Kudankulam Nuclear Power Plant | |
---|---|
Country | India |
Coordinates | 8°10′08″N77°42′45″E / 8.16889°N 77.71250°E |
Status | Operational |
Construction began | Units 1: 31 March 2002 Unit 2: 4 July 2002 Units 3 & 4: 29 June 2017 Units 5: 29 June 2021 Units 6: 20 December 2021 |
Commission date | Unit 1: 22 October 2013 Unit 2: 15 October 2016 |
Construction cost | Units 1 & 2: ₹17,270 crore (US$2.83 billion) Units 3 & 4: ₹39,849 crore (US$5.38 billion) Units 5 & 6: ₹49,621 crore (US$6.7 billion) |
Owner | Nuclear Power Corporation of India |
Nuclear power station | |
Reactors | 6 |
Reactor type | VVER |
Reactor supplier | Rosatom |
Cooling source | Laccadive Sea |
Power generation | |
Units operational | 2 × 1,000 MW (gross) |
Make and model | VVER-1000/412 |
Units planned | 2 x VVER-1200 [1] |
Units under const. | 4 × 1,000 MW (gross) |
Nameplate capacity | 2000 MW |
Capacity factor | 68.27% (2020–21) [2] |
Annual net output | 11,960.80 GW·h (2020–21) [2] |
External links | |
Website | Nuclear Power Corporation of India |
Commons | Related media on Commons |
Kudankulam Nuclear Power Plant (or Kudankulam NPP or KKNPP) is the largest [3] nuclear power station in India, situated in Kudankulam in the Tirunelveli district of the southern Indian state of Tamil Nadu. Construction on the plant began on 31 March 2002, [4] but faced several delays due to opposition from local fishermen. [5] [6] KKNPP is scheduled to have six VVER-1000 reactors built in collaboration with Atomstroyexport, the Russian state company and Nuclear Power Corporation of India Limited (NPCIL), with an installed capacity of 6,000 MW of electricity. [7]
Unit 1 was synchronised with the southern power grid on 22 October 2013 and since then, has been generating electricity at its warranted limit of 1,000 MW. [8] The original cost of the two units was ₹ 13,171 crore, but it was later revised to ₹ 17,270 crore (US$2.6 billion). Russia advanced a credit of ₹ 6,416 crore (US$0.97 billion) for both the units. [9] Unit 2 attained criticality on 10 July 2016 and was synchronised with the electricity grid on 29 August.
In 2015, Nuclear Power Corporation Ltd (NPCIL) announced a price of ₹ 4.29/kW·h (6.4 ¢/kW·h) for energy delivered from Kudankulam nuclear power plant. [10]
The ground-breaking ceremony for construction of units 3 & 4 was performed on 17 February 2016. Due to technology changes, inflation and insistence of the supplier and operator for additional liability insurance the construction cost of units 3 & 4 amounted to twice the cost of units 1 & 2 and was later revised to be ₹39,849 crore (US$5.38 billion). [11] [12] [13] A budget of ₹49,621 crore (US$6.7 billion) has been approved for construction of Units 5 & 6. [11]
An intergovernmental agreement (IGA) on the project was signed on 20 November 1988 by the Prime Minister of India, Rajiv Gandhi and the Soviet head of state, Mikhail Gorbachev, for the construction of two reactors. The project remained in limbo for a decade due to the dissolution of the Soviet Union. [7] There were also objections from the United States, on the grounds that the agreement did not meet the 1992 terms of the Nuclear Suppliers Group (NSG). [14] M. R. Srinivasan, Atomic Energy Commission (AEC) Chairman from 1987 to 1990, called the project "a non-starter". However, the project was revived on 21 June 1998. [7]
Construction began on 31 March 2002, with Nuclear Power Corporation of India Ltd (NPCIL) predicting that the first unit would be operational in March 2007, instead of the original target of December 2007. [7]
A small port became operational in Kudankulam on 14 January 2004. This port was established to receive barges carrying over-sized light water reactor equipment from ships anchored at a distance of 1.5 kilometres (0.93 mi). Until 2004, materials had to be brought in via road from the port of Thoothukudi, risking damage during transportation. [15] In 2008, negotiations on building four additional reactors at the site began. Though the capacity of these reactors had not been declared, it was expected that the capacity of each reactor will be 1,200 MW (1.2 GW). [16] [17] The new reactors would bring the total capacity of the power plant to 6,800 MW (6.8 GW).
