IE305 series

Last updated

iE305 series
CLI-225 series
Ujicoba KRL INKA seri iE305 Trainset 2.jpg
iE305 series arrived at track 2 of Jayakarta station while conducting a test run on the Bogor Line.
Stock type Electric Multiple Unit
In service2025–present
Manufacturer Industri Kereta Api
Built at Madiun and Banyuwangi, Indonesia [1]
Constructed2024–present
Entered service16 December 2025
Number under construction120 vehicles (10 sets)
Number built72 vehicles (6 sets)
Formation12 cars per trainset
Operators KAI Commuter
Lines served
Specifications
Car body construction Stainless steel
Car length20,000 mm (65 ft 7 in)
Width3,000 mm (9 ft 10 in)
Height3,985 mm (13 ft 0.9 in)
Doors4 doors on each side
Maximum speed120 km/h (75 mph)
Traction system Toyo Denki  [ ja ] RG6061-A-M VVVF-IGBT
Power output4000 hp
HVAC INKA I-Cond 36,000 kcal (2 units per car)
Electric system(s) 1,500 V DC overhead catenary
Current collection Toyo Denki  [ ja ] PT7206-A Pantograph
Bogies INKA TB1622 (Trailer), INKA MB1122 (Motor)
Braking system(s) Regenerative brake
Coupling system Shibata Coupling
Track gauge 1,067 mm (3 ft 6 in)

The iE305 series, [2] also known as CLI-225 series, [3] is an electric multiple unit (EMU) commuter train type operated by KAI Commuter. This EMU is designed and manufactured by Industri Kereta Api (INKA) in Madiun and Banyuwangi, East Java, [1] [4] in collaboration with Japan Transport Engineering Company (J-TREC). [5] This EMU uses technical specifications determined by the Directorate General of Railways (DJKA) of the Ministry of Transportation of the Republic of Indonesia. [4]

Contents

This EMU utilizes components sourced from both domestic and foreign production. In the electrical and equipment section, it uses components produced by Toyo Denki Seizo  [ ja ]. [6] As for the braking system, it uses components produced by Nabtesco. [7] [8]

The iE305 series has a formation of 12 cars on each trainset. [9]

History

KAI Commuter and PT INKA signed a contract for the production of 16 trainsets or 192 units of the iE305 series on 9 March 2023. [4] The delivery of the entire iE305 series will be carried out in stages from 2025 to 2027. [10]

The first trainset of the iE305 series was completed in early 2025. From 10 March to 12 March 2025, initial testing was conducted at the INKA factory in Madiun and Japan [9]

On 17 March 2025, the first trainset of the iE305 series was delivered from the INKA factory in Madiun to the Solo Jebres EMU Depot. Just a day before on 16 March 2025, the EMU was for the first time went outside the factory area and was exhibited to journalists at Madiun Station. [9] The Solo Jebres EMU Depot is a EMU Depot owned by the DJKA Railway Maintenance Center and managed by KAI Commuter. [11]

The delivery of each trainset is carried out in two phases, with each phase comprising six cars, pulled by a locomotive that is accompanied by several unmanned passenger cars to aid in braking.

iE305 series conducted a test run on the Yogyakarta Line passing Delanggu station. Kereta Rel Listrik (KRL) baru buatan PT. INKA, EA205.jpg
iE305 series conducted a test run on the Yogyakarta Line passing Delanggu station.

In the afternoon of 18 March 2025, the EMU underwent a short test run around Solo Jebres station. This short test run was carried out for the train driver to adapt to the train controls. [12]

In the early hours of 19 March 2025, the iE305 series for the first time underwent a full speed test at 120 km per hour on the Solo Jebres-Lempuyangan section of the Yogyakarta Line. Later in the afternoon, the test run continued on the Solo Jebres-Klaten section. [12] The test run was carried out by INKA, KAI Commuter and PT Surveyor Indonesia as consultants. [9]

On 16 April 2025, the first trainset continued its delivery from Solo Jebres Depot to Depok EMU Depot via Purwokerto, following the trial run on the Yogyakarta Line. [8] [13]

iE305 series (CLI-225 series) and SFC120-V series (CLI-125 series) on exhibit during an event commemorating the 100th anniversary of the first railway electrification in Indonesia. KRL INKA seri EA207 (CLI-225) & KRL CRRC seri SFC120-V (CLI-125) in Jakarta Kota station.jpg
iE305 series (CLI-225 series) and SFC120-V series (CLI-125 series) on exhibit during an event commemorating the 100th anniversary of the first railway electrification in Indonesia.

