Smiling Buddha Pokhran-I | |
---|---|
Information | |
Country | India |
Test site | Pokhran Test Range |
Coordinates | 27°04′44″N71°43′21″E / 27.0788°N 71.7224°E |
Period | 18 May 1974, 8:05 IST |
Number of tests | 1 |
Test type | Underground shaft |
Device type | Fission |
Max. yield | 8–10 kilotons of TNT (33–42 TJ) |
Test chronology | |
Smiling Buddha (MEA designation: Pokhran-I) was the code name of India's first successful nuclear weapon test on 18 May 1974. The nuclear fission type bomb was detonated in the Pokhran Test Range of the Indian Army in Rajasthan. As per the United States military intelligence, the operation was named as Happy Krishna. The Indian Ministry of External Affairs (MEA) described the test as a peaceful nuclear explosion.
The bomb was built by scientists at the Bhabha Atomic Research Centre (BARC) headed by Raja Ramanna, in assistance with the Defence Research and Development Organisation (DRDO) headed by B. D. Nag Chaudhuri under the supervision of the Atomic Energy Commission headed by Homi Sethna. A CIRUS nuclear reactor given by Canada and heavy water (used as a neutron moderator) supplied by the United States were used in the production of nuclear material for the bomb. The preparations for the test and the detonation was conducted in extreme secrecy with very few people outside the team of scientists being aware of the test.
The device was of the implosion-type design with a plutonium core. It had a hexagonal cross section, 1.25 m (4 ft 1 in) in diameter, and weighed 1,400 kg (3,100 lb). It was assembled, mounted on a hexagonal metal tripod, and was transported to the test site on rails. The test was conducted at 8.05 IST on 18 May 1974. The data on the exact nuclear yield of the test has been varied and scarce, and sources indicate that the bomb might have yielded between six and ten kilotons.
It was the first confirmed nuclear weapons test by a nation outside the five permanent members of the United Nations Security Council. The test led to the formation of the Nuclear Suppliers Group (NSG) to control nuclear proliferation. After the test, India carried out one other subsequent nuclear test named Pokhran-II in 1998.
The origins of India's nuclear programme can be traced back to 1945 when Homi Bhabha established the Tata Institute of Fundamental Research with the aid of Tata Group. After Indian Independence, the Atomic Energy Act was passed on 15 April 1948, that established the Indian Atomic Energy Commission (IAEC). [1] India was involved in the development of the Nuclear Non-Proliferation Treaty, but ultimately opted not to sign it. [2] In 1954, Department of Atomic Energy (DAE) was established which was responsible for the atomic energy development programme and was allocated a significant amount of the defence budget in the subsequent years. In 1956, the first nuclear reactor named APSARA became operational at Trombay, becoming the first operating reactor in Asia. [3] A CIRUS reactor was given to India as a part of an understanding with Canada and the United States under the Atoms for Peace programme. India set up an indigenous program to manufacture Uranium nuclear fuel for the reactor, as opposed to importing from other countries. [1] In July 1958, then Prime Minister Jawaharlal Nehru authorized "Project Phoenix" to build a reprocessing plant with a capacity to produce 20 tons of Plutonium fuel a year using the PUREX process, designed by the Vitro Corporation of America. The construction of the plutonium plant began in 1961, and it was commissioned in mid-1964. [1]
The civilian nuclear program to produce electricity from nuclear energy was also established during this period with plans to construct new nuclear power plants for the purpose. Nehru's discussions with Bhabha and Kenneth Nichols, a US Army engineer, showed his approach and intention to create nuclear weapons as a means of deterrence. [4] In 1962, India was engaged in a war with China and with China pursuing its own atomic development programme, it accelerated India's need to develop nuclear weapons. [1] During this period, India signed an agreement with Soviet Union to help build nuclear reactors in India. [5]
With two reactors operational in early 1960s, Bhabha was involved in learning and development of know-how to manufacture nuclear weapons. The Atomic energy act was amended in 1962 to give far more control to the central government. Bhabha was also aggressively lobbying for nuclear weapons and made several public speeches on the matter. He also estimated that a nuclear device with a 10 kt yield would cost US$350,000. The reactors were not producing fuel at the expected rate and with Nehru death in 1964, the programme slowed down. [6] The incoming prime minister Lal Bahadur Shastri was involved in the Indo-Pakistani War of 1965 and later appointed physicist Vikram Sarabhai as the head of the nuclear programme. Because of his non-violent Gandhian beliefs, Sarabhai was asked to direct the programme towards peaceful purposes rather than military development. [7] Meanwhile, the design work on the bomb proceeded under physicist Raja Ramanna, who continued the nuclear weapons technology research after Bhabha's death in 1966. [6]