The ground-breaking ceremony for construction of third and fourth units was performed on 17 February 2016 and AERB authorised the first pour of concrete on 19 June 2017. [18] Construction of the third and fourth units started on 29 June 2017. [19] AERB granted excavation permit for Unit 5 and 6 in 14 November 2018 and concerete pour begun in 2020. [20] [21] [22] Construction of units 5 and 6 commenced on 29 June 2021. Unit 5 is expected to be ready for commissioning in December 2026, while unit 6 is expected to be ready by September 2027.
In 2019, NPCIL confirmed identification of malware in the internet connected administrative network but said that the critical internal network was isolated. KNPP officials had earlier termed reports on the cyber attack as false. The malware was linked to the North Korea based Lazarus Group. [23]
The reactors are pressurised water reactor of Russian design, model VVER-1000/V-412 referred also as AES-92. Thermal capacity is 3,000 MW, gross electrical capacity is 1,000 MW with a net capacity of 917 MW. [24] Construction is by NPCIL and Atomstroyexport. The plant is the largest nuclear power generation complex in India producing a cumulative 2 GW of electric power. [25] Both units are water-cooled, water-moderated power reactors. [26] [27] [28] [29]
The first reactor of the plant attained criticality on 13 July 2013 and was connected to the grid three months later. [30] [31] It started commercial operation from 31 December 2014. [32] The second unit achieved criticality on 10 July 2016 and was connected to the grid in August. [33] Commercial operation started on 15 October 2016. [34] [35]
The Kerala State Electricity Board (KSEB) board members have approved signing of a power purchase agreement (PPA) with the Nuclear Power Corporation of India (NPCIL) for sourcing electricity from the Kudankulam nuclear power project (KKNPP).
Unit 1 was shut down in June 2015 for refuelling and annual maintenance. On 21 January 2016 the reactor restarted and was connected to grid on 30 January 2016. [36]
Kudankulam Nuclear Power Project Site Director D. S. Choudhary stated on 26 January 2018 that units 1 and 2 of the nuclear plant had generated a combined total of 22,800 million units since they began functioning. [37]
People had been opposing the plant since its proposal in 1979. The proposal however, was halted because of the protests. It was brought back in 2000, and construction started under the government of Atal Bihari Vajpayee. [38]
In 2011, thousands from the vicinity of the plant protested against it, fearing a nuclear disaster, in the wake of the Fukushima Daiichi nuclear disaster [39] According to the protesters, evacuation of people in the event of a nuclear disaster would be impossible. [40] According to S P Udayakumar, of the People's Movement Against Nuclear Energy, "the nuclear plant is unsafe". However, in 2012, the chief of India's nuclear energy programme, Dr Srikumar Banerjee, called the plant "one of the safest" in the world. [41] In December 2012, The Hindu reported that hundreds of villagers in the region were largely ignorant of the risks and benefits of the plant. [42]
A public interest litigation (PIL) was filed in 2011 with the Supreme Court asking for nuclear power development to be delayed until safety concerns were independently assessed. [43] [44] In May 2013, the Supreme Court ruled in favour of the plant, stating that the nuclear power plant was in the larger public interest. [45]
In March 2012, nearly 200 anti-nuclear protesters were detained for a few hours by the police. The protesters were set to join protests objecting resumption of work of one of two 1 GW reactors, a day after the local government restarted work on the project. [46]
There have also been rallies and protests in favour of commissioning this nuclear power plant. [47] [48]
On, 24 February 2012, Prime Minister Manmohan Singh blamed foreign NGOs for protests at the power plant. News agencies reported that three NGOs had diverted donations earmarked for religious and social causes to the protests, in violation of foreign exchange regulations. [49] [50]
Supporters of the power plant in Idinthakarai village have been targeted by opponents using improvised explosive devices. [51]
The Church of South India and the National Council of Churches opposed the power plant and supported the protests against it. [52] Supporters of the power plant and the government have alleged that the protest against the power plant was instigated by churches and funded by foreign sources. The protestors dismissed the allegation of foreign funding, but said that seeking support from church was "natural" as many protestors were Christian localities living in the vicinity of the Reactor. [53]
Former chairman of Atomic Energy Commission of India Srinivasan said, "The Fukushima plant was built on a beach-front, but the Kudankulam was constructed on a solid terrain and that too keeping all the safety aspects in mind. Also, we are not in a tsunami prone area. The plants in Kudankulam have a double containment system which can withstand high pressure. At least ₹ 14,000 crore has been spent. If we don't operate the plant immediately, it will affect the economic stability of our country". [54]
A centre panel constituted by the Government of India, which did a survey of the safety features in the plant, vouched for the safety of the Kudankulam reactors. Dr Muthunayagam, who headed the panel, said that the protesters asked for some documents which are not related to the safety of the reactor. [55] Nuclear scientist and principal scientific adviser to the federal Government of India Rajagopala Chidambaram has said "We have learnt lessons from the Fukushima nuclear accident, particularly on the post-shut-down cooling system", and also added Fukushima nuclear accident should not deter or inhibit India from pursuing a safe civil nuclear programme. [56]
The Tamil Nadu state government formed a four-member expert panel which submitted a report to the government after inspecting the safety features of the plant. The Tamil Nadu government in the wake of the acute power shortages in the state has ordered in favour of the commissioning of the plant. [57]
Government of India announced the power allocation from the two units of the reactor on 29 August 2013. [58]
Beneficiary | Power (MW) |
---|---|
Tamil Nadu | 925 MW |
Karnataka | 442 MW |
Kerala | 266 MW |
Puducherry | 67 MW |
Unallotted | 300 MW |
Total | 2,000 MW |
As of 1 December 2021, the government is considering to increase its capability to 6,000 MW, on completion of KKNPP-3 & 4 (2 x 1,000 MW) and KKNPP-5 & 6 (2 x 1,000 MW) which are presently under construction.
