July 2013 Spuyten Duyvil derailment

Last updated
Spuyten Duyvil derailment
(July 2013)
Freight derailment on Metro-North Railroad Hudson Line (9319579202).jpg
A waste container spilled on the tracks
shortly after the accident
Details
DateJuly 18, 2013
8:29 p.m. EDT (12:19 UTC)
LocationBetween Spuyten Duyvil and Marble Hill stations, Bronx, NY
Coordinates 40°52′33″N73°55′01″W / 40.87590°N 73.91681°W / 40.87590; -73.91681
CountryUnited States
Line Hudson Line
Operator CSX
Incident type Derailment
CauseExcessive track gauge [1]
Statistics
Trains1
Crew4
Deaths0
Injured0
DamageUS$827,000 [1]

On the evening of July 18, 2013, a CSX freight train carrying municipal solid waste on tracks of the Hudson Line along the Harlem River Ship Canal in the New York City borough of The Bronx partially derailed between the Marble Hill and Spuyten Duyvil stations. While no one was injured, the derailment caused over US$800,000 in damage and took several days to clean up. Commuter rail service by Metro-North Railroad, which owns the line, was suspended for two weekends in order to fully restore normal operations.

Contents

After investigating the accident, the National Transportation Safety Board (NTSB) found it had been caused by the track stretching to an excessive gauge at the point of derailment. It did not fault the crew, instead criticizing Metro-North for failing to maintain the track and surrounding ballast to the point that the track went out of gauge. Later in the year, in a comprehensive safety review after another derailment of a passenger train nearby resulted in the first passenger fatalities in Metro-North's history, the NTSB cited the maintenance shortfall as part of an inadequate "safety culture" at the railroad. [2]

Background

A different CSX freight using the bypass track at the Marble Hill station, shown in October 2014 EMD loco of CSX EB thru Marble Hill Sta jeh.jpg
A different CSX freight using the bypass track at the Marble Hill station, shown in October 2014

The CSX train left Oak Point Yard near Hunts Point in the South Bronx at 6:30 p.m. that evening. The weather was clear and hot—temperatures were above 90 °F (32 °C), as they had been for the previous three days, enough for the National Weather Service to have issued a heat advisory for the city. A crew of four, an engineer and conductor plus a trainee for those positions, led a consist of two SD40-2 locomotives and 24 flatcars specially modified to carry four large containers of solid waste collected by New York's sanitation department to a landfill in Virginia. [1]

From Oak Point the train went first south along the Northeast Corridor line also used by Amtrak, until it left to follow a spur west along the north side of the Bronx Kill and, after that, the Harlem River, where the track turned northwest to follow the river. At Highbridge Yard, the train followed the track as it merged onto those used by Metro-North Railroad's Hudson Line commuter rail service from Grand Central Station to points along the east bank of the Hudson River as far north as Poughkeepsie. It was one of four such waste trains that regularly use the Hudson Line's tracks each night; two northbound [Note 1] with full containers and two southbound [Note 2] returning the emptied ones. [3]

There are generally two tracks along this stretch, both electrified with third rails for Metro-North's electric multiple unit trains serving the stations along the Hudson Line south of Croton-Harmon in Westchester County. [Note 3] With a few exceptions, they are immediately adjacent to the river and almost completely level. They consist of ribbon rail laid in standard gauge on prestressed concrete ties supported by a bed of crushed trap rock ballast. [1]

In Metro-North territory, the train passed the Morris Heights and University Heights stations, serving those areas of the Bronx. Just north of the latter, a third track diverged to allow trains to bypass the Marble Hill station, in a mainland section of Manhattan, where passenger trains stop more frequently, allowing a transfer to the nearby subway station. Metro-North rates the tracks in this area as Class 2 under Federal Railroad Administration (FRA) guidelines, allowing a passenger speed limit of 30 miles per hour (48 km/h) and a freight speed limit of 15 miles per hour (24 km/h) 10 mph below that allowed by the FRA. [1]

Accident

Almost two hours after leaving Oak Point, the CSX train reached the Marble Hill station, where the train was on the outside track closest to the river and away from the elevated platform. Metro-North train #781, an EMU consist making all local stops up to Croton-Harmon, [4] was stopped at the station while the freight had priority. Ahead, at the control point marking exactly 10 miles (16 km) from Grand Central, was a red signal. The engineer later told NTSB investigators he used the dynamic brakes to slow the train down. It was almost stopped when it changed back to green, allowing the train to proceed. [1]

