Type | Public |
---|---|
Industry | Electricity generation |
Founded | 1970 |
Headquarters | Bengaluru, Karnataka, India |
Key people | Srikar M S, IAS, Managing Director & Narendra kumar, Technical Director |
Products | Electricity |
Revenue | INR 7744.20 crores(2019) |
INR 254.35 crores (2019) | |
Number of employees | 4429 |
Website | http://www.karnatakapower.com/ |
Karnataka Power Corporation Limited (or KPCL) is a company owned by the government of Karnataka, and is engaged in the Service of generating electrical power in the state of Karnataka in India. The modes for generation of electric power are hydroelectric, thermal, diesel, gas, wind and solar. The company was started on 20.07.1970 due to a vision of the Karnataka government for separate entities for generation and distribution of electric power. This was done, long before world bank dictated power sector reforms were initiated in early 21st century in India. Karnataka Power Corporation Limited began its journey with a humble beginning in 1970. With an installed capacity of 746 MW (1970), it has expanded its capacity to 8738.305 MW (2019). A revenue of Rs.77442 Million in 2019 as compared, to Rs.1.30 Million in 1971, speaks volumes about KPCL's progress.
KPCL has 34 dams (including the main, pickup and saddle dams) and 24 power stations across the state with power production capabilities ranging from 0.35 MW to 1035 MW. The hydroelectric projects of Karnataka Power Corporation Limited are built mainly across rivers Kaveri (Cauvery), Sharavathi, Kali, Krishna, Tungabhadra and their tributaries. The total installed capacity of KPCL is 8846.305 MW. [1] The corporation has its thermal power station at Raichur And two more thermal project at Bellary of 500 MW station. The installed capacity of the thermal power station is 1720 MW (210 MW ×7units+1x250MW) at Raichur and 1700MW (2x500MW+1x700MW) at Bellary. The total gross power generation per annum is in the order of 10,362 GW·h at a plant load factor (PLF) 80% and 11,589 GW·h at a plant load factor of 90%. The corporation, in order to increase generation, has planned one moreadditional units in Bellary of 1x700MW, The corporation has Yermarus Thermal Power Station under construction at Yermarus, Raichur of capacity, with two units of 800MW each.
The power stations of Karnataka are: [1]
Power Station | Type | Number of Units | Capacity (MW) | Total |
---|---|---|---|---|
Raichur Thermal Power station | Thermal | 7 + 1 | 7x210 + 1x250 | 1720 |
Bellary Thermal Power station | Thermal | 2 + 1 | 2x500 + 1x700 | 1700 |
Yermarus Thermal Power Station | Thermal | 2 | 2x800 | 1600 |
Sharavathi | Hydel | 10 | 103.5 | 1035 |
Nagjhari | Hydel | 6 | 150 | 900 |
Varahi River | Hydel | 4 | 115 | 460 |
Almatti Dam | Hydel | 5 + 1 | 5x55 + 1x15 | 290 |
Gerusoppa | Hydel | 4 | 60 | 240 |
Kadra Dam | Hydel | 3 | 50 | 150 |
Kodasalli Dam | Hydel | 3 | 40 | 120 |
Supa Dam | Hydel | 2 | 50 | 100 |
MGHE-2 | Hydel | 4 | 21.6 | 86.4 |
Linganamakki Dam | Hydel | 2 | 27.5 | 55 |
MGHE-1 | Hydel | 4 | 13.2 | 52.8 |
Bhadra right bank-1 | Hydel | 1 | 7.2 | 7.2 |
Bhadra right bank-2 | Hydel | 1 | 6 | 6 |
Bhadra left bank-1 | Hydel | 2 | 12 | 24 |
Bhadra left bank-2 | Hydel | 1 | 2 | 2 |
Mani | Hydel | 2 | 4.5 | 9 |
Ghataprabha | Hydel | 2 | 16 | 32 |
Shivanasamudra-1 | Hydel | 4 | 6 | 24 |
Shivanasamudra-2 | Hydel | 6 | 3 | 18 |
Shimshapura | Hydel | 2 | 8.6 | 17.2 |
Munirabad-1 | Hydel | 2 | 9 | 18 |
Munirabad-2 | Hydel | 1 | 10 | 10 |
Mallapura | Mini | 2 | 4.5 | 9 |
Sirwar | Mini | 1 | 1 | 1 |
Kalmala | Mini | 1 | 0.4 | 0.4 |
Ganekal | Mini | 1 | 0.35 | 0.35 |
Kappatagudda-1 | Wind | 9 | 0.225 | 2.025 |
Kappatagudda-2 | Wind | 11 | 0.230 | 2.53 |
Yalesandra Solar PV Plant, Kolar Dist | Solar Project | 1 | 3 | 3 |
Yapaldinni Solar PV Plant, Raichur Dist | Solar Project | 1 | 3 | 3 |
Simsha Solar PV Plant, Shimshapur Mandya Dist | Solar Project | 1 | 5 | 5 |
Itnal Solar PV Plant, Belgaum Dist | Solar Project | 1 | 3 | 3 |
Total | -- | -- | -- | 8846.305 |
