HMAS Adelaide (L01)

Last updated

HMAS-Adelaide-JAN-2016.jpg
Adelaide (L01) at anchor in Jervis Bay
History
Naval Ensign of Australia.svgAustralia
Namesake City of Adelaide
Builder Navantia, Ferrol, Spain and BAE Systems Australia, Williamstown, Victoria
Laid down18 February 2011
Launched4 July 2012
Commissioned4 December 2015
Homeport Fleet Base East
Identification
MottoUnited for the common good
Honours and
awards
Battle honours: four inherited battle honours
StatusActive
Badge HMAS Adelaide (L01) badge.gif
General characteristics
Class and type Canberra-class Landing Helicopter Dock
Displacement27,500 tonnes (30,300 short tons; 27,100 long tons) at full load
Length230.82 m (757.3 ft)
Beam32.0 m (105.0 ft)
Draft7.08 m (23.2 ft)
Propulsion
Speed
  • Over 20 knots (37 km/h; 23 mph) maximum
  • 19 knots (35 km/h; 22 mph) full-load sustained
  • 15 knots (28 km/h; 17 mph) economical
Range9,000 nautical miles (17,000 km; 10,000 mi) at 15 knots (28 km/h; 17 mph)
Boats & landing
craft carried
4 × LLC
Capacity
  • Up to 110 vehicles
  • Heavy vehicle deck: 1,410 m2 (15,200 sq ft)
  • Light vehicle deck: 1,880 m2 (20,200 sq ft)
Troops1,046
Complement358 personnel; 293 RAN, 62 Australian Army, 3 RAAF
Sensors and
processing systems
Giraffe AMB radar, Saab 9LV combat system
Electronic warfare
& decoys
Armament
Aircraft carried
  • 8 helicopters (standard)
  • 18 helicopters (maximum hangar space)
Aviation facilitiesFlight deck with 13 degree ski-jump, 6 in-line deck landing spots

HMAS Adelaide (L01) is the second of two Canberra-class landing helicopter dock (LHD) ships of the Royal Australian Navy (RAN) and is the largest naval vessel ever built for Australia. Construction of the ship started at Navantia's Spanish shipyard, with steel-cutting in February 2010. The ship was laid down in February 2011, and launched on 4 July 2012. Delivery to Australia for fitting out at BAE Systems Australia's facilities in Victoria was scheduled for 2013, but did not occur until early 2014. Despite construction delays and predictions, the ship was commissioned in December 2015.

Contents

Design

The Canberra-class design is based on the warship Juan Carlos I, built by Navantia for the Spanish Navy. [1] The contract was awarded to Navantia and Australian company Tenix Defence following a request for tender which ran from February 2004 to June 2007, beating the enlarged Mistral-class design offered by the French company Direction des Constructions Navales. [1] [2] [3] Adelaide has the same physical dimensions as Juan Carlos I, but differs in the design of the island superstructure and the internal layout, in order to meet Australian conditions and requirements. [4] Unlike the Spanish vessel, the Australian ships are built to meet Lloyd's Naval Rules. [4]

Adelaide in 2018 HMAS Adelaide arriving at Pearl Harbor in June 2018.jpg
Adelaide in 2018

The Canberra-class vessels are 230.82 metres (757.3 ft) long overall, with a maximum beam of 32 metres (105 ft), and a maximum draught of 7.08 metres (23.2 ft). [5] At full load, Adelaide will displace 27,500 tonnes (27,100 long tons; 30,300 short tons), making the Canberra-class ships the largest vessels to serve in the RAN. [5] Propulsion is provided by two Siemens Energy SiPOD 11-megawatt (15,000 hp) azimuth thrusters, each with an onboard electric motor, driving two 4.5-metre (15 ft) diameter propellers. [5] [6] The electricity is provided by a Combined diesel-electric and gas system, with a single General Electric LM2500 turbine producing 19,160 kilowatts (25,690 hp), supported by two Navantia MAN 16V32/40 diesel generators, each providing 7,448 kilowatts (9,988 hp). [5] Maximum speed is over 20 knots (37 km/h; 23 mph), with a maximum sustainable full-load speed of 19 knots (35 km/h; 22 mph), and an economical cruising speed of 15 knots (28 km/h; 17 mph). [5] Economical range is 9,000 nautical miles (17,000 km; 10,000 mi). [5]