On 21 April 2025, along with the SFC120-V series, the iE305 series was sent from Depok EMU Depot to Manggarai Station in preparation for the event commemorating the 100th anniversary of the first railway electrification in Indonesia on the next day. On 22 April 2025, the iE305 series was exhibited at Jakarta Kota Station, alongside the ESS 3200 class, SFC120-V series and various other EMUs. [14]

CLI-225 series (iE305 series) entering Lenteng Agung station EA207 melintas langsung Lenteng Agung.png
CLI-225 series (iE305 series) entering Lenteng Agung station

After previously being exhibited, the first trainset of the iE305 series resumed its trial run in Jabodetabek. The trial run began on the Bogor Line on Sunday night, 27 April 2025. [15] The trial was conducted by KAI Commuter together with Toyo Denki Seizo  [ ja ] and Nabtesco. [8]

These trials follow the guidelines of the Ministry of Transportation Number 49 of 2023 concerning Standards, Test Procedures, and Certification of the Feasibility of Normal Speed Trains with Self-Driving. The tests consist of Design and Engineering Tests, Static Tests and Dynamics Tests. [16]

On 16 December 2025, the first and second trainsets of the iE305 series officially entered service, with a public trial run carrying passengers on the Bogor Line. [17]

Formations

Each trainset in the iE305 series comprises 12 cars. This configuration features two driver cabins situated in the first car and the twelfth car (the final car). These two cars are non-motorized and are classified as trailer cars with driver cabins (Tc).

Meanwhile, the other trains are divided into several types, namely:

In general, the standard formation configuration of the iE305 series is arranged as follows:

 Train Formation
 
 
 
Car number123456789101112
NumberingCLI-225.X001CLI-225.X002CLI-225.X003CLI-225.X004CLI-225.X005CLI-225.X006CLI-225.X007CLI-225.X008CLI-225.X009CLI-225.X010CLI-225.X011CLI-225.X012
Designation [18] Tc1M1M2T1T2M1M2T3T1M1M2Tc2
Weight (kg)34.10037.60037.10033.00030.10037.60037.10029.60033.00037.60037.10034.100

Formation List

 Train Formation
Car number123456789101112
Designation [19] Tc1M1M2T1T2M1M2T3T1M1M2Tc2
CLI-225.1001F [20] CLI-225.1001
K1 1 25 37
CLI-225.1002
K1 1 25 38
CLI-225.1003
K1 1 25 39
CLI-225.1004
K1 1 25 40
CLI-225.1005
K1 1 25 41
CLI-225.1006
K1 1 25 42
CLI-225.1007
K1 1 25 43
CLI-225.1008
K1 1 25 44
CLI-225.1009
K1 1 25 45
CLI-225.1010
K1 1 25 46
CLI-225.1011
K1 1 25 47
CLI-225.1012
K1 1 25 48
CLI-225.2001F [21] CLI-225.2001
K1 1 25 97
CLI-225.2002
K1 1 25 98
CLI-225.2003
K1 1 25 99
CLI-225.2004
K1 1 25 100
CLI-225.2005
K1 1 25 101
CLI-225.2006
K1 1 25 102
CLI-225.2007
K1 1 25 103
CLI-225.2008
K1 1 25 104
CLI-225.2009
K1 1 25 105
CLI-225.2010
K1 1 25 106
CLI-225.2011
K1 1 25 107
CLI-225.2012
K1 1 25 108
CLI-225.3001F [21] CLI-225.3001
K1 1 25 157
CLI-225.3002
K1 1 25 158
CLI-225.3003
K1 1 25 159
CLI-225.3004
K1 1 25 160
CLI-225.3005
K1 1 25 161
CLI-225.3006
K1 1 25 162
CLI-225.3007
K1 1 25 163
CLI-225.3008
K1 1 25 164
CLI-225.3009
K1 1 25 165
CLI-225.3010
K1 1 25 166
CLI-225.3011
K1 1 25 167
CLI-225.3012
K1 1 25 168
CLI-225.4001F [22] CLI-225.4001
K1 1 25 169
CLI-225.4002
K1 1 25 170
CLI-225.4003
K1 1 25 171
CLI-225.4004
K1 1 25 172
CLI-225.4005
K1 1 25 173
CLI-225.4006
K1 1 25 174
CLI-225.4007
K1 1 25 175
CLI-225.4008
K1 1 25 176
CLI-225.4009
K1 1 25 177
CLI-225.4010
K1 1 25 178
CLI-225.4011
K1 1 25 179
CLI-225.4012
K1 1 25 180
CLI-225.5001F [23] CLI-225.5001
K1 1 25 181
CLI-225.5002
K1 1 25 182
CLI-225.5003
K1 1 25 183
CLI-225.5004
K1 1 25 184
CLI-225.5005
K1 1 25 185
CLI-225.5006
K1 1 25 186
CLI-225.5007
K1 1 25 187
CLI-225.5008
K1 1 25 188
CLI-225.5009
K1 1 25 189
CLI-225.5010
K1 1 25 190
CLI-225.5011
K1 1 25 191
CLI-225.5012
K1 1 25 192
CLI-225.6001F [24] CLI-225.6001
K1 1 25 193
CLI-225.6002
K1 1 25 194
CLI-225.6003
K1 1 25 135
CLI-225.6004
K1 1 25 196
CLI-225.6005
K1 1 25 197
CLI-225.6006
K1 1 25 198
CLI-225.6007
K1 1 25 199
CLI-225.6008
K1 1 25 200
CLI-225.6009
K1 1 25 201
CLI-225.6010
K1 1 25 202
CLI-225.6011
K1 1 25 203
CLI-225.6012
K1 1 25 204

