Rayalaseema Thermal Power Station | |
---|---|
Country | India |
Location | Kadapa, Kadapa, Andhra Pradesh |
Coordinates | 14°42′N78°28′E / 14.70°N 78.46°E |
Status | Operational |
Commission date | Unit 1: 31 March 1994 Unit 2: 25 February 1995 Unit 3: 25 January 2007 Unit 4: 20 November 2007 Unit 5: 14 March 2018 |
Operator(s) | APGENCO |
Thermal power station | |
Primary fuel | Coal |
Power generation | |
Units operational | 5 X 210 MW and 1 × 600 MW |
Nameplate capacity | 1650 MW |
Rayalaseema Thermal Power Station is located at Yerraguntla (Md) in Kadapa(Dist) in Andhra Pradesh. The power plant is one of the coal based power plants of APGENCO. [1]
The Thermal Power Station has a capacity of 1650 MW; 5 units of 210 MW each and 1 units of 600 MW.
Phase | Installed Capacity (MW) | Date of Commissioning | Status |
---|---|---|---|
I | 2X210 | 1994 | Commissioned |
II | 2X210 | 2007 | Commissioned |
III | 1X210 | 2010 | Commissioned |
IV | 1X600 | 2018 | Commissioned |
Rayalaseema Thermal Power Plant was developed under 3 stages namely stage I, II, III and IV. The station is performing well in the recent years by achieving high plant load factor. It stood first in country during 98–99, 2002–03, 2003–04 and second during 99–2000, 2001–02. [2] The station has received Meritorious productivity awards for six consecutive years and Incentive award for seven consecutive years. [1] BHEL commissioned stage IV unit 1x600MW in March 2018 leading to total installed capacity of RTPP to 1650MW. [3]
NLC India Limited (NLC) is a central public sector undertaking under the administrative control of the Ministry of Coal, Government of India. It annually produces about 30 million tonnes of lignite from opencast mines at Neyveli in the state of Tamil Nadu in southern India and at Barsingsar in Bikaner district of Rajasthan state. The lignite is used at pithead thermal power stations of 3640 MW installed capacity to produce electricity. Its joint venture has a 1000 MW thermal power station using coal. Lately, it has diversified into renewable energy production and installed 1404 MW solar power plant to produce electricity from photovoltaic (PV) cells and 51 MW electricity from windmills.
Panki Thermal Power Station is located at Panki in Kanpur Uttar Pradesh. Its first stage was commissioned in 1967 by the then Prime Minister, Indira Gandhi. It has an installed capacity of 660 Mega Watts. The power plant is owned and operated by Uttar Pradesh Rajya Vidyut Utpadan Nigam. It has a 275 Metres high chimney which is one of the tallest structures in India
Dr. Narla Tata Rao Thermal Power Station or Vijayawada Thermal Power Plant is located at Vijayawada in Andhra Pradesh. It is named after, Narla Tata Rao, the erstwhile chairman of the Andhra Pradesh State Electricity board. The power plant is one of the coal-based power plants of APGENCO. It is well placed between Ibrahimpatnam and Kondapalli villages.
Kakatiya Thermal Power Station is located near Chelpur village of Ghanpur mandal in Warangal district of the Indian state of Telangana. The power plant is one of the coal based power plants of TSGENCO
Feroze Gandhi Unchahar Thermal Power Plant is located at Unchahar in Raebareli district in Indian state of Uttar Pradesh. The power plant is one of the coal based power plants of NTPC Limited. In the year 1992, Uttar Pradesh State Electricity Board (U.P.S.E.B.) transferred Unchahar Thermal Power Station to NTPC Limited against payment overdue and later on renamed it to Feroze Gandhi Unchahar Thermal Power Plant by NTPC Limited.
NTPC Limited, formerly known as National Thermal Power Corporation, is an Indian central Public Sector Undertaking under the ownership of the Ministry of Power and the Government of India, who is engaged in the generation of electricity and other activities. The headquarters of the PSU are situated at New Delhi. NTPC's core function is the generation and distribution of electricity to State Electricity Boards in India. The body also undertakes consultancy and turnkey project contracts that involve engineering, project management, construction management, and operation and management of power plants.