Each ship is fitted with a Saab 9LV Mark 4 combat management system. [4] The sensor suite includes a Sea Giraffe 3D surveillance radar, and a Vampir NG infrared search and track system. [4] For self-defence, the LHDs will be fitted with four Rafael Typhoon 25 mm remote weapons systems (one in each corner of the flight deck), [7] six 12.7 mm machine guns, an AN/SLQ-25 Nixie towed torpedo decoy, and a Nulka missile decoy. [5] Defence against aircraft and larger targets is to be provided by escort vessels and air support from the Royal Australian Air Force (RAAF). [7] The ships' companies will consist of 358 personnel; 293 RAN, 62 Australian Army, and 3 RAAF. [8]

The LHDs will transport 1,046 soldiers and their equipment. [8] Adelaide will be capable of deploying a reinforced company of up to 220 soldiers at a time by airlift. [4] Two vehicle decks (one for light vehicles, the other for heavy vehicles and tanks) have areas of 1,880 square metres (20,200 sq ft) and 1,410 square metres (15,200 sq ft) respectively, and between them can accommodate up to 110 vehicles. [5] The well deck will carry up to four LHD Landing Craft, which can be launched and recovered in conditions up to Sea State 4. [5] [6] The flight deck can operate six MRH-90-size helicopters or four Chinook-size helicopters simultaneously, in conditions up to Sea State 5. [7] A mix of MRH-90 transport helicopters and S-70B Seahawk anti-submarine helicopters will be carried: up to eight can be stored in the hangar deck, and the light vehicle deck can be repurposed to fit another ten. [5] [9] The ski-jump ramp of Juan Carlos I has been retained for the RAN ships, although fixed-wing flight operations are not planned for the ships. [8] [10]

Construction

The hull of Adelaide being towed across Vigo Bay, shortly before being loaded onto the heavy lift ship MV Blue Marlin Vigo Embarque del portaaviones HMAS Adelaide en la plataforma Blue Marlin (11308259696).jpg
The hull of Adelaide being towed across Vigo Bay, shortly before being loaded onto the heavy lift ship MV Blue Marlin

Construction of Adelaide began at Navantia's shipyard in Ferrol, northern Spain, during February 2010, when the first steel was cut. [4] Hull modules were fabricated at Ferrol and Fene, with the first hull blocks laid down on 18 February 2011. [11] Adelaide's hull was launched on 4 July 2012. [12] [13] Initially, the ship was due to reach Australia in early 2013 to begin final fitout and superstructure installation at BAE Systems Australia facilities in Victoria, [8] [11] but instead, the hull was loaded onto Blue Marlin on 10 December 2013 in Vigo Bay. [14] Blue Marlin and Adelaide arrived at Williamstown on 7 February 2014. [15] On 17 June 2015, Adelaide departed from Williamstown to commence sea trials, which included sailing to Sydney for docking at Garden Island, before returning to Williamstown on 11 July. [16] [17] A second set of trials ran from 19 to 28 August, and the ship was delivered to Fleet Base East two days later. [18] [19]

Entry into RAN service was originally planned for mid-2015, but as of July 2011, this had been pushed back to sometime in 2016. [4] [11] Fitting out of the ship progressed at a faster rate than expected, which brought the predicted commissioning date back to September 2015, [17] although this did not eventuate.[ why? ] The ship was formally handed over to the ADF on 22 October, and was commissioned into the RAN on 4 December. [18] Although identified as "LHD02" during construction, Adelaide received the pennant number "L01" on commissioning; the number corresponding to that used by the frigate of the same name. [20] [21]

Operational history

Adelaide at Fleet Base East HMAS Adelaide (L01) at Fleet Base East in Nov 2015.jpg
Adelaide at Fleet Base East

In early 2016, Adelaide undertook post-commissioning trials and other activities as the ship was worked up to full operational status. [18]

In September 2016, Adelaide took part in Exercise Kakadu 2016, based at Darwin, Northern Territory.