After Shastri's death in 1966, Indira Gandhi became the prime minister and work on the nuclear programme resumed. Homi Sethna, a chemical engineer, put in charge of plutonium development. The project for the design and manufacturing of the nuclear device employed just 75 scientists because of the secret nature of the project. [7] Ramanna lead the project with P. K. Iyengar serving as his deputy and the leadership team also included Sethna and Sarabhai. [8] The weapons programme was directed towards the production of plutonium rather than uranium and then in 1969, enough plutonium had been accumulated for the production of a single nuclear bomb. [6] In 1968–69, Iyengar led a team to the Soviet Union and toured the nuclear research facilities at Dubna. Upon his return to India, Iyengar set about developing a plutonium fueled fast breeder reactor named Purnima under Mahadeva Srinivasan. In 1969, R. Chidambaram was engaged for researching the use of plutonium. [9] [10]
Simultaneous work on the fabrication of the bomb core and implosion design was conducted by teams led by physicist V. S. Ramamurthy. The detonation system development began in April 1970 with Pranab R. Dastidar collaborating with W. D. Patwardhan at the High Energy Materials Research Laboratory (ERDL) of the Defense Research and Development Organization (DRDO). In July, physicist B. D. Nagchaudhuri was appointed as the scientific adviser to the Defense Minister and as Director of the DRDO. [9] Nagchaudhuri and Ramanna worked together to recruit the team and set up the requirements necessary for a nuclear weapon test. Terminal Ballistics Research Laboratory (TBRL) of the DRDO developed the explosive lenses for the implosion system. Srinivasan and K. Subba Rao were tasked with developing fission models and prediction of the test's efficiency. In April 1971, Nagchaudhuri appointed N. S. Venkatesan as the new Director of TBRL to help develop the implosion system. V.K. Iya was in charge of developing the neutron initiator system. In the same year, Sethna succeeded Sarabhai as the chairman of the Atomic Energy Commission. [9]
In December 1971, during the Indo-Pakistani War, the U.S. government sent a carrier battle group led by the USS Enterprise (CVN-65) into the Bay of Bengal in an attempt to intimidate India. The Soviet Union responded by sending a submarine armed with nuclear missiles from Vladivostok to trail the US task force. The Soviet response demonstrated the deterrent value and significance of nuclear weapons and ballistic missile submarines to India. [11] After India gained military and political initiative over Pakistan in the Indo-Pakistani war of 1971, the work on building a nuclear device continued. The hardware began to be built in early 1972 and the Prime Minister authorized the development of a nuclear test device in September 1972. [12]
The Indian Army was involved in the test preparations at the Pokhran Test Range in Rajasthan. The project was code named Operation Smiling Buddha (MEA designation: Pokhran-I) while as per the United States military intelligence, the operation was named as Happy Krishna. [13] The preparations were carried by civilian scientists assisted by the Indian Army. [14] Indira Gandhi maintained tight control of all aspects of the preparations of the test, which was conducted in extreme secrecy. Besides Gandhi, only her advisers Parmeshwar Haksar and D. P. Dhar were kept informed. Dhar had protested the test, fearing that the sanctions that would follow, would affect the Indian economy. [14] [13] The Indian Defence Minister Jagjivan Ram was informed only a few days prior and Swaran Singh, the Minister of External Affairs, was given only a 48 hours advance notice. [15] [16] General G. G. Bewoor, Indian army chief, and Lieutenant-General T. N. Raina, the commander of Indian Western Command were the only military commanders who knew about the test. [14] The test was called as a Peaceful Nuclear Explosive (PNE). The device was detonated on 18 May 1974 at 8.05 IST with Dastidar pushing the firing button. [14] [17] [18] [19]
The nuclear yield of the test has been difficult to determine with unclear data provided by Indian sources. Although politicians had given multiple numbers ranging from 2 kt to 20 kt, the official yield was initially set at 12 kt. Independent seismic data from outside and analysis of the crater features indicated a lower figure. Analysts estimate the yield at 4 to 6 kt, using conventional seismic magnitude-to-yield conversion formulas. Later, both Sethna and Iyengar conceded the official yield to be an exaggeration. Iyengar has stated that the yield was 8–10 kt, that the device was designed to yield 10 kt, and that the yield was 8 kt "exactly as predicted". [14] [20]
