transmission network serving Great Britain, connecting power stations and major substations, and ensuring that electricity generated anywhere on the grid can be used to satisfy demand elsewhere. The network serves the majority of Great Britain and some of the surrounding islands. It does not cover Northern Ireland, which is part of the Irish single electricity market.

<span class="mw-page-title-main">Northern Ireland Electricity</span> Irish energy company

Northern Ireland Electricity Networks Limited (NIE Networks) is the electricity asset owner of the transmission and distribution infrastructure in Northern Ireland, established in 1993 when the business was privatised. NIE Networks does not generate or supply electricity. Since 2010 it has been a subsidiary of ESB Group.

<span class="mw-page-title-main">Electricity sector in India</span> Power generation and distribution

India is the third largest producer of electricity in the world. During the fiscal year (FY) 2022–23, the total electricity generation in the country was 1,844 TWh, of which 1,618 TWh was generated by utilities.

<span class="mw-page-title-main">Tehri Dam</span> Dam in Uttarakhand, India

With a height of 260.5 m (855 ft) Tehri Dam is the tallest dam in India and 12th tallest dam in the world. It is a multi-purpose rock and earth-fill embankment dam on the Bhagirathi River in New Tehri, Tehri Garhwal district in Uttarakhand, India. It is the primary dam of the THDC India Ltd. and the Tehri hydroelectric complex. Phase 1 was completed in 2006. The Tehri Dam withholds a reservoir for irrigation, municipal water supply and the generation of 1,000 megawatts (1,300,000 hp) of hydroelectricity. The dam's 1,000 MW variable-speed pumped-storage scheme is currently under construction with expected commissioning of first two units in 2023.

<span class="mw-page-title-main">The Electricity Act, 2003</span> Electricity act of government of India

The Electricity Act, 2003 is an Act of the Parliament of India enacted to transform the power sector in India.

Power Grid Corporation of India Limited is an Indian central public sector undertaking under the ownership of the Ministry of Power, Government of India. It is engaged mainly in transmission of bulk power across different states of India. It is headquartered in Gurugram. Power Grid transmits about 50% of the total power generated in India on its transmission network.

Northern Powergrid Holdings Company is an electrical distribution company based in Newcastle Upon Tyne in England. It is the owner of Northern Powergrid (Northeast) plc and Northern Powergrid (Yorkshire) plc which are the distribution network operators for the North East England and Yorkshire regions and the North Lincolnshire area.

The Nathpa Jhakri Dam is a concrete gravity dam on the Sutlej river in Himachal Pradesh, India. The primary purpose of the dam is hydroelectric power production and it supplies a 1,500 megawatts (2,000,000 hp) underground power station with water. Before reaching the power station, water is diverted through a 27.4 km (17 mi) headrace tunnel. Construction on the project began in 1993 and it was complete in 2004. The last two of the 250 megawatts (340,000 hp) Francis turbine-generators went online in March 2004. It is owned by SJVN.

The Central Electricity Authority of India (CEA) advises the government on policy matters and formulates plans for the development of electricity systems. It is a statutory organisation constituted under section 3(1) of Electricity Supply Act 1948, which has been superseded by section 70(1) of the Electricity Act 2003.

<span class="mw-page-title-main">Solar power in India</span>

India's solar power installed capacity was 72.31 GWAC as of 30 November 2023.

<span class="mw-page-title-main">Availability-based tariff</span> Pricing system used in India for unscheduled electric power transactions

Availability Based Tariff (ABT) is a frequency based pricing mechanism applicable in India for unscheduled electric power transactions. The ABT falls under electricity market mechanisms to charge and regulate power to achieve short term and long term network stability as well as incentives and dis-incentives to grid participants against deviations in committed supplies as the case may be.

<span class="mw-page-title-main">NHPC</span> Indian public sector hydropower company

NHPC Limited is an Indian public sector hydropower company that was incorporated in 1975 to plan, promote and organise an integrated and efficient development of hydroelectric power. Recently it has expanded to include other sources of energy like solar, geothermal, tidal, and wind.