On 12 December 2016, Adelaide intercepted the 50m former Japanese whaling vessel Kaiyo Maru No. 8 in international waters in the Southern Ocean, south-east of Tasmania. The vessel had attracted the attention of Maritime Border Command after loitering and circling more than 200 nautical miles off the southern coast of Australia. Tactical Assault Group personnel boarded the vessel and located suspected illicit drugs, after which the vessel was escorted to Hobart with approximately 186 kilograms of cocaine located on board. [22] [23] [24] [25] The vessel was loitering after a botched rendezvous 300 nautical miles off the coast of Port Fairy in Victoria. [26]

In September 2017, Adelaide sailed as part of the largest Australian task group to deploy since the early 1980s on Exercise Indo-Pacific Endeavour 2017. This was planned as a series of exercises with nations around the Pacific Rim testing communications, disaster relief plans and regional security. Adelaide was accompanied by fleet oiler HMAS Sirius and a varying number of escorts, with a total of four frigates (Melbourne, Darwin, Toowoomba and Parramatta) sailing from Sydney on 4 September 2017. [27] The last time such a large deployment of Australian warships went to sea was September 1980, led by the aircraft carrier HMAS Melbourne. [28]

On 5 January 2020, Adelaide sailed as part of Operation Bushfire Assist, assisting with the Royal Australian Navy's ongoing efforts to help evacuate people from bushfire zones that have become cut off by road and air due to conditions. [29]

On 18 January 2022, Adelaide departed from Sydney for Brisbane on its way to provide disaster relief to Tonga following the Hunga Tonga–Hunga Ha'apai eruption and tsunami. [30] On 25 January, the Department of Defence confirmed that 23 crew members aboard the Adelaide had tested positive for COVID-19 while enroute to Tonga. [31] On 26 January, the Adelaide docked in Tonga to make a contactless delivery to avoid COVID-19 transmissions. [32] During its period at Tonga, the ship was crippled for several days when its main and backup power systems failed. [33] It was reported that as a result of the power failure, most of the crew were forced to sleep "above deck". [34] On 17 February, navy officials revealed the first power outage on 29 January was likely due to volcanic debris in seawater blocking the cooling systems of the ship's diesel generators, which eventually led to multiple system failures. [35] The second outage on 30 January was a fault on the gas turbine. [35]

In September 2022, Adelaide participated in Exercise Trident, a joint amphibious landing exercise with the Singapore Armed Forces at the Shoalwater Bay Training Area. [36] More than 1,600 personnel from both nations were involved, as well as two Republic of Singapore Navy landing platform docks (RSS Endurance and RSS Persistence), Chinook and Apache helicopters, and LHD Landing Craft (LLC). [37]