The device was of the implosion-type design with a plutonium core, similar to Fat Man , the American nuclear bomb detonated over Nagasaki in 1945. The implosion system was assembled at the TBRL of the DRDO in Chandigarh. The detonation system was developed at the HEMRL of the DRDO in Pune. [14] The 6 kg of plutonium came from the CIRUS reactor at BARC and the neutron initiator was of the polonium–beryllium type, code-named Flower. The entire nuclear bomb was engineered and finally assembled by Indian engineers at BARC before transportation to the test site. The fully assembled device had a hexagonal cross section, 1.25 m (4 ft 1 in) in diameter, and weighed 1,400 kg (3,100 lb). The device was mounted on a hexagonal metal tripod, and was transported to the shaft on rails which the army kept covered with sand. [14] [21]
Indian Prime Minister Indira Gandhi gained much popularity after the test, which had flagged from its heights after the 1971 war with Pakistan. The overall popularity and image of the Congress Party was enhanced and it was well received in the Indian Parliament. In 1975, Sethna, Ramanna and Nagchaudhuri were honoured with the Padma Vibhushan , India's second highest civilian award. Five other project members received the Padma Shri , India's fourth highest civilian award. India consistently maintained that this was a peaceful nuclear bomb test and that it had no intentions of militarising its nuclear programme. However, according to independent monitors, this test was part of an accelerated Indian nuclear programme. [22] In 1997 Raja Ramanna, speaking to the Press Trust of India , maintained:
The Pokhran test was a bomb, I can tell you now.... An explosion is an explosion, a gun is a gun, whether you shoot at someone or shoot at the ground.... I just want to make clear that the test was not all that peaceful.
— Raja Ramanna, to Press Trust of India in 1997 [14]
While India continued to state that the test was for peaceful purposes, it encountered opposition from many quarters. The Nuclear Suppliers Group (NSG) was formed in reaction to the Indian tests to check international nuclear proliferation. [19] The NSG decided in 1992 to require full-scope IAEA safeguards for any new nuclear export deals, which effectively ruled out nuclear exports to India. [23] It was only waived as part of the Indo-US civilian nuclear agreement in 2008. [24]
The plutonium used in the test was created in the reactor supplied by Canada and using heavy water (used as Neutron moderator) supplied by the United States. Both countries reacted negatively, especially in light of then ongoing negotiations on the Nuclear Non-Proliferation Treaty and the economic aid both countries had provided to India. [25] While Canada concluded that the test violated a 1971 understanding between the two states, and froze nuclear energy assistance for the two heavy water reactors then under construction, the United States concluded that the test did not violate any agreement and proceeded with a June 1974 shipment of enriched uranium for the Tarapur reactor. New Zealand's Prime Minister Norman Kirk commented that, "The announcement of an underground nuclear explosion by India raises more urgently than ever the need for international agreement to end all nuclear testing." [26]
Pakistan did not view the test as a peaceful nuclear explosion, and cancelled scheduled talks with India. In June 1974, Prime Minister Zulfikar Ali Bhutto said that Pakistan considered this as an intimidation and would not accept India's superiority in the subcontinent. [27] In 2011, nuclear physicist Pervez Hoodbhoy stated that he believed the test pressed Pakistan into developing nuclear weapons of its own. [28]
Despite many proposals, India did not carry out further nuclear tests until 1998. Code named as Operation Shakti (officially known as Pokhran-II) was carried out at the Pokhran test site, using technology designed and built over the preceding two decades. [29] [30]
Nuclear proliferation is the spread of nuclear weapons, fissionable material, and weapons-applicable nuclear technology and information to nations not recognized as "Nuclear Weapon States" by the Treaty on the Non-Proliferation of Nuclear Weapons, commonly known as the Non-Proliferation Treaty or NPT. Proliferation has been opposed by many nations with and without nuclear weapons, as governments fear that more countries with nuclear weapons will increase the possibility of nuclear warfare, de-stabilize international or regional relations, or infringe upon the national sovereignty of nation states.