The CSX engineer began accelerating his train again, preparing to merge on to one of the two main tracks. He was mindful also of a slight curve into a rock cut just past the control point. He followed his usual practice of taking the curve by notching the throttle up until the train had reached Metro-North's 15 mph speed limit, then taking it back down to idle so as to drift through the curve, then notching it up again slowly as it lost speed in the curve. [1] [Note 4]

As the CSX train rounded the curve, the engineer of the Metro-North train saw sparks and dust. He realized that some of the freight's cars had derailed, and immediately notified that train's engineer by radio. The CSX engineer applied the air brakes at full pressure, and soon the train's own emergency brakes took over. When the train came to a stop, the conductor departed the cab and made a visual inspection. Nine cars in the middle of the train had indeed derailed, some of them blocking the other track, along with containers that had fallen off their cars and spilled. [1]

Aftermath

Workers inspecting the accident site shortly afterwards Freight Derailment on Metro-North Hudson Line (9321106740).jpg
Workers inspecting the accident site shortly afterwards

As soon as the accident was reported to it, Metro-North suspended service in the affected area between Marble Hill and Spuyten Duyvil. Passengers on the #781 train, or already waiting at Marble Hill, were taken back to the Yankee Stadium station south of Highbridge Yard and discharged. Some complained they were offered neither an explanation or alternatives, although Metro-North began offering shuttle bus service between Marble Hill and Riverdale, the next station north of Spuyten Duyvil, by midnight. It also announced that Hudson Line tickets would be cross-honored on the Harlem Line, which parallels the New York–Connecticut state line through the same three counties. [5]

Metro-North crews began working within hours to assess the damage. By morning rush hour, the railroad had suspended all service on the Hudson Line south of Yonkers, three stations north of the accident site, until cleanup and repairs could be completed. In the meantime, it arranged bus service from Yonkers to the Van Cortlandt Park – 242nd Street station, the northern terminus of the New York City Subway's 1 train, which many Hudson Line passengers disembark to at the Marble Hill station to reach jobs on the West Side of Manhattan. Howard Permut, president of Metro-North, promised riders that normal service would resume by July 22, the next Monday, four days after the accident. [3]

The narrow rock cut where the derailment occurred complicated cleanup efforts Metro-North Cleanup Continues (9343208930).jpg
The narrow rock cut where the derailment occurred complicated cleanup efforts

The next morning, a Friday, posed a challenge for regular Hudson Line commuters. Some riders, particularly those who normally took trains to Grand Central, more convenient to the East Side and Brooklyn, chose to drive in instead or take the day off, giving themselves an unanticipated three-day weekend. Those that took the train anyway were mostly late for work, since the detours added as much as an hour and a half to their commutes. A Poughkeepsie woman interning on Wall Street told The New York Times she did not bother calling her superiors to explain why she was late, since "[t]hey take the train too." Metro-North estimated that Hudson Line ridership was half of what it otherwise might have been that day. [3]

Throughout the day and following weekend cleanup continued. That task was complicated by the location of most of the derailed cars in a short, narrow rock cut. Cranes and other heavy equipment used to lift cars back onto the tracks, and the spilled containers back on them, had to be laboriously repositioned after each use due to the limited space available, adding hours to the job. Some of the flatcar trucks were badly damaged in the accident and had to be repaired in situ to make them usable again. Workers also had to contend with the continued hot and humid weather. [6] Some containers had also opened in the accident, spilling their contents, which had to be repacked. "It's not like pickup sticks", explained a Metro-North spokeswoman. [3]

Crews from Metro-North, assisted by subway workers, worked around the clock through the weekend. After clearing the wrecked flatcars and reloading the containers, they had to repair a 1,500-foot (460 m) stretch of track. By Monday morning Metro-North was able to keep Permut's promise and reopen one of the two main tracks affected. It was able to handle 40 inbound and 12 outbound trains, mostly during the morning and evening rush hours. [7]

Work continued throughout the week on the other track. It was necessary to suspend service again over the next weekend, starting on Saturday morning to avoid disrupting service for fans headed to a New York Yankees home baseball game on the night of July 26, a Friday. [8] By the evening of Monday, July 29, the tracks had been completely cleared and fully repaired. Service on both tracks was restored to normal. [6]

Investigation

The Metro-North workers were joined at the site by investigators from the NTSB, there to determine the cause of the accident. They retrieved electronic devices like the cab video cameras and event data recorder. After examining the damaged infrastructure closely, they took samples back to Highbridge for testing. Later they interviewed the crew of the CSX train, the Metro-North engineer who had witnessed the derailment and notified the CSX crew, and Metro-North employees responsible for maintenance of way. [1]