Citations

  1. 1 2 Brown, Spanish designs are Australia's choice for warship programmes
  2. Borgu, Capability of First Resort?, pp. 5-6
  3. Fish, First Australian LHD takes shape
  4. 1 2 3 4 5 6 7 Fish, Amphibious assault ships
  5. 1 2 3 4 5 6 7 8 9 10 Royal Australian Navy, Amphibious Assault Ship (LHD)
  6. 1 2 Amphibious Ships, in Semaphore, p. 2
  7. 1 2 3 Defense Industry Daily, Australia's Canberra class LHDs
  8. 1 2 3 4 Kerr, Amphibious Ambitions
  9. Gillis, Interview. Landing Helicopter Dock Project – Canberra Class, pp. 28–9
  10. Borgu, Capability of First Resort?, p. 11
  11. 1 2 3 Fish, Australia awaits new LHDs for amphibious uplift
  12. "Launch of second Amphibious Ship Landing Helicopter Dock". Royal Australian Navy. 5 July 2012. Retrieved 5 October 2012.
  13. "Navantia botá el último megabuque en construcción". La voz de Galicia (in Spanish). 4 July 2012.
  14. Otero, A. (11 December 2013). "Perfecto embarque de un coloso del mar". Faro de Vigo (in Spanish). Retrieved 11 December 2013.
  15. "Adelaide LHD hull arrives in Melbourne". Australian Aviation. 7 February 2014. Retrieved 7 February 2014.
  16. Rahmat, Ridzwan (22 June 2015). "RAN's second Canberra-class LHD sails for first sea trials". IHS Jane's Defence Weekly. Retrieved 24 June 2015.
  17. 1 2 Durrant, Patrick (10 July 2015). "Second LHD completes initial sea trials". Australian Defence Magazine. Retrieved 19 July 2015.
  18. 1 2 3 Staples, Natalie (4 December 2015). "HMAS Adelaide enters service". Navy Daily. Royal Australian Navy. Retrieved 7 December 2015.
  19. Rice, Deborah (30 October 2015). "Adelaide warship arrives at Garden Island in Sydney, ahead of commissioning". ABC News. Australian Broadcasting Corporation. Retrieved 7 December 2015.
  20. "On the way to Australia". Navy News. Royal Australian Navy (Directorate of Defence News). 55 (16): 5. 30 August 2012.
  21. Fish, Tim (5 February 2010). "Steel cut for second Australian LHD". Jane's Navy International.
  22. "Vessel Escorted to Hobart". Tasmania Police (Press release). 16 December 2016. Retrieved 18 January 2017.
  23. "Criminal syndicates dismantled after more arrests related to major Hobart cocaine seizure". Australian Federal Police (Press release). 18 January 2017. Retrieved 18 January 2017.
  24. "186kgs cocaine seized, 10 men charged". Australian Border Force (Press release). 21 December 2016. Retrieved 18 January 2017.
  25. Farrell, John Hunter (Autumn 2017). "Special Forces Drug Bust HMAS Adelaide". Australian & NZ Defender Magazine. No. 97. Brisbane Market: Fullbore Magazines. ISSN   1322-039X.
  26. "Seasickness foils alleged coke smugglers plan". Sky News. 21 January 2017. Archived from the original on 24 January 2017. Retrieved 27 July 2017.
  27. "Australian Navy sends six-ship fleet on Indo-Pacific mission". navaltoday.com. 4 September 2017. Retrieved 6 September 2017.
  28. "HMAS Melbourne (II) - Part 2". Royal Australian Navy. Retrieved 6 September 2017.
  29. Navy, Royal Australian (5 January 2020). "HMAS Adelaide has arrived off the coast of Eden NSW to commence relief & evacuation operations. Due to the smoke in the air, visibility quickly worsened as the ship sailed from Sydney to the south coast. #AusNavy #OurCommunity #WeAreWithYou #OpBushfireAssistpic.twitter.com/CEbgCwCpBf".
  30. "First aid shipments leave for Tonga, amid fears aid workers could bring 'tsunami of Covid'". The Guardian. 19 January 2022. Retrieved 19 January 2022.
  31. "Covid-19 confirmed aboard HMAS Adelaide enroute to Tonga". Radio New Zealand . 25 January 2022. Archived from the original on 26 January 2022. Retrieved 29 January 2022.
  32. "HMAS Adelaide delivers vital aid to Tonga a day after COVID-19 outbreak was detected on board". ABC News . Australian Broadcasting Corporation. Associated Press. 27 January 2022. Archived from the original on 26 January 2022. Retrieved 29 January 2022.
  33. Greene, Andrew (31 January 2022). "Australia's largest warship suffers power failure during mission to Tonga". ABC News. Retrieved 31 January 2022.
  34. "Australia's HMAS Adelaide suffers power failure during Tongan aid mission". RNZ. 31 January 2022.
  35. 1 2 Greene, Andrew (17 February 2022). "Ash from Tonga volcano explosion linked to crippling power failure on HMAS Adelaide". ABC News. Retrieved 18 February 2022.
  36. Australia Government (23 September 2022). "Australia and Singapore join forces for amphibious exercise" . Retrieved 27 September 2022.
  37. Ng, Wei Kai (27 September 2022). "S'pore and Australia militaries conduct largest ever bilateral exercise simulating beach landing". The Straits Times.

