Jersey City Urby | |
---|---|
Alternative names | URL Harborside, URBY Harborside |
General information | |
Status |
|
Type | Residential |
Location | Jersey City |
Address | 200 Greene Street and 195 Hudson Street, Jersey City, New Jersey |
Country | United States |
Coordinates | 40°43′13″N74°02′12″W / 40.7202°N 74.0366°W |
Construction started |
|
Completed |
|
Renovation cost |
|
Owner | Veris Residential; Ironstate Holdings |
Height |
|
Technical details | |
Floor count |
|
Floor area | 867,706 square feet (80,612.5 m2) |
Lifts/elevators |
|
Design and construction | |
Architect(s) | Concrete |
Architecture firm | HLW International |
Structural engineer | DeSimone Consulting Engineers |
Other information | |
Number of rooms |
|
Parking | 500 parking spaces in all buildings |
Website | |
https://www.urby.com/jersey-city | |
References | |
[1] [2] [3] [4] |
Jersey City Urby is a residential tower complex in downtown Jersey City, New Jersey, United States, known for its Jenga -like appearance. The first tower was proposed in 2012 as URL Harborside, and later renamed to Jersey City Urby. [5] The construction of the first tower began in 2014, and completed in 2017. At 700 feet (210 m), the 69-story tower is the fourth tallest building in New Jersey, as well as in Jersey City as of May 2024 [update] . [1] It overtook Ocean Resort Casino in Atlantic City for the title of second place when it was completed, but moved down to fourth after the constructions of 99 Hudson Street and Journal Squared Tower 2 respectively. The company, Urby, also has five other locations such as Staten Island, Stamford, [6] Dallas, [7] Newark, [8] and Harrison. [9]
Originally planned to be a trio of three 69-story towers comprising 2,358 residential units, in 2022 a new proposal was approved which scaled back the Jenga appearance of the second and third towers. The new proposal has the two buildings being 677 feet with 1,606 residences, of which 164 hotel units are included. These units break down into 95 studios, 1,195 one-bedrooms, and 383 two bedrooms. The ground floor of the two towers would contain 32,000 square feet (3,000 m2) of retail space split amongst five storefronts, of which one will face Hudson Street, two will face Bay Street, and two will face the pedestrian walkway facing Harborside 5. A 272-spot garage connecting the towers with valet parking is included, with an outdoor pool and landscaped garden hill on top the roof of the garage. Other amenities include a fitness center and indoor pool [10] [11] In July 2022, the city council gave approval of construction of two similar buildings in the complex. [2]
In May 2024, Jersey City approved some slight changes to the development of Phase Two, which would reduce the number of units to 1,510 units, ground-level retail being reduced from five storefronts to four, some slight façade changes, and the addition of a dog park, outdoor seating with a café, and extra greenery. The plans for 164 hotel units and a 272-space valet parking garage with rooftop amenities remained unchanged. It is predicted that construction will begin in 2024, and that construction will begin with the base of the tower, followed by the construction of Tower Two, which will be followed by the construction of Tower Three once completed. [12]
Similarly, in nearby Journal Square, a 317-unit, 25-story tower called Journal Square Urby was topped out in September 2023. The building will have similar amenities to the already existing tower complex in downtown. [13]
There are three types of apartments within the tower, including studio, one bedroom, and two bedrooms. The apartments have large windows for full city views. They contain their own washer and dryer, built-in storage, full amenities within the kitchen, and air conditioning. Rentals range from $3,217to $5,460. [14]
Most of the building's shared social space features are located on the 9th floor. This includes a 24/7 concierge service, a heated swimming pool, a pool patio, a BBQ, a green space, a fully equipped gym with classes, outdoor lounges with fire pits, a post room, the Urby Kitchen (a space dedicated to classes and events), filtered water stations, cultural events, food tasting and local chef Q&As throughout the year, and currently has two restaurants, Canard Cafe and DOMODOMO sushi. [14] [15]
The complex is within a 10-minute walk of three PATH stations: Exchange Place, Grove Street, and Newport. [16] The Harborside Hudson-Bergen Light Rail (HBLR) station is directly in front of the building. The Harborside Ferry Terminal, which operates the NY Waterway ferry, is located right next to the HBLR station as well, in addition to the Paulus Hook ferry terminal being a 10-minute walk away. Two Academy Bus Lines routes stop nearby.
Additionally, several NJ Transit bus lines stop near Urby, all of which stop at Exchange Place.
The Hudson–Bergen Light Rail (HBLR) is a light rail system in Hudson County, New Jersey, United States. Owned by New Jersey Transit (NJT) and operated by the 21st Century Rail Corporation, it connects the communities of Bayonne, Jersey City, Hoboken, Weehawken, Union City, at the city line with West New York, and North Bergen.
The Newport station is a station on the PATH system. Located on Town Square Place at the corner of Washington Boulevard in the Newport neighborhood of Jersey City, New Jersey, it is served by the Hoboken–World Trade Center and Journal Square–33rd Street lines on weekdays, and by the Journal Square–33rd Street line on weekends. As of 2017, its estimated weekday use was nearly 20,000 passengers, up from 17,000 to 18,000 average weekday passengers in 2010.