Central Electricity Regulatory Commission (CERC), a key regulator of power sector in India, is a statutory body functioning with quasi-judicial status under sec – 76 of the Electricity Act 2003. CERC was initially constituted on 24 July 1998 under the Ministry of Power's Electricity Regulatory Commissions Act, 1998 for rationalization of electricity tariffs, transparent policies regarding subsidies, promotion of efficient and environmentally benign policies, and for matters connected Electricity Tariff regulation. CERC was instituted primarily to regulate the tariff of Power Generating companies owned or controlled by the government of India, and any other generating company which has a composite scheme for power generation and interstate transmission of energy, including tariffs of generating companies.

<span class="mw-page-title-main">NTPC Limited</span> National Thermal Power Corporation, Central Public Sector Undertaking

NTPC Limited, formerly known as National Thermal Power Corporation, is an Indian central Public Sector Undertaking under the ownership of the Ministry of Power and the Government of India, who is engaged in the generation of electricity and other activities. The headquarters of the PSU are situated at New Delhi. NTPC's core function is the generation and distribution of electricity to State Electricity Boards in India. The body also undertakes consultancy and turnkey project contracts that involve engineering, project management, construction management, and operation and management of power plants.

<span class="mw-page-title-main">2012 India blackouts</span> Widespread power outages in India

Two severe power outages affected most of northern and eastern India on 30 and 31 July 2012. The 30 July 2012 blackout affected over 400 million people and was briefly the largest power outage in history by number of people affected, beating the January 2001 blackout in Northern India. The blackout on 31 July is the largest power outage in history. The outage affected more than 620 million people, about 9% of the world population, or half of India's population, spread across 22 states in Northern, Eastern, and Northeast India. An estimated 32 gigawatts of generating capacity was taken offline. Of the affected population, 320 million initially had power, while the rest lacked direct access. Electric service was restored in the affected locations between 31 July and 1 August 2012.

Formally constituted in 1965, Central Power Engineering Service (CPES) is a Group-A & Group- B Central Engineering Services under the administrative control of Ministry of Power (MoP) in India. CPES is the only organized Service under Ministry of Power. It deals with Indian Power sector which is one of the most complex and diverse in the world owing to vast geography, terrains, climatic condition, natural resources available in India.

<span class="mw-page-title-main">National Grid (India)</span>

The National Grid is the high-voltage electricity transmission network in India, connecting power stations and major substations and ensuring that electricity generated anywhere in India can be used to satisfy demand elsewhere. The National Grid is owned, and maintained by state-owned Power Grid Corporation of India and operated by state-owned Power System Operation Corporation. It is one of the largest operational synchronous grids in the world with 417.68 GW of installed power generation capacity as of 31 May 2023.

<span class="mw-page-title-main">Himachal Pradesh State Electricity Board</span> Indian electrical contractor

Himachal Pradesh State Electricity Board Limited (HPSEBL) is a electricity board operating within the state of Himachal Pradesh, India, that generates and supplies power through a network of transmission, sub- transmission, and distribution lines. Himachal Pradesh State Electricity Board which was constituted on 1 September 1971 in accordance with the provisions of Electricity Supply Act (1948) and has been reorganized as Himachal Pradesh State Electricity Board Limited from 2010 under company act 1956.

References

  1. "Name change of POSOCO".
  2. "Page 25 of CABIL Report by Forum of Regulators" (PDF).
  3. "Pradhan Committee Report" (PDF).
  4. "Meeting Chaired by Secretary Power on 07-08-2008" (PDF).
  5. "Satnam Singh Committee Report" (PDF).
  6. "CERC Fees and Charges Regulations 2009" (PDF).
  7. "eGazette for formation of POSOCO as an Independent Company under Ministry of Power Govt. of India" (PDF).
  8. "CABIL Report by Forum of Regulators" (PDF).
  9. "Electricity Act 2003".
  10. "National Electricity Policy 2005".
  11. "Board of Directors in POSOCO".
  12. "Origin of POSOCO".
  13. "Powerless again: Northern, eastern grids fail". 31 July 2012.
  14. "'Independent audit of grids in 3 months'". 7 August 2012.