They found a wheel flange mark on the inside of the western rail at a point almost 73 feet (22 m) north of the control point where the CSX train had slowed almost to a stop when it saw the red. This they identified as the point of derailment (POD). They noticed immediately that the insulators on the Pandrol clips holding the rails to the concrete ties had slipped out of place slightly, with a noticeable gap between them and the rails in some areas. At the POD the rail was bowed slightly outward, resulting in a 516-inch (7.9 mm) variance from gauge. [1]

Rail damage in an area where soil infiltration was evident Metro-North Freight Derailment Recovery (9320881209).jpg
Rail damage in an area where soil infiltration was evident

At and near the POD the ballast and track were notably paler. This was because they were covered with dust, indicating that soil infiltration had occurred. The pale dust was not the soil itself, but residue from the tie ends, which had suffered serious abrasion. Wheel flange grooves were also evident in some of the ties taken back to Highbridge, suggesting the track had been bending outward under load due to decreased structural support from the fouled ballast. This evidence was noted in 2010 satellite photos of the area on Google Earth and more recent photos taken by Metro-North itself. [1]

After making these measurements, they compared them with data from recent FRA and Metro-North track inspections. In early June, the agency had gone through the area with its track geometry car. At the POD it had recorded a 2-inch (51 mm) dip in the same track, consistent with motion noted on the cab video cameras in both CSX locomotives, and recorded the gauge as 0.06 inches (1.5 mm) over the regulatory standard of 57+34 inches (1,470 mm) for Class 2 track. Both values were within tolerance. [1]

Metro-North laying new ballast after the accident Metro-North Track Restoration (9390525585).jpg
Metro-North laying new ballast after the accident

The day before the accident, Metro-North had conducted a visual inspection of the track in the area on foot. The railroad's inspectors noted no reportable defects at or near the POD. However, within a mile (1.6 km) to the north of the accident, there were others, including broken ties and poorly drained areas. [1]

Upon review of Metro-North's maintenance records, the investigators learned that the track and concrete ties had been installed in 2000. The railroad's plans indicated that the track was to be resurfaced (i.e., the ballast replaced) every three years, and the ties and rails replaced every seven. However, since a 2004 resurfacing, neither action had been taken. Metro-North's chief engineer admitted the railroad was behind. He could not explain why, but he said Metro-North was "working towards getting back into phase." [1]

More recently, the NTSB noted, following a derailment of a passenger train in Connecticut two months earlier, which had also resulted from a defective and inadequately maintained rail, the railroad had hired Transportation Technology Center, Inc. (TTCI), to evaluate its track maintenance program. Among the tasks undertaken by TTCI was to survey the entire Metro-North system for areas exhibiting surfacing issues like fouled ballast and poor drainage. One of the 654 such areas it found was the POD. [1]

Conclusion

The NTSB did not issue its report until October 2014, due to delays caused by its investigation of a derailment of a Metro-North passenger train near the same site in December 2013, which caused the first passenger fatalities in Metro-North's history. In the report, the NTSB found the accident had not been caused by any of the CSX crew's actions, nor those of Metro-North's dispatchers. There were no mechanical problems with the train, and the waste containers had been loaded properly and were within their permitted weights. The signal system was also working properly. [1]

Instead, it found the proximate cause of the accident to be the excessive track gauge at the POD. It, in turn, resulted from the soil infiltration of the underlying ballast, which had itself been the result of inadequate drainage. As trains passed over that section of track, the stored water was pumped within the ballast, compromising the track's ability to support the train. Eventually the ties began to crack in the center and abrade at the ends, and the rails themselves begin to cant outwards, gradually exceeding permitted gauge limits, as the track had in this case. Ultimately, the fault was Metro-North's for failing to follow its own maintenance schedule, the NTSB said. [1]

Four days later, the NTSB issued a press release noting that Metro-North had experienced five major accidents, resulting in four passenger and two worker fatalities (the first in its history), in the space of 10 months. Its investigations had identified "several safety management problems that were common to all of the accidents", among them "inadequate and ineffective track inspection and maintenance [and] extensive deferred maintenance issues" such as those that had contributed to the CSX derailment. All were "deficiencies in ... organizational safety culture", the agency said, that could make a huge difference if corrected. [2]

See also

Notes

  1. Most freight leaving New York City or Long Island for destinations to the south of the city must first go north up the east side of the Hudson to where it can cross over to Selkirk, NY, 140 miles (230 km) north of the city, and then begin its journey southwards.
  2. Likewise, freight traffic to the city from the south must also go up through Selkirk and then down the east side of the river.
  3. The CSX trains, powered by diesel-fueled electromotor locomotives, do not use the third rails.
  4. According to the NTSB report, the train's event data recorder showed that the train had reached a speed of 19 miles per hour (31 km/h) going through the curve this way.