Related Research Articles

HMAS <i>Choules</i>

HMAS Choules (L100) is a Bay-class landing ship that served with the Royal Fleet Auxiliary (RFA) from 2006 to 2011, before being purchased by the Royal Australian Navy (RAN). The vessel was built as RFA Largs Bay by Swan Hunter in Wallsend, Tyne and Wear. She was named after Largs Bay in Ayrshire, Scotland, and entered service in November 2006. During her career with the RFA, Largs Bay served as the British ship assigned to patrol the Falkland Islands in 2008, and delivered relief supplies following the 2010 Haiti earthquake.

Bay-class landing ship 2006 class of British landing ships

The Bay class is a ship class of four dock landing ships built for the British Royal Fleet Auxiliary (RFA) during the 2000s. They are based on the Dutch-Spanish Royal Schelde Enforcer design, and replaced the Round Table-class logistics ships. Two ships each were ordered from Swan Hunter and BAE Systems Naval Ships. Construction work started in 2002, but saw major delays and cost overruns, particularly at Swan Hunter's shipyard. In mid-2006, Swan Hunter was stripped of work, and the incomplete second ship was towed to BAE's shipyard for completion. All four ships, Largs Bay, Lyme Bay, Mounts Bay, and Cardigan Bay had entered service by 2007.

<span class="mw-page-title-main">Landing helicopter dock</span> Ship type

A landing helicopter dock (LHD) is a multipurpose amphibious assault ship which is capable of operating helicopters and has a well deck. The United States Navy (USN) and the Royal Australian Navy (RAN) use the term as a hull classification symbol.

HMAS <i>Kanimbla</i> (L 51) Amphibious Ship operated by the Australian Navy

HMAS Kanimbla was a Kanimbla-class landing platform amphibious ship operated by the Royal Australian Navy (RAN). Originally built for the United States Navy (USN) as the Newport-class tank landing shipUSS Saginaw (LST-1188), the ship was decommissioned in 1994 and sold to the RAN.

<i>Hobart</i>-class destroyer Class of destroyer of Royal Australian Navy

The Hobart class is a ship class of three air warfare destroyers (AWDs) built for the Royal Australian Navy (RAN). Planning for ships to replace the Adelaide-class frigates and restore the capability last exhibited by the Perth-class destroyers began by 2000, initially under acquisition project SEA 1400, which was re-designated SEA 4000. Although the designation "Air Warfare Destroyer" is used to describe ships dedicated to the defence of a naval force from aircraft and missile attack, the planned Australian destroyers are expected to also operate in anti-surface, anti-submarine, and naval gunfire support roles.

Spanish amphibious assault ship <i>Juan Carlos I</i> Amphibious assault ship

Juan Carlos I is a multi-purpose amphibious assault ship-aircraft carrier in the Spanish Navy. Similar in role to many aircraft carriers, the amphibious landing ship has a ski jump for STOVL operations, and is equipped with the McDonnell Douglas AV-8B Harrier II attack aircraft or the new Lockheed Martin F-35B Lightning II fighter aircraft. The vessel is named in honour of Juan Carlos I, the former King of Spain.

HMAS <i>Manoora</i> (L 52)

HMAS Manoora was a Kanimbla-class landing platform amphibious ship operated by the Royal Australian Navy (RAN). Originally built for the United States Navy (USN) as the Newport-class tank landing shipUSS Fairfax County (LST-1193), the ship was decommissioned in 1994 and sold to the RAN.

A joint support ship (JSS) is a multi-role naval vessel capable of launching and supporting joint amphibious and airlift operations. It can also provide command and control, sealift and seabasing, underway replenishment, disaster relief and logistics capabilities for combined land and sea operations.

The Royal Australian Navy, although a significant force in the Asia-Pacific region, is nonetheless classed as a medium-sized navy. Its fleet is based around two main types of surface combatant, with limited global deployment and air power capability. However, in 2009, a white paper, Defending Australia in the Asia Pacific Century: Force 2030, was produced by the Australian government which set out a programme of defence spending that will see significant improvements to the RAN's fleet and capabilities.