The town council of Volgodonsk, Rostov Oblast named a lane located next to the Atommash plant as Kudankulam Alley in November 2018. The plant, which is owned by Rosatom, manufactures equipment for the Kudankulam Nuclear Power Plant. [59]
Phase | Unit No. | Reactor | Status | Capacity in MWe | Construction start | First criticality | Grid Connection | Commercial operation | Closure | Notes | ||
---|---|---|---|---|---|---|---|---|---|---|---|---|
Type | Model | Net | Gross | |||||||||
I | 1 | PWR | VVER-1000 | Operational | 932 | 1000 | 31 March 2002 | 13 July 2013 | 22 October 2013 | 22 October 2013 | — | [31] |
2 | PWR | VVER-1000 | Operational | 932 | 1000 | 4 July 2002 | 10 July 2016 | 29 August 2016 | 15 October 2016 | — | [35] | |
II | 3 | PWR | VVER-1000 | Under Construction | 917 | 1000 | 29 June 2017 | — | — | — | — | [19] |
4 | PWR | VVER-1000 | Under Construction | 917 | 1000 | 29 June 2017 | — | — | — | — | [19] | |
III | 5 | PWR | VVER-1000 | Under Construction | 917 | 1000 | 29 June 2021 | — | — | — | — | [60] |
6 | PWR | VVER-1000 | Under Construction | 917 | 1000 | 20 December 2021 | — | — | — | — | ||
IV | 7 | PWR | VVER-1200 | Planned | 1110 | 1200 | — | — | — | — | — | [1] |
8 | PWR | VVER-1200 | Planned | 1110 | 1200 | — | — | — | — | — |
State Atomic Energy Corporation Rosatom, also known as Rosatom State Nuclear Energy Corporation,, or Rosatom State Corporation, is a Russian state corporation headquartered in Moscow that specializes in nuclear energy, nuclear non-energy goods and high-tech products. It was established in 2007 and comprises more than 350 enterprises, including scientific research organizations, a nuclear weapons complex, and the world's only nuclear icebreaker fleet.
The Nuclear Power Corporation of India Limited (NPCIL) is an Indian public sector undertaking based in Mumbai, Maharashtra. It is wholly owned by the Government of India and is responsible for the generation of electricity from nuclear power. NPCIL is administered by the Department of Atomic Energy (DAE).
The water-water energetic reactor (WWER), or VVER is a series of pressurized water reactor designs originally developed in the Soviet Union, and now Russia, by OKB Gidropress. The idea of such a reactor was proposed at the Kurchatov Institute by Savely Moiseevich Feinberg. VVER were originally developed before the 1970s, and have been continually updated. They were one of the initial reactors developed by the USSR, the other being the infamous RBMK. As a result, the name VVER is associated with a wide variety of reactor designs spanning from generation I reactors to modern generation III+ reactor designs. Power output ranges from 70 to 1300 MWe, with designs of up to 1700 MWe in development. The first prototype VVER-210 was built at the Novovoronezh Nuclear Power Plant.
Kaiga Generating Station is a nuclear power generating station situated at Kaiga, near the river Kali, in Uttara Kannada district of Karnataka, India. The plant has been in operation since March 2000 and is operated by the Nuclear Power Corporation of India.
