Kaiga Atomic Power Station

Last updated

Kaiga Generating Station
Kaiga Atomic Power Station.jpg
Kaiga Atomic Power Station
CountryIndia
Coordinates 14°51′55.16″N74°26′22.71″E / 14.8653222°N 74.4396417°E / 14.8653222; 74.4396417
StatusOperational
Construction began1989
Commission date 16 November 2000
Owner(s) NPCIL
Operator(s) NPCIL
Nuclear power station
Reactors4
Reactor typeUnits 1,2,3 & 4: IPHWR-220
Units 5 & 6: IPHWR-700
Reactor supplier NPCIL/BARC
Cooling source Kadra Dam, Kali River
Power generation
Units operational4 x 220 MW
Nameplate capacity 880 MW
Capacity factor 92.02% (2020-21) [1]
Annual net output 7094 GW.h (2020-21) [1]
External links
Website www.npcil.nic.in/main/ProjectOperationDisplay.aspx?ReactorID=76

Kaiga Generating Station is a nuclear power generating station situated at Kaiga, near the river Kali, in Uttara Kannada district of Karnataka, India. The plant has been in operation since March 2000 and is operated by the Nuclear Power Corporation of India.

Contents

It has four units. The fourth unit went critical on 27 November 2010. [2] The two oldest units comprise the west half of the site and the two newer units are adjoining the east side of the site. The older four units are small-sized pressurized heavy water reactors of 220  MW gross.

History

On 27 November 2010 the Kaiga Generating Station unit 4 of 220 MW capacity became operational. [3]

On 19 January 2011, unit 4 with 220 MW capacity was connected to the southern power grid at 01:56 hours. With this, the total capacity rose to 880 MW gross making it the third largest in India after Tarapur (1400 MW) and Rawatbhata (1180 MW). The unit, fueled by indigenous uranium, will supply electricity to Karnataka, Andhra Pradesh, Kerala, Tamil Nadu and Puducherry. [4]

In December 2018, it got the distinction of setting a world record of continuous operation among all nuclear power plants. As on 10 December 2018, KGS-1, which was synchronized to India's Southern grid on 13 May 2016, continues to operate for a record number of 962 days. Previous record of continuous operation was held by Unit 8 of Heysham II, which operated from 18 February 2014 to 15 September 2016 for a record number of 940 days. [5] [6]

Two IPHWR units, each with a 700 MW capacity, are under construction at this location. [7] As of February 2017 pre-project activities have begun for them and if everything goes as planned the first of the two will become critical around 2024–25. [8]

Units

PhaseUnit
No.
ReactorStatusCapacity in MWeConstruction beganFirst criticality Grid ConnectionCommercial operationClosureNotes
TypeModelNetGross
I1 PHWR IPHWR-220 Operational2022201 September 198926 September 200012 October 200016 November 2000 [9]
2 PHWR IPHWR-220 Operational2022201 December 198924 September 19992 December 199916 March 2000 [10]
II3 PHWR IPHWR-220 Operational20222030 March 200226 February 200711 April 20076 May 2007 [11]
4 PHWR IPHWR-220 Operational20222010 May 200227 November 201019 January 201120 January 2011 [12]
III5 PHWR IPHWR-700 Under construction6307002020(2026) [13] [14]
6 PHWR IPHWR-700 Under construction6307002020(2026) [13]

See also

Related Research Articles

<span class="mw-page-title-main">Nuclear Power Corporation of India</span> Indian public sector undertaking

The Nuclear Power Corporation of India Limited (NPCIL) is an Indian public sector undertaking based in Mumbai, Maharashtra. It is wholly owned by the Government of India and is responsible for the generation of electricity from nuclear power. NPCIL is administered by the Department of Atomic Energy (DAE).