Harborside station is a station on the Hudson–Bergen Light Rail (HBLR) located east of Greene Street, between Morgan and Steuben Streets, in Exchange Place section of Jersey City, New Jersey and named for the adjacent Harborside office complex. There are two tracks and an island platform.
International Plaza is a high-rise commercial and residential building at 10 Anson Road in Tanjong Pagar, within the Downtown Core of Singapore, next to Tanjong Pagar MRT station on the East West line.
The James Monroe is a 312-foot-tall (95-m) residential skyscraper in the Newport neighborhood of Jersey City, New Jersey. It was completed in 1989 and has 34 floors and stands at a height of 312 feet. The 443-unit, 34-story residential condominium tower contains studio apartments, one and two bedroom units, and three bedroom duplexes. It was developed by the Lefrak Organization of Rego Park, Queens together with Melvin Simon & Associates of Indianapolis and the Glimcher Company of Columbus, Ohio.
Harborside is a mixed-use residential, retail, and office complex in the Exchange Place district of Jersey City, New Jersey located on the Hudson Waterfront. The majority of the buildings were originally owned and managed by Veris Residential, however many of the buildings were sold to other companies, including Harborside Plaza 1, 2, 3, 4, 5, 6, and 10. The complex contains some of the tallest buildings in Jersey City.
Hudson Greene is an apartment complex in Jersey City, New Jersey which consists two towers, the East Tower at 77 Hudson Street, which are condominiums, and the West Tower at 70 Greene Street, which are rental apartments. Both have 48 floors and are 500 ft (152m) tall. They are tied with each other for 16th tallest building in Jersey City. Construction on the towers began on June 25, 2006, and was completed in 2009 and 2010. The East Tower at 77 Hudson Street has 420 residences and 19,000 square feet (1,800 m2) of street-level retail space. The building was designed by the architectural firm CetraRuddy.
1 Journal Square is a skyscraper complex under construction at Journal Square in Jersey City, New Jersey. Slated to become the fourth tallest building by structural height in Jersey City, construction began in 2022 after significant delays, and completion is expected in 2026. The complex includes twin 52-story high-rises over a 12-story base rising 710 feet (220 m). As of July 2024, Tower 1 has topped-out.
56 Leonard Street is an 821 ft-tall (250 m), 57-story skyscraper on Leonard Street in the neighborhood of Tribeca in Manhattan, New York City. The building was designed by the Swiss architecture firm Herzog & de Meuron, which describes the building as "houses stacked in the sky." It is the tallest structure in Tribeca.
The Modern is a residential skyscraper complex in Fort Lee, New Jersey near George Washington Bridge Plaza at the western end of the George Washington Bridge (GWB) on the Hudson Waterfront. Situated atop the Hudson Palisades, the twin towers provide panoramic views of the New York City skyline, the Hudson River, the GWB, and surrounding suburbs.
Kushner Real Estate Group, also known as the KRE Group is an American real estate development company based in Bridgewater, New Jersey. The company has developed, owns, and manages properties throughout New Jersey, New York, and Pennsylvania, including more than 6,000,000 square feet of commercial industrial, and retail property, and more than 9,000 existing apartments, with an additional 7,000 apartments in various stages of approvals and construction. The company controls more than 6 million square feet of commercial industrial, and retail property, and more than 9,000 apartments.
Veris Residential, Inc. is a real estate investment trust headquartered in Jersey City, New Jersey, investing primarily in multifamily real estate in New Jersey and Boston.
99 Hudson is a 79-story condominium in Jersey City, New Jersey. It is the tallest building in Jersey City and the state of New Jersey, and the 46th tallest building in the United States. It is also the tallest residential building in the United States outside of New York City and Chicago. Developed by China Overseas America, 99 Hudson is the first residential project in the U.S. for the firm. The 1.4 million square-foot building includes 781 condominium units ranging from studios to three bedrooms.
Journal Squared, or J2, is a three-tower retail and residential complex under construction at Journal Square in Jersey City, New Jersey. Upon completion, the complex will consist of buildings of 54, 60, and 68 stories, among the tallest buildings in the state.
The HELIX Health + Life Science Exchange, originally called The Hub for the New Jersey Innovation and Technology Hub, is a research, business incubator and innovation center under construction in New Brunswick, New Jersey, which itself is called The Hub City. It is planned to contain three buildings: H-1,H-2, and H-3.
The Halo is a three-tower residential skyscraper complex under construction in Newark, New Jersey, which will include some of tallest buildings in the city. It is located on Washington Street west of Four Corners in Downtown Newark, situated between Teacher's Village and the Essex County Government Complex. The project was designed by INOA Architecture, which has also conceived other projects in Newark. The first of the three towers was topped off in 2024, becoming the 2nd tallest building in the city.
Haus25 is a 57-story residential building in Jersey City, New Jersey. At 626 ft (191 m), it is the 7th tallest building in Jersey City and the 8th tallest building in New Jersey. The building was first proposed in 2016, began construction in 2019, and was completed in 2022. The building is attached to an elementary school that was built alongside the development of the tower itself.