Sri Damodaram Sanjeevaiah Thermal Power Station is located in Nelatur Village, near Krishnapatnam and at a distance of 23 km from Nellore city of Andhra Pradesh. The power plant is one of the coal-based power plants of Andhra Pradesh Power Development Company Limited (APPDCL). It is the Special Purpose Vehicle (SPV), a joint venture company of APGENCO and IL AND FS partnership.
Neyveli Thermal Power Station is a set of power plant situated near lignite mines of Neyveli. It consists of three distinct units capable of producing 420 MW, 1,970 MW and 1000 MW respectively including their expansion units. It is operated by NLC. The total installed capacity of this station is 3390 MW as of April 2021.
NTPC Kanti also known as George Fernandes Thermal Power Plant Station is located in Kanti, Muzaffarpur, Bihar. George Fernandes was former Member of Parliament from Muzaffarpur constituency of Bihar. It is wholly owned subsidiary company of NTPC. The share of the company is 100% of the NTPC. The plant was not functional between 2003 and 2013; however, renovation of both older units paved the way for commercial production of electricity by the end of 2013.
Sagardighi Thermal Power Station is a thermal power plant located at Manigram, 13 km north of Sagardighi in the Indian state of West Bengal. The power plant is operated by the West Bengal Power Development Corporation Limited.
Mauda Super Thermal Power Station or NTPC Mauda is located at Mauda a Tehsil in Ramtek subdivision of Nagpur district in Nagpur revenue Division in the Berar region in the state of Maharashtra, India. The power plant is one of the coal based power plants of National Thermal Power Corporation. 1000 MW Stage 1 was dedicated to nation by Prime Minister Narendra Modi on 21 August 2014.
Vallur Thermal Power Station is a power plant located in Vallur, Thiruvallur district, India. The power plant is operated by NTPC Tamil Nadu Energy Company Limited, a joint venture between NTPC Limited and TANGEDCO and has three units with 500 MW each.
Jindal Tanmar Thermal Power Plant is a coal-based thermal power plant located in Tamnar village near Raigarh town in Raigarh district in the Indian state of Chhattisgarh. The power plant is operated by the Jindal Power Limited which is a subsidiary of Jindal Steel and Power.
Bongaigaon Thermal Power Station is an under construction power project located at Salakati near Bongaigaon in Kokrajhar district in Indian state of Assam. The power plant is one of the coal based power plants of NTPC.
Angul Thermal Power Station is a coal based thermal power project located at Derang village in Angul district in Indian state of Odisha. The power plant is one of the coal based power plants of Jindal India Thermal Power Limited.
Prayagraj Power Generation Company Limited is a coal-based, 3*660MW, super critical thermal power plant located in Bara Tehsil in Prayagraj district, Uttar Pradesh. The power plant is owned by Renascent Power, a subsidiary of the Tata Power. The total cost of the project was INR 12,000 crores. In November 2019 Resurgent Power Ventures Pte. Limited has announced closing the deal for acquiring 75 per cent stake in Jaiprakash Associates Ltd's Prayagraj Power.
Lalitpur Power Generation Company Limited is a coal-based thermal power plant located in Mahroni Tehsil in Lalitpur district, Uttar Pradesh. The power plant is owned by Bajaj Hindusthan Limited. Bharat Heavy Electricals is executing the project.
Gadarwara Super Thermal Power Station is a coal based thermal power project located at near by Gangai village in Gadarwara Tehsil in Narsinghpur District in Indian state of Madhya Pradesh. The power plant is one of the coal based power plants of NTPC Limited. are the critical equipment supplier.
Hinduja National Thermal Power Station, Vizag is a coal-based thermal power plant located in Palavalasa village in Visakhapatnam district, Andhra Pradesh. The power plant is owned by Hinduja National Power Company Limited, a subsidiary of the Hinduja Group.
Jhabua Thermal Power Project is a coal based thermal power project located in village Barela – Gorakhpur, in Ghansore tehsil in Seoni district in Indian state of Madhya Pradesh. The power plant is owned by Jhabua Power Limited, a wholly owned subsidiary of Gautam Thapar led Avantha Group. On 5 September 2022, NTPC acquired the Jhabua power through insolvency process.