<span class="mw-page-title-main">Madras Atomic Power Station</span> Nuclear power plant south of Chennai, India

Madras Atomic Power Station (MAPS) located at Kalpakkam about 80 kilometres (50 mi) south of Chennai, India, is a comprehensive nuclear power production, fuel reprocessing, and waste treatment facility that includes plutonium fuel fabrication for fast breeder reactors (FBRs). It is also India's first fully indigenously constructed nuclear power station, with two units each generating 220 MW of electricity. The first and second units of the station went critical in 1983 and 1985, respectively. The station has reactors housed in a reactor building with double shell containment improving protection also in the case of a loss-of-coolant accident. An Interim Storage Facility (ISF) is also located in Kalpakkam.

The Karachi Nuclear Power Plant is a large commercial nuclear power plant located at the Paradise Point in Karachi, Sindh, Pakistan.

The Chashma Nuclear Power Plant is a large commercial nuclear power plant located at Chashma in Mianwali, Punjab, Pakistan.

In Pakistan, nuclear power is provided by six commercial nuclear power plants with a net capacity of 3,262 megawatts (3.262 GW) from pressurized water reactors. In 2020, Pakistan's nuclear power plants produced a total of 133 terawatt-hours of electricity, which accounted for roughly 10% of the nation's total electric energy generation.

<span class="mw-page-title-main">Tarapur Atomic Power Station</span> First nuclear power station built in India

Tarapur Atomic Power Station (T.A.P.S.) is located in Tarapur, Palghar, India. It was the first commercial nuclear power station built in India.

<span class="mw-page-title-main">Kudankulam Nuclear Power Plant</span> Nuclear power plant in India

Kudankulam Nuclear Power Plant is the largest nuclear power station in India, situated in Kudankulam in the Tirunelveli district of the southern Indian state of Tamil Nadu. Construction on the plant began on 31 March 2002, but faced several delays due to opposition from local fishermen. KKNPP is scheduled to have six VVER-1000 reactors built in collaboration with Atomstroyexport, the Russian state company and Nuclear Power Corporation of India Limited (NPCIL), with an installed capacity of 6,000 MW of electricity.

<span class="mw-page-title-main">Obninsk Nuclear Power Plant</span> Nuclear power plant in Obninsk, Russia (operates 1954–2002)

Obninsk Nuclear Power Plant was built in the "Science City" of Obninsk, Kaluga Oblast, about 110 km (68 mi) southwest of Moscow, Soviet Union. Connected to the power grid in June 1954, Obninsk was the first grid-connected nuclear power plant in the world, i.e. the first nuclear reactor that produced electricity industrially, albeit at small scale. It was located at the Institute of Physics and Power Engineering. The plant is also known as APS-1 Obninsk. It remained in operation between 1954 and 2002. Its production of electricity for the grid ceased in 2002; thereafter it functioned as a research and isotope production plant only.

<span class="mw-page-title-main">Kakrapar Atomic Power Station</span> Indian atomic power plant

Kakrapar Atomic Power Station is a nuclear power station in India, which lies in the proximity of Mandvi, Surat and Tapi river in the state of Gujarat.

The Rajasthan Atomic Power Station is a nuclear power plant located at Rawatbhata in the state of Rajasthan, India.

Nuclear power is the fifth-largest source of electricity in India after coal, gas, hydroelectricity and wind power. As of November 2020, India has 23 nuclear reactors in operation in 8 nuclear power plants, with a total installed capacity of 7,380 MW. Nuclear power produced a total of 43 TWh in 2020–21, contributing 3.11% of total power generation in India. 10 more reactors are under construction with a combined generation capacity of 8,000 MW.

The Hongyanhe Nuclear Power Plant (红沿河核电站) is located in Donggang Town, Wafangdian in Liaoning Province of China. The site is within the Prefecture-level city of Dalian, 104 kilometres (65 mi) north of Dalian City proper. The first unit started commercial operations in June 2013.

<span class="mw-page-title-main">Novovoronezh Nuclear Power Plant II</span> Nuclear power plant in Voronezh Oblast, Russia

Novovoronezh Nuclear Power Plant II is a Russian nuclear power plant with two 1200 MW pressurized water reactors (VVER) located in Voronezh Oblast. The power plant is built on the same site as the present Novovoronezh Nuclear Power Plant.