Pokhran is a town and a municipality located 112 km east of Jaisalmer city in the Jaisalmer district of the Indian state of Rajasthan. It is situated in the Thar Desert region. Surrounded by rocks, sand and five salt ranges, the word "Pokaran" (पोकरण) means "place surrounded by five salt-ranges" in Rajasthani. The site for India's first and second underground nuclear weapon test is near Pokhran.
India possesses nuclear weapons and previously developed chemical weapons. Although India has not released any official statements about the size of its nuclear arsenal, recent estimates suggest that India has 172 nuclear weapons and has produced enough weapons-grade plutonium for up to 200 nuclear weapons. In 1999, India was estimated to have 800 kilograms (1,800 lb) of separated reactor-grade plutonium, with a total amount of 8,300 kilograms (18,300 lb) of civilian plutonium, enough for approximately 1,000 nuclear weapons. India has conducted nuclear weapons tests in a pair of series namely Pokhran I and Pokhran II.
Pakistan is one of nine states that possess nuclear weapons. Pakistan began developing nuclear weapons in January 1972 under Prime Minister Zulfikar Ali Bhutto, who delegated the program to the Chairman of the Pakistan Atomic Energy Commission (PAEC) Munir Ahmad Khan with a commitment to having the device ready by the end of 1976. Since PAEC, which consisted of over twenty laboratories and projects under reactor physicist Munir Ahmad Khan, was falling behind schedule and having considerable difficulty producing fissile material, Abdul Qadeer Khan, a metallurgist working on centrifuge enrichment for Urenco, joined the program at the behest of the Bhutto administration by the end of 1974. Producing fissile material was pivotal to the Kahuta Project's success and thus to Pakistan obtaining the capability to detonate a nuclear weapon by the end of 1984.
Raja Ramanna was an Indian nuclear physicist. He was the director of India's nuclear program in the late 1960s and early 1970s, which culminated in Smiling Buddha, India's first successful nuclear weapon test on 18 May 1974.
Homi Jehangir Bhabha, FNI, FASc, FRS(30 October 1909 – 24 January 1966) was an Indian nuclear physicist who is widely credited as the "father of the Indian nuclear programme". He was the founding director and professor of physics at the Tata Institute of Fundamental Research (TIFR), as well as the founding director of the Atomic Energy Establishment, Trombay (AEET) which was renamed the Bhabha Atomic Research Centre in his honour. TIFR and AEET served as the cornerstone to the Indian nuclear energy and weapons programme. He was the first chairman of the Indian Atomic Energy Commission and secretary of the Department of Atomic Energy. By supporting space science projects which initially derived their funding from the AEC, he played an important role in the birth of the Indian space programme.
Anil Kakodkar, is an Indian nuclear physicist and mechanical engineer. He was the chairman of the Atomic Energy Commission of India and the Secretary to the Government of India, he was the Director of the Bhabha Atomic Research Centre, Trombay from 1996 to 2000. He was awarded the Padma Vibhushan, India's second highest civilian honour, on 26 January 2009.
The Bhabha Atomic Research Centre (BARC) is India's premier nuclear research facility, headquartered in Trombay, Mumbai, Maharashtra, India. It was founded by Homi Jehangir Bhabha as the Atomic Energy Establishment, Trombay (AEET) in January 1954 as a multidisciplinary research program essential for India's nuclear program. It operates under the Department of Atomic Energy (DAE), which is directly overseen by the Prime Minister of India.
Pokhran-II was a series of five nuclear weapon tests conducted by India in May 1998. The bombs were detonated at the Indian Army's Pokhran Test Range in Rajasthan. It was the second instance of nuclear testing conducted by India, after the first test, code-named Smiling Buddha, was conducted in May 1974.