Madras Atomic Power Station (MAPS) located at Kalpakkam about 80 kilometres (50 mi) south of Chennai, India, is a comprehensive nuclear power production, fuel reprocessing, and waste treatment facility that includes plutonium fuel fabrication for fast breeder reactors (FBRs). It is also India's first fully indigenously constructed nuclear power station, with two units each generating 220 MW of electricity. The first and second units of the station went critical in 1983 and 1985, respectively. The station has reactors housed in a reactor building with double shell containment improving protection also in the case of a loss-of-coolant accident. An Interim Storage Facility (ISF) is also located in Kalpakkam.
Russia is one of the world's largest producers of nuclear energy. In 2020 total electricity generated in nuclear power plants in Russia was 215.746 TWh, 20.28% of all power generation. The installed gross capacity of Russian nuclear reactors is 29.4 GW in December 2020.
The Armenian Nuclear Power Plant (ANPP), also known as the Metsamor Nuclear Power Plant, is the only nuclear power plant in the South Caucasus, located 36 kilometers west of Yerevan in Armenia.
Tarapur Atomic Power Station (T.A.P.S.) is located in Tarapur, Palghar, India. It was the first commercial nuclear power station built in India. It is one of the largest nuclear power plant in the country. It has 4 reactors, 2 BWR-1 of 160 MWe each and 2 IPHWRs Of 540 MWe each.
Kakrapar Atomic Power Station is a nuclear power station in India, which lies in the proximity of Mandvi, Surat and Tapi river in the state of Gujarat.
The Rajasthan Atomic Power Station is a nuclear power plant located at Rawatbhata in the state of Rajasthan, India.
Nuclear power is the fifth-largest source of electricity in India after coal, gas, hydroelectricity and wind power. As of November 2020, India has 23 nuclear reactors in operation in 8 nuclear power plants, with a total installed capacity of 7,380 MW. Nuclear power produced a total of 43 TWh in 2020–21, contributing 3.11% of total power generation in India. 10 more reactors are under construction with a combined generation capacity of 8,000 MW.
Atomstroyexport (ASE) JSC (Russian: Атомстройэкспорт) is the Russian Federation's nuclear power equipment and service exporter. It is a fully owned subsidiary of Rosatom.
India's three-stage nuclear power programme was formulated by Homi Bhabha, the well-known physicist, in the 1950s to secure the country's long term energy independence, through the use of uranium and thorium reserves found in the monazite sands of coastal regions of South India. The ultimate focus of the programme is on enabling the thorium reserves of India to be utilised in meeting the country's energy requirements. Thorium is particularly attractive for India, as India has only around 1–2% of the global uranium reserves, but one of the largest shares of global thorium reserves at about 25% of the world's known thorium reserves. However, thorium is more difficult to use than uranium as a fuel because it requires breeding, and global uranium prices remain low enough that breeding is not cost effective.
Jaitapur Nuclear Power Project is a proposed nuclear power plant in India. If built, it would be the largest nuclear power generating station in the world by net generation capacity, at 9,900 MW. The power project is proposed by Nuclear Power Corporation of India (NPCIL) and would be built at Madban village of Ratnagiri district in Maharashtra.
Vietnam is considering developing nuclear power for peaceful purposes based on modern, verified technology since 1995, and firm proposals surfaced in 2006. In November 2016 Vietnam suspended its nuclear power plans. In 2022 industry and trade minister Nguyen Hong Dien announced that developing nuclear power is an “inevitable trend” for Vietnam, and will help the country to become carbon neutral by 2050.
The Barakah nuclear power plant (BNPP) is the United Arab Emirates' first nuclear power station, the first nuclear power station in the Arabian Peninsula and the first commercial nuclear power station in the Arab World. It consists of four APR-1400 nuclear reactors. Total nameplate capacity is 5600 MW which is intended to supply up to 25% of UAE's electricity needs. The site is in the Gharbiya region of Abu Dhabi, on the coastline between the Persian Gulf and the E11 highway, 50 km west of Ruwais.
The Gorakhpur Nuclear Power Plant or the Gorakhpur Haryana Anu Vidyut Pariyojana (GHAVP) is a proposed nuclear power plant to be built on a 560 hectares area west of Gorakhpur village of Fatehabad district of Haryana.
The Chutka Nuclear Power Plant is a proposed nuclear power plant to be built on a 1,200 acres (490 ha) area, near Chutka Village of Mandla district of Madhya Pradesh. The site is near Kanha National Park, one of the tiger reserves of India and the largest national park of Madhya Pradesh state in India.
The IPHWR-700 is an Indian pressurized heavy-water reactor designed by the NPCIL. It is a Generation III reactor developed from earlier CANDU based 220 MW and 540 MW designs. It can generate 700 MW of electricity. Currently there are two units operational, 6 units under construction and 8 more units planned, at a cost of ₹1.05 lakh crore (US$13 billion).