Pumped-storage hydroelectricity (PSH), or pumped hydroelectric energy storage (PHES), is a type of hydroelectric energy storage used by electric power systems for load balancing. The method stores energy in the form of gravitational potential energy of water, pumped from a lower elevation reservoir to a higher elevation. Low-cost surplus off-peak electric power is typically used to run the pumps. During periods of high electrical demand, the stored water is released through turbines to produce electric power. Although the losses of the pumping process make the plant a net consumer of energy overall, the system increases revenue by selling more electricity during periods of peak demand, when electricity prices are highest. If the upper lake collects significant rainfall or is fed by a river then the plant may be a net energy producer in the manner of a traditional hydroelectric plant.
India is the third largest producer of electricity in the world. The national electric grid in India has an installed capacity of 403.759 GW as of 30 June 2022. Renewable power plants, which also include large hydroelectric plants, constitute 39.2% of total installed capacity. During the fiscal year (FY) 2019–20, the gross electricity generated by utilities in India was 1,383.5 TWh and the total electricity generation in the country was 1,598 TWh. The gross electricity consumption in FY2019 was 1,208 kWh per capita. In FY2015, electric energy consumption in agriculture was recorded as being the highest (17.89%) worldwide. The per capita electricity consumption is low compared to most other countries despite India having a low electricity tariff.
NLC India Limited (NLC) is a central public sector undertaking under the administrative control of the Ministry of Coal, Government of India. It annually produces about 30 million tonnes of Lignite from opencast mines at Neyveli in the state of Tamil Nadu in southern India and at Barsingsar in Bikaner district of Rajasthan state. The lignite is used at pithead thermal power stations of 3640 MW installed capacity to produce electricity. Its joint venture has a 1000 MW thermal power station using coal. Lately, it has diversified into renewable energy production and installed 1404 MW solar power plant to produce electricity from photovoltaic (PV) cells and 51 MW electricity from windmills.
Tata Power Company Limited is an Indian electric utility company based in Mumbai, Maharashtra, India and is part of the Tata Group. The core business of the company is to generate, transmit and distribute electricity. With an installed electricity generation capacity of 10,577 MW, it is India's largest integrated power company. Tata Power has been ranked 3rd in 2017 Responsible Business Rankings developed by IIM Udaipur. In February 2017, Tata Power became the first Indian company to ship over 1 GW solar modules.
Shaktinagar is a town in Raichur taluk and Raichur district in the Indian state of Karnataka. There is a coal-based thermal power plant is working by Karnataka Power Corporation Limited (KPCL).
The Lal Bahadur Shastri Dam is also known as Almatti Dam is a hydroelectric project on the Krishna River in North Karnataka, India which was completed in July 2005. The target annual electric output of the dam is 560 MU.
Solar power in India is a fast developing industry. The country's solar installed capacity was 60.813 GWAC as of 30 September 2022. Solar power generation in India ranks fourth globally in 2021.
Raichur Thermal Power Station (RTPS) is a coal-fired electric power station located at Yadlapur D(Shaktinagar) in the Raichur district of the state of Karnataka, India. It is operated by the Karnataka Power Corporation Limited (KPCL) and was the first thermal power plant to be set up in the state. The power station was commissioned during various periods from 1985 and it accounts for about 70% of the total electricity generated in Karnataka.
The Mahanirmiti or Mahagenco formerly known as MSEB is a major power generating company in the state of Maharashtra, India and a wholly owned subsidiary of Maharashtra State Electricity Board. With a total generation of 14,400 MW, it is the second largest power producing company in India. The power generated by Mahagenco is supplied to Maharashtra. It was a part of Maharashtra State Electricity Board (MSEB) until 6 June 2005.