See also

References

  1. 1 2 Media, Kompas Cyber (26 September 2024). "KCI Butuh Pengadaan 37 KRL hingga 2027, Mayoritas Dipesan dari INKA". KOMPAS.com (in Indonesian). Archived from the original on 22 November 2024. Retrieved 12 July 2025.
  2. "INKA Proudly Present, KRL karya anak bangsa series iE305". PT INKA Persero on Facebook (in Indonesian). 30 April 2025. Retrieved 30 April 2025.
  3. 実は日本技術の結晶「インドネシア製電車」の中身 中古車両導入は途絶えても「日本式」に高い信頼 [Japanese technology "crystallizes" in Indonesian trains]. Toyo Keizai Online (in Japanese). 5 April 2025. Retrieved 5 April 2025.
  4. 1 2 3 antaranews.com (8 February 2024). "KAI Commuter: 92 persen pengadaan KRL bekerja sama dengan INKA". Antara News (in Indonesian). Retrieved 18 March 2025.
  5. "Ujung-ujungnya Teknologi Jepang". Tempo (in Indonesian). 10 April 2023. Retrieved 18 March 2025.
  6. Denki, Toyo (30 November 2023). "Notice on Orders Received for Electrical Equipment of New Rolling Stock for Commuter Railway in Indonesia" (PDF). Toyo Denki. Retrieved 18 March 2025.
  7. "PT INKA Tampilkan KRL Baru Jabodetabek". YouTube. CNN Indonesia. 25 February 2025. Retrieved 17 April 2025.
  8. 1 2 3 antaranews.com (16 April 2025). "PT INKA uji coba KRL pesanan KAI Commuter di perlintasan Jabodetabek". Antara News (in Indonesian). Retrieved 17 April 2025.
  9. 1 2 3 4 antaranews.com (16 March 2025). "PT INKA uji coba KRL Jabodetabek di perlintasan Solo Jateng". Antara News (in Indonesian). Retrieved 18 March 2025.
  10. Priambada, Yulius Brahmantya (6 April 2023). "Jalan Panjang Polemik Impor KRL Bekas (Bagian 1)". kompas.id (in Indonesian). Retrieved 18 March 2025.
  11. https://www.rri.co.id/daerah/859919/krl-solo-yogya-miliki-depo-di-jebres-solo-kerja-sama-dengan-djka
  12. 1 2 Sulistyo, Bayu Tri (19 March 2025). "Rangkaian KRL Seri CLI-225 Jalani Uji Dinamis Perdana". Railway Enthusiast Digest (in Indonesian). Retrieved 18 April 2025.
  13. Sulistyo, Bayu Tri (16 April 2025). "Rangkaian Pertama KRL Seri CLI-225 Dikirim ke Depok". Railway Enthusiast Digest (in Indonesian). Retrieved 17 April 2025.
  14. antaranews.com (22 April 2025). "KAI Commuter hadirkan parade KRL lawas rayakan 100 tahun operasi KRL". Antara News (in Indonesian). Retrieved 24 April 2025.
  15. Sulistyo, Bayu Tri (29 April 2025). "Rangkaian Pertama KRL Seri CLI-225 Jalani Uji Dinamis di Jabodetabek". Railway Enthusiast Digest (in Indonesian). Retrieved 29 April 2025.
  16. "Permenhub No. 49 Tahun 2023". Database Peraturan | JDIH BPK. Retrieved 12 March 2025.
  17. Liputan6.com (16 December 2025). "KAI Commuter Operasikan 2 KRL Baru Made in Indonesia untuk Rute Bogor". liputan6.com (in Indonesian). Retrieved 16 December 2025.{{cite web}}: CS1 maint: numeric names: authors list (link)
  18. "KERETA REL LISTRIK INKA SERI iE305". www.instagram.com. 20 May 2025. Retrieved 1 July 2025.
  19. "KERETA REL LISTRIK INKA SERI iE305". www.instagram.com. 20 May 2025. Retrieved 1 July 2025.
  20. AfifFahreza (19 April 2025), KRL BARU BUATAN INKA MADIUN SAMPAI DEPOK || Pengiriman Ke Dua KRL INKA EA 207 Trainset Pertama , retrieved 21 April 2025
  21. 1 2 Feryan Adi Anggana (15 June 2025), iE305 TRAINSET 3 KLAKSON BEDA? TAKSAKA SELESAI RECALL? iE305 SIAP KIRIM 😱😱 , retrieved 20 June 2025
  22. Feryan Adi Anggana (22 July 2025), TRAINSET TERAKHIR PRODUKSI MADIUN 🤔 | Hunting Langsiran iE305 Trainset 4 , retrieved 23 July 2025
  23. Feryan Adi Anggana (22 September 2025), BAGIAN KEPALA KRL TIBA DI INKA MADIUN 😱 | Pengiriman KRL INKA iE305 Trainset 5 Unit 8 , retrieved 24 September 2025
  24. Feryan Adi Anggana (30 September 2025), MOMEN BERTURUT TURUT😱 | KLB Uji dinamis SSNG Trainset 35 Dan Pengiriman iE305 Trainset 6 , retrieved 30 September 2025