<span class="mw-page-title-main">India's three-stage nuclear power programme</span> Indias nuclear energy progamme envisioned by Homi J. Bhabha

India's three-stage nuclear power programme was formulated by Homi Bhabha, the well-known physicist, in the 1950s to secure the country's long term energy independence, through the use of uranium and thorium reserves found in the monazite sands of coastal regions of South India. The ultimate focus of the programme is on enabling the thorium reserves of India to be utilised in meeting the country's energy requirements. Thorium is particularly attractive for India, as India has only around 1–2% of the global uranium reserves, but one of the largest shares of global thorium reserves at about 25% of the world's known thorium reserves. However, thorium is more difficult to use than uranium as a fuel because it requires breeding, and global uranium prices remain low enough that breeding is not cost effective.

<span class="mw-page-title-main">Narora Atomic Power Station</span> Indian nuclear power plant

Narora Atomic Power Station (NAPS) is a nuclear power plant located in Narora, Dibai Tehsil, Bulandshahar District in Uttar Pradesh, India.

Changjiang Nuclear Power Plant is a nuclear power plant in Tangxing Village of Haiwei Township, Changjiang Li Autonomous County in the province of Hainan. It is the first power plant of its kind in the province.

The Darkhovin Nuclear Power Plant is a planned nuclear power plant located in Khuzestan province, Iran about 70 kilometers south of Ahvaz at the Karun river. Construction of one reactor has started. Some other projects on this site were cancelled. It's built by Masna.

<span class="mw-page-title-main">IPHWR-700</span> Indian nuclear reactor design

The IPHWR-700 is an Indian pressurized heavy-water reactor designed by the NPCIL. It is a Generation III reactor developed from earlier CANDU based 220 MW and 540 MW designs. It can generate 700 MW of electricity. Currently there is two unit operational, 6 units under construction and 8 more units planned, at a cost of 1.05 lakh crore (US$13 billion).

References

  1. 1 2 "Monthly Genration Reports Actual for Apr-2021 : Central Sector Nuclear" (PDF). National Power Portal. Central Electricity Authority. Retrieved 10 October 2021.
  2. "Front Page : Kaiga-4 achieves criticality". The Hindu . 28 November 2010. Archived from the original on 30 November 2010. Retrieved 14 September 2022.
  3. Hegde, Radha (27 November 2010). "Kaiga Atomic Power Plant Unit 4 Starts". abclive.in. Archived from the original on 30 November 2010. Retrieved 17 February 2017.
  4. "India's 20th nuclear reactor connected to power grid". The Times of India . 19 January 2011. Retrieved 17 February 2017.
  5. "K'taka nuclear power plant second best in world for continuous operation". The News Minute . 7 November 2018. Archived from the original on 7 November 2018. Retrieved 7 November 2018.
  6. "Indian-Designed Nuclear Reactor Breaks Record for Continuous Operation". POWER Magazine. 1 February 2019. Retrieved 28 March 2019.
  7. "Centre's nod for units 5, 6 at Kaiga nuclear station". The Hindu. 12 June 2012. Retrieved 17 February 2017.
  8. Ray, Kalyan (13 February 2017). "Kaiga's 700 MWe units to be delayed; first one may become critical in 2024". Deccan Herald . Retrieved 17 February 2017.
  9. "Nuclear Power Reactor Details - Kaiga-1". Power Reactor Information System. International Atomic Energy Agency (IAEA). Retrieved 13 February 2020.
  10. "Nuclear Power Reactor Details - Kaiga-2". PRIS. (IAEA). Retrieved 13 February 2020.
  11. "Nuclear Power Reactor Details - Kaiga-3". Power Reactor Information System. International Atomic Energy Agency (IAEA). Retrieved 13 February 2020.
  12. "Nuclear Power Reactor Details - Kaiga-4". Power Reactor Information System. International Atomic Energy Agency (IAEA). Retrieved 13 February 2020.
  13. 1 2 "Kaiga Nuclear Power Plant Expansion". Ns Energy. Retrieved 7 September 2019.
  14. "Excavation begins at NPCIL's Kaiga 5&6 Project, to increase capacity of the atomic power station to 2280 MW". PIB (Press release). 22 April 2022.