According to the International Hydropower Association, Canada is the fourth largest producer of hydroelectricity in the world in 2021 after the United States, Brazil, and China. In 2014, Canada consumed the equivalent of 85.7 megatonnes worth of oil of hydroelectricity, 9.8% of worldwide hydroelectric consumption. Furthermore, hydroelectricity accounted for 25.7% of Canada's total energy consumption. It is the third-most consumed energy in Canada behind oil and natural gas.
India is world's 3rd largest consumer of electricity and world's 3rd largest renewable energy producer with 40% of energy capacity installed in the year 2022 coming from renewable sources. Ernst & Young's (EY) 2021 Renewable Energy Country Attractiveness Index (RECAI) ranked India 3rd behind USA and China. In November 2021, India had a renewable energy capacity of 150 GW consisting of solar, wind, small hydro power, bio-mass, large hydro, and nuclear. India has committed for a goal of 500 GW renewable energy capacity by 2030.
Jaiprakash Associates Limited, commonly known as Jaypee Group, is an Indian conglomerate company based in Noida, Uttar Pradesh, India. It has business interests in engineering, construction, power, cement, real estate, hospitality, IT, sports and education (not-for-profit).
India is 5th globally for installed hydroelectric power capacity. As of 31 March 2020, India's installed utility-scale hydroelectric capacity was 46,000 MW, or 12.3% of its total utility power generation capacity. Additional smaller hydroelectric power units with a total capacity of 4,683 MW have been installed. India's hydroelectric power potential is estimated at 148,700 MW at 60% load factor. In the fiscal year 2019–20, the total hydroelectric power generated in India was 156 TWh with an average capacity factor of 38.71%.
JSW Energy Limited (JSWEL) is a division of JSW Group in India.
NTPC Limited, formerly known as National Thermal Power Corporation Limited, is an Indian central public sector undertaking under the ownership of Ministry of Power, Government of India which is engaged in generation of electricity and allied activities. The headquarters of the psu is situated at New Delhi. NTPC's core function is the generation and distribution of electricity to State Electricity Boards in India. The body also undertakes consultancy and turnkey project contracts that involve engineering, project management, construction management, and operation and management of power plants.
The Koldam Hydropower Station commonly known as Koldam, is an embankment dam on the Satluj River upstream of the Dehar Power House. It is 18 km from Bilaspur off the Chandigarh-Manali Highway (NH-21) near Barmana, Himachal Pradesh, India. The main purpose of the dam is hydroelectric power generation and it will support an 800 MW power station. The dam was constructed by NTPC Limited.
Bihar State Power Holding Company Limited (BSPHCL), formerly Bihar State Electricity Board (BSEB) is a state-owned electricity regulation board operating within the state of Bihar in India. BSEB was established in 1958 as a statutory corporation under the Electricity (Supply) Act, 1948. As of November 2012, BSEB has nearly 1,700 officers and 14,850 employees. The derated capacity comes to just 530 MW. The BSEB was unbundled on 2 August 2011. Power Finance Corporation was the main consultant for BSEB's restructuring.
Bellary Thermal Power station is located in Kudatini Village, Bellary District in the Indian state of Karnataka. Two coal-fired units of 500 MW each are in operation with generating capacity of 12 million units per day and a 700 MW coal-fired unit with operation The thermal electric power generating station is run by KPCL a government of Karnataka undertaking. This electric generating plant is located at Kudatini village on Hosapete - Ballari road.
Kudgi Super Thermal Power Station is a power station located at Kudgi village of Basavana Bagewadi Taluq in Bijapur district, Karnataka in Indian state of Karnataka. This is one of the coal based thermal power plants of NTPC Limited.
Power sector of Andhra Pradesh is divided into 4 categories namely Regulation, Generation, Transmission and Distribution. Andhra Pradesh Electricity Regulatory Commission (APERC) is the regulatory body. APGENCO deals with the electricity production and also maintenance, proposes new projects and upgrades existing ones as well. The APGENCO also set up a Special Purpose Vehicle (SPV), named as Andhra Pradesh Power Development Company Limited (APPDCL), a joint venture company of APGENCO and IL&FS to set up Krishnapatanam thermal power project.