Related Research Articles

<i>Empire Service</i> Amtrak service between New York City, NY and Niagara Falls, NY

The Empire Service is an Inter-city rail service operated by Amtrak within the state of New York in the United States. The brand name originated with the New York Central Railroad in 1967. Trains on the line provide frequent daily service along the 460-mile (740 km) Empire Corridor between New York City and Niagara Falls via Albany, the state capital.

<span class="mw-page-title-main">Spuyten Duyvil station</span> Metro-North Railroad station in the Bronx, New York

Spuyten Duyvil station is a commuter rail stop on the Metro-North Railroad's Hudson Line, serving the Spuyten Duyvil neighborhood of the Bronx, New York City.

Spuyten Duyvil may refer to:

<i>Adirondack</i> (train) Amtrak service between New York City, NY and Montreal, QC

The Adirondack is an intercity rail passenger train operated daily, partially along the Empire Corridor, by Amtrak between New York City and Montreal. Trains take approximately 11 hours to travel the 381 miles (613 km) route through the scenic Hudson Valley and along the eastern border of the Adirondack Mountains. Operation of the Adirondack is supported by the New York State Department of Transportation and Via Rail.

<span class="mw-page-title-main">Spuyten Duyvil, Bronx</span> Neighborhood of the Bronx in New York City

Spuyten Duyvil is a neighborhood of the Bronx, New York City. It is bounded on the north by Riverdale, on the east by Kingsbridge, on the south by the Harlem River, and on the west by the Hudson River, although some consider it to be the southernmost part of Riverdale.

<span class="mw-page-title-main">New York Connecting Railroad</span> Freight train infrastructure in Queens

The New York Connecting Railroad or NYCR is a rail line in the borough of Queens in New York City. It links New York City and Long Island by rail directly to the North American mainland. Amtrak, CSX, Canadian Pacific Railway, Providence and Worcester Railroad and New York and Atlantic Railway (NYAR) currently use the line. It runs from the Hell Gate Bridge over the East River to Fresh Pond Junction yard in Glendale in Queens. It was completed in 1917. Amtrak uses the northernmost section of the line from Sunnyside Junction in the Woodside section of Queens to the Hell Gate Bridge into the Bronx from which it follows the line north to Boston.

<span class="mw-page-title-main">Empire Corridor</span> Railroad corridor in the U.S. state of New York

The Empire Corridor is a 461-mile (742 km) passenger rail corridor in New York State running between Penn Station in New York City and Niagara Falls, New York. Major cities on the route include Poughkeepsie, Albany, Schenectady, Amsterdam, Utica, Syracuse, Rochester, and Buffalo. Much of the corridor was once part of the New York Central Railroad's main line.

<span class="mw-page-title-main">West Side Line</span> Railroad line in New York City

The West Side Line, also called the West Side Freight Line, is a railroad line on the west side of the New York City borough of Manhattan. North of Penn Station, from 34th Street, the line is used by Amtrak passenger service heading north via Albany to Toronto; Montreal; Niagara Falls and Buffalo, New York; Burlington, Vermont; and Chicago. South of Penn Station, a 1.45-mile (2.33 km) elevated section of the line, abandoned since 1980, has been transformed into an elevated park called the High Line. The south section of the park from Gansevoort Street to 20th Street opened in 2009 and the second section up to 30th Street opened in 2011, while the final section to 34th Street opened in 2014.

<span class="mw-page-title-main">Oak Point Link</span>

The Oak Point Link, also known as the South Bronx–Oak Point Link, is a 1.9-mile (3.1 km) long railroad line in the Bronx, New York City, United States, along the east bank of the Harlem River. It connects the Metro-North Railroad's Hudson Line with the Harlem River Intermodal Yard and the CSX Transportation Oak Point Yard at the north end of the Hell Gate Bridge.

<span class="mw-page-title-main">Hudson Line (Metro-North)</span> Metro-North Railroad line in New York

The Hudson Line is a commuter rail line owned and operated by the Metro-North Railroad in the U.S. state of New York. It runs north from New York City along the east shore of the Hudson River, terminating at Poughkeepsie. The line was originally the Hudson River Railroad, and eventually became the Hudson Division of the New York Central Railroad. It runs along what was the far southern leg of the Central's famed "Water Level Route" to Chicago.