<i>Kanimbla</i>-class landing platform amphibious

The Kanimbla class was a class of amphibious transport ships operated by the Royal Australian Navy (RAN). Two ships were purchased by Australia in 1994 and modified. Problems during the handover process and the need to repair previously unidentified defects meant the ships did not enter operational service until the end of the decade.

<i>Canberra</i>-class landing helicopter dock Australian naval amphibious ship class

The Canberra class is a ship class of two landing helicopter dock (LHD) ships built for the Royal Australian Navy (RAN). Planning to upgrade the navy's amphibious fleet began in 2000, based on Australian experiences leading the International Force for East Timor peacekeeping operation. With a new climate for growing Australian Navy spending, a desire existed for forward defence capability for landing and supporting troops on Asian territory, that had never existed in Australian history, even with the old Majestic-class light fleet carriers, HMAS Melbourne and HMAS Sydney in the 1970s. In 2004, French company Direction des Constructions Navales (DCN) and Spanish company Navantia were invited to tender proposals, with DCN offering the Mistral-class amphibious assault ship and Navantia proposing the "Buque de Proyección Estratégica" design. The Spanish design was selected in 2007, with Navantia responsible for construction of the ships from the keel to the flight deck, and BAE Systems Australia handling the fabrication of the combat and communications systems. Finally, Siemens (Germany) supplied and fitted the azimuth thrusters.

HMAS <i>Sirius</i> (O 266) Fleet replenishment vessel

HMAS Sirius was a commercial tanker purchased by the Royal Australian Navy and converted into a fleet replenishment vessel to replace HMAS Westralia. She was named in honour of HMS Sirius of the First Fleet. Launched in South Korea on 2004, and converted in Western Australia, Sirius was commissioned in 2006; three years before a purpose-built vessel would have been built, and at half the cost. The tanker was decommissioned in 2021.

<span class="mw-page-title-main">Amphibious warfare ships of Australia</span>

The Royal Australian Navy and Australian Army have operated 24 amphibious warfare ships. These ships have been used to transport Army units and supplies during exercises and operational deployments.

Tenix Defence was Australia's largest defence contractor with core capabilities in Aerospace, Land, Marine and Electronic Systems applications. BAE Systems announced its intention to acquire the company from Tenix in January 2008 and the acquisition was completed in June 2008 for A$775 million. BAE Systems Australia thus became Australia's largest defence contractor.

HMAS <i>Canberra</i> (L02) Royal Australian Navy helicopter landing ship

HMAS Canberra (L02) is the first ship of the Canberra-class landing helicopter dock in service with the Royal Australian Navy (RAN) and is the second largest in the Navy, succeeded by its sister ship HMAS Adelaide (L01). Construction of the ship started in Spain in 2008, with the hull launched by Navantia in 2011. The hull was then transported to Australia in late 2012 for completion by BAE Systems Australia. Canberra was commissioned on 28 November 2014.

LCM-1E Military landing craft

The LCM-1E is a class of amphibious mechanized landing craft manufactured by Navantia at their factory in San Fernando. These craft are intended to deliver troops and equipment onshore from amphibious assault ships during amphibious assaults. The craft are operated by the Spanish Navy and the Royal Australian Navy, and have been ordered by the Turkish Navy.

The procurement of Landing Platform Docks (LPD) by the Indian Navy, formerly known as the "Multi-Role Support Vessel Program" (MRSV) - is an initiative of the Indian Navy (IN) to procure a series of landing platform docks, specific vessels dedicated to amphibious warfare, as part of the service's strategy to augment its capabilities of amphibious warfare, disaster-response, humanitarian assistance and auxiliary duties.

HMAS <i>Supply</i> (A195) Supply-class replenishment oiler of Royal Australian Navy

HMAS Supply (A195), named after the Royal Navy ship HMS Supply, is the lead ship of the Supply-class replenishment oilers built for the Royal Australian Navy by Navantia at their yard in Ferrol, Spain. The Australian Supply-class ships are based on the Spanish Navy's replenishment oiler Cantabria. The vessel was launched on 18 November 2017 and commissioned on 10 April 2021.