Uranium-233 is a fissile isotope of uranium that is bred from thorium-232 as part of the thorium fuel cycle. Uranium-233 was investigated for use in nuclear weapons and as a reactor fuel. It has been used successfully in experimental nuclear reactors and has been proposed for much wider use as a nuclear fuel. It has a half-life of 160,000 years.
CIRUS was a research reactor at the Bhabha Atomic Research Center (BARC) in Trombay near Mumbai, India. CIRUS was supplied by Canada in 1954, but used heavy water supplied by the United States. It was the second nuclear reactor to be built in India.
Homi Nusserwanji Sethna was an Indian nuclear scientist and a chemical engineer, gaining international fame as the Chairman of the Atomic Energy Commission (India) during the time when the first nuclear test, codename Smiling Buddha in Pokhran Test Range in 1974 was conducted. He was the primary and central figure in India's civilian nuclear program as well as the construction of nuclear power plants. In 1991, he was appointed as Sheriff of Mumbai.
The Atomic Energy Commission of India is the governing body of the Department of Atomic Energy (DAE), Government of India. The DAE is under the direct charge of the Prime Minister.
Rajagopala Chidambaram is an Indian Physicist who is known for his integral role in India's nuclear weapons program; he coordinated test preparation for the Pokhran-I (1975) and Pokhran-II (1998).
Munir Ahmad Khan, NI, HI, FPAS, was a Pakistani nuclear reactor physicist who is credited, among others, with being the "father of the atomic bomb program" of Pakistan for their leading role in developing their nation's nuclear weapons during the successive years after the war with India in 1971.
Padmanabhan Krishnagopala Iyengar, best known as P. K. Iyengar, was an Indian nuclear physicist who is widely known for his central role in the development of the nuclear program of India. Iyengar previously served as the director of BARC and former chairman of the Atomic Energy Commission of India, he raised his voice and opposition against the nuclear agreement between India and the United States and expressed that the deal favoured the United States.
Project-706, also known as Project-786 was the codename of a research and development program to develop Pakistan's first nuclear weapons. The program was initiated by Prime Minister Zulfiqar Ali Bhutto in 1974 in response to the Indian nuclear tests conducted in May 1974. During the course of this program, Pakistani nuclear scientists and engineers developed the requisite nuclear infrastructure and gained expertise in the extraction, refining, processing and handling of fissile material with the ultimate goal of designing a nuclear device. These objectives were achieved by the early 1980s with the first successful cold test of a Pakistani nuclear device in 1983. The two institutions responsible for the execution of the program were the Pakistan Atomic Energy Commission and the Kahuta Research Laboratories, led by Munir Ahmed Khan and Abdul Qadeer Khan respectively. In 1976 an organization called Special Development Works (SDW) was created within the Pakistan Army, directly under the Chief of the Army Staff (Pakistan) (COAS). This organization worked closely with PAEC and KRL to secretly prepare the nuclear test sites in Baluchistan and other required civil infrastructure.
Satinder Kumar Sikka was an Indian nuclear condensed matter physicist, crystallographer and a former Scientific Secretary to the Principal Scientific Advisor of the Government of India. He was known to have played a crucial role, along with Raja Ramanna, Rajagopala Chidambaram and Basanti Dulal Nagchaudhuri, in the design and development of a Hydrogen Bomb by India, which was tested at the Pokhran Test Range in May 1998, under the code name, Operation Shakthi. He was also involved in the Smiling Buddha tests, conducted in 1974. He was awarded the fourth highest civilian award of the Padma Shri, by the Government of India, in 1999.
Pranab Rebatiranjan Dastidar was an Indian electronics engineer and nuclear physicist. He was a director of Bhabha Atomic Research Center. Dastidar led the Electronic Detonation System in Smiling Buddha project, India's first ever nuclear bomb test. He received Padma Shri in 1975. He died at California on 11 February 2022.
India's so-called Peaceful Nuclear Explosion (PNE) is tested and designed to intimidate and establish "Indian hegemony in the subcontinent", most particularly Pakistan...