<span class="mw-page-title-main">Spuyten Duyvil Bridge</span> Bridge between Manhattan and the Bronx, New York

<span class="mw-page-title-main">Highbridge Facility</span> Railroad maintenance facility in the Bronx, New York

The Highbridge Facility, also simply known as Highbridge or High Bridge, is a maintenance facility for the Metro-North Railroad in the Highbridge section of the Bronx, New York City, United States. It is the third stop along the Hudson Line north of Grand Central Terminal, and is for Metro-North employees only, though this stop also formerly served commuter rail passengers and was called High Bridge station. The station is located south of the High Bridge off Depot Place and Exterior Drive, and is accessible from Sedgwick Avenue by way of a viaduct that carries Depot Place over the Major Deegan Expressway, the Hudson Line, and Exterior Drive.

<span class="mw-page-title-main">Incidents on the Washington Metro</span> Collisions, derailments, and other accidents involving the WMATA transit service

There have been numerous incidents on the Washington Metro over its history, including several collisions causing injuries and fatalities, and numerous derailments. The Washington Metropolitan Area Transit Authority (WMATA) has been criticized for disregarding safety warnings and advice from experts.

<span class="mw-page-title-main">Fairfield train crash</span>

The Fairfield/Bridgeport train crash occurred on May 17, 2013, when a Metro-North Railroad passenger train derailed between the Fairfield Metro and Bridgeport stations in Fairfield, Connecticut, in the United States. The derailed train fouled the adjacent line and a train heading in the opposite direction then collided with it. There were at least 65 injured among the approximately 250 people on board each of the two trains. Metro-North reported damages at $18.5 million.

<span class="mw-page-title-main">December 2013 Spuyten Duyvil derailment</span> Passenger commuter train accident that killed four

On the morning of December 1, 2013, a Metro-North Railroad Hudson Line passenger train derailed near the Spuyten Duyvil station in the New York City borough of the Bronx. Four of the 115 passengers were killed and another 61 injured; the accident caused $9 million worth of damage. It was the deadliest train accident within New York City since a 1991 subway derailment in Manhattan, and the first accident in Metro-North's history to result in passenger fatalities. The additional $60 million in legal claims paid out as of 2020 have also made it the costliest accident in Metro-North's history.

<span class="mw-page-title-main">Spuyten Duyvil and Port Morris Railroad</span> Former New York railroad company (1842–1871)

Spuyten Duyvil and Port Morris Railroad was a railroad built in what is today the West Bronx and South Bronx in New York City, United States. It ran from the junction between the West Side Line and the Hudson River Railroad near Spuyten Duyvil Creek, then along the Harlem River to the northwestern shore of the East River in what is today the Port Morris section of the Bronx.

There were two train derailments in the Bronx neighborhood of Spuyten Duyvil during 2013:

<span class="mw-page-title-main">Hudson Rail Link</span>

The Hudson Rail Link is a feeder bus system operated by Logan Bus Company for Metro-North Railroad. It connects the Riverdale and Spuyten Duyvil stations on the Hudson Line to the neighborhoods of the same name. Service began in 1991, and route M began in 2002. As of 2014, more than half of the daily commuters who use Spuyten Duyvil station arrive using the feeder bus. Service operates on weekdays only, connecting to and from Metro-North trains. It accepts MetroCard, and UniTickets are available at a discount for rail passengers.

References

  1. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 "Railroad Accident Brief: Metro-North Railroad Derailment" (PDF). National Transportation Safety Board. October 24, 2014. Retrieved May 24, 2015.
  2. 1 2 Holloway, Keith (October 28, 2014). "Ineffective Safety Management a Common Theme in Five Recent Metro-North Accidents" (Press release). National Transportation Safety Board . Retrieved May 25, 2015.
  3. 1 2 3 4 Flegenheimer, Matt; Hu, Winnie (July 20, 2013). "Metro-North Line Is Tied Up After a Freight Train Derails". The New York Times . Retrieved May 26, 2015.
  4. "Hudson Line" (PDF). Metro-North Railroad. November 9, 2014. Retrieved May 26, 2015.
  5. "Train Hauling Trash Derails in Bronx, Metro-North Service Suspended". WNBC-TV . July 19, 2013. Retrieved May 26, 2015.
  6. 1 2 "Reconstruction Complete Following Hudson Line Freight Derailment at Spuyten Duyvil". Metro-North Railroad. July 31, 2013. Retrieved May 26, 2015.
  7. "Metro-North service back after freight train derailment". Newsday . July 21, 2013. Retrieved May 26, 2015.
  8. Bowen, Douglas John (July 26, 2013). "Metro-North: Normal Hudson Line service Monday". Railway Age . Retrieved May 26, 2015.